| | document type = Letter, Request for Additional Information (RAI) | | | document type = Letter, Request for Additional Information (RAI) |
| | page count = 5 | | | page count = 5 |
| | | project = TAC:ME4938, TAC:ME5122 |
| | | stage = RAI |
| | }} |
| | |
| | =Text= |
| | {{#Wiki_filter:REG U{ UNITED NUCLEAR REGULATORY ... ' WASHINGTON, D.C. 20555"()001 <t 0In ' l: , September 1, 2011...;-... " " 'vI] .;.0 ****.... Mr. G. T Vice President, Technical Support and STP Nuclear Operating P.O. Box VVadsworth, TX REQUESTS FOR ADDITIONAL INFORMATION FOR THE REVIEVV OF THE SOUTH TEXAS PROJECT LICENSE RENEVVAL APPLICATION (TAC NOS. ME4938 AND ME5122) Dear Mr. Powell: By letter dated October 25, 2010, STP Nuclear Operating Company submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54 (10 C FR Part 54) to renew operating licenses NPF-76 and NPF-80 for South Texas Project for review by the U.S. Nuclear Regulatory Commission (NRC or the staff). The staff is reviewing the information contained in the license renewal application and has identified, in the enclosure, areas where additional information is needed to complete the review. These requests for additional information were discussed with Mr. Arden Aldridge and it was agreed that a plan of action and schedule for providing the requested additional information will be provided within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-3617 or e-mail at Tam.Tran@nrc.gov. Sincerely, 1/l;v-, t Tam Tran, Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. and 50-499 Requests for Additional cc w/encl: Listserv SOUTH TEXAS PROJECTLICENSE RENEWAL REQUESTS FOR ADDITIONAL REGARDING THE ANALYSIS OF ACCIDENT MITIGATION The requests for information (RAls) listed below were derived from the discussion during the conference call of July 28, 2011 (ML 11216A263). The purpose for the call was to seek additional clarification for the RAI responses of July 5, 2011 (ML 11193A016). (1) RAI 3.b: Fire-analysis individual plant examination (lPE) use of technical report NUREG/CR-6850 Background: The response to this RAI simply indicates that a review of the NUREG/CR-6850 will be performed in the future. However, the recent research and guidance reported in NUREG/CR-6850, specifically in the areas of hot short probabilities, fire ignition frequencies, and non-suppression probabilities, indicate that the fire analysis methodologies utilized for the IPE may underestimate fire risk. Requested information: Provide assurance that consideration of this new information is not expected to impact the selection of cost beneficial severe accident mitigation alternatives (SAMAs) for South Texas Project (STP). (2) RAI 3.c: Seismic-analysis IPE of external events (IPEEE) -use of Lawrence Livermore National Laboratory (LLNL) or United States Geological Survey (USGS) hazard curves Background: The response to this RAI did not provide the requested updated seismic core damage frequency (CDF) results. Instead, the applicant cited Notice IN 2010-18. While this Information Notice concluded that the US plants had adequate safety margin, it did indicate that the seismic CDF for STP could be as high as 3E-06 per year (for spectral accelerations of 5 hz and 10 hz). This is 40 times the total seismic CDF given in the environmental report (ER). Also, note that the STP IPE gives a seismic CDF using the LLNL hazard curve of 1.7E-05 per year which is over 200 times the value used in the probabilistic risk assessment (PRA). Since the seismic CDF was determined using point estimates, the seismic CDF for the analysis STP _REV6, based on the LLNL hazard curve, can be obtained from the LLNL seismic frequencies from Table 3.4.4-9 of the IPE or IPEEE or both and the conditional core damage probabilities (CCDPs) from Table F.2-1 of the ER. The result is a seismic core damage frequency (SCDF) of 8.7E-06 per year. Comparing the USGS hazard curves for the STP site with the Electric Power Research Institute (EPRI) hazard curves indicates that the frequency for the USGS curves is 60 to 150 times those for the EPRI curves over the range of 0.4 to 0.6 g which is the range for the largest contributors to STP seismic CDF. Furthermore, the USGS hazard curve is higher than the LLNL hazard curve by a factor of 1.5 to 2 over the same range. Using the above method for determining the CDF for SEIS3 and SEIS4 initiators for the seismic event scenarios gives seismic CDFs of 4E-06 and 5E-06 per year, respectively. |
| | -2 This indicates that applying the LLNL hazard curves or the 2008 USGS hazard curves to the SEIS3 and SEIS4 initiators could lead to CDF contributions of about 60 to 150% of the STP _REV6 total CDF. Requested information: Provide an assessment of the seismic CDF contribution due to the updated USGS hazard curves and the potential for cost beneficial SAMAs. |
| | September 1, 2011 Mr. G. T. Powell Vice President, Technical Support and Oversight STP Nuclear Operating Company P.O. Box 289 VVadsworth, TX 77483 REQUESTS FOR ADDITIONAL INFORMATION FOR THE REVIEVV OF THE SOUTH TEXAS PROJECT LICENSE RENEVVAL APPLICATION (TAC NOS. ME4938 AND ME5122) Dear Mr. Powell: By letter dated October 25, 2010, STP Nuclear Operating Company submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54 (10 CFR Part 54) to renew operating licenses NPF-76 and NPF-80 for South Texas Project for review by the U.S. Nuclear Regulatory Commission (NRC or the staff). The staff is reviewing the information contained in the license renewal application and has identified, in the enclosure, areas where additional information is needed to complete the review. These requests for additional information were discussed with Mr. Arden Aldridge and it was agreed that a plan of action and schedule for providing the requested additional information will be provided within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-3617 or e-mail at Tam.Tran@nrc.gov. Sincerely, IRA! Tam Tran, Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-498 and Requests for Additional cc w/encl: See next ADAMS Accession No.: ML *concurred via emaiOFFICE LADLR* PM:RPB2:DLR BC:AADB:DRA BC:RPB2:DLR NAME IKing TTran TTate DVVrona DATE 8/29/11 8/31/11 8/30/11 9/1111-OFFICIAL RECORD COpy Letter to G. T. Powell from Tam Tran dated September 01,2011 REQUESTS FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE SOUTH TEXAS PROJECT LICENSE RENEWAL APPLICATION (TAC NOS. ME4938 AND ME5122) DISTRIBUTION: E-MAIL: PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource RidsNrrDraApla Resource RidsOgcMailCenter JDaily TTran ICouret, OPA BSingal. DORL WWalker, RIV JDixon, RIV BTharakan, RIV WMaier, RIV VDricks, RIV NO'Keefe, RIV AVegel, RIV SGraves, RIV |
| }} | | }} |
Revision as of 11:14, 4 April 2018
Letter Sequence RAI |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance
Results
Other: ML110872079, ML11145A064, ML11256A057, ML11256A058, ML12086A081, ML12264A642, ML13029A497, ML13063A071, ML13198A056, ML13253A163, ML16118A311, NOC-AE-12002780, Clarification of Information in Support of the Review of the License Renewal Application, NOC-AE-13002945, Update to License Renewal Application - Environmental Permits
|
MONTHYEARML1030102572010-10-25025 October 2010 Project, Units 1 & 2, Transmittal of License Renewal Application Project stage: Request ML1108720792011-04-0505 April 2011 Project Manager Change for the License Renewal of South Texas Project, Units 1 and 2 Project stage: Other ML11145A0642011-06-21021 June 2011 Plan for the Environmental Related Regulatory Audit Regarding the South Texas Project, Units 1 and 2, License Renewal Application Review (TAC Nos. ME4938 and ME4939) Project stage: Other NOC-AE-11002687, Response to Request for Additional Information for the South Texas Project License Renewal Application2011-07-0505 July 2011 Response to Request for Additional Information for the South Texas Project License Renewal Application Project stage: Response to RAI NOC-AE-11002691, Response to Request for Additional Information for the Review of the License Renewal Application2011-07-0505 July 2011 Response to Request for Additional Information for the Review of the License Renewal Application Project stage: Response to RAI ML11154A0132011-07-0606 July 2011 Summary of Telephone Conference Call Held on May 23, 2011, Between the NRC and STPNOC, Concerning Requests for Additional Information Pertaining to the South Texas Project, LRA-Future Consideration of Operating Experience Project stage: RAI ML11201A0622011-08-0404 August 2011 Request for Additional Information for the Review of the South Texas Project, License Renewal Application (TAC Nos. ME4938 and ME5122) Project stage: RAI ML11214A2072011-08-18018 August 2011 RAI for the Review of the STP, License Renewal Application (TAC No. ME4938 and ME512) Project stage: RAI ML1123000162011-08-18018 August 2011 License Renewal - Errata in AMP RAI Package Project stage: RAI NOC-AE-11002711, Response to Request for Additional Information for License Renewal Application2011-08-23023 August 2011 Response to Request for Additional Information for License Renewal Application Project stage: Response to RAI ML11256A0572011-08-31031 August 2011 Documents to Support Review of the South Texas Project License Renewal Application, List of Transmitted Documents Including Copy of Each Document, Enclosure to NOC-AE-11002720 Project stage: Other ML11256A0582011-08-31031 August 2011 Documents to Support Review of the South Texas Project License Renewal Application, WR-5, Tceq Id No. 1610103/1610051 (Operation of Public Potable Water System) Project stage: Other ML11256A0562011-08-31031 August 2011 Project, Units 1 and 2 - Transmittal of Documents to Support Review of the South