Letter Sequence Response to RAI |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance
Results
Other: ML110872079, ML11145A064, ML11256A057, ML11256A058, ML12086A081, ML12264A642, ML13029A497, ML13063A071, ML13198A056, ML13253A163, ML16118A311, NOC-AE-12002780, Clarification of Information in Support of the Review of the License Renewal Application, NOC-AE-13002945, Update to License Renewal Application - Environmental Permits
|
MONTHYEARML1030102572010-10-25025 October 2010 Project, Units 1 & 2, Transmittal of License Renewal Application Project stage: Request ML1108720792011-04-0505 April 2011 Project Manager Change for the License Renewal of South Texas Project, Units 1 and 2 Project stage: Other ML11145A0642011-06-21021 June 2011 Plan for the Environmental Related Regulatory Audit Regarding the South Texas Project, Units 1 and 2, License Renewal Application Review (TAC Nos. ME4938 and ME4939) Project stage: Other NOC-AE-11002687, Response to Request for Additional Information for the South Texas Project License Renewal Application2011-07-0505 July 2011 Response to Request for Additional Information for the South Texas Project License Renewal Application Project stage: Response to RAI NOC-AE-11002691, Response to Request for Additional Information for the Review of the License Renewal Application2011-07-0505 July 2011 Response to Request for Additional Information for the Review of the License Renewal Application Project stage: Response to RAI ML11154A0132011-07-0606 July 2011 Summary of Telephone Conference Call Held on May 23, 2011, Between the NRC and STPNOC, Concerning Requests for Additional Information Pertaining to the South Texas Project, LRA-Future Consideration of Operating Experience Project stage: RAI ML11201A0622011-08-0404 August 2011 Request for Additional Information for the Review of the South Texas Project, License Renewal Application (TAC Nos. ME4938 and ME5122) Project stage: RAI ML11214A2072011-08-18018 August 2011 RAI for the Review of the STP, License Renewal Application (TAC No. ME4938 and ME512) Project stage: RAI ML1123000162011-08-18018 August 2011 License Renewal - Errata in AMP RAI Package Project stage: RAI NOC-AE-11002711, Response to Request for Additional Information for License Renewal Application2011-08-23023 August 2011 Response to Request for Additional Information for License Renewal Application Project stage: Response to RAI ML11256A0572011-08-31031 August 2011 Documents to Support Review of the South Texas Project License Renewal Application, List of Transmitted Documents Including Copy of Each Document, Enclosure to NOC-AE-11002720 Project stage: Other ML11256A0582011-08-31031 August 2011 Documents to Support Review of the South Texas Project License Renewal Application, WR-5, Tceq Id No. 1610103/1610051 (Operation of Public Potable Water System) Project stage: Other ML11256A0562011-08-31031 August 2011 Project, Units 1 and 2 - Transmittal of Documents to Support Review of the South Texas Project License Renewal Application Project stage: Request ML1123601142011-09-0101 September 2011 Request for Additional Information for the Review of the South Texas Project License Renewal Application Project stage: RAI NOC-AE-11002719, Response to Request for Additional Information for the License Renewal Application2011-09-0606 September 2011 Response to Request for Additional Information for the License Renewal Application Project stage: Response to RAI NOC-AE-11002734, Transmittal of Document to Support Review of the License Renewal Application2011-09-12012 September 2011 Transmittal of Document to Support Review of the License Renewal Application Project stage: Request NOC-AE-11002723, Response to Requests for Additional Information for the License Renewal Application2011-09-12012 September 2011 Response to Requests for Additional Information for the License Renewal Application Project stage: Response to RAI ML11270A0602011-09-22022 September 2011 Response to Requests for Additional Information for License Renewal Application (TAC Nos. ME4938 and ME5122) Project stage: Response to RAI