Other: LR-N09-0162, PSEG Nuclear, Hope Creek Generating Station, Transmittal Letter, License Renewal Application, LR-N10-0234, 10 CFR 54.21(b) Review to Identify Any Current Licensing Basis (CLB) Changes Made Since Submittal of the License Renewal Application (LRA), ML092430373, ML092430374, ML092430384, ML092430386, ML092430387, ML092430388, ML092430389, ML092430390, ML092430484, ML092460442, ML092520185, ML092650382, ML092660174, ML092660447, ML100850462, ML101660452, ML102100544, ML111090416
|
MONTHYEARLR-N09-0191, Information to Support NRC Staff Review of the Application for Renewed Operating License2009-08-18018 August 2009 Information to Support NRC Staff Review of the Application for Renewed Operating License Project stage: Request ML0924303742009-08-18018 August 2009 PSEG Nuclear, Hope Creek Generating Station, License Renewal Application, Volume 2 of 3 Project stage: Other ML0924303892009-08-18018 August 2009 PSEG Nuclear, Hope Creek Generating Station, License Renewal Application, Volume 3, Appendix E Project stage: Other ML0924303842009-08-18018 August 2009 PSEG Nuclear, Hope Creek Generating Station, License Renewal Application, Volume 3 Through Appendix a Project stage: Other ML0924303862009-08-18018 August 2009 PSEG Nuclear, Hope Creek Generating Station, License Renewal Application, Volume 3, Appendix B Project stage: Other ML0924303872009-08-18018 August 2009 PSEG Nuclear, Hope Creek Generating Station, License Renewal Application, Volume 3, Appendix C Project stage: Other ML0924303902009-08-18018 August 2009 PSEG Nuclear, Hope Creek Generating Station, License Renewal Application, Volume 3, Appendix F Project stage: Other ML0924304842009-08-18018 August 2009 PSEG Nuclear, Hope Creek Generating Station, License Renewal Application, Volume 3 of 3 Project stage: Other ML0924303882009-08-18018 August 2009 PSEG Nuclear, Hope Creek Generating Station, License Renewal Application, Volume 3, Appendix D Project stage: Other LR-N09-0162, PSEG Nuclear, Hope Creek Generating Station, Transmittal Letter, License Renewal Application2009-08-18018 August 2009 PSEG Nuclear, Hope Creek Generating Station, Transmittal Letter, License Renewal Application Project stage: Other ML0924303732009-08-18018 August 2009 PSEG Nuclear, Hope Creek Generating Station, License Renewal Application, Volume 1 of 3 Project stage: Other ML0924604422009-09-0303 September 2009 Delaware Citizen Comment on Salem Hope Creek License Renewal Application Project stage: Other ML0926601742009-09-0707 September 2009 Comment on License Renewal for Salem and Hope Creek Power Plants - Goodman Project stage: Other ML0926503822009-09-0808 September 2009 Citizen Comment on Salem Hope Creek License Renewal Application Project stage: Other ML0925201852009-09-0808 September 2009 Comments About Relicensing Salem and Hope Creek Reactors in Nj, Steven Hegedus Project stage: Other ML0926604472009-09-23023 September 2009 Hope Creek, E-mail from Ruth Panella Comments on License Renewal Project stage: Other ML1007704192010-03-17017 March 2010 Task Order No. 005 Under Delivery Order No. NRC-DR-03-09-061 Project stage: Acceptance Review ML1008504622010-04-0606 April 2010 Project Manager Change for the License Renewal of Hope Creek Generating Station Project stage: Other ML1009703502010-04-14014 April 2010 License Renewal Application - Request for Additional Information for Section 2.2.5, Boral Monitoring Program Project stage: RAI ML1007503312010-04-15015 April 2010 Request for Additional Information Regarding Scoping and Screening Results for the Hope Creek Generating Station (Tac ME1832) Project stage: RAI ML1010205112010-04-27027 April 2010 License Renewal Application - Request for Additional Information for Section 2.1, Scoping and Screening Methodology Project stage: RAI ML1010601552010-05-14014 May 2010 Request for Additional Information for the Review of the Hope Creek Generating Station License Renewal Application Identified During the Audit Project stage: RAI ML1013803162010-06-0101 June 2010 Request for Additional Information for the Review of the Hope Creek Generating Station License Renewal Application Section 3.3.2 Project stage: RAI ML1013806202010-06-0101 June 2010 Request for Additional Information Regarding Sections 4.6 and 4.7 of the Hope Creek Generating Station License Renewal Application Project stage: RAI ML1014501792010-06-0303 June 2010 Letter Request for Additional Information for the Review of the Hope Creek Generating Station License Renewal Application Project stage: RAI ML1013801492010-06-0707 June 2010 Request for