Person / Time | |
---|---|
Site: | Prairie Island, Cook, 05000000 |
Issue date: | 03/06/1984 |
From: | Abramson P, Wei T ARGONNE NATIONAL LABORATORY |
To: | Guttmann J Office of Nuclear Reactor Regulation |
Shared Package | |
ML17320A970 | List: |
References | |
CON-FIN-A-2311 NUDOCS 8404040304 | |
Download: ML17320A971 (5) | |
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217M3371999-10-20020 October 1999
[Table view]Forwards Notice of Docketing of License SNM-2506 Amend Application.Notice Has Been Forwarded to Ofc of Fr for Publication ML20217M1111999-10-19019 October 1999 Forwards Insp Repts 50-282/99-14 & 50-306/99-14 on 990920- 22.One Violation Noted & Being Treated as Ncv.Insp Focused on Testing & Maint of Heat Exchangers in High Risk Sys ML20217F4331999-10-15015 October 1999 Forwards Rev 39 to Security Plan.Changes Do Not Decrease Effectiveness of Security Plan.Rev Withheld,Per 10CFR73.21 ML20217J4721999-10-15015 October 1999 Forwards NRC Physical Security Insp Repts 50-315/99-27 & 50-316/99-27 on 990920-24.Two Violations Noted & Being Treated as Ncvs,Consistent with App C of Enforcement Policy. Areas Examined Exempt from Disclosure,Per 10CFR73.21 ML20217D9241999-10-0808 October 1999 First Final Response to FOIA Request for Documents.Documents Listed in App a Being Released in Entirety IA-99-379, First Final Response to FOIA Request for Documents.Documents Listed in App a Being Released in Entirety1999-10-0808 October 1999 First Final Response to FOIA Request for Documents.Documents Listed in App a Being Released in Entirety ML17335A5511999-10-0707 October 1999 Forwards LER 99-023-00, Inadequate TS Surveillance Testing of ESW Pump ESF Response Time. Commitments Identified in LER Listed ML20217C2351999-10-0606 October 1999 Forwards Insp Repts 50-282/99-12 & 50-306/99-12 on 990823-0917.No Violations Noted.Insp Consisted of Selected Exam of Procedures & Representative Records,Observation of Activities & Interviews with Personnel ML20217D9361999-09-30030 September 1999 FOIA Request for Document Re Section 9.7 of SE by Directorate of Licensing,Us Ae Commission in Matter of Indiana & Michigan Electric Co & Indiana & Michigan Power Co,Dc Cook Nuclear Plan,Units 1 & 2 IR 05000272/19990071999-09-28028 September 1999 Forwards Insp Repts 50-272/99-07 & 50-306/99-07 on 990721- 0831.One Potentially Safety Significant Issue Identified Dealing with Control Room Special Ventilation System.Four Addl Issues of Low Safety Significance Identified ML20212J8811999-09-28028 September 1999 Forwards Preliminary Accident Sequence Precurson Analysis of Operational Event That Occurred at Plant,Unit 1 on 990105, for Review & Comment.Comment Requested within 30 Days of Receipt of Ltr ML20212G7171999-09-24024 September 1999 Submits Semiannual Status Update on Project Plans for USAR Review Project & Conversion to Its.Conversion Package Submittal Continues to Be Targeted for Aug of 2000 ML20212G9801999-09-23023 September 1999 Refers to Resolution of Unresolved Items Identified Re Security Alarm Station Operations at Both Monitcello & Prairie Island ML20212F5121999-09-20020 September 1999 Forwards Response to NRC , Preparation & Scheduling of Operator Licensing Examinations ML17326A1541999-09-20020 September 1999 Provides Notification of Change in Senior Licensed Operator Status.Operating Licenses for CR Smith,License SOP-30159-4 & Tw Welch,License SOP-30654-2 Are No Longer Required & Should Be Withdrawn ML17326A1261999-09-17017 September 1999 Forwards LER 99-022-00 Re Electrical Bus Degraded Voltage Setpoints Too Low for Safety Related Loads.Listed Commitment Identified in Submittal ML17326A1441999-09-17017 September 1999 Submits Trace on Second Shipment of Two Plant,Unit 2 Steam Generators.Info Re Shipment Submitted ML17326A1531999-09-16016 September 1999 Submits Info Pertaining to Plant Proposed