ML11269A0022011-09-28028 September 2011 Requests for Additional Information for the Review of the South Texas Project License Renewal Application (TAC ME4938 and ME5122) Project stage: RAI ML11298A0852011-10-18018 October 2011 Response to Requests for Additional Information for License Renewal Application (TAC No. ME4938 and ME5122) Project stage: Response to RAI NOC-AE-11002761, Clarification to Response to Request for Additional Information for License Renewal Application (TAC No. ME4938 & ME5122)2011-11-17017 November 2011 Clarification to Response to Request for Additional Information for License Renewal Application (TAC No. ME4938 & ME5122) Project stage: Response to RAI NOC-AE-12002780, Clarification of Information in Support of the Review of the License Renewal Application2012-01-10010 January 2012 Clarification of Information in Support of the Review of the License Renewal Application Project stage: Other NOC-AE-11002773, Supplemental Response to Requests for Additional Information for the South Texas Project License Renewal Application - SAMA2012-01-19019 January 2012 Supplemental Response to Requests for Additional Information for the South Texas Project License Renewal Application - SAMA Project stage: Response to RAI ML12033A1342012-02-14014 February 2012 January 31, 2012, Summary of Telephone Conference Call Held Between the NRC and STP Nuclear Operating Company, Concerning Requests for Additional Information Pertaining to the South Texas Project License Renewal Application Project stage: RAI NOC-AE-12002795, Clarification to Supplemental Response to Request for Additional Information for the South Texas Project License Renewal Application - SAMA2012-02-16016 February 2012 Clarification to Supplemental Response to Request for Additional Information for the South Texas Project License Renewal Application - SAMA Project stage: Response to RAI ML12017A1282012-02-29029 February 2012 RAI for the Review of the STP LRA (TAC Nos. ME4938 and ME5122) Project stage: RAI ML12047A2852012-02-29029 February 2012 January 17, 2012, Summary of Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission & STP Nuclear Operating Company, Concerning Requests for Additional Information Pertaining to the South Texas Project License Renewal Project stage: RAI NOC-AE-12002818, Response to Requests for Additional Information for the Review of the South Texas Project License Renewal Application2012-03-12012 March 2012 Response to Requests for Additional Information for the Review of the South Texas Project License Renewal Application Project stage: Response to RAI ML11290A2262012-03-19019 March 2012 Revision of Schedule for the Conduct of Environmental Review of the South Texas Project License Renewal Application Project stage: Approval NOC-AE-12002840, Renewal of the Wastewater Discharge Permit2012-04-17017 April 2012 Renewal of the Wastewater Discharge Permit Project stage: Request ML12128A0612012-05-0404 May 2012 NRR E-mail Capture - NEPA Consultation - Waterborne Outbreak Project stage: Request ML12142A0022012-05-18018 May 2012 NRR E-mail Capture - Environmental Permit Updated Status Project stage: Request ML12144A4432012-06-25025 June 2012 Request for Additional Information for the Review of the South Texas Project, Units 1 and 2, License Renewal Application- Aging Management, Set 20 TAC Nos. ME4939 and ME4937) STP-RAIs-Set 20-RAI Project stage: RAI ML12171A4832012-08-10010 August 2012 Revision of Schedule for the Conduct of Environmental Review of the South Texas Project License Renewal Application (TAC Nos. ME5122, ME5123, ME4938, and ME4939) Project stage: Approval ML11153A0822012-11-14014 November 2012 Issuance of Environmental Scoping Summary Report Associated with the Staff'S Review of the Application by STP Nuclear Operating Company for Renewal of the Operating License for South Texas Project, Units 1 and 2 Project stage: Approval ML12086A0812012-11-14014 November 2012 Environmental Impact Statement Scoping Process Summary Report for South Texas Project, Units 1 and 2 Project stage: Other ML12264A6422012-11-14014 November 2012 STP Scoping Report_Paula Cooper Project stage: Other ML12324A0492012-11-30030 November 2012 NUREG-1437 Supp 48 Dfc Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding South Texas Project, Units 1 and 2 (Draft for Comment) Project stage: Draft Other ML12339A2652012-12-0505 December 2012 Notice of Availability of the Draft Plant-Specific Supplement 48 to the GEIS for License Renewal of Nuclear Plants Regarding South Texas Project, Units 1 and 2, (TAC ME5122, ME5123, ME4938, and ME4939) Project stage: Draft Other ML12195A0852012-12-0505 December 2012 Notice of Availability of the Draft Plant-Specific Supplement 48 to the GEIS for License Renewal of Nuclear Plants Regarding South Texas Project, Units 1 and 2, (TAC Nos. ME5122, ME5123, ME4938, and ME4939) Project stage: Draft Other ML13029A4972013-01-15015 January 2013 Slides - Preliminary Site-Specific Results of the Environmental Review for South Texas Project License Renewal Project stage: Other ML13029A7552013-01-15015 January 2013 Transcript of South Texas Project License Renewal Public Meeting: Afternoon Session, January 15, 2013, Pages 1-34 Project stage: Meeting NOC-AE-13002945, Update to License Renewal Application - Environmental Permits2013-01-21021 January 2013 Update to License Renewal Application - Environmental Permits Project stage: Other ML13011A1312013-02-11011 February 2013 Revision of Schedule for the Conduct of Environmental Review of the South Texas Project License Renewal Application (TAC Nos. ME5122, ME5123, ME4938, and ME939) Project stage: Approval ML13023A3342013-02-25025 February 2013 1/15/2013 Summary of Public Meetings Conducted to Discuss Draft Supplemental Environmental Impact Statement Related to Review of South Texas Project, Units 1 & 2, License Renewal Application ML13063A0712013-03-0101 March 2013 Efh Consultation W/ NRC for South Texas Nuclear Plant License Renewal Project stage: Other NOC-AE-13002969, Response to Requests for Additional Information for Review of License Renewal Application Concerning Wildlife Management (TAC Nos. ME5122 and ME5123)2013-03-0606 March 2013 Response to Requests for Additional Information for Review of License Renewal Application Concerning Wildlife Management (TAC Nos. ME5122 and ME5123) Project stage: Response to RAI ML13077A1172013-03-14014 March 2013 NRR E-mail Capture - South Texas NRC Informal Consultation Project stage: Request NOC-AE-13002999, Annual Environmental Operating Report, Chapter 5 Through End2013-04-30030 April 2013 Annual Environmental Operating Report, Chapter 5 Through End Project stage: Request NOC-AE-13003000, Radioactive Effluent Release Report2013-04-30030 April 2013 Radioactive Effluent Release Report Project stage: Request 2012-11-30
[Table View] |
|
---|
Category:Letter type:NOC
MONTHYEARNOC-AE-230040, Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06)2023-12-14014 December 2023 Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06) NOC-AE-230039, Docket Nos. Stn 50-498, Stn 50-499 - Reply to a Notice of Violation, NRC Inspection Report 05000498/2023003 and 05000499/20230032023-12-12012 December 2023 Docket Nos. Stn 50-498, Stn 50-499 - Reply to a Notice of Violation, NRC Inspection Report 05000498/2023003 and 05000499/2023003 NOC-AE-230039, Submittal of Update Foreign Ownership, Control or Influence (FOCI)2023-07-11011 July 2023 Submittal of Update Foreign Ownership, Control or Influence (FOCI) NOC-AE-220039, Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program Revision 252023-02-0606 February 2023 Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program Revision 25 NOC-AE-220038, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask2022-06-23023 June 2022 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask NOC-AE-210038, Submittal of Operations Quality Assurance Plan Changes QA-089, QA-091, and Revision 252022-01-0404 January 2022 Submittal of Operations Quality Assurance Plan Changes QA-089, QA-091, and Revision 25 NOC-AE-21003858, 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes2021-12-0606 December 2021 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes NOC-AE-21003853, Revised Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material2021-12-0303 December 2021 Revised Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material NOC-AE-21003848, Unit 1 Cycle 24 Core Operating Limits Report2021-11-18018 November 2021 Unit 1 Cycle 24 Core Operating Limits Report NOC-AE-21003846, Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material2021-11-0404 November 2021 Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material NOC-AE-21003842, 10 CFR 50.59 Summary Report2021-09-23023 September 2021 10 CFR 50.59 Summary Report NOC-AE-21003841, Request for Relief from ASME Section Xl Code Requirements for Weld Examinations (Relief Request RR-ENG-3-25)2021-09-23023 September 2021 Request for Relief from ASME Section Xl Code Requirements for Weld Examinations (Relief Request RR-ENG-3-25) NOC-AE-21003832, Supplement to License Amendment Request to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2021-09-0909 September 2021 Supplement to License Amendment Request to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections NOC-AE-21003812, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2021-08-10010 August 2021 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections NOC-AE-21003825, Update of Foreign Ownership, Control, or Influence Information (FOCI)2021-08-0505 August 2021 Update of Foreign Ownership, Control, or Influence Information (FOCI) NOC-AE-21003824, Update Foreign Ownership, Control, or Influence (FOCI)2021-07-29029 July 2021 Update Foreign Ownership, Control, or Influence (FOCI) NOC-AE-21003823, Update Foreign Ownership Control or Influence (FOCI)2021-07-28028 July 2021 Update Foreign Ownership Control or Influence (FOCI) NOC-AE-21003820, Nuclear Insurance Protection2021-07-20020 July 2021 Nuclear Insurance Protection NOC-AE-21003819, Inservice Inspection Summary Report - 2RE212021-07-15015 July 2021 Inservice Inspection Summary Report - 2RE21 NOC-AE-21003816, Commitment Change Summary Report2021-06-30030 June 2021 Commitment Change Summary Report NOC-AE-21003814, Technical Specification Bases Control Program2021-06-24024 June 2021 Technical Specification Bases Control Program NOC-AE-21003810, Update Foreign Ownership, Control, or Influence (FOCI)- CPS Energy2021-06-17017 June 2021 Update Foreign Ownership, Control, or Influence (FOCI)- CPS Energy NOC-AE-21003811, Update Foreign Ownership, Control, or Influence (FOCI)- Nrg Energy2021-06-17017 June 2021 Update Foreign Ownership, Control, or Influence (FOCI)- Nrg Energy NOC-AE-21003806, Inservice Inspection Program Plan and Inservice Testing Program Snubber Inservice Test Plan for the Fourth Ten-Year Interval2021-05-20020 May 2021 Inservice Inspection Program Plan and Inservice Testing Program Snubber Inservice Test Plan for the Fourth Ten-Year Interval NOC-AE-21003801, Annual Dose Report for 20202021-04-26026 April 2021 Annual Dose Report for 2020 NOC-AE-21003802, 2020 South Texas Project Electric Generating Station Annual Environmental Operating Report2021-04-26026 April 2021 2020 South Texas Project Electric Generating Station Annual Environmental Operating Report NOC-AE-21003804, Operator Licensing Examination Schedule2021-04-21021 April 2021 Operator Licensing Examination Schedule NOC-AE-21003800, Radioactive Effluent Release Report2021-04-19019 April 2021 Radioactive Effluent Release Report NOC-AE-21003799, Changes to South Texas Project Electric Generating Station (STPEGS) Emergency Plan2021-04-15015 April 2021 Changes to South Texas Project Electric Generating Station (STPEGS) Emergency Plan NOC-AE-21003795, Cycle 22 Core Operating Limits Report2021-04-15015 April 2021 Cycle 22 Core Operating Limits Report NOC-AE-21003796, Update Foreign Ownership, Control, or Influence (FOCI)2021-04-15015 April 2021 Update Foreign Ownership, Control, or Influence (FOCI) NOC-AE-21003791, Financial Assurance for Decommissioning - 2021 Update2021-03-31031 March 2021 Financial Assurance for Decommissioning - 2021 Update NOC-AE-21003790, Response to Apparent Violations in NRC Inspection Report 05000498/2020401 