Transcript of South Texas Project License Renewal Public Meeting: Afternoon Session, January 15, 2013, Pages 1-34
ML13029A755
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 01/15/2013
From:
Division of License Renewal
To:
Tran T, 415-3617
References
NRC-3030
Download: ML13029A755 (34)


Text

Official Transcript of Proceedings NUCLEAR REGULATORY COMMISSION Title: South Texas Project License Renewal Public Meeting: Afternoon Session Docket Number: (n/a)

Location: Bay City, Texas Date: Tuesday, January 15, 2013 Work Order No.: NRC-3030 Pages 1-34 NEAL R. GROSS AND CO., INC.

Court Reporters and Transcribers 1323 Rhode Island Avenue, N.W.

Washington, D.C. 20005 (202) 234-4433

1 1 UNITED STATES OF AMERICA 2 NUCLEAR REGULATORY COMMISSION 3 + + + + +

4 PRELIMINARY SITE-SPECIFIC RESULTS 5 OF THE ENVIRONMENTAL REVIEW FOR 6 SOUTH TEXAS PROJECT LICENSE RENEWAL 7 + + + + +

8 PUBLIC MEETING 9 AFTERNOON SESSION 10 + + + + +

11 Tuesday, January 15, 2013 12 201 7th Street 13 Bay City, Texas 14 2:00 p.m.

15 16 ON BEHALF OF THE NRC:

17 SUSAN SALTER, Facilitator 18 19 OTHER NRC STAFF:

20 TAM TRAN 21 BINESH THARAKAN 22 DAVE WRONA 23 EMILY LARSON 24 LARA [USELDING]

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

2 1 CONTENTS 2 SPEAKER/TOPIC PAGE 3 NRC Introduction ................................... 3 4 NRC Staff Presentation ............................. 5 5 Public Comments ................................... 20 6 NRC Closing Remarks ............................... 32 7 Adjourn 8

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

3 1 P R O C E E D I N G S 2 MS. SALTER: Welcome to the NRC's public 3 meeting. My name is Susan Salter, and I'm going to be 4 your facilitator for the meeting this afternoon. Bob 5 Hagar is going to be helping me facilitate, and our role 6 as facilitators is really just to help the meeting run 7 smoothly, keep us on time, make sure that everyone who's 8 come out to make a comment has an opportunity to do so.

9 A couple of housekeeping items: We are 10 having the meeting transcribed. Leslie Berridge is our 11 recorder, and to help Leslie get an accurate recording, 12 we ask you to help us with a couple of things.

13 One is to keep background noise or sidebar 14 conversations to a minimum. In addition, if you have 15 electronic devices, please put them on silent mode. If 16 you need to take a call, we certainly understand that and 17 just ask that you step outside of the meeting room to do 18 that.

19 Restrooms: If you go out this door to the 20 left, the first left is the women's room; straight is the 21 exit; and right next to the exit is the men's room. You 22 can also go to the right and there are some other 23 restrooms and exits out there, but I think the closest 24 one is to your left as you exit out of this room.

25 So let me get started by just restating the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

4 1 purpose of tonight's meeting, which is to present the 2 findings and collect public comment on the Draft 3 Environmental Impact Statement for the proposed renewal 4 of the South Texas Project nuclear power plant's 5 operating licenses for an additional 20 years.

6 Now, during this meeting you may hear 7 individuals refer to the Environmental Impact Statement 8 as the EIS or the DEIS, for Draft Environmental Impact 9 Statement, and I know NRC staff tries to keep those 10 abbreviations to a minimum, but those ones I'm sure will 11 probably creep up.

12 The agenda for the meeting this afternoon, 13 as well as the meeting tonight, which will begin at 7:00, 14 is to have a presentation by NRC staff, and following that 15 we'll have a very brief, maybe ten-minute, Q&A session.

16 And the reason for that is during the public 17 comment period, which will follow the Q&A, the NRC staff 18 is really in a listening mode so they don't engage in a 19 dialog with the public; they really just listen to the 20 public's comments. That's why they're here.