Texas Project License Renewal Application Project stage: Request ML1123601142011-09-0101 September 2011 Request for Additional Information for the Review of the South Texas Project License Renewal Application Project stage: RAI NOC-AE-11002719, Response to Request for Additional Information for the License Renewal Application2011-09-0606 September 2011 Response to Request for Additional Information for the License Renewal Application Project stage: Response to RAI NOC-AE-11002734, Transmittal of Document to Support Review of the License Renewal Application2011-09-12012 September 2011 Transmittal of Document to Support Review of the License Renewal Application Project stage: Request NOC-AE-11002723, Response to Requests for Additional Information for the License Renewal Application2011-09-12012 September 2011 Response to Requests for Additional Information for the License Renewal Application Project stage: Response to RAI ML11270A0602011-09-22022 September 2011 Response to Requests for Additional Information for License Renewal Application (TAC Nos. ME4938 and ME5122) Project stage: Response to RAI ML11269A0022011-09-28028 September 2011 Requests for Additional Information for the Review of the South Texas Project License Renewal Application (TAC ME4938 and ME5122) Project stage: RAI ML11298A0852011-10-18018 October 2011 Response to Requests for Additional Information for License Renewal Application (TAC No. ME4938 and ME5122) Project stage: Response to RAI NOC-AE-11002761, Clarification to Response to Request for Additional Information for License Renewal Application (TAC No. ME4938 & ME5122)2011-11-17017 November 2011 Clarification to Response to Request for Additional Information for License Renewal Application (TAC No. ME4938 & ME5122) Project stage: Response to RAI NOC-AE-12002780, Clarification of Information in Support of the Review of the License Renewal Application2012-01-10010 January 2012 Clarification of Information in Support of the Review of the License Renewal Application Project stage: Other NOC-AE-11002773, Supplemental Response to Requests for Additional Information for the South Texas Project License Renewal Application - SAMA2012-01-19019 January 2012 Supplemental Response to Requests for Additional Information for the South Texas Project License Renewal Application - SAMA Project stage: Response to RAI ML12033A1342012-02-14014 February 2012 January 31, 2012, Summary of Telephone Conference Call Held Between the NRC and STP Nuclear Operating Company, Concerning Requests for Additional Information Pertaining to the South Texas Project License Renewal Application Project stage: RAI NOC-AE-12002795, Clarification to Supplemental Response to Request for Additional Information for the South Texas Project License Renewal Application - SAMA2012-02-16016 February 2012 Clarification to Supplemental Response to Request for Additional Information for the South Texas Project License Renewal Application - SAMA Project stage: Response to RAI ML12017A1282012-02-29029 February 2012 RAI for the Review of the STP LRA (TAC Nos. ME4938 and ME5122) Project stage: RAI ML12047A2852012-02-29029 February 2012 January 17, 2012, Summary of Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission & STP Nuclear Operating Company, Concerning Requests for Additional Information Pertaining to the South Texas Project License Renewal Project stage: RAI NOC-AE-12002818, Response to Requests for Additional Information for the Review of the South Texas Project License Renewal Application2012-03-12012 March 2012 Response to Requests for Additional Information for the Review of the South Texas Project License Renewal Application Project stage: Response to RAI ML11290A2262012-03-19019 March 2012 Revision of Schedule for the Conduct of Environmental Review of the South Texas Project License Renewal Application Project stage: Approval NOC-AE-12002840, Renewal of the Wastewater Discharge Permit2012-04-17017 April 2012 Renewal of the Wastewater Discharge Permit Project stage: Request ML12128A0612012-05-0404 May 2012 NRR E-mail Capture - NEPA Consultation - Waterborne Outbreak Project stage: Request ML12142A0022012-05-18018 May 2012 NRR E-mail Capture - Environmental Permit Updated Status Project stage: Request ML12144A4432012-06-25025 June 2012 Request for Additional Information for the Review of the South Texas Project, Units 1 and 2, License Renewal Application- Aging Management, Set 20 TAC Nos. ME4939 and ME4937) STP-RAIs-Set 20-RAI Project stage: RAI ML12171A4832012-08-10010 August 2012 Revision of Schedule for the Conduct of Environmental Review of the South Texas Project License Renewal Application (TAC Nos. ME5122, ME5123, ME4938, and ME4939) Project stage: Approval ML11153A0822012-11-14014 November 2012 Issuance of Environmental Scoping Summary Report Associated with the Staff'S Review