and 05000499/2020401: (EA-20-122) (Letter)2021-03-31031 March 2021 Response to Apparent Violations in NRC Inspection Report 05000498/2020401 and 05000499/2020401: (EA-20-122) (Letter) NOC-AE-210037, STP Fire Hazards Analysis Report, Amendment 26 (Redacted)2021-03-30030 March 2021 STP Fire Hazards Analysis Report, Amendment 26 (Redacted) NOC-AE-21003792, STP Fire Hazards Analysis Report, Amendment 26 (Redacted)2021-03-30030 March 2021 STP Fire Hazards Analysis Report, Amendment 26 (Redacted) NOC-AE-200037, License Amendment Request to Revise Technical Specification 3.6.3 to Append a Note and Remove the Index from Technical Specifications2021-03-11011 March 2021 License Amendment Request to Revise Technical Specification 3.6.3 to Append a Note and Remove the Index from Technical Specifications NOC-AE-21003784, Response to Request for Additional Information Regarding 1RE22 Inspection Summary Report for Steam Generator Tubing2021-03-0808 March 2021 Response to Request for Additional Information Regarding 1RE22 Inspection Summary Report for Steam Generator Tubing NOC-AE-21003786, Annual Fitness for Duty Performance Report for 20202021-03-0101 March 2021 Annual Fitness for Duty Performance Report for 2020 NOC-AE-21003785, Evidence of Financial Protection2021-02-23023 February 2021 Evidence of Financial Protection NOC-AE-21003781, Notice Regarding Withdrawal of Funds from Nuclear Decommissioning Trust Subaccounts2021-01-27027 January 2021 Notice Regarding Withdrawal of Funds from Nuclear Decommissioning Trust Subaccounts NOC-AE-21003780, Submittal of Update Foreign Ownership, Control, or Influence (FOCI)2021-01-0707 January 2021 Submittal of Update Foreign Ownership, Control, or Influence (FOCI) NOC-AE-20003778, Changes to South Texas Project Electric Generating Station Emergency Plan2020-12-17017 December 2020 Changes to South Texas Project Electric Generating Station Emergency Plan NOC-AE-20003777, STPNOC Concerns Regarding the Proposed Change to the Evaluated Force-on-Force Inspection Guidance During the COVID-19 Public Health Emergency2020-12-10010 December 2020 STPNOC Concerns Regarding the Proposed Change to the Evaluated Force-on-Force Inspection Guidance During the COVID-19 Public Health Emergency NOC-AE-20003766, Supplement to Change Implementation Date for License Amendment Request to Revise the STPEGS Emergency Plan2020-12-0202 December 2020 Supplement to Change Implementation Date for License Amendment Request to Revise the STPEGS Emergency Plan NOC-AE-20003767, Request for a One-Time Exemption from 10 CFR 73, Appendix 8, Section VI, Subsection C.3.(1)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic2020-11-16016 November 2020 Request for a One-Time Exemption from 10 CFR 73, Appendix 8, Section VI, Subsection C.3.(1)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic NOC-AE-20003765, Inservice Testing Program Description for the Fourth Ten-Year Interval2020-10-28028 October 2020 Inservice Testing Program Description for the Fourth Ten-Year Interval NOC-AE-20003764, 1 RE22 Inspection Summary Report for Steam Generator Tubing2020-10-0707 October 2020 1 RE22 Inspection Summary Report for Steam Generator Tubing NOC-AE-20003762, Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-374, Revision 0, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil Using the Consolidated Line Item Improvemen2020-09-22022 September 2020 Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-374, Revision 0, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil Using the Consolidated Line Item Improvemen NOC-AE-20003761, Supplement to Exemption Request from 10 CFR 50 Appendix E Due to COVID-19 Pandemic2020-09-10010 September 2020 Supplement to Exemption Request from 10 CFR 50 Appendix E Due to COVID-19 Pandemic NOC-AE-20003760, Update Foreign Ownership. Control. or Influence(FOCI)- Transmittal2020-09-0808 September 2020 Update Foreign Ownership. Control. or Influence(FOCI)- Transmittal 2023-07-11
[Table view] |
Text
Nuclear Operating Company South Texas Pro/ect Electric Generating Station PO. Box 289 Wadsworth, Texas 77483 'vvvA -
February 16, 2012 NOC-AE-12002795 10CFR54 STI: 33302799 File: G25 U.S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852-2746 South Texas Project Units 1 and 2 Docket Nos. STN 50-498, STN 50-499 Clarification to Supplemental Response to Request for Additional Information for the South Texas Proiect License Renewal ADDlication - SAMA (TAC No. ME4938 and ME5122V)
References:
- 1. STPNOC Letter dated October 25, 2010, from G. T. Powell to NRC Document Control Desk, "License Renewal Application" (NOC-AE-1 0002607) (ML103010257)
- 2. STPNOC Letter dated January 19, 2012 from D. W. Rencurrel to NRC Document Control Desk, "Supplemental Response to Requests for Additional Information for the South Texas Project License Renewal Application - SAMA (TAC Nos. ME4938 and ME5122)" (NOC-AE-1 1002773) (ML12030A081)
- 3. Summary of Telephone Conference Call Held on January 31, 2012, Between the U.S. Nuclear Regulatory Commission and STP Nuclear Operating Company, Concerning Requests for Additional Information Pertaining to the South Texas Project License Renewal Application (ML12033A134)
By Reference 1, STP Nuclear Operating Company (STPNOC) submitted the License Renewal Application (LRA) for South Texas Project (STP) Units 1 and 2. By Reference 2, STPNOC provided supplemental information to a response to NRC requests for additional information regarding severe accident mitigation alternatives (SAMA). This letter provides clarification to the information provided in Reference 2 as agreed to by STPNOC during a teleconference (Reference 3) with the Nuclear Regulatory Commission on January 31, 2012.
There are no regulatory commitments in this letter.
Should you have any questions regarding this letter, please contact either Arden Aldridge, STP License Renewal Project Lead, at (361) 972-8243 or Ken Taplett, STP License Renewal Project regulatory point-of-contact, at (361) 972-8416.
NOC-AE-12002795 Page 2 I declare under penalty of perjury that the foregoing is true and correct.
Executed on 2/11Zk/2, Date D. W. Rencurrel Senior Vice President, Technical Support & Oversight KJT
Enclosure:
Clarification to STPNOC Response to Requests for Additional Information
NOC-AE-12002795 Page 3 cc:
(paper copy) (electronic copy)
Regional Administrator, Region IV A. H. Gutterman, Esquire U. S. Nuclear Regulatory Commission Kathryn M. Sutton, Esquire 1600 East Lamar Boulevard Morgan, Lewis & Bockius, LLP Arlington, Texas 76011-4511 Balwant K. Singal John Ragan Senior Project Manager Chris O'Hara U.S. Nuclear Regulatory Commission Jim von Suskil One White Flint North (MS 8B1) NRG South Texas LP 11555 Rockville Pike Rockville, MD 20852 Senior Resident Inspector Kevin Polio U. S. Nuclear Regulatory Commission Richard Pena P.O. Box 289, Mail Code: MN116 City Public Service Wadsworth, TX 77483 C. M. Canady Peter Nemeth City of Austin Crain Caton & James, P.C.
Electric Utility Department 721 Barton Springs Road C. Mele Austin, TX 78704 City of Austin John W. Daily Richard A. Ratliff License Renewal Project Manager (Safety) Alice Rogers U.S. Nuclear Regulatory Commission Texas Department of State Health Services One White Flint North (MS 011-Fl)
Washington, DC 20555-0001 Tam Tran Balwant K. Singal License Renewal Project Manager John W. Daily (Environmental) Tam Tran U. S. Nuclear Regulatory Commission U. S. Nuclear Regulatory Commission One White Flint North (MS O11F01)
Washington, DC 20555-0001
Enclosure NOC-AE-12002795 Page 1 of 4 SOUTH TEXAS PROJECT LICENSE RENEWAL APPLICATION CLARIFICATION TO STPNOC RESPONSE TO REQUESTS FOR ADDITIONAL INFORMATION
Reference:
STPNOC Letter dated January 19, 2012 from D. W. Rencurrel to NRC Document Control Desk, "Supplemental Response to Requests for Additional Information for the South Texas Project License Renewal Application - SAMA (TAC Nos. ME4938 and ME5122)" (NOC-AE-1 1002773) (ML12030A081)
As the result of a teleconference between the Nuclear Regulatory Commission and STP Nuclear Operating Company (STPNOC) on January 31, 2012 regarding the referenced letter, STPNOC provides the following clarifying information.
Clarification 1 NRC Request:
Background information:
The staffs assessment of SAMA 4 scenario listed in the January 12, 2012, response (ML12030A081), is that it is potentially cost-beneficial if the staff takes into account the applicant's August 23, 2011, response (ML11250A067), to the original May 31, 2011, RAI 2.e (ML11140A015), regarding non-conservative source terms (the applicant did not address this in the revised analysis of identified SAMAs in the January 19, 2012, RAI response (ML12030A081)). RAI 2.e is listed below:
RAI 2.e:
ER Section F.3.6 describes the selection of the representative accident sequence/source terms for the major release categories. The one example discussed was that an accident sequence with a moderate frequency and severe release characteristics would be selected over an accident sequence with a relatively high frequency and a minor radionuclide release. From the information provided, none of the selected representative sequences (for those categories where multiple source term results are provided) follow this conservative example.
For major Release Categories II and III, the selected sequences are not those with the most severe release characteristics. While the information provided in ER Table F.3-8 indicates that the representative sequences are appropriate for the base case, this is not necessarily true for a SAMA case where the Level 2 end-state distribution would be different from the base case. For example, if a SAMA primarily impacted sequences which have low reactor pressure vessel (RPV) failure pressure then the frequency of end-states R07SU and R1 1 U would be reduced. Since these end-states have higher release fractions (and most likely, higher dose-risk and offsite economic cost risk per event) than the representative sequence chosen, the benefit could be larger than that assessed using the representative release fractions.
Enclosure NOC-AE-12002795 Page 2 of 4 If the source term chosen for a release category is not the most severe of the significantly contributing end-states, the benefit could be underestimated for any SAMA which primarily impacts an end-state with a higher release fraction. For example, SAMA 4 impacts only the end-state VSEQ (interfacing system loss of coolant accident (LOCA)) portion of Release Category I. It is not clear that end-state VSEQ has a less severe release than the ISGTR end-state, which was chosen as representative for Release Category I. Release fractions for Inter-System LOCA (ISLOCA) are usually greater than that given for ISGTR. The STP IPE (Table 4.8.3-4) gives interfacing system Cs and I release fractions from 0.15 to 0.4 depending on the methodology. Similarly for SAMA 10, which impacts steam generator tube rupture (SGTR) sequences, the removal of these sequences from Release Category III will have a more significant impact since the release fractions for SGTR are three orders of magnitude greater than those for the representative sequence. Provide further support for the selection of the representative sequences and their adequacy for the SAMA analysis.
Clarification needed:
The staff requested the applicant to provide further justification for why it is not cost-beneficial based on further review and breakdown of its benefit analysis.
STPNOC Response:
The Severe Accident Mitigation Alternative (SAMA) 4 averted cost-risk estimates for the fire update (Table 19 of Attachment 1 to the Enclosure of the referenced letter), for the seismic update (Table 6 of Attachment 2 to the Enclosure of the referenced letter), and for the "integrated" update (Table 12 of Attachment 2 to the Enclosure of the referenced letter) are inconsistent.
Specifically, the averted cost-risk for SAMA 4 is approximately the same when the updated fire and seismic results are considered separately (approximately $71,000 using the 9 5 th percentile Probabilistic Risk Assessment (PRA) results). However, when the fire and seismic updates are considered simultaneously (in the "integrated" model), the averted cost-risk is estimated to be approximately $83,000. While this is a relatively small change compared to the South Texas Project (STP) maximum averted cost-risk (MACR), SAMA 4 could be classified as cost-beneficial if this larger averted cost-risk is used as the starting point to scale up the results to account for the conservative source terms used in the sensitivity analysis for the response to SAMA RAI 2e (
Reference:
STPNOC letter dated July 5, 2011, NOC-AE-1 1002687, ML 1193A016).
The calculation results were reviewed to identify and evaluate the source of the differences in the SAMA 4 averted cost-risk estimates. The results of the review indicate that the differences are due to the rounding of the core damage frequency (CDF) and Level 2 release category frequencies. If the PRA results for the "integrated" model are used without rounding, the averted cost-risk for SAMA 4 is consistent with the other cases (i.e. $71,226 when the nominal source terms and the 9 5 th percentile multiplier are applied).