Additional Information for the Review of the Hope Creek Generating Station License Renewal Application for Section 3.5 Project stage: RAI ML1013705592010-06-0909 June 2010 Request for Additional Information for the Review of the Hope Creek Generating Station License Review Application Project stage: RAI ML1014600772010-06-10010 June 2010 Request for Additional Information for Salem Nuclear Generating Station Units 1 and 2 License Renewal Application (TAC ME1832 and ME1836) Project stage: RAI ML1013707612010-06-14014 June 2010 Request for Additional Information for the Review of the Hope Creek Generating Station License Renewal Application Project stage: RAI ML1016104482010-06-22022 June 2010 RAI for the Review of the Hope Creek Generating Station License Renewal Application for Fire Protection Project stage: RAI LR-N10-0234, 10 CFR 54.21(b) Review to Identify Any Current Licensing Basis (CLB) Changes Made Since Submittal of the License Renewal Application (LRA)2010-06-24024 June 2010 10 CFR 54.21(b) Review to Identify Any Current Licensing Basis (CLB) Changes Made Since Submittal of the License Renewal Application (LRA) Project stage: Other ML1016601502010-06-25025 June 2010 Request for Additional Information for the Review of the Hope Creek Generating Station License Renewal Application for Open Cycle Cooling Water System Program and Structures Project stage: RAI ML1015906752010-06-25025 June 2010 Request for Additional Information for the Review of the Hope Creek Generating Station License Renewal Application for Section 4.3 Project stage: RAI ML1017500242010-06-29029 June 2010 Request for Additional Information for the Review of the Hope Creek Generating Station License Renewal Application for Fiberglass Doors Project stage: RAI LR-N10-0211, Response to NRC Request for Additional Information, Dated June 3, 2010, Related to Sections 3.2.2, 3.3.2 and B.2.2.2 of License Renewal Application2010-06-30030 June 2010 Response to NRC Request for Additional Information, Dated June 3, 2010, Related to Sections 3.2.2, 3.3.2 and B.2.2.2 of License Renewal Application Project stage: Response to RAI ML1015804812010-06-30030 June 2010 Request for Additional Information for the Review of the Hope Creek Generating Station License Renewal Application for Metal Fatigue of Reactor Coolant Pressure Boundary Program Project stage: RAI LR-N10-0242, Response to NRC Request for Additional Information, Dated June 9, 2010, Related to Sections 3.1.2 and 3.3.2 of License Renewal Application2010-07-0606 July 2010 Response to NRC Request for Additional Information, Dated June 9, 2010, Related to Sections 3.1.2 and 3.3.2 of License Renewal Application Project stage: Response to RAI LR-N10-0248, Response to NRC Request for Additional Information, Dated June 22, 2010, Related to Fire Protection License Renewal Application2010-07-19019 July 2010 Response to NRC Request for Additional Information, Dated June 22, 2010, Related to Fire Protection License Renewal Application Project stage: Response to RAI ML1020002932010-08-0303 August 2010 Request for Additional Information for the Review of the Hope Creek Generating Station License Renewal Application for Bolting and Flow Element Project stage: RAI ML1015400542010-08-0606 August 2010 Request for Additional Information for the Review of the Hope Creek Generating Station License Renewal Application for Buried Piping Inspection Program Project stage: RAI ML1020303982010-08-18018 August 2010 Request for Additional Information for the Review of the Hope Creek Generating Station License Renewal Application for Primary Containment Valve Material Project stage: RAI ML1021005442010-08-19019 August 2010 Scoping and Screening Audit Summary Regarding Hope Creek Generating Station License Renewal Application Project stage: Other LR-N10-0317, Response to NRC Request for Additional Information Dated August 3, 2010, Related to Bolting and Flow Element, and Update to PSEG July 6, 2010, Response to NRC RAI Associated with RPV Leak Detection Line - License Renewal Application2010-08-26026 August 2010 Response to NRC Request for Additional Information Dated August 3, 2010, Related to Bolting and Flow Element, and Update to PSEG July 6, 2010, Response to NRC RAI Associated with RPV Leak Detection Line - License Renewal Application Project stage: Response to RAI ML1016604522010-09-0303 September 2010 Audit Report Regarding the Hope Creek Generating Station License Renewal Application Project stage: Other ML1027804222010-10-12012 October 2010 Request for Additional Information for the Review of the Hope Creek