of the Application by STP Nuclear Operating Company for Renewal of the Operating License for South Texas Project, Units 1 and 2 Project stage: Approval ML12086A0812012-11-14014 November 2012 Environmental Impact Statement Scoping Process Summary Report for South Texas Project, Units 1 and 2 Project stage: Other ML12264A6422012-11-14014 November 2012 STP Scoping Report_Paula Cooper Project stage: Other ML12324A0492012-11-30030 November 2012 NUREG-1437 Supp 48 Dfc Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding South Texas Project, Units 1 and 2 (Draft for Comment) Project stage: Draft Other ML12339A2652012-12-0505 December 2012 Notice of Availability of the Draft Plant-Specific Supplement 48 to the GEIS for License Renewal of Nuclear Plants Regarding South Texas Project, Units 1 and 2, (TAC ME5122, ME5123, ME4938, and ME4939) Project stage: Draft Other ML12195A0852012-12-0505 December 2012 Notice of Availability of the Draft Plant-Specific Supplement 48 to the GEIS for License Renewal of Nuclear Plants Regarding South Texas Project, Units 1 and 2, (TAC Nos. ME5122, ME5123, ME4938, and ME4939) Project stage: Draft Other ML13029A4972013-01-15015 January 2013 Slides - Preliminary Site-Specific Results of the Environmental Review for South Texas Project License Renewal Project stage: Other ML13029A7552013-01-15015 January 2013 Transcript of South Texas Project License Renewal Public Meeting: Afternoon Session, January 15, 2013, Pages 1-34 Project stage: Meeting NOC-AE-13002945, Update to License Renewal Application - Environmental Permits2013-01-21021 January 2013 Update to License Renewal Application - Environmental Permits Project stage: Other ML13011A1312013-02-11011 February 2013 Revision of Schedule for the Conduct of Environmental Review of the South Texas Project License Renewal Application (TAC Nos. ME5122, ME5123, ME4938, and ME939) Project stage: Approval ML13023A3342013-02-25025 February 2013 1/15/2013 Summary of Public Meetings Conducted to Discuss Draft Supplemental Environmental Impact Statement Related to Review of South Texas Project, Units 1 & 2, License Renewal Application ML13063A0712013-03-0101 March 2013 Efh Consultation W/ NRC for South Texas Nuclear Plant License Renewal Project stage: Other NOC-AE-13002969, Response to Requests for Additional Information for Review of License Renewal Application Concerning Wildlife Management (TAC Nos. ME5122 and ME5123)2013-03-0606 March 2013 Response to Requests for Additional Information for Review of License Renewal Application Concerning Wildlife Management (TAC Nos. ME5122 and ME5123) Project stage: Response to RAI ML13077A1172013-03-14014 March 2013 NRR E-mail Capture - South Texas NRC Informal Consultation Project stage: Request NOC-AE-13002999, Annual Environmental Operating Report, Chapter 5 Through End2013-04-30030 April 2013 Annual Environmental Operating Report, Chapter 5 Through End Project stage: Request NOC-AE-13003000, Radioactive Effluent Release Report2013-04-30030 April 2013 Radioactive Effluent Release Report Project stage: Request 2012-11-30
[Table View] |
|
---|
Category:Letter
MONTHYEARML24318C5082024-11-13013 November 2024 Condition Prohibited by Technical Specifications IR 05000498/20253012024-11-0707 November 2024 Notification of NRC Initial Operator Licensing Examination 05000498/2025301; 05000499/2025301 IR 05000498/20240032024-11-0707 November 2024 Integrated Inspection Report 05000498/2024003 and 05000499/2024003 ML24304B0512024-10-30030 October 2024 Cycle 26 Core Operating Limits Report IR 05000498/20244022024-10-23023 October 2024 Security Baseline Inspection Report 05000498/2024402 and 05000499/2024402 05000499/LER-2024-003, Containment Isolation Valve Inoperable Resulting in Condition Prohibited by Technical Specification and Prevention of Fulfillment of Safety Function2024-10-22022 October 2024 Containment Isolation Valve Inoperable Resulting in Condition Prohibited by Technical Specification and Prevention of Fulfillment of Safety Function ML24295A0772024-10-21021 October 2024 Licensed Operator Positive Fitness-for-Duty Test 05000499/LER-2024-002, Two Control Room Envelope HVAC Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-10-17017 October 2024 Two Control Room Envelope HVAC Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24290A1162024-10-16016 October 2024 Change to South Texas Project Electric Generating Station (STPEGS) Emergency Plan ML24255A0322024-09-30030 September 2024 The Associated Independent Spent Fuel Storage Installation - Notice of Consideration of Approval of Direct Transfer of Licenses and Opportunity to Request a Hearing (EPID L-2024-LLM-0002) - Letter ML24269A1762024-09-25025 September 2024 Tpdes Permit Renewal Application WQ0001 908000 05000498/LER-2024-004, Loss of Offsite Power Resulting in Unit 1 Automatic Reactor Trip and Actuation of