MONTHYEARNOC-AE-000675, Forwards Clarification on Items Included in 990531 Response to RAI Re Proposed License Amend Associated with Operator Action for Sbloca,As Requested1999-10-21021 October 1999
[Table view]Forwards Clarification on Items Included in 990531 Response to RAI Re Proposed License Amend Associated with Operator Action for Sbloca,As Requested IR 05000412/19990071999-10-21021 October 1999 Refers to Special Team Insp 50-412/99-07 Conducted from 990720-29 & Forwards Nov.Two Violations Identified.First Violation Involved Failure to Implement C/A to Prevent Biofouling of Service Water System NOC-AE-000680, Forwards Rev 5 to 0PGP03-ZV-0001, Severe Weather Plan1999-10-20020 October 1999 Forwards Rev 5 to 0PGP03-ZV-0001, Severe Weather Plan NOC-AE-000683, Forwards 30-day Rept Concerning Significant Changes to Accepted Large Break Loss of Coolant Accident ECCS Evaluation Model for South Tx Project,Units 1 & 2,IAW 10CFR50.46(a)(3)(ii)1999-10-19019 October 1999 Forwards 30-day Rept Concerning Significant Changes to Accepted Large Break Loss of Coolant Accident ECCS Evaluation Model for South Tx Project,Units 1 & 2,IAW 10CFR50.46(a)(3)(ii) ML20217M1591999-10-19019 October 1999 Forwards NRC Rept Number 17, Requal Tracking Rept from Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Requal Pass Dates ML20217K9341999-10-15015 October 1999 Forwards SER Accepting Util 990609 Relief Request RR-ENG-2-4 for Relief from ASME Code,Section XI, Nondestructive Exam Requirements Applicable to Stp,Units 1 & 2,reactor Vessel Closure Head Nuts ML20217K9091999-10-15015 October 1999 Forwards SER Accepting Util 990609 Relief Request RR-ENG-2-3 from ASME Code,Section Xi,Nondestructive Exam Requirements Applicable to South Texas Project,Units 1 & 2, Pressurizer Support Attachment Welds NOC-AE-000674, Forwards Requested Estimates of Needs for Operator Licensing Exams,Per AL-99-03, Operator Licensing National Exam Schedule1999-10-12012 October 1999 Forwards Requested Estimates of Needs for Operator Licensing Exams,Per AL-99-03, Operator Licensing National Exam Schedule 05000498/LER-1999-008, Forwards LER 99-008-00 Re Turbine Trip That Occurred While Performing Main Turbine Emergency Trip Test.Commitments Made by Licensee Are Listed in Corrective Actions Section of LER1999-10-12012 October 1999 Forwards LER 99-008-00 Re Turbine Trip That Occurred While Performing Main Turbine Emergency Trip Test.Commitments Made by Licensee Are Listed in Corrective Actions Section of LER L-99-143, Informs That Subsequent Review of Approval Ltrs & SE for Relief Requests 1TYP-2-B5.40-1 (Rev 0),BV1-RV-AUG (Rev 1), BV2-RV-AUG (Rev 1),BV3-IWA-1 (Rev 1) & BV3-IWA-2 (Rev 1) Identified Erroneous Statements Which Dl Wishes to Correct1999-10-11011 October 1999 Informs That Subsequent Review of Approval Ltrs & SE for Relief Requests 1TYP-2-B5.40-1 (Rev 0),BV1-RV-AUG (Rev 1), BV2-RV-AUG (Rev 1),BV3-IWA-1 (Rev 1) & BV3-IWA-2 (Rev 1) Identified Erroneous Statements Which Dl Wishes to Correct L-99-152, Submits Relief Request BV3-N-533-1,rev 0,requesting Use of ASME Approved Code Case N-553-1, Alternative Requirements for VT-2 Visual Examination of Class 1,2 & 3 Insulated Pressure Retaining Bolted Connections1999-10-11011 October 1999 Submits Relief Request BV3-N-533-1,rev 0,requesting Use of ASME Approved Code Case N-553-1, Alternative Requirements for VT-2 Visual Examination of Class 1,2 & 3 Insulated Pressure Retaining Bolted Connections ML20217C6741999-10-0808 October 1999 Forwards RAI Re Licensee 970128 Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions, . Response Requested within 60 Days of Receipt of Ltr ML20217E0301999-10-0707 October 1999 Forwards Insp Repts 50-334/99-06 & 50-412/99-06 on 990809-13 & 990823-27.Violation Noted Involving Failure to Correctly Translate Design Change Re Pertinent Operating Logs & Plant Equipment Labeling L-99-151, Responds to NRC Re Violations Noted in Insp Rept 50-412/99-07.Corrective Actions:Condition Repts Were Written for Listed Issues So That Repts Could Be Addressed Using BVPS Corrective Action Program1999-10-0707 October 1999 Responds to NRC Re Violations Noted in Insp Rept 50-412/99-07.Corrective Actions:Condition Repts Were Written for Listed Issues So That Repts Could Be Addressed Using BVPS Corrective Action Program NOC-AE-000625, Requests Partial Relief from ASME Section XI Visual Exam Requirements of IWA-5242(a).Relief Request Is Based on Provisions of Draft ASME Section XI Code Case N-616,which Is Expected to Be Published in Near Future1999-10-0707 October 1999 Requests Partial Relief from ASME Section XI Visual Exam Requirements of IWA-5242(a).Relief Request Is Based on Provisions of Draft ASME Section XI Code Case N-616,which Is Expected to Be Published in Near Future NOC-AE-000653, Requests Relief from ASME Section XI Code Requirements of Table IWE-2500-1 for VT-3 Visual Exam of Seals & Gaskets on Airlocks,Hatches & Other Devices Required to Assure Containment leak-tight Integrity,Per 10CFR50.55a(a)(3)(i)1999-10-0707 October 1999 Requests Relief from ASME Section XI Code Requirements of Table IWE-2500-1 for VT-3 Visual Exam of Seals & Gaskets on Airlocks,Hatches & Other Devices Required to Assure Containment leak-tight Integrity,Per 10CFR50.55a(a)(3)(i) NOC-AE-000610, Requests Relief from ASME Section XI Code Nondestructive Exam Requirements of IWA-5250(a)(2) for Second Inservice Insp Interval,Per Provisions of 10CFR50.55a(3)(i)1999-10-0707 October 1999 Requests Relief from ASME Section XI Code Nondestructive Exam Requirements of IWA-5250(a)(2) for Second Inservice Insp Interval,Per Provisions of 10CFR50.55a(3)(i) ML20217C3221999-10-0707 October 1999 Forwards Insp Repts 50-498/99-16 & 50-499/99-16 on 990808-0918.No Violations Noted.Insp Generally Characterized by safety-conscious Operations,Sound Engineering & Maint Practices & Careful Radiological Work Controls NOC-AE-000664, Forwards Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 