Other: LR-N09-0162, PSEG Nuclear, Hope Creek Generating Station, Transmittal Letter, License Renewal Application, LR-N10-0234, 10 CFR 54.21(b) Review to Identify Any Current Licensing Basis (CLB) Changes Made Since Submittal of the License Renewal Application (LRA), ML092430373, ML092430374, ML092430384, ML092430386, ML092430387, ML092430388, ML092430389, ML092430390, ML092430484, ML092460442, ML092520185, ML092650382, ML092660174, ML092660447, ML100770419, ML100850462, ML101660452, ML102100544, ML111090416, ML13154A218, ML13270A126
|
MONTHYEARML0924303742009-08-18018 August 2009 PSEG Nuclear, Hope Creek Generating Station, License Renewal Application, Volume 2 of 3 Project stage: Other LR-N09-0191, Information to Support NRC Staff Review of the Application for Renewed Operating License2009-08-18018 August 2009 Information to Support NRC Staff Review of the Application for Renewed Operating License Project stage: Request ML0924303892009-08-18018 August 2009 PSEG Nuclear, Hope Creek Generating Station, License Renewal Application, Volume 3, Appendix E Project stage: Other ML0924303842009-08-18018 August 2009 PSEG Nuclear, Hope Creek Generating Station, License Renewal Application, Volume 3 Through Appendix a Project stage: Other ML0924303862009-08-18018 August 2009 PSEG Nuclear, Hope Creek Generating Station, License Renewal Application, Volume 3, Appendix B Project stage: Other ML0924303872009-08-18018 August 2009 PSEG Nuclear, Hope Creek Generating Station, License Renewal Application, Volume 3, Appendix C Project stage: Other ML0924303902009-08-18018 August 2009 PSEG Nuclear, Hope Creek Generating Station, License Renewal Application, Volume 3, Appendix F Project stage: Other ML0924304842009-08-18018 August 2009 PSEG Nuclear, Hope Creek Generating Station, License Renewal Application, Volume 3 of 3 Project stage: Other ML0924303882009-08-18018 August 2009 PSEG Nuclear, Hope Creek Generating Station, License Renewal Application, Volume 3, Appendix D Project stage: Other LR-N09-0162, PSEG Nuclear, Hope Creek Generating Station, Transmittal Letter, License Renewal Application2009-08-18018 August 2009 PSEG Nuclear, Hope Creek Generating Station, Transmittal Letter, License Renewal Application Project stage: Other ML0924303732009-08-18018 August 2009 PSEG Nuclear, Hope Creek Generating Station, License Renewal Application, Volume 1 of 3 Project stage: Other ML0924604422009-09-0303 September 2009 Delaware Citizen Comment on Salem Hope Creek License Renewal Application Project stage: Other ML0926601742009-09-0707 September 2009 Comment on License Renewal for Salem and Hope Creek Power Plants - Goodman Project stage: Other ML0926503822009-09-0808 September 2009 Citizen Comment on Salem Hope Creek License Renewal Application Project stage: Other ML0925201852009-09-0808 September 2009 Comments About Relicensing Salem and Hope Creek Reactors in Nj, Steven Hegedus Project stage: Other ML0926604472009-09-23023 September 2009 E-mail from Ruth Panella Comments on License Renewal Project stage: Other ML1007704192010-03-17017 March 2010 Task Order No. 005 Under Delivery Order No. NRC-DR-03-09-061 Project stage: Other ML1007503282010-03-31031 March 2010 License Renewal Application - Request for Additional Information for Section 2.4, Scoping and Screening Results: Structures Project stage: RAI ML1008504622010-04-0606 April 2010 Project Manager Change for the License Renewal of Hope Creek Generating Station Project stage: Other ML1009703502010-04-14014 April 2010 License Renewal Application - Request for Additional Information for Section 2.2.5, Boral Monitoring Program Project stage: RAI ML1007503312010-04-15015 April 2010 Request for Additional Information Regarding Scoping and Screening Results for the Hope Creek Generating Station (Tac ME1832) Project stage: RAI ML1010205112010-04-27027 April 2010 License Renewal Application - Request for Additional Information for Section 2.1, Scoping and Screening Methodology Project stage: RAI ML1010601552010-05-14014 May 2010 Request for Additional Information for the Review of the Hope Creek Generating Station License Renewal Application Identified During the Audit Project stage: RAI ML1013803162010-06-0101 June 2010 Request for Additional Information for the Review of the Hope Creek Generating Station License Renewal Application Section 3.3.2 Project stage: RAI ML1013806202010-06-0101 June 2010 Request for Additional Information Regarding Sections 4.6 and 4.7 of the Hope Creek Generating Station License Renewal Application Project stage: RAI ML1014501792010-06-0303 June 2010 Letter Request for Additional Information for the Review of the Hope Creek Generating Station License Renewal Application Project stage: RAI ML1013801492010-06-0707 June 2010 Request for Additional Information for the Review of the Hope Creek Generating Station License Renewal Application for Section 3.5 Project stage: RAI ML1013705592010-06-0909 June 2010 Request for Additional Information for the Review of the Hope Creek Generating Station License Review Application Project stage: RAI ML1014600772010-06-10010 June 2010 Request for Additional Information for Salem Nuclear Generating Station Units 1 and 2 License Renewal Application Project stage: RAI ML1013707612010-06-14014 June 2010 Request for Additional Information for the Review of the Hope Creek Generating Station License Renewal Application Project stage: RAI ML1016104482010-06-22022 June 2010 RAI for the Review of the Hope Creek Generating Station License Renewal Application for Fire Protection Project stage: RAI LR-N10-0234, 10 CFR 54.21(b) Review to Identify Any Current Licensing Basis (CLB) Changes Made Since Submittal of the License Renewal Application (LRA)2010-06-24024 June 2010 10 CFR 54.21(b) Review to Identify Any Current Licensing Basis (CLB) Changes Made Since Submittal of the License Renewal Application (LRA) Project stage: Other ML1015906752010-06-25025 June 2010 Request for Additional Information for the Review of the Hope Creek Generating Station License Renewal Application for Section 4.3 Project stage: RAI ML1016601502010-06-25025 June 2010 Request for Additional Information for the Review of the Hope Creek Generating Station License Renewal Application for Open Cycle Cooling Water System Program and Structures Project stage: RAI ML1017500242010-06-29029 June 2010 Request for Additional Information for the Review of the Hope Creek Generating Station License Renewal Application for Fiberglass Doors Project stage: RAI ML1015804812010-06-30030 June 2010 Request for Additional Information for the Review of the Hope Creek Generating Station License Renewal Application for Metal Fatigue of Reactor Coolant Pressure Boundary Program Project stage: RAI LR-N10-0211, Response to NRC Request for Additional Information, Dated June 3, 2010, Related to Sections 3.2.2, 3.3.2 and B.2.2.2 of License Renewal Application2010-06-30030 June 2010 Response to NRC Request for Additional Information, Dated June 3, 2010, Related to Sections 3.2.2, 3.3.2 and B.2.2.2 of License Renewal Application Project stage: Response to RAI LR-N10-0242, Response to NRC Request for Additional Information, Dated June 9, 2010, Related to Sections 3.1.2 and 3.3.2 of License Renewal Application2010-07-0606 July 2010 Response to NRC Request for Additional Information, Dated June 9, 2010, Related to Sections 3.1.2 and 3.3.2 of License Renewal Application Project stage: Response to RAI LR-N10-0248, Response to NRC Request for Additional Information, Dated June 22, 2010, Related to Fire Protection License Renewal Application2010-07-19019 July 2010 Response to NRC Request for Additional Information, Dated June 22, 2010, Related to Fire Protection License Renewal Application Project stage: Response to RAI ML1020002932010-08-0303 August 2010 Request for Additional Information for the Review of the Hope Creek Generating Station License Renewal Application for Bolting and Flow Element Project stage: RAI ML1015400542010-08-0606 August 2010 Request for Additional Information for the Review of the Hope Creek Generating Station License Renewal Application for Buried Piping Inspection Program Project stage: RAI ML1020303982010-08-18018 August 2010 Request for Additional Information for the Review of the Hope Creek Generating Station License Renewal Application for Primary Containment Valve Material Project stage: RAI ML1021005442010-08-19019 August 2010 Scoping and Screening Audit Summary Regarding Hope Creek Generating Station License Renewal Application Project stage: Other LR-N10-0317, Response to NRC Request for Additional Information Dated August 3, 2010, Related to Bolting and Flow Element, and Update to PSEG July 6, 2010, Response to NRC RAI Associated with RPV Leak Detection Line - License Renewal Application2010-08-26026 August 2010 Response to NRC Request for Additional Information Dated August 3, 2010, Related to Bolting and Flow Element, and Update to PSEG July 6, 2010, Response to NRC RAI Associated with RPV Leak Detection Line - License Renewal Application Project stage: Response to RAI ML1016604522010-09-0303 September 2010 Audit Report Regarding the Hope Creek Generating Station License Renewal Application Project stage: Other ML1027804222010-10-12012 October 2010 Request for Additional Information for the Review of the Hope Creek Generating Station License Renewal Application for Buried Piping Project stage: RAI ML1032805742010-12-13013 December 2010 Request for Additional Information for the Review of the Hope Creek Generating Station License Renewal Application for One Time Inspection and Selective Leaching Project stage: RAI ML1034405992011-01-0303 January 2011 Request for Additional Information for the Review of the Hope Creek Generating Station License Renewal Application for Drywell Shell Project stage: RAI ML1110904162011-05-0505 May 2011 Project Manager Change for the License Renewal of Hope Creek Generating Station Project stage: Other ML11144A2452011-06-10010 June 2011 Schedule Revision for the Review of the Hope Creek Generating Station License Renewal Application Project stage: Approval 2010-06-22
[Table View] |
Text
June 14, 2010 Mr. Thomas Joyce President and Chief Nuclear Officer PSEG Nuclear LLC P.O. Box 236 Hancocks Bridge, NJ 08038
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE HOPE CREEK GENERATING STATION LICENSE RENEWAL APPLICATION (TAC NO ME1832)
Dear Mr. Joyce:
By letter dated August 18, 2009, as supplemented by letter dated January 23, 2009, Public Service Enterprise Group Nuclear, LLC, submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54 (10 CFR Part 54) for renewal of Operating License No. NPF-57 for the Hope Creek Generating Station. The staff of the U.S. Nuclear Regulatory Commission (NRC or the staff) is reviewing this application in accordance with the guidance in NUREG-1800, Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants. During its review, the staff has identified areas where additional information is needed to complete the review. The staffs request for additional information is included in the Enclosure. Further requests for additional information may be issued in the future.
Items in the enclosure were provided to John Hufnagel and other members of your staff, and a mutually agreeable date for the response is within 30 days from the date of this letter. If you have any questions, please contact me by telephone at 301-415-2981 or by e-mail at bennett.brady@nrc.gov.
Sincerely,
/RA/
Bennett M. Brady, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-354
Enclosure:
As stated cc w/encl: See next page
ML101370761 OFFICE PM:DLR:RPB1 LA:DLR BC:DLR:RPB1 PM:DLR:RPB1 NAME B. Brady S. Figueroa B. Pham B. Brady DATE 06/14/10 06/07/10 06/09/10 06/14/10
Letter to T. Joyce from B. Brady dated June 14, 2010
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE HOPE CREEK GENERATING STATION LICENSE RENEWAL APPLICATION (TAC NO ME1832)
DISTRIBUTION:
HARD COPY:
DLR RF E-MAIL:
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RdsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRapb Resource RidsOgcMailCenter Resource BPham BBrady CEccleston REnnis CSanders BHarris, OGC ABurritt, RI RConte, RI MModes, RI DTifft, RI NMcNamara, RI
Hope Creek Generating Station cc:
Mr. Robert Braun Senior Vice President Nuclear PSEG Nuclear LLC One Alloway Creek Neck Road Hancocks Bridge, NJ 08038 Mr. Brian Booth Director Nuclear Oversight PSEG Nuclear P.O. Box 236 Hancocks Bridge, NJ 08038 Mr. John Perry Station Vice President - Hope Creek PSEG Nuclear P.O. Box 236 Hancocks Bridge, NJ 08038 Mr. Larry Wagner Plant Manager - Hope Creek PSEG Nuclear LLC One Alloway Creek Neck Road Hancocks Bridge, NJ 08038 Mr. Michael Gallagher Vice President - License Renewal Projects Exelon Nuclear LLC 200 Exelon Way Kennett Square, PA 19348 Mr. Jeffrie J. Keenan, Esquire Manager - Licensing PSEG Nuclear LLC One Alloway Creek Neck Road Hancocks Bridge, NJ 08038 Mr. Gregory Sosson Director Corporate Engineering PSEG Nuclear LLC One Alloway Creek Neck Road Hancocks Bridge, NJ 08038 Mr. Michael Gaffney Manager - Hope Creek Regulatory Assurance PSEG Nuclear LLC One Alloway Creek Neck Road Hancocks Bridge, NJ 08038 Mr. Ali Fakhar Manager, License Renewal PSEG Nuclear LLC One Alloway Creek Neck Road Hancocks Bridge, NJ 08038 Township Clerk Lower Alloways Creek Township Municipal Building, P.O. Box 157 Hancocks Bridge, NJ 08038 Mr. Paul Bauldauf, P.E., Asst. Director Radiation Protection Programs NJ Department of Environmental Protection and Energy, CN 415 Trenton, NJ 08625-0415 Mr. Brian Beam Board of Public Utilities 2 Gateway Center, Tenth Floor Newark, NJ 07102 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. Paul Davison Vice President, Operations Support PSEG Nuclear LLC One Alloway Creek Neck Road Hancocks Bridge, NJ 08038
Hope Creek Generating Station cc:
Ms. Christine Neely Director - Regulator Affairs PSEG Nuclear LLC One Alloway Creek Neck Road Hancocks Bridge, NJ 08038 Senior Resident Inspector Hope Creek Generating Station U.S. Nuclear Regulatory Commission Drawer 0509 Hancocks Bridge, NJ 08038 Mr. Earl R. Gage Salem County Administrator Administration Building 94 Market Street Salem, NJ 08079
ENCLOSURE REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE HOPE CREEK GENERATING STATION LICENSE RENEWAL APPLICATION (TAC NO ME1832)
RAI 3.0.3.2.10-01
Background:
The applicant discussed the Fuel Oil Chemistry Program enhanced procedures for Hope Creek as part of the License Renewal Application. During the staff review of the enhanced sampling procedures for the main fuel oil storage tank, the diesel fire pump fuel oil storage tanks, and the diesel fuel oil storage tanks, it was noted that the procedures state that if a significant amount of water (greater than two ounces per gallon of fuel) is present, then a Notification per the Corrective Action Plan should be submitted.