Operator Licensing Exam Requirements Through Yr 2003.NRC Form 536, Operator Licensing Exam Data, Which Provides Required Info Encl ML20212D8401999-09-16016 September 1999 Discusses 990902 Telcon Between D Wesphal & R Bailey Re Administeration of Retake Exam at Prairie Island During Wk of 991206.NRC May Make Exam Validation Visit to Facility During Wk of 991116 ML20217H2331999-09-10010 September 1999 Forwards Security Insp Repts 50-282/99-10 & 50-306/99-10 on 990809-12.Two Findings,Each of Low Risk Significance Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20212B0511999-09-0909 September 1999 Forwards Insp Repts 50-282/99-11 & 50-306/99-11 on 990816-20.One Issue of Low Safety Significance Was Identified & Being Treated as Ncb ML20212A9241999-09-0909 September 1999 Discusses Plans Made During 990902 Telephone Conversation to Inspect Licensed Operator Requalification Program at Prairie Island During Weeks of 991101 & 991108.Requests That Written Exams & Operating Tests Be Submitted by 991022 ML20217H5661999-09-0909 September 1999 Discusses 990907 Pilot Plan Mgt Meeting Re Results to-date of Pilot Implementation of NRC Revised Reactor Oversight Process at Prairie Island & Quad Cities.Agenda & Handouts Provided by Utils Encl ML20211Q7641999-09-0808 September 1999 Informs That NRC Tentatively Scheduled Initial Licensing Exam for Plant Operator License Applicants During Wk of 000515,in Response to D Westphal ML20211N8631999-09-0707 September 1999 Withdraws 970814 Request for Exemption from 10CFR50,App R, Section III.G.2, Fire Protection of Safe Shutdown Capabilities ML20211L0211999-09-0101 September 1999 Provides Notification That License Amends 141 & 132 & Associated License Conditions 6 & 7 Have Been Fully Implemented ML20211K5911999-09-0101 September 1999 Informs That Util Reviewed Rvid Data Base,As Requested in NRC .Summary of Proposed Changes & Observed Differences Are Included in Encl Tables ML20211Q6041999-08-31031 August 1999 Forwards Rev 19 to USAR for Pingp,Per 10CFR50.71(e).Rev Brings USAR up-to-date as of 990228,though Some Info Is More Recent.Attachment 1 Contains Descriptions & Summaries of SE for Changes,Tests & Experiments,Per 10CFR50.59 ML20211K5931999-08-31031 August 1999 Forwards License Amend Request for License SNM-2506, Proposing Change to License Conditions 6,7 & 8 & TSs App a of License by Permitting Inclusion of Bpras & Thimble Plug Devices in Sf Assemblies Stored in TN-40 Casks ML20211K2591999-08-27027 August 1999 Forwards NSP Co Fitness for Duty Program Performance Data for Six Month Period Ending 990630 ML17326A1101999-08-27027 August 1999 Forwards LER 99-021-00, GL 96-01 Test Requirements Not Met in Surveillance Tests. List of Commitments Identified in LER Provided ML17326A0991999-08-26026 August 1999 Forwards LER 99-020-00,re EDGs Being Declared Inoperable. Commitments Made by Util Are Listed ML20211D3541999-08-24024 August 1999 Discusses GL 95-07 Re Pressure Locking & Thermal Binding of safety-related Power Operated Gate Valves.Forwards SE Re Response to GL 95-07 ML17326A0981999-08-23023 August 1999 Forwards fitness-for-duty Program Performance Data for Period of 990101-0630 for DC Cook Nuclear Plants,Units 1 & 2,per 10CFR26.71(d) ML17326A1221999-08-23023 August 1999 Forwards Revised Page 2 to 1998 Annual Environ Operating Rept, for DC Cook Nuclear Plant,Correcting Omission to App I ML20211C7601999-08-19019 August 1999 Confirms NRC Intent to Meet with NSP & Ceco on 990807 in Lisle,Il to Discuss with Region III Pilot Plants,Any Observations,Feedback,Lessons Learned & Recommendations Relative to Implementation of Pilot Program ML20211C2311999-08-19019 August 1999 Forwards Unit 1 ISI Summary Rept,Interval 3,Period 2 Refueling Outage Dates 990425-0526,Cycle 19 971212-990526. Rept Identifies Components Examined,Exam Methods Used,Exam Number & Summarizes Results