COLR & Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr1999-09-30030 September 1999 Forwards Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 COLR & Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr ML20212L1651999-09-30030 September 1999 Responds to STP Nuclear Operating Co 981012 & s Which Provided Update to TS Bases Pages B 3/4 8-14 Through B 3/4 8-17.NRC Staff Found Change Consistent with TS 3/4.8.2 DC Sources. Staff Found & Deleted Typographical Error 05000499/LER-1999-006, Forwards LER 99-006-00,re Entry Into TS 3.0.3.Licensee Commitments Listed in Corrective Actions Section of Attachment1999-09-30030 September 1999 Forwards LER 99-006-00,re Entry Into TS 3.0.3.Licensee Commitments Listed in Corrective Actions Section of Attachment ML20212K8071999-09-30030 September 1999 Informs That on 990916,NRC Staff Completed mid-cycle Plant Performance Review (PPR) of Facility.Staff Conducted Reviews of All Operating NPPs to Integrate Performance Info & to Plan for Insp Activities at Facility ML20212M2661999-09-30030 September 1999 Forwards Order Approving Transfer of Licenses for Beaver Valley from Dlc to Pennsylvania Power Co & Approving Conforming Amends in Response to 990505 Application ML20216J9621999-09-30030 September 1999 Forwards Insp Repts 50-334/99-05 & 50-412/99-05 on 990725-0904.Two Violations Noted & Being Treated as Ncvs.One Violation Re Failure to Follow Operation Manual Procedure Associated with Configuration Control Identified ML20212J7141999-09-29029 September 1999 Forwards Insp Repts 50-498/99-15 & 50-499/99-15 on 990920-24 at South Texas Project Electric Generating Station.No Violations Noted.Insp Covered Requalification Training Program & Observation of Requalification Activities NOC-AE-000646, Informs NRC That STP Nuclear Operating Co Is Y2K Ready IAW Nei/Nusmg 97-07 Guidelines & Also Provides Response to NRC Ltr1999-09-28028 September 1999 Informs NRC That STP Nuclear Operating Co Is Y2K Ready IAW Nei/Nusmg 97-07 Guidelines & Also Provides Response to NRC Ltr L-99-149, Informs NRC That Items Identified in 990629 Response to GL 98-01 Have Been Completed.Attached Table Submitted with Has Been Updated to Reflect Completion1999-09-28028 September 1999 Informs NRC That Items Identified in 990629 Response to GL 98-01 Have Been Completed.Attached Table Submitted with Has Been Updated to Reflect Completion ML20212J0651999-09-27027 September 1999 Discusses Licensee 980330 Response to GL 97-06, Degradation of SG Internals. Concludes That Response to GL Provides Reasonable Assurance That Condition of SG Internals in Compliance with Current Licensing Bases for Facility ML20212F1791999-09-24024 September 1999 Discusses 990923 Meeting Conducted in Region IV Ofc Re Status of Activities to Support Confirmatory Order, ,modifying OL & to Introduce New Director,Safety Quality Concerns Program.List of Attendees Encl L-99-148, Notifies NRC of License Withdrawal of M Linch,License SOP-11478 IAW 10CFR50.74.M Linch Resigned from Employment at Bvps,Effective 9908171999-09-24024 September 1999 Notifies NRC of License Withdrawal of M Linch,License SOP-11478 IAW 10CFR50.74.M Linch Resigned from Employment at Bvps,Effective 990817 ML20212E9091999-09-23023 September 1999 Discusses GL 98-01, Year 2000 Readiness of Computer Sys at Npps, Supplement 1 & STP Nuclear Operating Co Response for STP Dtd 990629.Understands That at Least One Sys or Component Listed May Have Potential to Cause Transient ML20212G0601999-09-23023 September 1999 Forwards Answer of Duquesne Light Co to Petition to Waive Time Limits & Suppl Comments of Local 29, Intl Brotherhood of Electrical Workers.Copies of Answer Have Been Served to Parties & Petitioner by e-mail or Facsimile ML20212F2111999-09-22022 September 1999 Forwards Review of SG 90-day Rept, South Texas Unit-2 Cycle 7 Voltage-Based Repair Criteria Rept, Submitted by Util on 990119 NOC-AE-000633, Forwards Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment. Rept Satisfies Reporting Requirements of NEI 97-06,dtd Dec 19971999-09-21021 September 1999 Forwards Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment. Rept Satisfies Reporting Requirements of NEI 97-06,dtd Dec 1997 NOC-AE-000634, Forwards Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Povs. MOV design-basis Review Checklist,Encl1999-09-21021 September 1999 Forwards Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Povs. MOV design-basis Review Checklist,Encl ML20212C5521999-09-21021 September 1999 Forwards for Filing,Answer to Firstenergy Nuclear Operating Co & Pennsylvania Power Co in Opposition to Petition to Waive Time Limits & Suppl Comments of Local 29 Intl Brotherhood of Electrical Workers NOC-AE-000649, Forwards Current Annual Financial Data for STP Electric Generating Station Per 10CFR50.71(b),acting on Behalf of Central Power & Light Co,City of Austin,Tx,City Public Svc Board of San Antonio & Hl&P1999-09-21021 September 1999 Forwards Current Annual Financial Data for STP Electric Generating Station Per 10CFR50.71(b),acting on Behalf of Central Power & Light Co,City of Austin,Tx,City Public Svc Board of San Antonio & Hl&P 05000499/LER-1999-005, Forwards LER 99-005-00,re Esfa Following Loss of Power to Standby Transformer 2 Due to Electrical Fault.Licensee Commitments Are Listed in Corrective Actions Section of LER1999-09-20020 September 1999 Forwards LER 99-005-00,re Esfa Following Loss of Power to Standby Transformer 2 Due to Electrical Fault.Licensee Commitments Are Listed in Corrective Actions Section of LER L-99-144, Forwards NRC Form 536 Which Addresses Util Proposed Operator Licensing Exam Schedule,In Response to Administrative Ltr 99-031999-09-20020 September 1999 Forwards NRC Form 536 Which Addresses Util Proposed Operator Licensing Exam Schedule,In Response to Administrative Ltr 99-03 ML20212D9171999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of South Texas Project & Identified No Areas in Which Performance Warranted Insp Beyond Core Insp Program.Details of Insp Plan Through Mar 2000 & Historical Listing of Plant Issues,Encl ML20212B3291999-09-16016 September 1999 Forwards for Filing,Petition to Waive Time Limits in 10CFR2.1305 & Supplemental Comments of Local 29,Intl Brotherhood of Electrical Workers Re Beaver Valley Power Station,Units 1 & 2 L-99-134, Provides Addl Info to Support 990617 LAR 127,proposing Mods to Heatup,Cooldown & Overpressure Protection Curves.Info Is Provided to Formally Docket Info Discussed During 990820 Telcon with NRC1999-09-15015 September 1999 Provides Addl Info to Support 990617 LAR 127,proposing Mods to Heatup,Cooldown & Overpressure Protection Curves.Info Is Provided to Formally Docket Info Discussed During 990820 Telcon with NRC ML20216F5471999-09-15015 September 1999 Discusses 990914 Meeting Conducted at Region Iv.Meeting Was Requested by Staff to Introduce New Management Organization to Region IV & to Discuss General Plant Performance & Mgt Challenges IR 05000498/19990121999-09-14014 September 1999 Forwards Insp Repts 50-498/99-12 & 50-499/99-12 on 990816-19.Three Violations Occurred & Being Treated as Ncvs. Areas Examined During Insp Included Portions of Access Authorization & Physical Security Programs 05000498/LER-1999-007, Forwards LER 99-007-00 Re Train 'B' CR Makeup & Cleanup Filtration Sys Being Inoperable for Greater than Aot.Util Intends to Append Addl Info Section of LER with Brief Description of Test Results,Rather than Submit Separate LER1999-09-13013 September 1999 Forwards LER 99-007-00 Re Train 'B' CR Makeup & Cleanup Filtration Sys Being Inoperable for Greater than Aot.Util Intends to Append Addl Info Section of LER with Brief Description of Test Results,Rather than Submit Separate LER ML20211P7671999-09-0909 September 1999 Forwards SER Authorizing Licensee 990517 Alternative Proposed in Relief Request RR-ENG-2-8 to Code Case N-491-2 for Second 10-year Insp Interval of South Texas Project, Units 1 & 2,pursuant to 10CFR50.55a(a)(3)(i) ML20211P7871999-09-0909 September 1999 Forwards Safety Evaluation Re First 10-yr Interval Inservice Insp Program Plan Request for Relief RR-ENG-31 ML20211P8201999-09-0909 September 1999 Forwards SE Authorizing 990224 Submittal of First 10-year Interval ISI Program Plan - Relief Request RR-ENG-24,from ASME Section XI Code,Table IWC-2500-1 NOC-AE-000638, Forwards License Renewal Applications & Certifications of Medical Exam for Seven Listed Licensed Operators at Stp,Per 10CFR55.57.Encl Withheld,Per 10CFR2.790(a)(6)1999-09-0909 September 1999 Forwards License Renewal Applications & Certifications of Medical Exam for Seven Listed Licensed Operators at Stp,Per 10CFR55.57.Encl Withheld,Per 10CFR2.790(a)(6) ML20211Q3431999-09-0808 September 1999 Informs That During 990903 Telcon Between L Briggs & T Kuhar,Arrangements Were Made for NRC to Inspect Licensed Operator Requalification Program at Plant,Unit 1.Insp Planned for Wk of 991115 1999-09-09 Category:INCOMING CORRESPONDENCE MONTHYEARNOC-AE-000675, Forwards Clarification on Items Included in 990531 Response to RAI Re Proposed License Amend Associated with Operator Action for Sbloca,As Requested1999-10-21021 October 1999
[Table view]Forwards Clarification on Items Included in 990531 Response to RAI Re Proposed License Amend Associated with Operator Action for Sbloca,As Requested NOC-AE-000680, Forwards Rev 5 to 0PGP03-ZV-0001, Severe Weather Plan1999-10-20020 October 1999 Forwards Rev 5 to 0PGP03-ZV-0001, Severe Weather Plan NOC-AE-000683, Forwards 30-day Rept Concerning Significant Changes to Accepted Large Break Loss of Coolant Accident ECCS Evaluation Model for South Tx Project,Units 1 & 2,IAW 10CFR50.46(a)(3)(ii)1999-10-19019 October 1999 Forwards 30-day Rept Concerning Significant Changes to Accepted Large Break Loss of Coolant Accident ECCS Evaluation Model for South Tx Project,Units 1 & 2,IAW 10CFR50.46(a)(3)(ii) NOC-AE-000674, Forwards Requested Estimates of Needs for Operator Licensing Exams,Per AL-99-03, Operator Licensing National Exam Schedule1999-10-12012 October 1999 Forwards Requested Estimates of Needs for Operator Licensing Exams,Per AL-99-03, Operator Licensing National Exam Schedule 05000498/LER-1999-008, Forwards LER 99-008-00 Re Turbine Trip That Occurred While Performing Main Turbine Emergency Trip Test.Commitments Made by Licensee Are Listed in Corrective Actions Section of LER1999-10-12012 October 1999 Forwards LER 99-008-00 Re Turbine Trip That Occurred While Performing Main Turbine Emergency Trip Test.Commitments Made by Licensee Are Listed in Corrective Actions Section of LER L-99-143, Informs That Subsequent Review of Approval Ltrs & SE for Relief Requests 1TYP-2-B5.40-1 (Rev 0),BV1-RV-AUG (Rev 1), BV2-RV-AUG (Rev 1),BV3-IWA-1 (Rev 1) & BV3-IWA-2 (Rev 1) Identified Erroneous Statements Which Dl Wishes to Correct1999-10-11011 October 1999 Informs That Subsequent Review of Approval Ltrs & SE for Relief Requests 1TYP-2-B5.40-1 (Rev 0),BV1-RV-AUG (Rev 1), BV2-RV-AUG (Rev 1),BV3-IWA-1 (Rev 1) & BV3-IWA-2 (Rev 1) Identified Erroneous Statements Which Dl Wishes to Correct L-99-152, Submits Relief Request BV3-N-533-1,rev 0,requesting Use of ASME Approved Code Case N-553-1, Alternative Requirements for VT-2 Visual Examination of Class 1,2 & 3 Insulated Pressure Retaining Bolted Connections1999-10-11011 October 1999 Submits Relief Request BV3-N-533-1,rev 0,requesting Use of ASME Approved Code Case N-553-1, Alternative Requirements for VT-2 Visual Examination of Class 1,2 & 3 Insulated Pressure Retaining Bolted Connections L-99-151, Responds to NRC Re Violations Noted in Insp Rept 50-412/99-07.Corrective Actions:Condition Repts Were Written for Listed Issues So That Repts Could Be Addressed Using BVPS Corrective Action Program1999-10-0707 October 1999 Responds to NRC Re Violations Noted in Insp Rept 50-412/99-07.Corrective Actions:Condition