Generating Station License Renewal Application for Buried Piping Project stage: RAI ML1032805742010-12-13013 December 2010 Request for Additional Information for the Review of the Hope Creek Generating Station License Renewal Application for One Time Inspection and Selective Leaching Project stage: RAI ML1110904162011-05-0505 May 2011 Project Manager Change for the License Renewal of Hope Creek Generating Station Project stage: Other ML11144A2452011-06-10010 June 2011 Schedule Revision for the Review of the Hope Creek Generating Station License Renewal Application Project stage: Approval ML11117A2062011-07-20020 July 2011 Notice of Issuance of Renewed Facility Operating License No. NPF-57 for an Additional 20-Year Period Project stage: Request ML11116A1482011-07-20020 July 2011 Issuance of Renewed Facility Operating License No. NPF-57 for Hope Creek Generating Station Project stage: Approval 2010-06-24
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000354/20230042024-02-0101 February 2024 Integrated Inspection Report 05000354/2023004 ML24030A8752024-02-0101 February 2024 Operator Licensing Examination Approval ML24009A1022024-01-26026 January 2024 Exemption from Select Requirements of 10 CF Part 73 (EPID L-2023-LLE-0045 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000354/20234012024-01-22022 January 2024 Material Control and Accounting Program Inspection Report 05000354/2023401 ML23341A1372024-01-16016 January 2024 Issuance of Amendment No. 235 Revise Trip and Standby Auto-Start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning ML23335A1122023-12-15015 December 2023 Retest Schedule for Drywell to Suppression Chamber Vacuum Breakers ML23307A1532023-12-15015 December 2023 NRC Investigation Report No. 1-2023-001 ML23270C0072023-11-29029 November 2023 Notice of Proposed Amendment to Decommissioning Trust Agreement ML23324A3072023-11-17017 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000354/20230032023-11-0707 November 2023 Integrated Inspection Report 05000354/2023003 IR 05000272/20234022023-10-12012 October 2023 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2023402, 05000272/2023402 and 05000311/2023402 (Cover Letter Only) LR-N23-0065, Submittal of 2023 Annual 10 CFR 50.46 Report2023-10-0202 October 2023 Submittal of 2023 Annual 10 CFR 50.46 Report LR-N23-0045, and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement ML23249A2612023-09-0606 September 2023 License Amendment Request to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000354/20230052023-08-31031 August 2023 Updated Inspection Plan for Hope Creek Generating Station (Report 05000354/2023005) ML23192A8212023-08-14014 August 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 234, 347, and 329 Revise Technical Specifications to Delete Meteorological Tower Location IR 05000354/20230022023-08-0303 August 2023 Integrated Inspection Report 05000354/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200048/2023001 IR 05000354/20230102023-08-0303 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000354/2023010 LR-N23-0052, Retest Schedule for Drywell to Suppression Chamber Vacuum Breakers Per Technical Specification 4.6.2.12023-07-31031 July 2023 Retest Schedule for Drywell to Suppression Chamber Vacuum Breakers Per Technical Specification 4.6.2.1 LR-N23-0042, Spent Fuel Cask Registration2023-07-12012 July 2023 Spent Fuel Cask Registration LR-N23-0046, Emergency Plan Document Revisions Implemented June 28, 20232023-07-10010 July 2023 Emergency Plan Document Revisions Implemented June 28, 2023 IR 05000354/20230112023-05-0101 May 2023 Commercial Grade Dedication Report 05000354/2023011 ML23121A1412023-05-0101 May 2023 Senior Reactor and Reactor Operator Initial License Examinations LR-N23-0034, 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station2023-04-27027 April 2023 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station LR-N23-0035, 2022 Annual Radioactive Effluent Release Report (ARERR)2023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report (ARERR) IR 05000354/20230012023-04-26026 April 2023 Integrated Inspection Report 05000354/2023001 LR-N23-0010, License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location2023-04-21021 April 2023 License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location LR-N23-0009, License Amendment Request (LAR) to Revise the Hope Creek Trip and Standby Auto-start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning (HVAC) Trains2023-04-18018 April 2023 License Amendment Request (LAR) to Revise the Hope Creek Trip and Standby Auto-start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning (HVAC) Trains ML23087A1492023-04-17017 April 2023 NRC to PSEG Salem, Transmittal of the National Marine Fisheries Service'S March 24, 2023, Biological Opinion GAR-2020-02842 Concerning Salem and Hope Creek ML23089A0942023-04-17017 April 2023 NRC to PSEG Hope Creek, Transmittal of the National Marine Fisheries Service'S March 24, 2023, Biological Opinion GAR-2020-02842 Concerning Salem and Hope Creek ML23103A3232023-04-13013 April 2023 Submittal of Updated Final Safety Analysis Report, Rev. 26, Summary of Revised Regulatory Commitments for Hope Creek, Summary of Changes to PSEG Nuclear LLC, Quality Assurance Topical Report, NO-AA-10, Rev. 89 ML23095A3682023-04-12012 April 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Threshold Determination for Proposed Transfer of Land Ownership LR-N23-0024, Submittal of Hope Creek Generating Station Technical Specification Bases Changes2023-03-29029 March 2023 Submittal of Hope Creek Generating Station Technical Specification Bases Changes LR-N23-0006, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-24024 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23086A0912023-03-24024 March 2023 NMFS to NRC, Transmittal of Biological Opinion for Continued Operations of Salem and Hope Creek Nuclear Generating Stations LR-N23-0019, and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2023-03-21021 March 2023 and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums ML23037A9712023-03-0909 March 2023 and Salem Nuclear, Unit Nos. 1 and 2 Issuance of Amendment Nos. 233, 344, and 325 Relocate Technical Specification Staff Qualification Requirements to the PSEG Quality Assurance Topical Report IR 05000354/20220062023-03-0101 March 2023 Annual Assessment Letter for Hope Creek Generating Station (Report 05000354/2022006) LR-N23-0016, and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments2023-02-28028 February 2023 and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments LR-N23-0018, Technical Specification 6.9.1.5.b - 2022 Annual Report of SRV Challenges2023-02-27027 February 2023 Technical Specification 6.9.1.5.b - 2022 Annual Report of SRV Challenges LR-N23-0012, Annual Property Insurance Status Report2023-02-24024 February 2023 Annual Property Insurance Status Report LR-N23-0014, Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.7172023-02-23023 February 2023 Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.717 IR 05000354/20220042023-01-24024 January 2023 Integrated Inspection Report 05000354/2022004 LR-N23-0011, In-Service Inspection Activities - 90 Day Report: Twenty-Fourth Refueling Outage2023-01-19019 January 2023 In-Service Inspection Activities - 90 Day Report: Twenty-Fourth Refueling Outage LR-N22-0096, and Salem Generating Station, Units 1 and 2 - Request for Threshold Determination2023-01-0505 January 2023 and Salem Generating Station, Units 1 and 2 - Request for Threshold Determination LR-N22-0094, Emergency Plan Document Revisions Implemented November 21, 20222022-12-14014 December 2022 Emergency Plan Document Revisions Implemented November 21, 2022 LR-N22-0091, Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments2022-12-0202 December 2022 Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments ML22335A0412022-12-0101 December 2022 Notification of Commercial Grade Dedication Inspection (05000354/2023011) and Request for Information IR 05000354/20220032022-11-0303 November 2022 Integrated Inspection Report 05000354/2022003 2024-02-01
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 12, 2010 Mr. Thomas Joyce President and Chief Nuclear Officer PSEG Nuclear LLC P.O. Box 236 Hancocks Bridge, NJ 08038
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE HOPE CREEK GENERATING STATION LICENSE RENEWAL APPLICATION FOR BURIED PIPING (TAC NO. ME1832)
Dear Mr. Joyce:
By letter dated August 18, 2009, Public Service Enterprise Group Nuclear, LLC, submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54 (10 CFR Part 54) for renewal of Operating License No. NPF-57 for the Hope Creek Generating Station. The staff of the U.S. Nuclear Regulatory Commission (NRC or the staff) is reviewing this application in accordance with the guidance in NUREG-1800, "Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants." During its review, the staff has identified areas where additional information is needed to complete the review. The staff's request for additional information is included in the Enclosure. Further requests for additional information may be issued in the future.
Items in the enclosure were provided to John Hufnagel and other members of your staff, and a mutually agreeable date for the response is within 30 days from the date of this letter. If you have any questions, please contact me by telephone at 301-415-2981 or bye-mail at bennett.brady@nrc.gov.
Sincerely, Bennett M. Brady, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-354
Enclosure:
As stated cc wlencl: Distribution via Listserv
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE HOPE CREEK GENERATING STATION LICENSE RENEWAL APPLICATION FOR BURIED PIPING (TAC NO. ME1832)
RAI 8.2.1.24-02
Background:
Given that there have been a number of recent industry events involving leakage from buried or underground piping, the U.S. Nuclear Regulatory Commission (NRC or the staff) required further information to evaluate the impact that these recent industry events might have on the applicant's Buried Piping Inspection and Buried Non-Steel Piping Inspection Programs. By letter dated August 6, 2010, the staff issued request for additional information (RAI) B.2.1.24-01 requesting that the applicant provide information regarding how Hope Creek Generating Station (HCGS) will incorporate the recent industry operating experience into its aging management reviews (AMRs) and programs. The applicant responded on September 1, 2010. In reviewing the response, the staff had further questions.
Issue:
a) The applicant's response stated that "Planned direct visual inspections of excavated piping typically cover the entire circumference and a length of approximately 8 feet for larger pipe (based on a standard shoring box size), when practical." The staff does not have enough information to evaluate the statement, "when practical." While the staff acknowledges that examining buried pipe from the exterior surface may sometimes not be possible due to plant configuration (e.g., the piping is located underneath foundations); nevertheless, it is important to expose a large enough length of the piping in order to establish reasonable assurance of the condition of the piping system. The staff believes that in instances where it is not possible to expose eight feet of piping during each inspection, an alternative examination should be proposed. The staff notes that it is reasonable to substitute an ultrasonic volumetric examination from the interior of the pipe provided the surface is properly prepared.
b) The applicant's response stated that, "Included among the systems that are cathodically protected are some portions of in-scope carbon steel Fire Protection System buried piping, and some portions of in-scope stainless steel Condensate Storage and Transfer System buried piping. Only a small amount of Condensate Storage and Transfer System is buried carbon steel pipe (less than 10 linear feet of 1% inch piping) and this portion of piping is not within the scope of license renewal." The applicant also stated that "The only other buried piping system within the scope of license renewal (Service Water System) has approximately 12 linear feet of 36 inch nominal carbon steel pipe.
The remaining approximately 2,050 feet of Service Water System buried piping within the scope of license renewal is pre-stressed concrete pipe." The staff believes that cathodic protection is an important preventive measure for steel piping where soil resistivity values are below 20,000 ohm cm. The license renewal application (LRA) and supplemental documents lack sufficient detail for the staff to understand which portions of systems that contain steel piping are cathodically protected.
ENCLOSURE
-2 c) The applicant's response did not discuss if annual NACE potential surveys were being conducted at the station. The staff believes that annual NACE potential surveys are important to ensure that the appropriate protection is provided to the buried piping, trending data is obtained on cathodic protection field output. and potential coating holidays are located.
d) The staff does not have enough information to determine if the condensate storage and transfer system contain hazardous material during normal operation (Le., material which, if released, could be detrimental to the environment such as diesel fuel and radioisotopes that exceed the Environmental Protection Agency drinking water standards). The staff believes that there is a minimum set of excavated and visual inspections of buried piping segments that contain hazardous materials that should be conducted to establish a reasonable basis of assurance that aging effects are not adversely impacting buried pipe and resulting in the release of hazardous materials to the environment.
e) Neither the LRA nor RAI response described the quality of the backfill in the vicinity of buried in-scope piping. The staff understands that the presence of rocks and sharp objects in the backfill around buried pipes is a leading precursor of degradation of buried piping when over time; ground movement causes these materials to come in contact with the buried pipe resulting in damage to the pipe's coating or external surfaces.
Request:
a) Define what is meant by "when practical" in relation to the length of piping being excavated for inspection. Additionally, where it is not practical to excavate and inspect eight feet of piping for each inspection, state what alternative means will be utilized to determine the condition of the piping material, or justify why inspecting less than eight feet of piping in the context of all planned inspections for each discrete material type provides a reasonable assurance of the condition of the buried pipe and coatings where applicable.
b) For buried in-scope steel piping respond to the following:
- i. What portions of the Fire Protection System, discriminated by material type, are provided with cathodic protection?
ii. LRA Table 3.4.2-1, Condensate Storage and Transfer System, lists an AMR line item, Piping and Fittings (Pipe Sleeves), constructed of carbon steel exposed to soil and being managed for loss of material by the Buried Piping Inspection Program. Reconcile this line item with the above statement that there is no in-scope buried carbon steel piping in the Condensate Storage and Transfer System.
iii. Is the approximate 12 linear feet of 36" service water carbon steel piping provided with cathodic protection?
-3 iv. If there are in-scope buried carbon steel piping segments that are not cathodically protected, justify why it is acceptable to inspect only one carbon steel piping segment in each ten year period starting ten years prior to the period of extended operation.
c) Clarify the periodicity of conducting NACE potential surveys, and if not annual, justify the proposed periodicity in light of ensuring appropriate protection is provided to the buried piping, trending data is obtained on cathodic protection field output, and potential coating holidays are located.
d) For buried in-scope piping respond to the following:
- i. Does the condensate storage and transfer system contain hazardous material during normal operation?
ii. If the condensate storage and transfer system contains hazardous material during normal operation, state what percent of total linear feet of buried in-scope condensate storage and transfer system piping will be inspected by excavation and direct inspection during each ten year period starting ten years prior to the period of extended operation. If there are no planned inspections for this piping, justify why it is acceptable to not inspect in-scope buried pipe containing hazardous materials.
e) For buried in-scope piping respond to the following:
- i. Provide details on the quality of the backfill in the vicinity of in-scope buried pipes.
If there is no information on the condition of the quality of backfill beyond initial installation specifications (Le., no documented observations of the quality of the backfill), justify why the planned inspections are adequate to detect potential degradation as a result of coating damage or holidays, or damage to the exterior surface of non-coated piping. .
'.. ML102780422 "via e-mail OFFICE I PM:RPB1:DLR LADLR BC:RPB1:DLR PM:RPB1:DLR NAME B. Brady I. King .. B. Pham B. Brady DATE 10107/10 110/7/10 10112/10 10/12/10
Letter to Thomas Joyce from Bennett Brady dated October 12, 2010
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE HOPE CREEK GENERATING STATION LICENSE RENEWAL APPLICATION FOR BURIED PIPING (TAC NO. ME1832)
DISTRIBUTION:
HARDCOPY:
DLRRF E-MAIL:
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RdsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRapb Resource RidsOgcMailCenter Resource BPham BBrady ACunanan SCuadrado CEccleston REnnis CSanders BHarris, OGC ABurritt, RI RConte, RI MModes, RI DTifft, RI NMcNamara, RI