{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 March 4, 2013  
[[Issue date::March 4, 2013]]


Mr. Steven Site Vice President Duke Energy Corporation McGuire Nuclear Station MG01VP/12700 Hagers Ferry Road Huntersville, NC 28078
Mr. Steven D. Capps Site Vice President Duke Energy Corporation McGuire Nuclear Station MG01VP/12700 Hagers Ferry Road Huntersville, NC 28078


SUBJECT: ANNUAL ASSESSMENT LETTER FOR MCGUIRE NUCLEAR STATION UNITS 1 AND 2 (NRC INSPECTION REPORT 05000369/201001 AND 05000370/201001)
SUBJECT: ANNUAL ASSESSMENT LETTER FOR MCGUIRE NUCLEAR STATION UNITS 1 AND 2 (NRC INSPECTION REPORT 05000369/201001 AND 05000370/201001)
Dear Mr. Ca pps: On February 12, 2013, the NRC completed its end-of-cycle performance review of the McGuire Nuclear Station Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2012, through December 31, 2012. This letter informs y ou of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.


==Dear Mr. Capps:==
The NRC determined that overall McGuire Units 1 and 2 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance for both units during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., Green) safety significance and all PIs indicated that your performance was within the nominal, expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
On February 12, 2013, the NRC completed its end-of-cycle performance review of the McGuire Nuclear Station Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2012, through December 31, 2012. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.


The NRC determined that overall McGuire Units 1 and 2 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance for both units during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., Green) safety significance and all PIs indicated that your performance was within the nominal, expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through June 30, 2014. Routine inspections performed by resident inspectors are not included in the inspection plan. We will also be performing an Independent Spent Fuel Storage Installation Initial Campaign inspection; Temporary Instruction 182, Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping; and operator licensing examinations. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.


The enclosed inspection plan lists the inspections scheduled through June 30, 2014. Routine inspections performed by resident inspectors are not included in the inspection plan. We will also be performing an Independent Spent Fuel Storage Installation Initial Campaign inspection; Temporary Instruction 182, Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping; and operator licensing examinations. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
S. Capps 2 In accordance with 10 CFR 2.390 of the NRC
=s A Rules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


Please contact me at 404-997-4607 with any questions you have regarding this letter.
Please contact me at 404-997-4607 with any questions you have regarding this letter.
Line 38: Line 38:
===Enclosure:===
===Enclosure:===
McGuire Nuclear Station Inspection/
McGuire Nuclear Station Inspection/
Activity Plan (03/01/2013 - 06/30/2014)
Activity Plan (03/01/2013 - 06/30/2014)  
cc w/encl: (See page 3)
 
cc w/encl: (See page 3)  
 
_________________________ X SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DRP RII:DRP SIGNATURE CWR /RA/ JHB /RA/ NAME CRapp JBartley DATE 02/27/2013 02/27/2013 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO S. Capps 3 cc w/encl: Charles J. Morris III Plant Manager Mc Guire Nuclear Station Duke Energy Corporation Electronic Mail Distribution
 
Jeffrey J. Nolin Design Engineering Manager McGuire Nuclear Station Duke Energy Corporation Electronic Mail Distribution H. Duncan Brewer Organizational Effectiveness Manager McGuire Nuclear Station Duke Energy Corporation Electronic Mail Distribution
 
Kenneth L. Ashe
 
Regulatory Compliance Manager McGuire Nuclear Station Duke Energy Corporation Electronic Mail Distribution
 
Kay L. Crane Senior Licensing Specialist McGuire Nuclear Station Duke Energy Corporation Electronic Mail Distribution
 
Joseph Michael Frisco, Jr.
 
Vice President, Nuclear Design Engineering
 
General Office Duke Energy Corporation Electronic Mail Distribution
 
M. Christopher Nolan
 
Director - Regulatory Affairs General Office Duke Energy Corporation Electronic Mail Distribution
 
David A. Cummings (acting)
Fleet Regulatory Compliance & Licensing Manager General Office Duke Energy Corporation Electronic Mail Distribution Alicia Richardson Licensing Administrative Assistant General Office Duke Energy Corporation Electronic Mail Distribution
 
Lara S. Nichols Deputy General Counsel Duke Energy Corporation Electronic Mail Distribution
 
David A. Cummings Associate General Counsel General Office Duke Energy Corporation Electronic Mail Distribution
 
Beth J. Horsley Wholesale Customer Relations Duke Energy Corporation Electronic Mail Distribution
 
David A. Repka Winston Strawn LLP Electronic Mail Distribution
 
County Manager of Mecklenburg County
 
720 East Fourth Street Charlotte, NC 28202
 
W. Lee Cox, III
 
Section Chief
 
Radiation Protection Section N.C. Department of Environmental Commerce & Natural Resources Electronic Mail Distribution
 
S. Capps 4 Letter to Steven D. Capps from Jonathan H. Bartley dated March 4, 2013
 
SUBJECT: ANNUAL ASSESSMENT LETTER FOR MCGUIRE NUCLEAR STATION UNITS 1 AND 2 (NRC INSPECTION REPORT 05000369/201001 AND 05000370/201001)
Distribution w/encl
: C. Evans, RII L. Douglas, RII OE Mail RIDSNRRDIRS
 
PUBLIC RidsNrrPMMcGuire Resource ROP Assessment Institute of Nuclear Power Operations (INPO)
McGuire Inspection / Activity Plan 03/01/2013
-06/30/2014 Unit Number Page 1 of 2 03/04/2013 07:45:01 Report 22 No. of Staff on Site Planned Dates Start End Inspection Activity Title 2 RP-RAD HAZARDS ANALYSIS AND TRANSPORTATION 1, 2 03/18/2013 03/22/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 03/18/2013 03/22/2013 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 1, 2 03/18/2013 03/22/2013 IP 71151 Performance Indicator Verification 2 ISI-UNIT 1 INSERVICE INSPECTION 1 03/25/2013 03/29/2013 IP 7111108P Inservice Inspection Activities - PWR 1 SGISI-UNIT 1 SG INSERVICE INSPECTION 1 04/01/2013 04/05/2013 IP 7111108P Inservice Inspection Activities - PWR 2 ISFSI-ISFSI MAGNASTOR INITIAL CAMPAIGN 1, 2 06/10/2013 06/14/2013 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 1 EP-EMERGENCY PREPAREDNESS EXERCISE 1, 2 08/05/2013 08/09/2013 IP 7111401 Exercise Evaluation 1, 2 08/05/2013 08/09/2013 IP 71151 Performance Indicator Verification 2 RP-RP PUBLIC RAD SAFETY BASELINE 1, 2 07/08/2013 07/12/2013 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 07/08/2013 07/12/2013 IP 71124.07 Radiological Environmental Monitoring Program 1, 2 07/08/2013 07/12/2013 IP 71151 Performance Indicator Verification 1 TI-182-TI-182 BURIED PIPING/TANK - PHASE 2 1, 2 07/15/2013 07/17/2013 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 3 MODS-PLANT MODIFICATIONS INSPECTION 1, 2 10/14/2013 10/18/2013 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 1, 2 10/28/2013 11/01/2013 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 2 OL EXAM-INITIAL EXAM PREP 1 11/04/2013 11/08/2013 V23402 MCGUIRE/DECEMBER 2013 INITIAL EXAM AT POWER FACILITIES 2 OL EXAM-INITIAL EXAM WEEK 1 1 12/02/2013 12/06/2013 V23402 MCGUIRE/DECEMBER 2013 INITIAL EXAM AT POWER FACILITIES 2 OL EXAM-INITIAL EXAM WEEK 2 1 12/09/2013 12/13/2013 V23402 MCGUIRE/DECEMBER 2013 INITIAL EXAM AT POWER FACILITIES 1 ISI-UNIT 2 IN-SERVICE INSPECTION 2 03/31/2014 04/04/2014 IP 7111108P Inservice Inspection Activities - PWR 1 SGISI-UNIT 2 SG IN-SERVICE INSPECTION 2 04/07/2014 04/11/2014 IP 7111108P Inservice Inspection Activities - PWR This report does not include INPO and OUTAGE activities.
 
This report shows only on-site and announced inspection procedures.
 
McGuire Inspection / Activity Plan 03/01/2013
-06/30/2014 Unit Number Page 2 of 2 03/04/2013 07:45:01 Report 22 No. of Staff on Site Planned Dates Start End Inspection Activity Title 4 PI&R-PROBLEM IDENTIFICATION AND RESOLUTION 1, 2 06/09/2014 06/13/2014 IP 71152B Problem Identification and Resolution 1, 2 06/23/2014 06/27/2014 IP 71152B Problem Identification and Resolution 1 OL EXAM-REQUAL INSP 1, 2 06/23/2014 06/27/2014 IP 7111111B Licensed Operator Requalification Program Comments: This report does not include INPO and OUTAGE activities.
 
This report shows only on-site and announced inspection procedures.
}}
}}

Revision as of 16:23, 18 July 2018

Annual Assessment Letter for McGuire, Units 1 & 2, (IR 05000369-12-001 and 05000370-12-001)
ML13063A552
Person / Time
Site: McGuire  Duke Energy icon.png
Issue date: 03/04/2013
From: Bartley J H
NRC/RGN-II/DRP/RPB1
To: Capps S D
Duke Energy Carolinas, Duke Energy Corp
References
IR-12-001
Download: ML13063A552 (7)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 March 4, 2013

Mr. Steven D. Capps Site Vice President Duke Energy Corporation McGuire Nuclear Station MG01VP/12700 Hagers Ferry Road Huntersville, NC 28078

SUBJECT: ANNUAL ASSESSMENT LETTER FOR MCGUIRE NUCLEAR STATION UNITS 1 AND 2 (NRC INSPECTION REPORT 05000369/201001 AND 05000370/201001)

Dear Mr. Ca pps: On February 12, 2013, the NRC completed its end-of-cycle performance review of the McGuire Nuclear Station Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2012, through December 31, 2012. This letter informs y ou of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall McGuire Units 1 and 2 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance for both units during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., Green) safety significance and all PIs indicated that your performance was within the nominal, expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through June 30, 2014. Routine inspections performed by resident inspectors are not included in the inspection plan. We will also be performing an Independent Spent Fuel Storage Installation Initial Campaign inspection; Temporary Instruction 182, Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping; and operator licensing examinations. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.

S. Capps 2 In accordance with 10 CFR 2.390 of the NRC

=s A Rules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 404-997-4607 with any questions you have regarding this letter.

Sincerely,/RA/ Jonathan H. Bartley, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos.: 50-369, 50-370 License Nos.: NPF-9, NPF-17

Enclosure:

McGuire Nuclear Station Inspection/

Activity Plan (03/01/2013 - 06/30/2014)

cc w/encl: (See page 3)

_________________________ X SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DRP RII:DRP SIGNATURE CWR /RA/ JHB /RA/ NAME CRapp JBartley DATE 02/27/2013 02/27/2013 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO S. Capps 3 cc w/encl: Charles J. Morris III Plant Manager Mc Guire Nuclear Station Duke Energy Corporation Electronic Mail Distribution

Jeffrey J. Nolin Design Engineering Manager McGuire Nuclear Station Duke Energy Corporation Electronic Mail Distribution H. Duncan Brewer Organizational Effectiveness Manager McGuire Nuclear Station Duke Energy Corporation Electronic Mail Distribution

Kenneth L. Ashe

Regulatory Compliance Manager McGuire Nuclear Station Duke Energy Corporation Electronic Mail Distribution

Kay L. Crane Senior Licensing Specialist McGuire Nuclear Station Duke Energy Corporation Electronic Mail Distribution

Joseph Michael Frisco, Jr.

Vice President, Nuclear Design Engineering

General Office Duke Energy Corporation Electronic Mail Distribution

M. Christopher Nolan

Director - Regulatory Affairs General Office Duke Energy Corporation Electronic Mail Distribution

David A. Cummings (acting)

Fleet Regulatory Compliance & Licensing Manager General Office Duke Energy Corporation Electronic Mail Distribution Alicia Richardson Licensing Administrative Assistant General Office Duke Energy Corporation Electronic Mail Distribution

Lara S. Nichols Deputy General Counsel Duke Energy Corporation Electronic Mail Distribution

David A. Cummings Associate General Counsel General Office Duke Energy Corporation Electronic Mail Distribution

Beth J. Horsley Wholesale Customer Relations Duke Energy Corporation Electronic Mail Distribution

David A. Repka Winston Strawn LLP Electronic Mail Distribution

County Manager of Mecklenburg County

720 East Fourth Street Charlotte, NC 28202

W. Lee Cox, III

Section Chief

Radiation Protection Section N.C. Department of Environmental Commerce & Natural Resources Electronic Mail Distribution

S. Capps 4 Letter to Steven D. Capps from Jonathan H. Bartley dated March 4, 2013

SUBJECT: ANNUAL ASSESSMENT LETTER FOR MCGUIRE NUCLEAR STATION UNITS 1 AND 2 (NRC INSPECTION REPORT 05000369/201001 AND 05000370/201001)

Distribution w/encl

C. Evans, RII L. Douglas, RII OE Mail RIDSNRRDIRS

PUBLIC RidsNrrPMMcGuire Resource ROP Assessment Institute of Nuclear Power Operations (INPO)

McGuire Inspection / Activity Plan 03/01/2013

-06/30/2014 Unit Number Page 1 of 2 03/04/2013 07:45:01 Report 22 No. of Staff on Site Planned Dates Start End Inspection Activity Title 2 RP-RAD HAZARDS ANALYSIS AND TRANSPORTATION 1, 2 03/18/2013 03/22/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 03/18/2013 03/22/2013 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 1, 2 03/18/2013 03/22/2013 IP 71151 Performance Indicator Verification 2 ISI-UNIT 1 INSERVICE INSPECTION 1 03/25/2013 03/29/2013 IP 7111108P Inservice Inspection Activities - PWR 1 SGISI-UNIT 1 SG INSERVICE INSPECTION 1 04/01/2013 04/05/2013 IP 7111108P Inservice Inspection Activities - PWR 2 ISFSI-ISFSI MAGNASTOR INITIAL CAMPAIGN 1, 2 06/10/2013 06/14/2013 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 1 EP-EMERGENCY PREPAREDNESS EXERCISE 1, 2 08/05/2013 08/09/2013 IP 7111401 Exercise Evaluation 1, 2 08/05/2013 08/09/2013 IP 71151 Performance Indicator Verification 2 RP-RP PUBLIC RAD SAFETY BASELINE 1, 2 07/08/2013 07/12/2013 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 07/08/2013 07/12/2013 IP 71124.07 Radiological Environmental Monitoring Program 1, 2 07/08/2013 07/12/2013 IP 71151 Performance Indicator Verification 1 TI-182-TI-182 BURIED PIPING/TANK - PHASE 2 1, 2 07/15/2013 07/17/2013 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 3 MODS-PLANT MODIFICATIONS INSPECTION 1, 2 10/14/2013 10/18/2013 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 1, 2 10/28/2013 11/01/2013 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 2 OL EXAM-INITIAL EXAM PREP 1 11/04/2013 11/08/2013 V23402 MCGUIRE/DECEMBER 2013 INITIAL EXAM AT POWER FACILITIES 2 OL EXAM-INITIAL EXAM WEEK 1 1 12/02/2013 12/06/2013 V23402 MCGUIRE/DECEMBER 2013 INITIAL EXAM AT POWER FACILITIES 2 OL EXAM-INITIAL EXAM WEEK 2 1 12/09/2013 12/13/2013 V23402 MCGUIRE/DECEMBER 2013 INITIAL EXAM AT POWER FACILITIES 1 ISI-UNIT 2 IN-SERVICE INSPECTION 2 03/31/2014 04/04/2014 IP 7111108P Inservice Inspection Activities - PWR 1 SGISI-UNIT 2 SG IN-SERVICE INSPECTION 2 04/07/2014 04/11/2014 IP 7111108P Inservice Inspection Activities - PWR This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

McGuire Inspection / Activity Plan 03/01/2013

-06/30/2014 Unit Number Page 2 of 2 03/04/2013 07:45:01 Report 22 No. of Staff on Site Planned Dates Start End Inspection Activity Title 4 PI&R-PROBLEM IDENTIFICATION AND RESOLUTION 1, 2 06/09/2014 06/13/2014 IP 71152B Problem Identification and Resolution 1, 2 06/23/2014 06/27/2014 IP 71152B Problem Identification and Resolution 1 OL EXAM-REQUAL INSP 1, 2 06/23/2014 06/27/2014 IP 7111111B Licensed Operator Requalification Program Comments: This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.