Repts Were Written for Listed Issues So That Repts Could Be Addressed Using BVPS Corrective Action Program NOC-AE-000610, Requests Relief from ASME Section XI Code Nondestructive Exam Requirements of IWA-5250(a)(2) for Second Inservice Insp Interval,Per Provisions of 10CFR50.55a(3)(i)1999-10-0707 October 1999 Requests Relief from ASME Section XI Code Nondestructive Exam Requirements of IWA-5250(a)(2) for Second Inservice Insp Interval,Per Provisions of 10CFR50.55a(3)(i) NOC-AE-000653, Requests Relief from ASME Section XI Code Requirements of Table IWE-2500-1 for VT-3 Visual Exam of Seals & Gaskets on Airlocks,Hatches & Other Devices Required to Assure Containment leak-tight Integrity,Per 10CFR50.55a(a)(3)(i)1999-10-0707 October 1999 Requests Relief from ASME Section XI Code Requirements of Table IWE-2500-1 for VT-3 Visual Exam of Seals & Gaskets on Airlocks,Hatches & Other Devices Required to Assure Containment leak-tight Integrity,Per 10CFR50.55a(a)(3)(i) NOC-AE-000625, Requests Partial Relief from ASME Section XI Visual Exam Requirements of IWA-5242(a).Relief Request Is Based on Provisions of Draft ASME Section XI Code Case N-616,which Is Expected to Be Published in Near Future1999-10-0707 October 1999 Requests Partial Relief from ASME Section XI Visual Exam Requirements of IWA-5242(a).Relief Request Is Based on Provisions of Draft ASME Section XI Code Case N-616,which Is Expected to Be Published in Near Future NOC-AE-000664, Forwards Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 COLR & Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr1999-09-30030 September 1999 Forwards Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 COLR & Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr 05000499/LER-1999-006, Forwards LER 99-006-00,re Entry Into TS 3.0.3.Licensee Commitments Listed in Corrective Actions Section of Attachment1999-09-30030 September 1999 Forwards LER 99-006-00,re Entry Into TS 3.0.3.Licensee Commitments Listed in Corrective Actions Section of Attachment NOC-AE-000646, Informs NRC That STP Nuclear Operating Co Is Y2K Ready IAW Nei/Nusmg 97-07 Guidelines & Also Provides Response to NRC Ltr1999-09-28028 September 1999 Informs NRC That STP Nuclear Operating Co Is Y2K Ready IAW Nei/Nusmg 97-07 Guidelines & Also Provides Response to NRC Ltr L-99-149, Informs NRC That Items Identified in 990629 Response to GL 98-01 Have Been Completed.Attached Table Submitted with Has Been Updated to Reflect Completion1999-09-28028 September 1999 Informs NRC That Items Identified in 990629 Response to GL 98-01 Have Been Completed.Attached Table Submitted with Has Been Updated to Reflect Completion L-99-148, Notifies NRC of License Withdrawal of M Linch,License SOP-11478 IAW 10CFR50.74.M Linch Resigned from Employment at Bvps,Effective 9908171999-09-24024 September 1999 Notifies NRC of License Withdrawal of M Linch,License SOP-11478 IAW 10CFR50.74.M Linch Resigned from Employment at Bvps,Effective 990817 ML20212G0601999-09-23023 September 1999 Forwards Answer of Duquesne Light Co to Petition to Waive Time Limits & Suppl Comments of Local 29, Intl Brotherhood of Electrical Workers.Copies of Answer Have Been Served to Parties & Petitioner by e-mail or Facsimile ML20212C5521999-09-21021 September 1999 Forwards for Filing,Answer to Firstenergy Nuclear Operating Co & Pennsylvania Power Co in Opposition to Petition to Waive Time Limits & Suppl Comments of Local 29 Intl Brotherhood of Electrical Workers NOC-AE-000634, Forwards Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Povs. MOV design-basis Review Checklist,Encl1999-09-21021 September 1999 Forwards Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Povs. MOV design-basis Review Checklist,Encl NOC-AE-000633, Forwards Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment. Rept Satisfies Reporting Requirements of NEI 97-06,dtd Dec 19971999-09-21021 September 1999 Forwards Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment. Rept Satisfies Reporting Requirements of NEI 97-06,dtd Dec 1997 NOC-AE-000649, Forwards Current Annual Financial Data for STP Electric Generating Station Per 10CFR50.71(b),acting on Behalf of Central Power & Light Co,City of Austin,Tx,City Public Svc Board of San Antonio & Hl&P1999-09-21021 September 1999 Forwards Current Annual Financial Data for STP Electric Generating Station Per 10CFR50.71(b),acting on Behalf of Central Power & Light Co,City of Austin,Tx,City Public Svc Board of San Antonio & Hl&P 05000499/LER-1999-005, Forwards LER 99-005-00,re Esfa Following Loss of Power to Standby Transformer 2 Due to Electrical Fault.Licensee Commitments Are Listed in Corrective Actions Section of LER1999-09-20020 September 1999 Forwards LER 99-005-00,re Esfa Following Loss of Power to Standby Transformer 2 Due to Electrical Fault.Licensee Commitments Are Listed in Corrective Actions Section of LER L-99-144, Forwards NRC Form 536 Which Addresses Util Proposed Operator Licensing Exam Schedule,In Response to Administrative Ltr 99-031999-09-20020 September 1999 Forwards NRC Form 536 Which Addresses Util Proposed Operator Licensing Exam Schedule,In Response to Administrative Ltr 99-03 ML20212B3291999-09-16016 September 1999 Forwards for Filing,Petition to Waive Time Limits in 10CFR2.1305 & Supplemental Comments of Local 29,Intl Brotherhood of Electrical Workers Re Beaver Valley Power Station,Units 1 & 2 L-99-134, Provides Addl Info to Support 990617 LAR 127,proposing Mods to Heatup,Cooldown & Overpressure Protection Curves.Info Is Provided to Formally Docket Info Discussed During 990820 Telcon with NRC1999-09-15015 September 1999 Provides Addl Info to Support 990617 LAR 127,proposing Mods to Heatup,Cooldown & Overpressure Protection Curves.Info Is Provided to Formally Docket Info Discussed During 990820 Telcon with NRC 05000498/LER-1999-007, Forwards LER 99-007-00 Re Train 'B' CR Makeup & Cleanup Filtration Sys Being Inoperable for Greater than Aot.Util