ML20211B8311999-08-19019 August 1999 Forwards Request for Relief 8 Re Limited Exams Associated with Unit 1 Third ten-year Interval Inservice Insp Program. Licensee Requests Relief Due to Impractibility of Obtaining 100% Exam Coverage for Affected Items ML20211B5711999-08-19019 August 1999 Forwards Second 90-day Rept for Implementation of Voltage Based Repair Criteria at Prairie Island Unit 1.Rept Fulfills Requirements of Section 6.b of Attachment 1 to GL 95-05 ML20211B0561999-08-18018 August 1999 Provides Addl Info on Proposed Rev to Main Steam Line Break Methodology ,in Response to NRC Staff Request Made in 990416 Telcon.Nuclear Svcs Corp Rept PIO-01-06, Analysis Rept Structural Analyses of Main Steam Check... Encl ML20211C7371999-08-17017 August 1999 Discusses Closure of Staff Review Re Generic Implication of Part Length Control Rod Drive Mechanism Housing Leak on 980123.Enclosed NRC 980811 & 1223 Ltrs Responded to WOG Positions Re Corrective Actions ML20211B2621999-08-17017 August 1999 Forwards Insp Repts 50-282/99-09 & 50-306/99-09 on 990719-22.No Violations Noted.Insp Included Review & Evaluation of Current Emergency Preparedness Performance Indicators ML17326A0891999-08-16016 August 1999 Forwards LER 99-019-00,re Victoreen Containment High Range Monitors Not Beign Environmentally Qualified to Withstand post-LOCA Conditions.Commitments Made by Util Are Listed ML20210T5661999-08-12012 August 1999 Forwards RAI Re & Suppl ,which Requested Exemptions from TSs of Section III.G.2 of 10CFR50 App R,To Extent That Specifies Separation of Certain Redundant Safe Shutdown Circuits with fire-related Barriers ML20210R7021999-08-12012 August 1999 Forwards Insp Repts 50-282/99-06 & 50-306/99-06 on 990601- 0720.One NCV Occurred,Consistent with App C of Enforcement Policy ML20210P5191999-08-11011 August 1999 Discusses GL 92-01,Rev 1,Supp 1, Rv Integrity, Issued by NRC on 950519 & NSP Responses for PINGP & 951117. Staff Reviewed Info in Rvid & Released Info as Rvid Version 2.Requests Submittal of Comments Re Revised Rvid by 990901 ML17326A0811999-08-10010 August 1999 Notifies NRC of Changes in Commitments Made in Response to GL 98-01,supplement 1, Yr 2000 Readiness of Computer Sys Ar Npps, Dtd 990623 ML17326A0821999-08-0606 August 1999 Informs That Util Is Submitting Encl Scope & Objectives for 991026 DC Cook Nuclear Plant Emergency Plan Exercise to G Shear of NRC Plant Support Branch.Exercise Will Include Full State & County Participation ML17326A0751999-08-0404 August 1999 Forwards LER 98-029-01, Fuel Handling Area Ventilation Sys Inoperable Due to Original Design Deficiency. Supplemental Rept Represents Extensive Rev to Original LER & Replaces Rept in Entirely.Commitment Listed ML17326A1451999-08-0404 August 1999 Requests Withholding of WCAP-15246, Control Rod Insertion Following Cold Leg Lbloca. 1999-09-09 Category:INCOMING CORRESPONDENCE MONTHYEARML20217F4331999-10-15015 October 1999
[Table view]Forwards Rev 39 to Security Plan.Changes Do Not Decrease Effectiveness of Security Plan.Rev Withheld,Per 10CFR73.21 ML17335A5511999-10-0707 October 1999 Forwards LER 99-023-00, Inadequate TS Surveillance Testing of ESW Pump ESF Response Time. Commitments Identified in LER Listed ML20217D9361999-09-30030 September 1999 FOIA Request for Document Re Section 9.7 of SE by Directorate of Licensing,Us Ae Commission in Matter of Indiana & Michigan Electric Co & Indiana & Michigan Power Co,Dc Cook Nuclear Plan,Units 1 & 2 ML20212G7171999-09-24024 September 1999 Submits Semiannual Status Update on Project Plans for USAR Review Project & Conversion to Its.Conversion Package Submittal Continues to Be Targeted for Aug of 2000 ML20212F5121999-09-20020 September 1999 Forwards Response to NRC , Preparation & Scheduling of Operator Licensing Examinations ML17326A1541999-09-20020 September 1999 Provides Notification of Change in Senior Licensed Operator Status.Operating Licenses for CR Smith,License SOP-30159-4 & Tw Welch,License SOP-30654-2 Are No Longer Required & Should Be Withdrawn ML17326A1261999-09-17017 September 1999 Forwards LER 99-022-00 Re Electrical Bus Degraded Voltage Setpoints Too Low for Safety Related Loads.Listed Commitment Identified in Submittal ML17326A1441999-09-17017 September 1999 Submits Trace on Second Shipment of Two Plant,Unit 2 Steam Generators.Info Re Shipment Submitted ML17326A1531999-09-16016 September 1999 Submits Info Pertaining to Plant Proposed Operator Licensing Exam Requirements Through Yr 2003.NRC Form 536, Operator Licensing Exam Data, Which Provides Required Info Encl ML20211N8631999-09-0707 September 1999 Withdraws 970814 Request for Exemption from 10CFR50,App R, Section III.G.2, Fire Protection of Safe Shutdown Capabilities ML20211L0211999-09-0101 September 1999 Provides Notification That License Amends 141 & 132 & Associated License Conditions 6 & 7 Have Been Fully Implemented ML20211K5911999-09-0101 September 1999 Informs That Util Reviewed Rvid Data Base,As Requested in NRC .Summary of Proposed Changes & Observed Differences Are Included in Encl Tables ML20211Q6041999-08-31031 August 1999 Forwards Rev 19 to USAR for Pingp,Per 10CFR50.71(e).Rev Brings USAR up-to-date as of 990228,though Some Info Is More Recent.Attachment 1 Contains Descriptions & Summaries of SE for Changes,Tests & Experiments,Per 10CFR50.59 ML20211K5931999-08-31031 August 1999 Forwards License Amend Request for License SNM-2506, Proposing Change to License Conditions 6,7 & 8 & TSs App a of License by Permitting Inclusion of Bpras & Thimble Plug Devices in Sf Assemblies Stored in TN-40 Casks ML20211K2591999-08-27027 August 1999 Forwards NSP Co Fitness for Duty Program Performance Data for Six Month Period Ending 990630 ML17326A1101999-08-27027 August 1999 Forwards LER 99-021-00, GL 96-01 Test Requirements Not Met in Surveillance Tests. List of Commitments Identified in LER Provided ML17326A0991999-08-26026 August 1999 Forwards LER 99-020-00,re EDGs Being Declared Inoperable. Commitments Made by Util Are Listed ML17326A0981999-08-23023 August 1999 Forwards fitness-for-duty Program Performance Data for Period of 990101-0630 for DC Cook Nuclear Plants,Units 1 & 2,per 10CFR26.71(d) ML17326A1221999-08-23023 August 1999 Forwards Revised Page 2 to 1998 Annual Environ Operating Rept, for DC Cook Nuclear Plant,Correcting Omission to App I ML20211C2311999-08-19019 August 1999 Forwards Unit 1 ISI Summary Rept,Interval 3,Period 2 Refueling Outage Dates 990425-0526,Cycle 19 971212-990526. Rept Identifies Components Examined,Exam Methods Used,Exam Number & Summarizes Results ML20211B8311999-08-19019 August 1999 Forwards Request for Relief 8 Re Limited Exams Associated with Unit 1 Third ten-year Interval Inservice Insp Program. Licensee Requests Relief Due to Impractibility of Obtaining 100% Exam Coverage for Affected Items ML20211B5711999-08-19019 August 1999 Forwards Second 90-day Rept for Implementation of Voltage Based Repair Criteria at Prairie Island Unit 1.Rept Fulfills Requirements of Section 6.b of Attachment 1 to GL 95-05 ML20211B0561999-08-18018 August 1999 Provides Addl Info on Proposed Rev to Main Steam Line Break Methodology ,in Response to NRC Staff Request Made in 990416 Telcon.Nuclear Svcs Corp Rept PIO-01-06, Analysis Rept Structural Analyses of Main Steam Check... Encl ML17326A0891999-08-16016 August 1999 Forwards LER 99-019-00,re Victoreen Containment High Range Monitors Not Beign Environmentally Qualified to Withstand post-LOCA Conditions.Commitments Made by Util Are Listed ML17326A0811999-08-10010 August 1999 Notifies NRC of Changes in Commitments Made in Response to GL 98-01,supplement 1, Yr 2000 Readiness of Computer Sys Ar Npps, Dtd 990623 ML17326A0821999-08-0606 August 1999 Informs That Util Is Submitting Encl Scope & Objectives for 991026 DC Cook Nuclear Plant Emergency Plan Exercise to G Shear of NRC Plant Support Branch.Exercise Will Include Full State & County Participation ML17326A0751999-08-0404 August 1999 Forwards LER 98-029-01, Fuel Handling Area Ventilation Sys Inoperable Due to Original Design Deficiency. Supplemental Rept Represents Extensive Rev to Original LER & Replaces Rept in Entirely.Commitment Listed ML17326A1451999-08-0404 August 1999 Requests Withholding of WCAP-15246, Control Rod Insertion Following Cold Leg Lbloca. ML20210G5061999-07-30030 July 1999 Responds to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates ML17326A0721999-07-29029 July 1999 Forwards LER 99-018-00 Re Refueling Water Storage Tank Suction Motor Operated Valves Inoperable,Due to Inadequate Design.Listed Commitments Were Identified in LER ML17326A0711999-07-27027 July 1999 Responds to 980123 RAI Re NRC GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Unresolved Safety Issue (USI) A-46. 05000282/LER-1999-007, Forwards LER 99-007-00,re Loss of CR Special Ventilation Function.One New Commitment Was Made in Rept as Indicated in Corrective Action Section Statement in Bold Italics1999-07-23023 July 1999 Forwards LER 99-007-00,re Loss of CR Special Ventilation Function.One New Commitment Was Made in Rept as Indicated in Corrective Action Section Statement in Bold Italics ML17326A0601999-07-22022 July 1999 Forwards UFSAR, IAW 10CFR50.71(e) & Rept of Changes,Tests & Experiments as Required by 10CFR50.59(b)(2) for DC Cook Nuclear Plant,Units 1 & 2.Without UFSAR ML20210J4991999-07-22022 July 1999 Forwards Rev 18 to USAR for Pingp,Bringing USAR up-to-date as of 990228,though Some Info More Recent.Safety Evaluation Summaries Also Encl ML17326A0631999-07-22022 July 1999 Forwards LER 98-014-03, Response to High-High Containment Pressure Procedure Not Consistent with Analysis of Record. Revised Info Marked by Sidebars in Right Hand Margin. Commitments Made by Util,Listed ML20209H8051999-07-14014 July 1999 Forwards Summary of non-modification Safety Evaluation Number 515 Re Storage of Fuel Inserts,Per Insp Rept 72-0010/99-201 ML20209D4181999-07-0707 July 1999 Informs That Util Has Changed Listed TS Bases Pages Attached for NRC Use.Util Made No New Commitments in Ltr ML20209B7541999-07-0101 July 1999 Final Response to GL 98-01,Suppl 1 Re Y2K Readiness of Computer Sys.Sys Remediated as Required for Plant Operation. Contingency Plans Developed to Mitigate Impact of Y2K-induced Events at Key Rollover Dates ML17326A0311999-07-0101 July 1999 Forwards LER 99-004-01 Re Failure to Perform TS Surveillance Analyses of Reactor Coolant Chemistry with Fuel Removed. Commitments Made by Util Are Listed ML20209C3951999-07-0101 July 1999 Forwards Supplemental Response to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves ML20196J8941999-06-30030 June 1999 Transmits Util Comments on Draft Regulatory Guide DG-1074, Steam Generator Tube Integrity. Licensee Recommends That NRC Focus on Several Important Listed Areas Considered Principal Concerns & Contentions ML20209C3011999-06-29029 June 1999 Forwards Annual Rept of Corrections to NSP ECCS Evaluation Models,Iaw 10CFR50.46.Since All Analyses Remain in Compliance,No Reanalysis Is Required or Planned ML17326A0281999-06-28028 June 1999 Provides Response to 981116 & 960228 RAIs Re GL 92-01. Revised Pressurized Thermal Shock Evaluation Based on New Weld Chemistry Info & Copy of W Rept WCAP-15074, Evaluation of 1P3571 Weld Metal from Surveillance Programs... Encl ML20209B5751999-06-24024 June 1999 Submits Revised Relief Request for Limited Examinations Associated with Third 10-yr ISI Examination Plan.Attached Is Unit 1 Relief Request 7,rev 1 Which Addresses Limited Examinations ML20196F3871999-06-23023 June 1999 Forwards Revised Pages 71,72 & 298 of Rev 7 to NSPNAD-8102, Prairie Island Nuclear Power Plant Reload Safety Evaluation Methods for Application to PI Units, Per Discussions with Nrc.Approved Version of Rept Will Be Issued ML17326A0241999-06-23023 June 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Y2K Readiness Disclosure for Plant & List of Commitments Encl 05000282/LER-1999-006, Forwards LER 99-006-00 Re Discovery That Manual SI Actuation Switch Had Not Been Tested on Staggered Basis During Integrated SI Test.Two New Commitments Are Indicated in Corrective Action Section Statement in Bold Italics1999-06-18018 June 1999 Forwards LER 99-006-00 Re Discovery That Manual SI Actuation Switch Had Not Been Tested on Staggered Basis During Integrated SI Test.Two New Commitments Are Indicated in Corrective Action Section Statement in Bold Italics ML17326A0121999-06-18018 June 1999 Forwards LER 99-014-00 Re Requirement of TS 4.0.5 Not Met for Boron Injection Tank Bolting.Commitments Identified in Submittal Listed ML17326A0111999-06-11011 June 1999 Provides Response to NRC RAI Re GL 97-01, Degradation of Crdm/Cedm Nozzle & Other Vessel Closure Head Penetrations. ML20195G4281999-06-0909 June 1999 Notifies That Amsac/Dss Mods Completed & TS 138/129 Has Been Fully Implemented 1999-09-07 Category:RESEARCH INSTITUTION/LABORATORY TO NRC MONTHYEARML17261A8541989-01-13013 January 1989
[Table view]Discusses 890110-11 Meetings Re Nozzle Sizing Study.Most Accurate Sizing Obtained by Collecting Data of Edge Diffracted Waves from Geometric Extremities of Flaw ML19324A1111988-05-19019 May 1988 Forwards Memo Describing Results of Testing of Plant Bolting Matls Under FIN A-3866,Task Assignment 12 ML19324B2701988-03-0202 March 1988 Forwards Rept on Metallurgical Evaluation of Five Bolts Obtained from Farley Plant.Bolts Found Acceptable ML20207R7571987-03-10010 March 1987 Forwards Technical Evaluation Rept Input for South Texas Initial Plant Test Program Through FSAR Amend 56,Feb 1987 Sser & & Beaver Valley Unit 2 Initial Plant Test Program Through FSAR Amend 15 & Nov 1986 Sser ML20207S5001987-03-0606 March 1987 Forwards Technical Evaluation Repts for Domestic Mark III Plants (Grand Gulf,Clinton,River Bend & Perry) & Gessar Ii. Inserts to Be Included in Section 6.2.1.8 of Draft Sser 2 for Clinton,River Bend & Perry Plants Also Encl ML20195F8651986-10-31031 October 1986 Forwards Request for Addl Info Re MSIV Operability at Facility,Based on Initial Review of Util Rept Entitled, Final Rept 10CFR50.55(e) MSIV Actuators, Forwarded by Util ML20206H3211986-09-10010 September 1986 Forwards Summary Repts from 860811-14 Visit to Kewaunee Nuclear Station & 851002-03 Visit to Cooper Nuclear Station Re Generic Issue 83 on Control Room Habitability ML20206J6001986-08-0808 August 1986 Advises That NUREG-0956 Support Calculations Using ORNL Trends Code to Evaluate Influence of Containment Chemistry or Retention of Hi Can Also Provide Useful Info for General NUREG-1150 Issue Paper,Per Telcon Discussion ML20206H1131986-06-23023 June 1986 Submits DHEAT2 Parametric Calculations for Plant,Per 860620 Discussions.Calculations Run Assuming Any Steam Spike Would Develop Too Slowly to Contribute to DCH Peak Pressure ML20214E1721986-02-25025 February 1986 Ack Receipt of 860210 & 21 Ltrs Accepting Task Orders 3 & 4 Under FIN A-3552 & Task Order 5,respectively.Orders Include Work at Palisades & LaSalle Stations & Mod Review at Davis-Besse.Modified Task Order 4 Under FIN A-3550 Encl ML20206J2521986-01-24024 January 1986 Forwards Early Draft of Executive Summary from Analysis of Station Blackout Accidents for Bellefonte PWR, Per Request. Initial Draft of Rept Scheduled to Be Completed by 860315 ML20206J3681986-01-15015 January 1986 Discusses Latest Calculations of Molecular Iodine (I2) & Organic Iodide (CH3I) Scrubbing During TC1 Sequence from Draft Plant Rept ML20136F4771985-12-31031 December 1985 Forwards PNL-5718, Review of Tdi Diesel Generator Owners Group Engine Requalification Program,Final Rept, Technical Evaluation Rept ML20206J4031985-12-13013 December 1985 Summarizes Preliminary Scoping Calculations for Molecular Iodine (I2) Scrubbing in BWR Pressure Suppression Pools. Calculations Made for Most Recent TC1 Sequence in Draft Plant Rept ML20133A3141985-09-27027 September 1985 Forwards Review of Section 4.7 of Technical Evaluation Rept PNL-5600, Review of Resolution of Known Problems in Engine Components for Tdi Emergency Diesel Generators, Reflecting Views Re Crankshafts for 16-cylinder Engines ML20128H7371985-06-27027 June 1985 Forwards Rev 1 to Review of Engine Base & Bearing Caps for Tdi DSRV-12,DSRV-16 & DSRV-20 Diesel Engines, Technical Evaluation Rept ML20141N2981985-05-29029 May 1985 Requests Listed Addl Info Re S&W 1982 Rept, Ultimate Pressure Capacity of Shoreham Primary Containment ML20126E8721985-05-24024 May 1985 Forwards PNL-5200-3, Review of Emergency Diesel Generator Engine & Auxiliary Module Wiring & Terminations, Dtd May 1985 ML20133N7721985-03-27027 March 1985 Forwards Info Telecopied on 850325 Re Locational Distribution of Three Fission Product Species for Surry V Sequence & Time Dependent Release for Fission Product Groups for Peach Bottom ML20214F5101985-03-13013 March 1985 Forwards List of Questions Re Plant Pra,Per 850512 Telcon. Statement of Work, Review of PRA for Seabrook Nuclear Power Plant, Encl ML20133N3461985-02-20020 February 1985 Discusses Review of March Results for Surry & Peach Bottom Sequences,In Order to Quantify Expected Noble Gas Releases. March Model Appropriate for Behavior of Noble Gases ML20134A1011985-02-20020 February 1985 Submits Results of Noble Gas Release Sequences Using March Code for Facilities ML20128P3401984-12-0505 December 1984 Submits Rept for Task 1 Per M Silberberg 841116 Memo Re Concerns Re Lanthanum Releases in BMI-2104.Discusses Discrepancies in Corcon Calculations,Presents Revised Tables 6.14 & 7.16 & Recommends Reanalyses ML20138N6971984-09-18018 September 1984 Forwards Repts Re Irradiation,Decontamination & DBA Testing, Per Request of Y Korobov of Carboline Co ML20134E1591984-08-0202 August 1984 Forwards Brief Summary Rept on Leakage Characteristics of Nuclear Containment Hatches During Severe Accident. Draft of Complete Rept Will Be Mailed Later in Aug ML20127B9221984-07-20020 July 1984 Forwards PNL-5201, Review & Evaluation of Tdi Diesel Engine Reliability & Operability - Grand Gulf Nuclear Station, Unit 1 ML20127B8881984-05-21021 May 1984 Comments on May 1984 Draft Tdi Diesel Generator Owners Group Program Plan.Full Insp of One Engine to Owners Group Spec Recommended ML20093G4821984-05-0202 May 1984 Provides Summary of Battelle Subcontract W/Tdi to Evaluate Special Silicon carbide-impregnated Cylinder Liners & Piston Rings.Task Does Not Involve Dependability Tests of Tdi Engines.No Apparent Conflict Found ML20113A0201984-04-0404 April 1984 Forwards Requests for Addl Info Developed During Review of FSAR Chapter 14 Re Initial Plant Test Program.Review Conducted Through Amend 4.Listing of Items Requiring Resolution Encl ML20117C9421984-04-0303 April 1984 Forwards Proposed Radiological Source Term Input for Facility.Encl Amended to Reflect NRC Suggested Changes ML20093C5281984-03-30030 March 1984 Forwards Audit of Susquehanna Unit 2 Tech Specs, Technical Evaluation Rept ML17320A9711984-03-0606 March 1984 Forwards First Round Questions Following Evaluation of Exxon Rept, Steam Tube Rupture Incident at Prairie Island Unit 1, PTSPWR2 Vs Data,Preliminary Benchmark Analysis. ML17320A9741984-03-0505 March 1984 Forwards First Round Questions on Exxon Methodology Rept for PTSPWR2.Rept Lacks Specific Details Re Biases in Initial Conditions & Boundary Conditions ML20128N6571984-02-22022 February 1984 Comments on Draft Vols IV-VI of BMI-2104,presented at Peer Review 840126 & 27 Meetings.Comments Concern Completed Calculations for Sequoyah Ice Condenser Plant,Recalculated Surry Results & Completed Calculations for Zion Plant ML19306A0151984-02-10010 February 1984 Summarizes 840206-07 Visit to Nevada Test Site Hydrogen Burn Facility to Inspect Condition of Equipment & Cable/Splice Samples After Series of Hydrogen Burn Tests Conducted by Epri.No Indication of External Damage to Equipment Noted ML17320A9731983-11-22022 November 1983 Forwards First Round Questions on Mods to Exxon Draft Repts, PTSPWR2 Mods for St Lucie Unit 1 & Description of Exxon Plant Transient Simulation Model for Pwrs. ML17320A9721983-09-30030 September 1983 Forwards First Round Questions on Exxon Plant Transient Code,Based on Review of Proprietary Rept, Description of Exxon Nuclear Plant Transient Simulation Model for Pwrs. ML20080B5631983-08-12012 August 1983 Forwards Draft Preliminary Review of Limerick Generating Station Severe Accident Risk Assessment,Vol I:Core Melt Frequency. Rept Satisfies Milestone for Task 1 of Project 3 Under FIN A-3393 ML20211D5971983-04-11011 April 1983 Forwards Summary of Independent Development of Finite Element Models & Determination of Natural Frequencies for Piping Problems in Containment Spray Discharge Line & Accumulator Loop 4 ML20132B4961983-02-11011 February 1983 Forwards Evaluation of Generic Key Indicators for Project Engineering/Design Activities at Facilities ML20072L7101982-12-20020 December 1982 Forwards BNL 821213 Memeo Re Degraded Core Accidents at Facilities,Per Task III.3 Defined in Design Basis for Hydrogen Control Sys in CP & OL Applications. No-cost Extension to Contract Requested ML20079J5641982-12-16016 December 1982 Summarizes Findings of 821207-08 Plant Tour Re Use of PORVs or Depressurization Scheme for Removing Decay Heat.Addl Info Requested Includes General Arrangement & Isometric Drawings of Piping Near San Onofre Pressurizer ML20027D4031982-10-21021 October 1982 Submits Evaluation of Fire Modeling Methodology Employed by Northern States Power Co in Fire Protection Safe Shutdown Analysis Compliance W/10CFR50 App R,Section Iii.G & Substantive Basis for Exemption Requests, Final Rept ML20027D1751982-10-18018 October 1982 Responds to 820806 Request to Evaluate Rapid Depressurization & DHR Sys for C-E Plants W/O Porvs, Discussing Role of Task Action Plan A-45, Shutdown Heat Removal Requirements, in Supporting Evaluation of Facility ML20126F4791982-10-0101 October 1982 Requests Permission to Observe Upcoming Types A,B & C Tests at Listed Facilities,Per FIN B-0489, Containment Leak Rate Testing ML20072L6851982-09-21021 September 1982 Forwards Analysis of Full Core Meltdown Accidents in Grand Gulf Reactor Plant, Draft Informal Rept.Rept Satisfies Preliminary Rept Milestone for Task I Defined in Safety Evaluation of Core Melt Accidents:Cp,Ml & OL Applicants ML17276B0731982-02-10010 February 1982 Comments on Const of Two Power Reactors by Skagit/Hanford Nuclear Project at Hanford.Purchasing & Finishing Terminated Wppss Plants at Hanford & Satsop Should Be Considered as One Alternative to Proposed Action ML20004D0451981-06-0303 June 1981 Forwards Auxiliary Feedwater Sys Automatic Initiation & Flow Indication, Technical Evaluation Rept ML17331A4651980-09-30030 September 1980 Forwards Fracture Toughness of Steam Generator & Reactor Coolant Pump Supports. Rept Describes Criteria for Review, Procedure & Basis for Conclusion Supporting NUREG-0577 Group III Plant Ranking for fracture-toughness Adequacy ML19246B0091979-06-21021 June 1979 Approves Fire Protection Program Developed by Brookhaven & Nrc.Offers Exceptions for NRC Evaluation:Electrical Valve Supervision Should Be Provided on All Valves Controlling Fire Water Sys 1989-01-13 |