Emergency Diesel Generators and Auxiliary Feedwater Pumps2024-09-19019 September 2024 Loss of Offsite Power Resulting in Unit 1 Automatic Reactor Trip and Actuation of Emergency Diesel Generators and Auxiliary Feedwater Pumps ML24271A3022024-09-18018 September 2024 STP-2024-09 Post-Exam Comments - Redacted ML24274A0902024-09-16016 September 2024 Written Response - EA-24-026 STP Operator - Redacted ML24250A1882024-09-11011 September 2024 Request for Information for an NRC Post-Approval Site Inspection for License Renewal ML24249A3372024-09-0404 September 2024 Inservice Inspection Summary Report - 2RE23 05000499/LER-2024-001-01, Supplement to Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators2024-08-29029 August 2024 Supplement to Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators ML24234A0912024-08-27027 August 2024 NRC Initial Operator Licensing Examination Approval 05000498/2024301; 05000499/2024301 IR 05000498/20240052024-08-22022 August 2024 Updated Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2024005 and 05000499/2024005) IR 05000498/20240022024-08-0909 August 2024 Integrated Inspection Report 05000498/2024002 and 05000499/2024002 IR 05000498/20240102024-08-0808 August 2024 Biennial Problem Identification and Resolution Inspection Report 05000498/2024010 and 05000499/2024010 ML24213A0842024-07-31031 July 2024 Application for Order Consenting to Direct Transfer of Licenses ML24218A1462024-07-26026 July 2024 2. EPA Comments on South Texas Project Exemption Ea/Fonsi ML24207A1782024-07-25025 July 2024 Licensed Operator Positive Fitness-For-Duty Test 05000499/LER-2024-001, Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators2024-07-0202 July 2024 Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators 05000498/LER-2024-003, Condition Prohibited by Technical Specifications and Potential Loss of Safety Function Due to Inoperable Low Head Safety Injection Pump2024-07-0101 July 2024 Condition Prohibited by Technical Specifications and Potential Loss of Safety Function Due to Inoperable Low Head Safety Injection Pump 05000498/LER-2024-002-01, Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-06-27027 June 2024 Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function 05000498/LER-2023-003-01, Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-06-19019 June 2024 Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24136A2872024-05-15015 May 2024 Submittal of 2024 Nrc/Fema Evaluated Exercise Scenario Manual ML24136A2842024-05-15015 May 2024 Independent Spent Fuel Storage Installation Supplement to Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance ML24130A2712024-05-0909 May 2024 Re Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24128A1572024-05-0707 May 2024 Independent Spent Fuel Storage Installation Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance IR 05000498/20240012024-05-0606 May 2024 Integrated Inspection Report 05000498/2024001 & 05000499/2024001 ML24120A3762024-04-29029 April 2024 Annual Dose Report for 2023 ML24116A2282024-04-25025 April 2024 Annual Environmental Operating Report 05000498/LER-2023-004-01, Condition Prohibited by Technical Specifications Due to Inoperable Train of Essential Chilled Water2024-04-25025 April 2024 Condition Prohibited by Technical Specifications Due to Inoperable Train of Essential Chilled Water ML24116A3032024-04-25025 April 2024 Operations Quality Assurance Plan Condition Adverse to Quality Definition Change Resulting in a Reduction in Commitment ML24117A1602024-04-24024 April 2024 2023 Radioactive Effluent Release Report ML24102A2452024-04-23023 April 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0046 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24113A3122024-04-22022 April 2024 Cycle 24 Core Operating Limits Report ML24097A0072024-04-0606 April 2024 Relief Request Number RR-ENG-4-07 – Request for an Alternative to ASME Code Case N-729-6 for Reactor Vessel Head Penetration 75 05000498/LER-2024-001, Re Two Steam Generator Power Operated Relief Valves (Porvs) Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-04-0101 April 2024 Re Two Steam Generator Power Operated Relief Valves (Porvs) Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24088A3022024-03-28028 March 2024 Financial Assurance for Decommissioning - 2024 Update NOC-AE-240040, Response to Request for Additional Information for Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2024-03-21021 March 2024 Response to Request for Additional Information for Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24080A2902024-03-19019 March 2024 Nuclear Liability Certificates of Insurance ML24066A2002024-03-0606 March 2024 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes ML24079A1312024-03-0505 March 2024 Nuclear Insurance Protection ML24060A1742024-02-28028 February 2024 Submittal of Annual Fitness for Duty Performance Report for 2023 IR 05000498/20230062024-02-28028 February 2024 Annual Assessment Letter for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2023006 and 05000499/2023006) 2024-09-04
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24207A1782024-07-25025 July 2024 Licensed Operator Positive Fitness-For-Duty Test ML24052A0112024-02-16016 February 2024 NRR E-mail Capture - South Texas Project - Draft Request for Additional Information - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications (L-2023-LLE-0046) ML24024A1162024-01-24024 January 2024 STP Unit 2 Request for Information ML23334A0062023-11-29029 November 2023 NRR E-mail Capture - South Texas Project - Request for Additional Information - Proposed Alternative to ASME BPV Code Requirements ML23319A4442023-11-15015 November 2023 NRR E-mail Capture - South Texas Project - Draft Request for Additional Information - Proposed Alternative to ASME BPV Code Requirements ML23278A1532023-10-0505 October 2023 NRR E-mail Capture - South Texas Project – Request for Additional Information - Request for Indirect Transfer of Licenses and Conforming Amendments (L-2023-LLM-0004) ML23264A0972023-09-21021 September 2023 NRR E-mail Capture - South Texas Project - Request for Additional Information - License Amendment Request to Revise the Alternate Source Term Dose Calculation (L-2023-LLA-0047) ML23255A2862023-09-12012 September 2023 NRR E-mail Capture - South Texas Project – Draft Request for Additional Information – License Amendment Request to Revise the Alternate Source Term Dose Calculation (L-2023-LLA-0047) ML23145A1872023-05-24024 May 2023 July 2023 Emergency Preparedness Program Inspection - Request for Information ML22255A1542022-09-13013 September 2022 Operating Company Information Request for the Cyber Security Baseline Inspection 05000498/2022401 and 05000499/2022401 ML22206A0142022-07-20020 July 2022 NRR E-mail Capture - South Texas Project - Request for Additional Information - 10 CFR 20.2002 Alternate Disposal Request ML22194A0502022-07-0707 July 2022 NRR E-mail Capture - South Texas Project - Updated Draft Request for Additional Information - 10 CFR 20.2002 Alternate Disposal Request ML22194A0492022-06-0808 June 2022 NRR E-mail Capture - South Texas Project - Draft Request for Additional Information - 10 CFR 20.2002 Alternate Disposal Request ML22123A3272022-05-0303 May 2022 STP EP Exercise Inspection July 2022 RFI ML22084A0762022-04-0404 April 2022 Notification of NRC Design Bases Assurance Inspection (Team) (05000498/2022012 and 05000499/2022012) and Request for Information ML21286A5732021-10-18018 October 2021 Notification of NRC Design Bases Assurance Inspection (Programs) (05000498/2022011 and 05000499/2022011) and Request for Information ML21166A2392021-06-16016 June 2021 Notification of Inspection (NRC Inspection Report 05000498/2021003 and 05000499/2021003) and Request for Information ML21160A1522021-06-0909 June 2021 Request for Information NRC Inspection 2021-003 Public Radiation Safety ML21133A2372021-05-0505 May 2021 Request for Additional Information: STP EP Exercise Inspection - July 2021 ML21039A8902021-02-0808 February 2021 NRR E-mail Capture - South Texas Project - Request for Additional Information - 1RE22 Inspection Summary Report for Steam Generator Tubing ML21029A3312021-01-29029 January 2021 NRR E-mail Capture - South Texas Project - Draft Request for Additional Information - 1RE22 Inspection Summary Report for Steam Generator Tubing ML20280A5452020-08-17017 August 2020 STP 2020 PIR Request for Information ML20111A0052020-04-17017 April 2020 NRR E-mail Capture - South Texas Project - Request for Additional Information - Proposed Alternative to ASME OM Code 2012 Edition - Relief Request PRR-01 ML20070N0222020-03-10010 March 2020 NRC Selection for Onsite Review ML20057G4612020-02-26026 February 2020 05000498/499 Request for Information - Occupational Radiation Safety Inspection ML20045E2172020-02-13013 February 2020 Licensed Operator Positive Fitness-For-Duty Test ML20036F5862020-02-0404 February 2020 Request for Additional Information - Proposed Alternative to ASME Code Requirements for the Repair of Essential Cooling Water System Class 3 Buried Piping (EPID L-2019-LLR-0096)Redacted ML19165A1032019-06-14014 June 2019 NRR E-mail Capture - Draft RAI for STP TS 3.8.1.1 Sbdg SR Change ML19081A1512019-03-21021 March 2019 NRR E-mail Capture - Draft Round 2 RAI - Sbdg Voltage and Frequency LAR (L-2018-LLA-0078) ML18283B9522018-10-10010 October 2018 NRR E-mail Capture - Final RAI - South Texas Standby DG TS Change (L-2018-LLA-0078) ML18263A1432018-09-12012 September 2018 NRR E-mail Capture - Final RAI for South Texas Project RR-ENG-E-16 (L-2018-LLR-0097) ML18197A4172018-07-17017 July 2018 Notification of NRC Triennial Heat Sink Performance Inspection (05000498/2018003 and 05000499/2018003) and Request for Information ML18003B4222018-01-0303 January 2018 NRR E-mail Capture - Final Request for Additional Information Amendment Request to Modify the Emergency Response Organization for South Texas Project ML17229B4672017-08-16016 August 2017 Notification of NRC Inspection 05000499/2017008 and Request for Information ML17132A0712017-05-15015 May 2017 Information Request the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000498/2017407; 05000499/2017407 ML17103A6272017-04-13013 April 2017 Notification of Evaluations of Changes, Tests, and Experiments Inspection (05000498/2017007 and 05000499/2017007) and Request for Information ML16351A1502016-12-16016 December 2016 Correction Letter Closeout of Request for Information Questions That Are No Longer Applicable Associated with the Resolution of Generic Safety Issue 191 (CAC Nos. MF2400 - MF2409) ML16302A4532016-12-12012 December 2016 Closeout of Request for Additional Information Questions That Are No Longer Applicable, Resolution of Generic Safety Issue (GSI) 191 (CAC Nos. MF2400-MF2409) ML16343A0422016-12-0808 December 2016 Request for Additional Information for the Review of the South Texas Project, Units 1 and 2 License Renewal Application (CAC NOS. ME4936, ME4937) ML16340A1022016-12-0505 December 2016 Requests for Additional Information for the Review of the South Texas Project License Renewal Application (CAC Nos. ME4936 and ME4937) ML16246A0952016-09-15015 September 2016 Correction to 8/26/16 Request for Additional Information Enclosure, License Amendment Request to Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies ML16214A2912016-08-26026 August 2016 Summary of June 28-30, 2016, Regulatory Audit at Westinghouse in Rockville, MD, License Amendment Request to Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies ML16187A0522016-07-0707 July 2016 Request for Additional Information Regarding License Renewal Application ML16141B0812016-05-31031 May 2016 Audit Summary, Risk Audit on April 12-13, 2016, at Alumni Center at the University of Texas, Austin, Tx; Pilot Generic Safety Issue 191 Submittal and Exemption Request, and Draft Request for Additional Information ML16125A2902016-05-26026 May 2016 Request for Additional Information, Risk Review, Exemption and License Amendment Request for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 (CAC Nos. MF2400-MF2409) ML16127A4522016-05-12012 May 2016 Supplemental Information Needed for Acceptance of Requested Licensing Action, Amendment Request to Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies ML16104A3522016-04-22022 April 2016 Requests for Additional Information Set 35 for the Review of the South Texas Project License Renewal Application (Tac Nos. ME4936, ME4937) ML16082A5072016-04-11011 April 2016 Request for Additional Information, Phased Response Requested, Exemption and License Amendment Request for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 (CAC Nos. MF2400-MF2409) ML16082A4842016-03-22022 March 2016 NRR E-mail Capture - South Texas Project Units 1 & 2, Draft Request for Additional Information for Risk Review for GSI-191 ML16081A0042016-03-18018 March 2016 NRR E-mail Capture - South Texas Project Units 1 & 2, Draft Request for Additional Information for Thermal-hydraulic Review for GSI-191 2024-07-25
[Table view] |
Text
REG U{ UNITED NUCLEAR REGULATORY ... ' WASHINGTON, D.C. 20555"()001 <t 0In ' l: , September 1, 2011...;-... " " 'vI] .;.0 ****.... Mr. G. T Vice President, Technical Support and STP Nuclear Operating P.O. Box VVadsworth, TX REQUESTS FOR ADDITIONAL INFORMATION FOR THE REVIEVV OF THE SOUTH TEXAS PROJECT LICENSE RENEVVAL APPLICATION (TAC NOS. ME4938 AND ME5122) Dear Mr. Powell: By letter dated October 25, 2010, STP Nuclear Operating Company submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54 (10 C FR Part 54) to renew operating licenses NPF-76 and NPF-80 for South Texas Project for review by the U.S. Nuclear Regulatory Commission (NRC or the staff). The staff is reviewing the information contained in the license renewal application and has identified, in the enclosure, areas where additional information is needed to complete the review. These requests for additional information were discussed with Mr. Arden Aldridge and it was agreed that a plan of action and schedule for providing the requested additional information will be provided within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-3617 or e-mail at Tam.Tran@nrc.gov. Sincerely, 1/l;v-, t Tam Tran, Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. and 50-499 Requests for Additional cc w/encl: Listserv SOUTH TEXAS PROJECTLICENSE RENEWAL REQUESTS FOR ADDITIONAL REGARDING THE ANALYSIS OF ACCIDENT MITIGATION The requests for information (RAls) listed below were derived from the discussion during the conference call of July 28, 2011 (ML 