March 4, 2013
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR MCGUIRE NUCLEAR STATION UNITS 1 AND 2 (NRC INSPECTION REPORT 05000369/2012001 AND 05000370/2012001)
Dear Mr. Capps:
On February 12, 2013, the NRC completed its end-of-cycle performance review of the McGuire Nuclear Station Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2012, through December 31, 2012. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
The NRC determined that overall McGuire Units 1 and 2 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance for both units during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., Green) safety significance and all PIs indicated that your performance was within the nominal, expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through June 30, 2014. Routine inspections performed by resident inspectors are not included in the inspection plan. We will also be performing an Independent Spent Fuel Storage Installation Initial Campaign inspection; Temporary Instruction 182, Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping; and operator licensing examinations. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 404-997-4607 with any questions you have regarding this letter.
Sincerely,
/RA/
Jonathan H. Bartley, Chief
Reactor Projects Branch 1 Division of Reactor Projects
Docket Nos.: 50-369, 50-370 License Nos.: NPF-9, NPF-17
Enclosure: McGuire Nuclear Station Inspection/
Activity Plan (03/01/2013 - 06/30/2014)
cc w/encl: (See page 3)
_________________________
X SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DRP RII:DRP
SIGNATURE CWR /RA/
JHB /RA/
NAME CRapp JBartley
DATE 02/27/2013 02/27/2013
E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO YES NO cc w/encl:
Charles J. Morris III Plant Manager Mc Guire Nuclear Station Duke Energy Corporation Electronic Mail Distribution
Jeffrey J. Nolin Design Engineering Manager McGuire Nuclear Station Duke Energy Corporation Electronic Mail Distribution
H. Duncan Brewer Organizational Effectiveness Manager McGuire Nuclear Station Duke Energy Corporation Electronic Mail Distribution
Kenneth L. Ashe Regulatory Compliance Manager McGuire Nuclear Station Duke Energy Corporation Electronic Mail Distribution
Kay L. Crane Senior Licensing Specialist McGuire Nuclear Station Duke Energy Corporation Electronic Mail Distribution
Joseph Michael Frisco, Jr.
Vice President, Nuclear Design Engineering General Office Duke Energy Corporation Electronic Mail Distribution
M. Christopher Nolan Director - Regulatory Affairs General Office Duke Energy Corporation Electronic Mail Distribution
David A. Cummings (acting)
Fleet Regulatory Compliance & Licensing Manager General Office Duke Energy Corporation Electronic Mail Distribution Alicia Richardson Licensing Administrative Assistant General Office Duke Energy Corporation Electronic Mail Distribution
Lara S. Nichols Deputy General Counsel Duke Energy Corporation Electronic Mail Distribution
David A. Cummings Associate General Counsel General Office Duke Energy Corporation Electronic Mail Distribution
Beth J. Horsley Wholesale Customer Relations Duke Energy Corporation Electronic Mail Distribution
David A. Repka Winston Strawn LLP Electronic Mail Distribution
County Manager of Mecklenburg County 720 East Fourth Street Charlotte, NC 28202
W. Lee Cox, III Section Chief Radiation Protection Section N.C. Department of Environmental Commerce & Natural Resources Electronic Mail Distribution Letter to Steven from Jonathan H. Bartley dated March 4, 2013
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR MCGUIRE NUCLEAR STATION UNITS 1 AND 2 (NRC INSPECTION REPORT 05000369/2012001 AND 05000370/2012001)
Distribution w/encl:
C. Evans, RII L. Douglas, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMMcGuire Resource ROP Assessment Institute of Nuclear Power Operations (INPO)
McGuire Inspection / Activity Plan 03/01/2013 - 06/30/2014 Unit Number Page 1 of 2 03/04/2013 07:45:01 Report 22 No. of Staff on Site Planned Dates Start End Inspection Activity Title
- RAD HAZARDS ANALYSIS AND TRANSPORTATION 1, 2 03/18/2013 03/22/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 03/18/2013 03/22/2013 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 1, 2 03/18/2013 03/22/2013 IP 71151 Performance Indicator Verification
- UNIT 1 INSERVICE INSPECTION
03/25/2013 03/29/2013 IP 7111108P Inservice Inspection Activities - PWR
SGISI
- UNIT 1 SG INSERVICE INSPECTION
04/01/2013 04/05/2013 IP 7111108P Inservice Inspection Activities - PWR
- ISFSI MAGNASTOR INITIAL CAMPAIGN 1, 2 06/10/2013 06/14/2013 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants
- EMERGENCY PREPAREDNESS EXERCISE 1, 2 08/05/2013 08/09/2013 IP 7111401 Exercise Evaluation 1, 2 08/05/2013 08/09/2013 IP 71151 Performance Indicator Verification
- RP PUBLIC RAD SAFETY BASELINE 1, 2 07/08/2013 07/12/2013 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 07/08/2013 07/12/2013 IP 71124.07 Radiological Environmental Monitoring Program 1, 2 07/08/2013 07/12/2013 IP 71151 Performance Indicator Verification
TI-182
- TI-182 BURIED PIPING/TANK - PHASE 2 1, 2 07/15/2013 07/17/2013 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping
MODS
- PLANT MODIFICATIONS INSPECTION 1, 2 10/14/2013 10/18/2013 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 1, 2 10/28/2013 11/01/2013 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications
OL EXAM
- INITIAL EXAM PREP
11/04/2013 11/08/2013 V23402 MCGUIRE/DECEMBER 2013 INITIAL EXAM AT POWER FACILITIES
OL EXAM
- INITIAL EXAM WEEK 1
12/02/2013 12/06/2013 V23402 MCGUIRE/DECEMBER 2013 INITIAL EXAM AT POWER FACILITIES
OL EXAM
- INITIAL EXAM WEEK 2
12/09/2013 12/13/2013 V23402 MCGUIRE/DECEMBER 2013 INITIAL EXAM AT POWER FACILITIES
- UNIT 2 IN-SERVICE INSPECTION
03/31/2014 04/04/2014 IP 7111108P Inservice Inspection Activities - PWR
SGISI
- UNIT 2 SG IN-SERVICE INSPECTION
04/07/2014 04/11/2014 IP 7111108P Inservice Inspection Activities - PWR This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
McGuire Inspection / Activity Plan 03/01/2013 - 06/30/2014 Unit Number Page 2 of 2 03/04/2013 07:45:01 Report 22 No. of Staff on Site Planned Dates Start End Inspection Activity Title
- PROBLEM IDENTIFICATION AND RESOLUTION 1, 2 06/09/2014 06/13/2014 IP 71152B Problem Identification and Resolution 1, 2 06/23/2014 06/27/2014 IP 71152B Problem Identification and Resolution
OL EXAM
- REQUAL INSP 1, 2 06/23/2014 06/27/2014 IP 7111111B Licensed Operator Requalification Program Comments: