Letter Sequence RAI |
|---|
|
Results
Other: LR-N09-0162, PSEG Nuclear, Hope Creek Generating Station, Transmittal Letter, License Renewal Application, LR-N10-0234, 10 CFR 54.21(b) Review to Identify Any Current Licensing Basis (CLB) Changes Made Since Submittal of the License Renewal Application (LRA), ML092430373, ML092430374, ML092430384, ML092430386, ML092430387, ML092430388, ML092430389, ML092430390, ML092430484, ML092460442, ML092520185, ML092650382, ML092660174, ML092660447, ML100770419, ML100850462, ML101660452, ML102100544, ML111090416, ML13154A218, ML13270A126
|
MONTHYEARML0924303742009-08-18018 August 2009 PSEG Nuclear, Hope Creek Generating Station, License Renewal Application, Volume 2 of 3 Project stage: Other LR-N09-0191, Information to Support NRC Staff Review of the Application for Renewed Operating License2009-08-18018 August 2009 Information to Support NRC Staff Review of the Application for Renewed Operating License Project stage: Request ML0924303892009-08-18018 August 2009 PSEG Nuclear, Hope Creek Generating Station, License Renewal Application, Volume 3, Appendix E Project stage: Other ML0924303842009-08-18018 August 2009 PSEG Nuclear, Hope Creek Generating Station, License Renewal Application, Volume 3 Through Appendix a Project stage: Other ML0924303862009-08-18018 August 2009 PSEG Nuclear, Hope Creek Generating Station, License Renewal Application, Volume 3, Appendix B Project stage: Other ML0924303872009-08-18018 August 2009 PSEG Nuclear, Hope Creek Generating Station, License Renewal Application, Volume 3, Appendix C Project stage: Other ML0924303902009-08-18018 August 2009 PSEG Nuclear, Hope Creek Generating Station, License Renewal Application, Volume 3, Appendix F Project stage: Other ML0924304842009-08-18018 August 2009 PSEG Nuclear, Hope Creek Generating Station, License Renewal Application, Volume 3 of 3 Project stage: Other ML0924303882009-08-18018 August 2009 PSEG Nuclear, Hope Creek Generating Station, License Renewal Application, Volume 3, Appendix D Project stage: Other LR-N09-0162, PSEG Nuclear, Hope Creek Generating Station, Transmittal Letter, License Renewal Application2009-08-18018 August 2009 PSEG Nuclear, Hope Creek Generating Station, Transmittal Letter, License Renewal Application Project stage: Other ML0924303732009-08-18018 August 2009 PSEG Nuclear, Hope Creek Generating Station, License Renewal Application, Volume 1 of 3 Project stage: Other ML0924604422009-09-0303 September 2009 Delaware Citizen Comment on Salem Hope Creek License Renewal Application Project stage: Other ML0926601742009-09-0707 September 2009 Comment on License Renewal for Salem and Hope Creek Power Plants - Goodman Project stage: Other ML0926503822009-09-0808 September 2009 Citizen Comment on Salem Hope Creek License Renewal Application Project stage: Other ML0925201852009-09-0808 September 2009 Comments About Relicensing Salem and Hope Creek Reactors in Nj, Steven Hegedus Project stage: Other ML0926604472009-09-23023 September 2009 E-mail from Ruth Panella Comments on License Renewal Project stage: Other ML1007704192010-03-17017 March 2010 Task Order No. 005 Under Delivery Order No. NRC-DR-03-09-061 Project stage: Other ML1007503282010-03-31031 March 2010 License Renewal Application - Request for Additional Information for Section 2.4, Scoping and Screening Results: Structures Project stage: RAI ML1008504622010-04-0606 April 2010 Project Manager Change for the License Renewal of Hope Creek Generating Station Project stage: Other ML1009703502010-04-14014 April 2010 License Renewal Application - Request for Additional Information for Section 2.2.5, Boral Monitoring Program Project stage: RAI ML1007503312010-04-15015 April 2010 Request for Additional Information Regarding Scoping and Screening Results for the Hope Creek Generating Station (Tac ME1832) Project stage: RAI ML1010205112010-04-27027 April 2010 License Renewal Application - Request for Additional Information for Section 2.1, Scoping and Screening Methodology Project stage: RAI ML1010601552010-05-14014 May 2010 Request for Additional Information for the Review of the Hope Creek Generating Station License Renewal Application Identified During the Audit Project stage: RAI ML1013803162010-06-0101 June 2010 Request for Additional Information for the Review of the Hope Creek Generating Station License Renewal Application Section 3.3.2 Project stage: RAI ML1013806202010-06-0101 June 2010 Request for Additional Information Regarding Sections 4.6 and 4.7 of the Hope Creek Generating Station License Renewal Application Project stage: RAI ML1014501792010-06-0303 June 2010 Letter Request for Additional Information for the Review of the Hope Creek Generating Station License Renewal Application Project stage: RAI ML1013801492010-06-0707 June 2010 Request for Additional Information for the Review of the Hope Creek Generating Station License Renewal Application for Section 3.5 Project stage: RAI ML1013705592010-06-0909 June 2010 Request for Additional Information for the Review of the Hope Creek Generating Station License Review Application Project stage: RAI ML1014600772010-06-10010 June 2010 Request for Additional Information for Salem Nuclear Generating Station Units 1 and 2 License Renewal Application Project stage: RAI ML1013707612010-06-14014 June 2010 Request for Additional Information for the Review of the Hope Creek Generating Station License Renewal Application Project stage: RAI ML1016104482010-06-22022 June 2010 RAI for the Review of the Hope Creek Generating Station License Renewal Application for Fire Protection Project stage: RAI LR-N10-0234, 10 CFR 54.21(b) Review to Identify Any Current Licensing Basis (CLB) Changes Made Since Submittal of the License Renewal Application (LRA)2010-06-24024 June 2010 10 CFR 54.21(b) Review to Identify Any Current Licensing Basis (CLB) Changes Made Since Submittal of the License Renewal Application (LRA) Project stage: Other ML1015906752010-06-25025 June 2010 Request for Additional Information for the Review of the Hope Creek Generating Station License Renewal Application for Section 4.3 Project stage: RAI ML1016601502010-06-25025 June 2010 Request for Additional Information for the Review of the Hope Creek Generating Station License Renewal Application for Open Cycle Cooling Water System Program and Structures Project stage: RAI ML1017500242010-06-29029 June 2010 Request for Additional Information for the Review of the Hope Creek Generating Station License Renewal Application for Fiberglass Doors Project stage: RAI ML1015804812010-06-30030 June 2010 Request for Additional Information for the Review of the Hope Creek Generating Station License Renewal Application for Metal Fatigue of Reactor Coolant Pressure Boundary Program Project stage: RAI LR-N10-0211, Response to NRC Request for Additional Information, Dated June 3, 2010, Related to Sections 3.2.2, 3.3.2 and B.2.2.2 of License Renewal Application2010-06-30030 June 2010 Response to NRC Request for Additional Information, Dated June 3, 2010, Related to Sections 3.2.2, 3.3.2 and B.2.2.2 of License Renewal Application Project stage: Response to RAI LR-N10-0242, Response to NRC Request for Additional Information, Dated June 9, 2010, Related to Sections 3.1.2 and 3.3.2 of License Renewal Application2010-07-0606 July 2010 Response to NRC Request for Additional Information, Dated June 9, 2010, Related to Sections 3.1.2 and 3.3.2 of License Renewal Application Project stage: Response to RAI LR-N10-0248, Response to NRC Request for Additional Information, Dated June 22, 2010, Related to Fire Protection License Renewal Application2010-07-19019 July 2010 Response to NRC Request for Additional Information, Dated June 22, 2010, Related to Fire Protection License Renewal Application Project stage: Response to RAI ML1020002932010-08-0303 August 2010 Request for Additional Information for the Review of the Hope Creek Generating Station License Renewal Application for Bolting and Flow Element Project stage: RAI ML1015400542010-08-0606 August 2010 Request for Additional Information for the Review of the Hope Creek Generating Station License Renewal Application for Buried Piping Inspection Program Project stage: RAI ML1020303982010-08-18018 August 2010 Request for Additional Information for the Review of the Hope Creek Generating Station License Renewal Application for Primary Containment Valve Material Project stage: RAI ML1021005442010-08-19019 August 2010 Scoping and Screening Audit Summary Regarding Hope Creek Generating Station License Renewal Application Project stage: Other LR-N10-0317, Response to NRC Request for Additional Information Dated August 3, 2010, Related to Bolting and Flow Element, and Update to PSEG July 6, 2010, Response to NRC RAI Associated with RPV Leak Detection Line - License Renewal Application2010-08-26026 August 2010 Response to NRC Request for Additional Information Dated August 3, 2010, Related to Bolting and Flow Element, and Update to PSEG July 6, 2010, Response to NRC RAI Associated with RPV Leak Detection Line - License Renewal Application Project stage: Response to RAI ML1016604522010-09-0303 September 2010 Audit Report Regarding the Hope Creek Generating Station License Renewal Application Project stage: Other ML1027804222010-10-12012 October 2010 Request for Additional Information for the Review of the Hope Creek Generating Station License Renewal Application for Buried Piping Project stage: RAI ML1032805742010-12-13013 December 2010 Request for Additional Information for the Review of the Hope Creek Generating Station License Renewal Application for One Time Inspection and Selective Leaching Project stage: RAI ML1034405992011-01-0303 January 2011 Request for Additional Information for the Review of the Hope Creek Generating Station License Renewal Application for Drywell Shell Project stage: RAI ML1110904162011-05-0505 May 2011 Project Manager Change for the License Renewal of Hope Creek Generating Station Project stage: Other ML11144A2452011-06-10010 June 2011 Schedule Revision for the Review of the Hope Creek Generating Station License Renewal Application Project stage: Approval 2010-06-22
[Table View] |
Text
April 14, 2010 Mr. Thomas Joyce President and Chief Nuclear Officer PSEG Nuclear LLC P.O. Box 236 Hancocks Bridge, NJ 08038
SUBJECT:
HOPE CREEK GENERATING STATION, LICENSE RENEWAL APPLICATION -
REQUEST FOR ADDITIONAL INFORMATION FOR SECTION 2.2.5, BORAL MONITORING PROGRAM (TAC NO. ME1832)
Dear Mr. Joyce:
By letter dated August 18, 2009, as supplemented by letter dated January 23, 2009, Public Service Enterprise Group Nuclear, LLC, submitted an application pursuant to Title 10 of the Code of Federal Regulation Part 54 for renewal of Operating License No. NPF-57 for the Hope Creek Generating Station. The staff of the U.S. Nuclear Regulatory Commission (NRC or the staff) is reviewing this application in accordance with the guidance in NUREG-1800, Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants. During its review, the staff has identified areas where additional information is needed to complete the review. The staffs requests for additional information are included in the Enclosure. Further requests for additional information may be issued in the future.
Items in the enclosure were discussed with John Hufnagel and other members of your staff during a telephone call on April 7, 2010, and a mutually agreeable date for the response is within 30 days from the date of this letter. If you have any questions, please contact me by telephone at 301-415-3191 or by e-mail at donnie.ashley@nrc.gov.
Sincerely,
/RA/
Donnie J. Ashley, Sr. Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-354
Enclosure:
As stated cc w/encl: See next page
ML100970350 OFFICE LA:DLR PM:DLR:RPB1 BC:DLR:RPB1 PM:DLR:RPB1 NAME S. Figueroa D. Ashley B. Pham D. Ashley DATE 04/12/10 04/12/10 04/14/10 04/14/10
Letter to T. Joyce from D. Ashley dated April 14, 2010
SUBJECT:
HOPE CREEK GENERATING STATION, LICENSE RENEWAL APPLICATION -
REQUEST FOR ADDITIONAL INFORMATION FOR SECTION 2.2.5, BORAL MONITORING PROGRAM (TAC NO. ME1832)
DISTRIBUTION:
HARD COPY:
DLR RF E-MAIL:
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RdsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRapb Resource RidsOgcMailCenter Resource BPham DAshley CEccleston REnnis CSanders MModes, RI DKern, RI JBrand, RI RConte, RI RBellamy, RI MMcLaughlin, RI
Hope Creek Generating Station cc:
Mr. Robert Braun Senior Vice President Nuclear PSEG Nuclear LLC One Alloway Creek Neck Road Hancocks Bridge, NJ 08038 Mr. Brian Booth Director Nuclear Oversight PSEG Nuclear P.O. Box 236 Hancocks Bridge, NJ 08038 Mr. John Perry Station Vice President - Hope Creek PSEG Nuclear P.O. Box 236 Hancocks Bridge, NJ 08038 Mr. Larry Wagner Plant Manager - Hope Creek PSEG Nuclear LLC One Alloway Creek Neck Road Hancocks Bridge, NJ 08038 Mr. Michael Gallagher Vice President - License Renewal Projects Exelon Nuclear LLC 200 Exelon Way Kennett Square, PA 19348 Mr. Jeffrie J. Keenan, Esquire Manager - Licensing PSEG Nuclear LLC One Alloway Creek Neck Road Hancocks Bridge, NJ 08038 Mr. Greg Sosson Director Corporate Engineering PSEG Nuclear LLC One Alloway Creek Neck Road Hancocks Bridge, NJ 08038 Mr. Michael Gaffney Manager - Hope Creek Regulatory Assurance PSEG Nuclear LLC One Alloway Creek Neck Road Hancocks Bridge, NJ 08038 Mr. Ali Fakhar Manager, License Renewal PSEG Nuclear LLC One Alloway Creek Neck Road Hancocks Bridge, NJ 08038 Township Clerk Lower Alloways Creek Township Municipal Building, P.O. Box 157 Hancocks Bridge, NJ 08038 Mr. Paul Bauldauf, P.E., Asst. Director Radiation Protection Programs NJ Department of Environmental Protection and Energy, CN 415 Trenton, NJ 08625-0415 Mr. Brian Beam Board of Public Utilities 2 Gateway Center, Tenth Floor Newark, NJ 07102 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. Paul Davison Vice President, Operations Support PSEG Nuclear LLC One Alloway Creek Neck Road Hancocks Bridge, NJ 08038
Hope Creek Generating Station cc:
Ms. Christine Neely Director - Regulator Affairs PSEG Nuclear LLC One Alloway Creek Neck Road Hancocks Bridge, NJ 08038 Senior Resident Inspector Hope Creek Generating Station U.S. Nuclear Regulatory Commission Drawer 0509 Hancocks Bridge, NJ 08038 Mr. Earl R. Gage Salem County Administrator Administration Building 94 Market Street Salem, NJ 08079
ENCLOSURE HOPE CREEK GENERATING STATION LICENSE RENEWAL APPLICATION REQUEST FOR ADDITIONAL INFORMATION FOR SECTION 2.2.5, BORAL MONITORING PROGRAM (TAC NO. ME1832)
The Boral Monitoring Program is described in Appendix B as an existing program that is consistent without exception or enhancement to the 10 elements of an Aging Managing Program (AMP), as shown in The Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants NUREG-1800, Revision 1.
RAI 2.2.5-1 Element 2 (Preventive Actions), Element 4 (Detection of Aging Effects), and Element 5 (Monitoring and Trending) of the Boral Monitoring Program contain the sentence, The assumption is that the spent fuel pool environments, including the pools water chemistry and radiation field, and the Boral material characteristics are consistent enough so that the results at other BWR [boiling water reactor] sites are representative of the results if the Hope Creek Boral test coupons were inspected and/or tested.
The position that spent fuel pool environments between different BWR plants can be considered to come from a single population has not been supported by the staff. The draft Interim Staff Guidance of November 2009 (LR-ISG-2009-01), cited specific examples of industry operating experience that have shown extrapolations on plant-specific data that were incorrect in trying to determine the future condition of neutron absorbing material in spent fuel pools. The staff clarified that an applicant should consider both plant-specific and industry operating experience in a license renewal application (LRA), and that the plant-specific operating experience should include data from an on-going inspection and monitoring program.
Please discuss your plan to implement changes to your Boral Monitoring Program that will include regular inspections of the spent fuel pool test coupons at Hope Creek Unit 1.
RAI 2.2.5-2 Element 6 (Acceptance Criteria) contains the following sentences:
If the test report conclusion indicates at least one of the two acceptance criteria is unsatisfactory, the test report information will be entered into the Hope Creek corrective action program for further evaluation. Additionally, this could trigger the requirement to retrieve one Boral test coupon from the Hope Creek spent fuel pool and initiate inspection, testing and evaluation in accordance with the Boral Monitoring Program.
Please describe the test results that would require a spent fuel pool test coupon to be retrieved, inspected, tested, and evaluated.
RAI 2.2.5-3 Please discuss the following regarding the spent fuel pool racks:
- a. If and how the racks are vented.
- b. What constitutes a drag test.
- c. The basis for the conclusion that the 15 cells marked as DO NOT USE did not suffer from Boral deformation.