11216A263). The purpose for the call was to seek additional clarification for the RAI responses of July 5, 2011 (ML 11193A016). (1) RAI 3.b: Fire-analysis individual plant examination (lPE) use of technical report NUREG/CR-6850 Background: The response to this RAI simply indicates that a review of the NUREG/CR-6850 will be performed in the future. However, the recent research and guidance reported in NUREG/CR-6850, specifically in the areas of hot short probabilities, fire ignition frequencies, and non-suppression probabilities, indicate that the fire analysis methodologies utilized for the IPE may underestimate fire risk. Requested information: Provide assurance that consideration of this new information is not expected to impact the selection of cost beneficial severe accident mitigation alternatives (SAMAs) for South Texas Project (STP). (2) RAI 3.c: Seismic-analysis IPE of external events (IPEEE) -use of Lawrence Livermore National Laboratory (LLNL) or United States Geological Survey (USGS) hazard curves Background: The response to this RAI did not provide the requested updated seismic core damage frequency (CDF) results. Instead, the applicant cited Notice IN 2010-18. While this Information Notice concluded that the US plants had adequate safety margin, it did indicate that the seismic CDF for STP could be as high as 3E-06 per year (for spectral accelerations of 5 hz and 10 hz). This is 40 times the total seismic CDF given in the environmental report (ER). Also, note that the STP IPE gives a seismic CDF using the LLNL hazard curve of 1.7E-05 per year which is over 200 times the value used in the probabilistic risk assessment (PRA). Since the seismic CDF was determined using point estimates, the seismic CDF for the analysis STP _REV6, based on the LLNL hazard curve, can be obtained from the LLNL seismic frequencies from Table 3.4.4-9 of the IPE or IPEEE or both and the conditional core damage probabilities (CCDPs) from Table F.2-1 of the ER. The result is a seismic core damage frequency (SCDF) of 8.7E-06 per year. Comparing the USGS hazard curves for the STP site with the Electric Power Research Institute (EPRI) hazard curves indicates that the frequency for the USGS curves is 60 to 150 times those for the EPRI curves over the range of 0.4 to 0.6 g which is the range for the largest contributors to STP seismic CDF. Furthermore, the USGS hazard curve is higher than the LLNL hazard curve by a factor of 1.5 to 2 over the same range. Using the above method for determining the CDF for SEIS3 and SEIS4 initiators for the seismic event scenarios gives seismic CDFs of 4E-06 and 5E-06 per year, respectively.
-2 This indicates that applying the LLNL hazard curves or the 2008 USGS hazard curves to the SEIS3 and SEIS4 initiators could lead to CDF contributions of about 60 to 150% of the STP _REV6 total CDF. Requested information: Provide an assessment of the seismic CDF contribution due to the updated USGS hazard curves and the potential for cost beneficial SAMAs.
September 1, 2011 Mr. G. T. Powell Vice President, Technical Support and Oversight STP Nuclear Operating Company P.O. Box 289 VVadsworth, TX 77483 REQUESTS FOR ADDITIONAL INFORMATION FOR THE REVIEVV OF THE SOUTH TEXAS PROJECT LICENSE RENEVVAL APPLICATION (TAC NOS. ME4938 AND ME5122) Dear Mr. Powell: By letter dated October 25, 2010, STP Nuclear Operating Company submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54 (10 CFR Part 54) to renew operating licenses NPF-76 and NPF-80 for South Texas Project for review by the U.S. Nuclear Regulatory Commission (NRC or the staff). The staff is reviewing the information contained in the license renewal application and has identified, in the enclosure, areas where additional information is needed to complete the review. These requests for additional information were discussed with Mr. Arden Aldridge and it was agreed that a plan of action and schedule for providing the requested additional information will be provided within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-3617 or e-mail at Tam.Tran@nrc.gov. Sincerely, IRA! Tam Tran, Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-498 and Requests for Additional cc w/encl: See next ADAMS Accession No.: ML *concurred via emaiOFFICE LADLR* PM:RPB2:DLR BC:AADB:DRA BC:RPB2:DLR NAME IKing TTran TTate DVVrona DATE 8/29/11 8/31/11 8/30/11 9/1111-OFFICIAL RECORD COpy Letter to G. T. Powell from Tam Tran dated September 01,2011 REQUESTS FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE SOUTH TEXAS PROJECT LICENSE RENEWAL APPLICATION (TAC NOS. ME4938 AND ME5122) DISTRIBUTION: E-MAIL: PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource RidsNrrDraApla Resource RidsOgcMailCenter JDaily TTran ICouret, OPA BSingal. DORL WWalker, RIV JDixon, RIV BTharakan, RIV WMaier, RIV VDricks, RIV NO'Keefe, RIV AVegel, RIV SGraves, RIV