Issue:
It is not clear how the person performing the testing will be able to complete the analysis with the current level of detail provided in the procedure. For example, with the main fuel oil storage tank, it was unclear how the tester would be able to discern two ounces of water in a 10 gallon sample. With the diesel fire pump fuel oil storage tank sample, it was unclear what level of water was rejectable, given that only a one liter sample was specified to be drawn.
Request:
Please clarify how there is reasonable assurance that the analyses requested to be performed in the enhanced procedures will be performed correctly.
RAI 3.1.1-15-01
Background:
The Generic Aging Lessons Learned (GALL) Report Item IV.C1-2 recommends that aging management should be performed according to Chapter XI.M12, Thermal Aging Embrittlement of Cast Austenitic Stainless Steel (CASS).
Issue:
In its review of components associated with AMR line item 3.1.1-15, the staff noted that cast austenitic stainless steel (CASS) is not listed as one of the materials. Additionally, for CASS flow elements, SRP-LR Table 3.1-1, item 57 recommends aging management for loss of fracture toughness due to thermal aging embrittlement. However, license renewal application (LRA) Table 3.4.2-4 includes two 3.1.1-15 line items under Table 1 items (flow elements, Class
- 1) with CASS as the material, and credits the LRA Boiler Water Reactor Water Chemistry and the One-Time Inspection Aging Management Programs (AMPs).
Request:
The staff requests that the applicant explain the following:
a) Why aging management review (AMR) line item 3.1.1-57 is not applicable when the GALL Report only exempts pump and valve bodies, and b) Why the flow elements associated with AMR line item 3.1.1-15 do not credit GALL AMP XI.M12, Thermal Aging Embrittlement of Cast Austenitic Stainless Steel (CASS) to manage loss of fracture toughness/thermal aging embrittlement.
RAI 3.3.2.10-1
Background:
LRA Table 3.3.2-10, page 3.3-191, states that gray cast iron (retarding chamber) tanks exposed to raw water environment has an aging effect of loss of material due to general, pitting, crevice, galvanic, and microbiologically influenced corrosion, and fouling, and that the aging effects will be managed by the Fire Water System Program. The AMR line items reference Table 1 line item 3.3.1-68 and GALL Report item VII.G-24, for piping, piping components, and piping elements, and also cite generic note C, indicating that the component is different, but consistent with NUREG-1801 item for material, environment, and aging effect.
Issue:
The staff reviewed GALL AMP XI.M27, Fire Water System, and noted that the AMP recommends wall thickness evaluations of fire protection piping be performed using non-intrusive technique (e.g., volumetric testing) to identify loss of material due to corrosion. Based on a telephone conversation with the applicant on May 25, 2010, the applicant clarified that the retarding chamber is a vertical pipe installed in a horizontal piping system and acts like a tank.
The staff infers that this vertical pipe is a low point in the system and will have stagnant water and will be susceptible to loss of material due to general, pitting and crevice corrosion. It is not clear from a review of LRA Section B.2.1.18, Fire Water System Program, whether volumetric inspection to detect loss of material due to corrosion will be performed on the internal surface (specifically the bottom) of the fire water and the retarding chamber tanks.
Request:
Clarify if the (retarding chamber) tanks are included in the sample of fire protection system components that will be volumetrically inspected for wall thickness evaluation to detect loss of material prior to loss of intended function. If not included, please justify how loss of material due to general, pitting, crevice, galvanic, and microbiologically influenced corrosion, and fouling will be detected from the bottom surface of these tanks.