Enclosure NOC-AE-12002795 Page 3 of 4 When the rounding error is eliminated, the SAMA 4 averted cost-risk is reduced and would not be cost beneficial when the "conservative" source term is applied.
Clarification 2 NRC Request:
Background information:
Table 5 of the applicant's January 19, 2012, response (ML12030A081) indicates, for the essential cooling water (ECW) pumps with HCLPFs (high confidence of a low probability of failure) of 0.48g, the credible failure mode of the pumps is the seismic restraint bolts for the support of the pump casing. However, the applicant did not evaluate this plant modification as a SAMA candidate and it appears to the staff that a SAMA to replace the existing bolts with stronger bolts might be a much less expensive SAMA than the "seismic safe" system that the applicant evaluated as a cost beneficial alternative, which could prove to be a cost beneficial lower cost mitigation alternative.
Clarification needed:
The staff requests the applicant to provide a discussion of the potential for cost beneficial lower cost mitigation alternatives for this ECW pumps failure mode (e.g., replacing the ECW seismic restraint bolts).
Discussion:
During the conference call, the applicant confirmed understanding of the request and the action of providing additional clarification in February 2012, as LRA supplement. Hence, there is no need for a follow-up RAI.
STPNOC Response:
The split fraction importance review documented in Tables 8 and 9 of Attachment 2 to the Enclosure of the referenced letter) was limited to those contributors that correlate to averted cost-risk values of $100,000 or more. No contributors related to the Essential Cooling Water (ECW) system met this criterion. Therefore, no SAMAs were developed to address ECW failures.
While failure of the ECW pump casing seismic restraint bolts may be a credible failure mode for the pumps, these failures are not large contributors to risk. In order to demonstrate the limited impact of a SAMA to replace the ECW pump casing seismic restraint bolts, an averted cost-risk was estimated using PRA insights. The importance results for the "integrated" model described in the referenced letter were reviewed to identify the contribution from ECW pump seismic restraint bolt failures. The component identifier "ECWPUMP" represents seismically-induced ECW pump failures that include this failure mode. The following table summarizes the Level 1 and Level 2 Fussel-Vesely importance values for the ECWPUMP component. These values are based on contribution to total risk, which includes internal and external events risk from the "integrated" model, nominal source terms, and nominal PRA results.
Enclosure NOC-AE-12002795 Page 4 of 4 ECWPUMP Importance Summary (based on total risk)
Sequence Group ECWPUMP Fussell-Vesely Value CDF 2.0689E-2 Level 2 2.6085E-2 As described in the STP License Renewal Application Environmental Report (ER), the Level 2 sequence group is based on the combined results of release category Groups 1, 2, and 3.
The ECWPUMP Fussell-Vesely values were used to estimate the reductions in CDF, Dose-Risk, and offsite economic cost-risk (OECR) that would result from eliminating the failures represented by ECWPUMP. The following table summarizes these results that are rounded off.
PRA Results Summary for ECW Pump Seismic Restraint Bolt Enhancement CDF Dose-Risk OECR Base Value 1.06E-05 3.48 $2,988 SAMA Value 1.04E-05 3.39 $2,910 Percent -2.1% -2.6% -2.6%
Change Using the methodology from Section F.4 of the ER, these results were used to calculate the cost-risk for the site assuming that the ECW pump seismic restraint bolts are made 100 percent reliable. The resulting value which accounts for both STP Units is $881,732. The total averted cost-risk is the difference between this resulting value and the MACR from the "integrated" model base case documented in the referenced letter.
Averted Cost Risk for ECW Pump Seismic Restraint Bolt Enhancement Base Case SAMA Averted Cost-Risk Cost-Risk Cost-Risk
$902,000 $881,732 $20,268 If the 9 5 th percentile PRA results are applied, the averted cost-risk is $54,276 based on the 2.7 multiplier. Because this value is below the minimum expected implementation cost of
$100,000, replacing the ECW pump seismic restraint bolts is not considered to be a cost-beneficial plant enhancement.