Intends to Append Addl Info Section of LER with Brief Description of Test Results,Rather than Submit Separate LER1999-09-13013 September 1999 Forwards LER 99-007-00 Re Train 'B' CR Makeup & Cleanup Filtration Sys Being Inoperable for Greater than Aot.Util Intends to Append Addl Info Section of LER with Brief Description of Test Results,Rather than Submit Separate LER NOC-AE-000638, Forwards License Renewal Applications & Certifications of Medical Exam for Seven Listed Licensed Operators at Stp,Per 10CFR55.57.Encl Withheld,Per 10CFR2.790(a)(6)1999-09-0909 September 1999 Forwards License Renewal Applications & Certifications of Medical Exam for Seven Listed Licensed Operators at Stp,Per 10CFR55.57.Encl Withheld,Per 10CFR2.790(a)(6) L-99-138, Forwards Rev 37 to Issue 4 for BVPS Physical Security Plan (PSP) (Base Plan,Safeguards Contingency Plan & Training & Qualification Plan).Changes to Plan Are Listed.Encls Withheld Per 10CFR2.790(d)1999-09-0303 September 1999 Forwards Rev 37 to Issue 4 for BVPS Physical Security Plan (PSP) (Base Plan,Safeguards Contingency Plan & Training & Qualification Plan).Changes to Plan Are Listed.Encls Withheld Per 10CFR2.790(d) L-99-136, Forwards Data Point Library (Dpl) Changes,Iaw Provisions of 10CFR50,App E,Section VI.3.a & NUREG-1394,Rev 1,Section 3.6, Administrative Implementation Requirements. Ten Listed Dpls Have Specific Setpoint Values Removed,Per Unit 2 Dpls1999-09-0202 September 1999 Forwards Data Point Library (Dpl) Changes,Iaw Provisions of 10CFR50,App E,Section VI.3.a & NUREG-1394,Rev 1,Section 3.6, Administrative Implementation Requirements. Ten Listed Dpls Have Specific Setpoint Values Removed,Per Unit 2 Dpls L-99-098, Forwards Proposed Changes to Bvps,Units 1 & 2 Operations QA Program Description,Iaw 10CFR50.54(a)(3)(ii).Change Would Reduce Operations QA Program Description Commitments by Limiting Required Onsite Safety Committee Reviews of Mods1999-09-0202 September 1999 Forwards Proposed Changes to Bvps,Units 1 & 2 Operations QA Program Description,Iaw 10CFR50.54(a)(3)(ii).Change Would Reduce Operations QA Program Description Commitments by Limiting Required Onsite Safety Committee Reviews of Mods L-99-137, Forwards Issue 3,rev 3 to Bvps,Unit 1 Inservice Testing Program for Pumps & Valves. Encl 1 Provides Summary of IST Program Changes Which Have Been Incorporated Into Issue 3, Rev 31999-08-31031 August 1999 Forwards Issue 3,rev 3 to Bvps,Unit 1 Inservice Testing Program for Pumps & Valves. Encl 1 Provides Summary of IST Program Changes Which Have Been Incorporated Into Issue 3, Rev 3 L-99-022, Forwards Issue 2,Rev 1 to Bvps,Unit 2 Inservice Testing (IST) Program for Pumps & Valves. Summary of Changes,Encl1999-08-31031 August 1999 Forwards Issue 2,Rev 1 to Bvps,Unit 2 Inservice Testing (IST) Program for Pumps & Valves. Summary of Changes,Encl NOC-AE-000562, Requests Relief from Contruction Code non-destructive Exam Requirements for Repair/Replacement Activities During Second Inservice Insp Interval of Units 1 & 2,IAW Provisions of 10CFR50.55a(a)(3)(i)1999-08-31031 August 1999 Requests Relief from Contruction Code non-destructive Exam Requirements for Repair/Replacement Activities During Second Inservice Insp Interval of Units 1 & 2,IAW Provisions of 10CFR50.55a(a)(3)(i) L-99-037, Forwards Proposed Change to Bvps,Units 1 & 2 Operations QA Program Description,Iaw 10CFR50.54(a)(3)(ii).Attachment 1 Further Describes Proposed Change & Identifies Reason for Change1999-08-30030 August 1999 Forwards Proposed Change to Bvps,Units 1 & 2 Operations QA Program Description,Iaw 10CFR50.54(a)(3)(ii).Attachment 1 Further Describes Proposed Change & Identifies Reason for Change L-99-012, Forwards Proposed Change to Bvps,Units 1 & 2,operations QA Program Description,Per 10CFR50.54(a)(3)(ii),including Description of Proposed Change,Reason for Change & Basis for Concluding Revised Program Satisfy 10CFR50,App B1999-08-30030 August 1999 Forwards Proposed Change to Bvps,Units 1 & 2,operations QA Program Description,Per 10CFR50.54(a)(3)(ii),including Description of Proposed Change,Reason for Change & Basis for Concluding Revised Program Satisfy 10CFR50,App B L-99-132, Forwards fitness-for-duty Program Six Month Rept for 990101-990630 for Bvps,Units 1 & 21999-08-26026 August 1999 Forwards fitness-for-duty Program Six Month Rept for 990101-990630 for Bvps,Units 1 & 2 NOC-AE-000617, Forwards semi-annual Fitness for Duty Program Performance Rept for 990101-990630,IAW 10CFR26.71(d)1999-08-26026 August 1999 Forwards semi-annual Fitness for Duty Program Performance Rept for 990101-990630,IAW 10CFR26.71(d) NOC-AE-000585, Provides Notification That South Texas Project Has Completed Integrity Evaluation of Units 1 & 2 Reactor Coolant Pump Casings Required by Paragraph (D) of Code Case N-4811999-08-25025 August 1999 Provides Notification That South Texas Project Has Completed Integrity Evaluation of Units 1 & 2 Reactor Coolant Pump Casings Required by Paragraph (D) of Code Case N-481 05000412/LER-1999-007, Forwards LER 99-007-00, Forced Shutdown Due to Inoperable EDG, Per 10CFR50.73(a)(2)(i).Rept Is Delayed Due to Util Needing Addl Three Days to Address Event Issues on Reportability & Provide Addl Safety Implications Info1999-08-19019 August 1999 Forwards LER 99-007-00, Forced Shutdown Due to Inoperable EDG, Per 10CFR50.73(a)(2)(i).Rept Is Delayed Due to Util Needing Addl Three Days to Address Event Issues on Reportability & Provide Addl Safety Implications Info L-99-127, Provides Response to NRC Ltr Requesting Review & Comment of NRC Reactor Vessel Structural Integrity Database by 990901.Inconsistencies Noted in Way Data Characterizes Condition of Reactor Vessel1999-08-17017 August 1999 Provides Response to NRC Ltr Requesting Review & Comment of NRC Reactor Vessel Structural Integrity Database by 990901.Inconsistencies Noted in Way Data Characterizes Condition of Reactor Vessel L-99-124, Requests Withdrawal of Editorial Changes That Do Not Pertain to Transfer of Operating Authority or Plant Ownership That Are Proposed in LARs 269 & 144.Revised mark-up License Pages Reflecting Changes,Attached1999-07-30030 July 1999 Requests Withdrawal of Editorial Changes That Do Not Pertain to Transfer of Operating Authority or Plant Ownership That Are Proposed in LARs 269 & 144.Revised mark-up License Pages Reflecting Changes,Attached NOC-AE-000603, Informs of Addition of Restriction to SRO License 42658, for KM Espinoza,Effective 990721,per 10CFR50.74.Encl Info Withheld,Per 10CFR2.790(a)(6)1999-07-29029 July 1999 Informs of Addition of Restriction to SRO License 42658, for KM Espinoza,Effective 990721,per 10CFR50.74.Encl Info Withheld,Per 10CFR2.790(a)(6) NOC-AE-000470, Forwards Amend 12 to STP Fire Hazards Analysis Rept. Summary of Changes Made Under Provision of 10CFR50.59 Also Encl1999-07-28028 July 1999 Forwards Amend 12 to STP Fire Hazards Analysis Rept. Summary of Changes Made Under Provision of 10CFR50.59 Also Encl L-99-121, Submits Data Point Library (Dpl) Changes,Iaw Requirements of 10CFR50,App E,Section VI.3.a & NUREG-1394,rev 1,Section 3.6, Administrative Implementation Reqiurements1999-07-28028 July 1999 Submits Data Point Library (Dpl) Changes,Iaw Requirements of 10CFR50,App E,Section VI.3.a & NUREG-1394,rev 1,Section 3.6, Administrative Implementation Reqiurements NOC-AE-000599, Forwards STP Unit 1,Cycle 9 Startup Testing Summary Rept. No New Licensing Commitments Contained in Ltr1999-07-28028 July 1999 Forwards STP Unit 1,Cycle 9 Startup Testing Summary Rept. No New Licensing Commitments Contained in Ltr 05000498/LER-1999-006, Forwards LER 99-006-00 Re Automatic Reactor Trip Due to over-temp delta-temp Actuation.Licensee Commitments Are Listed in Corrective Actions Section of LER1999-07-26026 July 1999 Forwards LER 99-006-00 Re Automatic Reactor Trip Due to over-temp delta-temp Actuation.Licensee Commitments Are Listed in Corrective Actions Section of LER NOC-AE-000582, Forwards 1RE08 ISI Summary Rept for Welds & Component Supports of STP Electric Generating Station,Unit 1. Summary Rept Satisfies Reporting Requirements of IWA-6000 of Section XI for Welds & Component Supports1999-07-26026 July 1999 Forwards 1RE08 ISI Summary Rept for Welds & Component Supports of STP Electric Generating Station,Unit 1. Summary Rept Satisfies Reporting Requirements of IWA-6000 of Section XI for Welds & Component Supports NOC-AE-000589, Forwards Rev to 1RE08 ISI Summary Repts for Repairs & Replacements & for Sys Pressure Tests,Corecting Date of End of Insp Interval Provided in Item 9 of from NIS-1 from 09/24/99 to 09/24/20001999-07-26026 July 1999 Forwards Rev to 1RE08 ISI Summary Repts for Repairs & Replacements & for Sys Pressure Tests,Corecting Date of End of Insp Interval Provided in Item 9 of from NIS-1 from 09/24/99 to 09/24/2000 L-99-118, Forwards Response to NRC AL 99-02,request for Info Re Estimate of Number of New Licensing Actions Expected to Be Submitted in Fy 2000 & 20011999-07-25025 July 1999 Forwards Response to NRC AL 99-02,request for Info Re Estimate of Number of New Licensing Actions Expected to Be Submitted in Fy 2000 & 2001 NOC-AE-000597, Forwards voltage-based Criteria 90-day Rept for SG Tube Exam Performed Under NRC GL 95-05 During Refueling Outage 1RE08. Rept Contains Info Required by Section 6.b of Attachment 2 to GL 95-051999-07-23023 July 1999 Forwards voltage-based Criteria 90-day Rept for SG Tube Exam Performed Under NRC GL 95-05 During Refueling Outage 1RE08. Rept Contains Info Required by Section 6.b of Attachment 2 to GL 95-05 1999-09-09 Category:RESEARCH INSTITUTION/LABORATORY TO NRC MONTHYEARML17261A8541989-01-13013 January 1989
[Table view]Discusses 890110-11 Meetings Re Nozzle Sizing Study.Most Accurate Sizing Obtained by Collecting Data of Edge Diffracted Waves from Geometric Extremities of Flaw ML20235T9821988-06-0909 June 1988 Forwards Comments on Emergency Response Capability Scenario. No Major Deficiencies Noted ML19324A1111988-05-19019 May 1988 Forwards Memo Describing Results of Testing of Plant Bolting Matls Under FIN A-3866,Task Assignment 12 ML19324B2701988-03-0202 March 1988 Forwards Rept on Metallurgical Evaluation of Five Bolts Obtained from Farley Plant.Bolts Found Acceptable ML20214Q3501987-04-21021 April 1987 Forwards EGG-NTA-7681, Audit of Pump & Valve Operability Assurance Program for South Texas Project,Unit 1. Several Specific & Generic Issues Identified That Applicant Must Resolve Before Fuel Load ML20214R6811987-03-25025 March 1987 Forwards Technical Evaluation Rept Re Licensee Isolator Test Rept.Isolators Qualified for Use in Class 1E Sys ML20207R7571987-03-10010 March 1987 Forwards Technical Evaluation Rept Input for South Texas Initial Plant Test Program Through FSAR Amend 56,Feb 1987 Sser & & Beaver Valley Unit 2 Initial Plant Test Program Through FSAR Amend 15 & Nov 1986 Sser ML20207S5001987-03-0606 March 1987 Forwards Technical Evaluation Repts for Domestic Mark III Plants (Grand Gulf,Clinton,River Bend & Perry) & Gessar Ii. Inserts to Be Included in Section 6.2.1.8 of Draft Sser 2 for Clinton,River Bend & Perry Plants Also Encl ML20195F8651986-10-31031 October 1986 Forwards Request for Addl Info Re MSIV Operability at Facility,Based on Initial Review of Util Rept Entitled, Final Rept 10CFR50.55(e) MSIV Actuators, Forwarded by Util ML20206H3211986-09-10010 September 1986 Forwards Summary Repts from 860811-14 Visit to Kewaunee Nuclear Station & 851002-03 Visit to Cooper Nuclear Station Re Generic Issue 83 on Control Room Habitability ML20206J6001986-08-0808 August 1986 Advises That NUREG-0956 Support Calculations Using ORNL Trends Code to Evaluate Influence of Containment Chemistry or Retention of Hi Can Also Provide Useful Info for General NUREG-1150 Issue Paper,Per Telcon Discussion ML20206H1131986-06-23023 June 1986 Submits DHEAT2 Parametric Calculations for Plant,Per 860620 Discussions.Calculations Run Assuming Any Steam Spike Would Develop Too Slowly to Contribute to DCH Peak Pressure ML20214E1721986-02-25025 February 1986 Ack Receipt of 860210 & 21 Ltrs Accepting Task Orders 3 & 4 Under FIN A-3552 & Task Order 5,respectively.Orders Include Work at Palisades & LaSalle Stations & Mod Review at Davis-Besse.Modified Task Order 4 Under FIN A-3550 Encl ML20206J2521986-01-24024 January 1986 Forwards Early Draft of Executive Summary from Analysis of Station Blackout Accidents for Bellefonte PWR, Per Request. Initial Draft of Rept Scheduled to Be Completed by 860315 ML20206J3681986-01-15015 January 1986 Discusses Latest Calculations of Molecular Iodine (I2) & Organic Iodide (CH3I) Scrubbing During TC1 Sequence from Draft Plant Rept ML20136F4771985-12-31031 December 1985 Forwards PNL-5718, Review of Tdi Diesel Generator Owners Group Engine Requalification Program,Final Rept, Technical Evaluation Rept ML20206J4031985-12-13013 December 1985 Summarizes Preliminary Scoping Calculations for Molecular Iodine (I2) Scrubbing in BWR Pressure Suppression Pools. Calculations Made for Most Recent TC1 Sequence in Draft Plant Rept ML20133A3141985-09-27027 September 1985 Forwards Review of Section 4.7 of Technical Evaluation Rept PNL-5600, Review of Resolution of Known Problems in Engine Components for Tdi Emergency Diesel Generators, Reflecting Views Re Crankshafts for 16-cylinder Engines ML20128H7371985-06-27027 June 1985 Forwards Rev 1 to Review of Engine Base & Bearing Caps for Tdi DSRV-12,DSRV-16 & DSRV-20 Diesel Engines, Technical Evaluation Rept ML20141N2981985-05-29029 May 1985 Requests Listed Addl Info Re S&W 1982 Rept, Ultimate Pressure Capacity of Shoreham Primary Containment ML20126E8721985-05-24024 May 1985 Forwards PNL-5200-3, Review of Emergency Diesel Generator Engine & Auxiliary Module Wiring & Terminations, Dtd May 1985 ML20133N7721985-03-27027 March 1985 Forwards Info Telecopied on 850325 Re Locational Distribution of Three Fission Product Species for Surry V Sequence & Time Dependent Release for Fission Product Groups for Peach Bottom ML20214F5101985-03-13013 March 1985 Forwards List of Questions Re Plant Pra,Per 850512 Telcon. Statement of Work, Review of PRA for Seabrook Nuclear Power Plant, Encl ML20134A1011985-02-20020 February 1985 Submits Results of Noble Gas Release Sequences Using March Code for Facilities ML20133N3461985-02-20020 February 1985 Discusses Review of March Results for Surry & Peach Bottom Sequences,In Order to Quantify Expected Noble Gas Releases. March Model Appropriate for Behavior of Noble Gases ML20128P3401984-12-0505 December 1984 Submits Rept for Task 1 Per M Silberberg 841116 Memo Re Concerns Re Lanthanum Releases in BMI-2104.Discusses Discrepancies in Corcon Calculations,Presents Revised Tables 6.14 & 7.16 & Recommends Reanalyses ML20138N6971984-09-18018 September 1984 Forwards Repts Re Irradiation,Decontamination & DBA Testing, Per Request of Y Korobov of Carboline Co ML20134E1591984-08-0202 August 1984 Forwards Brief Summary Rept on Leakage Characteristics of Nuclear Containment Hatches During Severe Accident. Draft of Complete Rept Will Be Mailed Later in Aug ML20127B9221984-07-20020 July 1984 Forwards PNL-5201, Review & Evaluation of Tdi Diesel Engine Reliability & Operability - Grand Gulf Nuclear Station, Unit 1 ML20127B8881984-05-21021 May 1984 Comments on May 1984 Draft Tdi Diesel Generator Owners Group Program Plan.Full Insp of One Engine to Owners Group Spec Recommended ML20093G4821984-05-0202 May 1984 Provides Summary of Battelle Subcontract W/Tdi to Evaluate Special Silicon carbide-impregnated Cylinder Liners & Piston Rings.Task Does Not Involve Dependability Tests of Tdi Engines.No Apparent Conflict Found ML20113A0201984-04-0404 April 1984 Forwards Requests for Addl Info Developed During Review of FSAR Chapter 14 Re Initial Plant Test Program.Review Conducted Through Amend 4.Listing of Items Requiring Resolution Encl ML20117C9421984-04-0303 April 1984 Forwards Proposed Radiological Source Term Input for Facility.Encl Amended to Reflect NRC Suggested Changes ML20093C5281984-03-30030 March 1984 Forwards Audit of Susquehanna Unit 2 Tech Specs, Technical Evaluation Rept ML17320A9711984-03-0606 March 1984 Forwards First Round Questions Following Evaluation of Exxon Rept, Steam Tube Rupture Incident at Prairie Island Unit 1, PTSPWR2 Vs Data,Preliminary Benchmark Analysis. ML17320A9741984-03-0505 March 1984 Forwards First Round Questions on Exxon Methodology Rept for PTSPWR2.Rept Lacks Specific Details Re Biases in Initial Conditions & Boundary Conditions ML20128N6571984-02-22022 February 1984 Comments on Draft Vols IV-VI of BMI-2104,presented at Peer Review 840126 & 27 Meetings.Comments Concern Completed Calculations for Sequoyah Ice Condenser Plant,Recalculated Surry Results & Completed Calculations for Zion Plant ML19306A0151984-02-10010 February 1984 Summarizes 840206-07 Visit to Nevada Test Site Hydrogen Burn Facility to Inspect Condition of Equipment & Cable/Splice Samples After Series of Hydrogen Burn Tests Conducted by Epri.No Indication of External Damage to Equipment Noted ML17320A9731983-11-22022 November 1983 Forwards First Round Questions on Mods to Exxon Draft Repts, PTSPWR2 Mods for St Lucie Unit 1 & Description of Exxon Plant Transient Simulation Model for Pwrs. ML17320A9721983-09-30030 September 1983 Forwards First Round Questions on Exxon Plant Transient Code,Based on Review of Proprietary Rept, Description of Exxon Nuclear Plant Transient Simulation Model for Pwrs. ML20080B5631983-08-12012 August 1983 Forwards Draft Preliminary Review of Limerick Generating Station Severe Accident Risk Assessment,Vol I:Core Melt Frequency. Rept Satisfies Milestone for Task 1 of Project 3 Under FIN A-3393 ML20211D5971983-04-11011 April 1983 Forwards Summary of Independent Development of Finite Element Models & Determination of Natural Frequencies for Piping Problems in Containment Spray Discharge Line & Accumulator Loop 4 ML20132B4961983-02-11011 February 1983 Forwards Evaluation of Generic Key Indicators for Project Engineering/Design Activities at Facilities ML20072L7101982-12-20020 December 1982 Forwards BNL 821213 Memeo Re Degraded Core Accidents at Facilities,Per Task III.3 Defined in Design Basis for Hydrogen Control Sys in CP & OL Applications. No-cost Extension to Contract Requested ML20079J5641982-12-16016 December 1982 Summarizes Findings of 821207-08 Plant Tour Re Use of PORVs or Depressurization Scheme for Removing Decay Heat.Addl Info Requested Includes General Arrangement & Isometric Drawings of Piping Near San Onofre Pressurizer ML20027D1751982-10-18018 October 1982 Responds to 820806 Request to Evaluate Rapid Depressurization & DHR Sys for C-E Plants W/O Porvs, Discussing Role of Task Action Plan A-45, Shutdown Heat Removal Requirements, in Supporting Evaluation of Facility ML20126F4791982-10-0101 October 1982 Requests Permission to Observe Upcoming Types A,B & C Tests at Listed Facilities,Per FIN B-0489, Containment Leak Rate Testing ML20072L6851982-09-21021 September 1982 Forwards Analysis of Full Core Meltdown Accidents in Grand Gulf Reactor Plant, Draft Informal Rept.Rept Satisfies Preliminary Rept Milestone for Task I Defined in Safety Evaluation of Core Melt Accidents:Cp,Ml & OL Applicants ML17276B0731982-02-10010 February 1982 Comments on Const of Two Power Reactors by Skagit/Hanford Nuclear Project at Hanford.Purchasing & Finishing Terminated Wppss Plants at Hanford & Satsop Should Be Considered as One Alternative to Proposed Action ML20098C8521976-03-26026 March 1976 Forwards Revised Concept Calculations Requested by Jc Petersen for Facilities & Results of Calculations 1989-01-13 |
Text
. -
OBaHelle Pacific Northwest Laboratories P.O. Box 999 Richland, Washington U.S.A. 99352 Telephone (509) 375-3621 Telex 15-2874 March 10, 1987 Mr. Don Hickman Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555
Dear Don:
Enclosed are the Technical Evaluation Reports for South Texas and Beaver Valley 2. If you have any questions, please feel free to call.
Sincerely, 4
%kT bd i Robert Gruel Nuclear Systems and Concept Analysis
/c Enclosures 1
xc: L Ruth, w/o Enc
)
4 0703180103 870310 h ya aoock oso g 2 , lt i
i
3-9-87 SOUTH TEXAS The following items are the TER input for the South Texas Initial Plant Test Program through FSAR Amendment 56 (11-86), SSER dated 2-87, and letter dated 1-9-86 (ST-HL-AE-1568) from M. R. Wisenburg (HP&L) to G. W. Knighton (NRC).
14.2-1 423.22 5.u Confirmatory based on 1-9-86 letter (involves 5.mm modification of this item and 640.08N, 5.mm, with regard to MSIV testing).
14.2-2 through 14.2-15 Closed.
SSER Item a. Closed (dealt with the deletion of the RTD Bypass Flow Verification Test; deletion acceptable due to plant design enodifications).
SSER Item b. FSAR 14.2.12.2.14, Main and Unit Auxiliary Transformer Acceptance Test, should be reclassified as a preoperational test as it has been modified to include testing of ESF-related components.
SSER Item c. FSAR Subsection 14.2.12.3.24, Loss of Offsite Power Test, should be reinstated (reference RG 1.68, Appendix A.S.jj and RAIs 423.33(n) and 640.30).
l l
3-9-87 BEAVER VALLEY - UNIT 2 The following items are the TER input for the Beaver Valley-2 Initial Plant Test Program through FSAR Amendment 15 (3-87) and the SSER dated 11/86.
SER ITEM RAI STATUS 6 640.20 FSAR Stibsection 14.2.12.12.6 (Miscellaneous Safety Injection Motor-Operated Valves Control and Alarm Test) should be modified to ensure that the accumulator isolation valves can open under the maximum differential pressure conditions of zero RCS pressure and maximum expected accumulator precharge pressure, or technical justification for exception to RG 1.79, Preoperational Testing of Emergency Core Cooling Systems for Pressurized Water Reactort,,
Position 1.c(2), should be provided in FSAR Table 1.8-1.
14C Closed (Amendment 13).
14D Closed (Amendment 15).
14E Closed (Amendment 15).
14F FSAR Subsection 14.2.11.2 should be revised to reinstate that approved preoperational and startup test procedures will be available for NRC review at least 60 days prior to the scheduled performance of the test and at least 60 days before fuel load, s respectively (Amendment 13 modification).
14G Justification should be provided for exception to RG 1.68, Initial Test Programs for Water-Cooled Nuclear Power Plants, Appendix A, Parts 4.c, 5.f, and 5.e, respectively, in FSAR Table 1.8-1 (Amendment 13 deletions):
FSAR Section Title 14.2.12.2.10 RCCA Pseudo Ejection Test at Zero Power _
14.2.12.2.11 Static RCCA Drop Test at 50% Power 14.2.12.2.14 RCCA Pseudo Ejection Test at Power 14H FSAR Subsection 14.2.12 should be modified to reinstate the following tests or technical justification should be provided for exception to RG 1.68.3, Preoperational Testing of instrument and Control Air Systems, Position C.2, and RG 1.68, Appendix A, Parts 1.g(1) and 1.j(10), respectively, in FSAR Table 1.8-1 (Amendment 13 deletions):
FSAR Section Title 14.2.12.52.4 Containment Instrument Air Design Verification 14.2.12.54.1 Normal AC Power Distribution Test 14.2.12.72.1 Seismic Instrumentation Test
~ - ~
14I FSAR Subsection 14.2.12.53.1, Main Generator Test, should be modified to reinstate testing of the transformer cooling systems or technical justification should be provided for exception to RG 1.68, Appendix A, Part 1.g(1), in FSAR Table 1.8-1 (Amendment 13 deletion).
14J FSAR Subsection 14.2.12.66.2, Containment Air Recirculation System Test, should be modified to reinstate recording of containment air temperatures either during hot functional testing or prior to 5%
power, or technical justification should be provided for exception to RG 1.68, Appendix A, Part 4.j, in FSAR Table 1.8-1. FSAR Figure 14.2-3 currently shows such a test at 5% power (Amendment 15 modification).