21 But to provide any clarifications on what 22 you may hear during the presentation or to answer any 23 questions on the NRC process, they want to give the public 24 about 10 or 15 minutes or so to ask those questions and 25 to get those clarifications.

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

5 1 So I'll go over the process that we'll use 2 for the public comment period when we get to that point, 3 but just as a reminder, as I said, if you want to make 4 a comment, you do need to fill out a yellow card. Those 5 are helpful for Leslie to make sure we have accurate 6 spelling of your names.

7 So please, if you change your mind during 8 the meeting, if you haven't signed up yet, you can always 9 sign up during the meeting. Bob has cards as well. You 10 can raise your hand or get his attention and get a card 11 from him, fill it out, give it back to him.

12 So with that, I think I've covered all the 13 housekeeping items. I think I'm going to turn it over 14 to Tam Tran.

15 Tam is the project manager in the Division 16 of License Renewal in the NRC's office of Nuclear Reactor 17 Regulation, and he is going to provide the NRC 18 presentation for this afternoon.

19 MR. TRAN: Thank you, Susan. Thank you all 20 for taking the time to come to this meeting. My name is 21 Tam Tran; I'm the project manager for the environmental 22 review of the South Texas Project license renewal.

23 I hope the information we provide with this 24 presentation will help you to understand the process 25 we're going through, what we have done so far, and the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

6 1 role that you can play in helping us and make sure that 2 the Final Environmental Impact Statement is accurate.

3 With that, I would like to acknowledge a few 4 NRC staff here today. First of all, I would like to 5 acknowledge our South Texas Project resident inspector, 6 Binesh Tharakan. Next I would like to acknowledge our 7 branch chief for the Environmental Project Branch for 8 License Renewal, Dave Wrona.

9 Next Emily Larson's our social scientist 10 who contributes significant review to our draft 11 supplemental Environmental Impact Statement. Also we 12 have today Lara [Uselding], who is from Region 4, 13 representing our regional office.

14 Next I would like to start off by briefly 15 going over the agenda for today's presentation. I will 16 explain the NRC license renewal process for nuclear power 17 plants, with emphasis on the environmental review 18 process, when we are going to present the preliminary 19 finding of our environmental review, which assesses the 20 impacts associated with extending the operating license 21 of the South Texas Project for an additional 20 years.

22 Then we'll give you some information about 23 the schedule for the balance of our review and how you 24 can submit comments in the future, and then finally 25 really the most important part of today's meeting is NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

7 1 where we receive any comment that you may have for this 2 review.

3 Before I get into the discussion of license 4 renewal process, I would like to take a minute to talk 5 about the NRC in terms of what we do and what our mission 6 is.

7 The Atomic Energy Act authorizes the NRC to 8 regulate the civilian use of nuclear materials in the 9 United States, including the use of nuclear materials for 10 power production.

11 In exercising that authority, the NRC's 12 mission is threefold: To ensure adequate protection of 13 public health and safety, to promote the common defense 14 and security, and to protect the environment.

15 The NRC accomplishes its mission through a 16 combination of regulatory programs and processes, such 17 a reviewing license applications, conducting 18 inspections, issue enforcement actions, assessing 19 licensee performance, and evaluating operating 20 experience from nuclear plants across the country and 21 internationally.

22 The Atomic Energy Act is the legislation 23 that authorizes the NRC to issue licenses. The Atomic 24 Energy Act provides for a 40-year license term for power 25 reactors. This 40-year terms is based primarily on NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

8 1 economic considerations and antitrust factors, not on 2 safety limitations of the plant.

3 NRC conducts license reviews for plants 4 whose owners wish to operate them beyond their initial 5 license period.

6 This slide gives an overview of the South 7 Texas Project license renewal process. The review 8 process involves two parallel paths: the safety review 9 and environmental review. For the purpose of today's 10 meeting, we will discuss the environmental review.

11 The staff environmental review consists of 12 the Generic Environmental Impact Statement and the 13 Supplemental Environmental Impact Statement. The 14 Generic EIS examines the possible environmental impacts 15 that could occur as a result of renewing licenses of 16 nuclear power plants under 10 CFR Part 54.

17 The Generic EIS, to the extent possible, 18 established the bounds and significance of these 19 potential impacts. The analyses in the Generic EIS 20 encompasses all operating light-water power reactors.

21 These analyses attempt to establish a generic finding 22 covering as many plants as possible.

23 For some environmental issues the Generic 24 EIS found that the generic evaluation was not sufficient 25 and that a plant-specific analysis was required.

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

9 1 To supplement the Generic EIS, the staff 2 conducted site-specific reviews of the South Texas 3 Project. The site-specific findings for South Texas 4 Project are contained in the Draft Supplemental 5 Environmental Impact Statement. This document contains 6 analyses of all appropriate site-specific issues as well 7 as a review of issues covered by the Generic EIS. This 8 is to determine whether the conclusions in the Generic 9 EIS are valid for South Texas Project.

10 In this process NRC staff also reviewed the 11 environmental impacts of potential power generation 12 alternatives to license renewal to determine whether or 13 not the impacts expected from the license renewal are 14 unreasonable.

15 Together the Generic EIS and the 16 Supplemental EIS form the staff's analysis of the impact 17 of the license renewal for South Texas Project.

18 This slide shows the approach that the staff 19 used for environmental analysis. The NRC evaluates 20 impacts of all plants across the entire country to 21 determine if there were impacts that were common to all 22 operating plants.

23 NRC looked at 92 separate impact areas and 24 found 69 issues. The impacts were the same for plants 25 with similar features. NRC called these Category 1 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

10 1 issues and made the same, or generic, determinations 2 about the impacts in the Generic Environmental Impact 3 Statement for license renewal.

4 NRC was not able to make generic conclusions 5 about the remaining 23 issues. Twenty-one of these 6 issues, which the NRC called Category 2 issues, the NRC 7 decided to prepare site-specific supplements to the 8 Generic EIS that address these 21 issues.

9 For example, electromagnetic field acute 10 effects are electric shock associated with the 11 electrical lines at South Texas Project, is a Category 12 2 issue.

13 In addition, two issues are referred to as 14 not categorized, and therefore a site-specific analysis 15 is also needed.

16 The Supplemental Environmental Impact 17 Statement for South Texas Project license renewal is 18 being discussed today. The NRC did not rule out the 19 possibility that the generic conclusions in the Generic 20 EIS may not apply to any specific plant in all cases.

21 If new and significant information is found 22 that would change the generic conclusions in the Generic 23 EIS, then the staff would perform a site-specific 24 analysis on that issue.

25 This slide shows important milestones for NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

11 1 the environmental review process. The highlighted 2 dates indicate opportunities for public involvement in 3 the environmental review.

4 As each plant comes in for license renewal, 5 we publish a plant-specific supplement to the Generic 6 EIS. The Draft Supplemental Environmental Impact 7 Statement for South Texas Project was published on 8 December 5, 2012, and also known as Supplement 48 of the 9 Generic EIS. And we are currently accepting public 10 comments on this document until February 22, 2013.

11 Today's meeting is being transcribed, and 12 comment provided here will be considered the same way as 13 written comment submitted to NRC. Once the comment 14 period closes, we will develop the final Supplemental 15 EIS, which we expect to publish in 2013, approximately 16 seven months from the draft.

17 Now I'm going to discuss in more detail 18 about the preliminary result of the review. For each 19 environmental issue identified, an impact level is 20 assigned.

21 For a small impact, the effect is not 22 detectable or too small to destabilize or noticeably 23 alter any important attribute of the environmental 24 resource being reviewed.

25 For a moderate impact, the effect is NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

12 1 sufficient to alter noticeably but not destabilize 2 important attributes of the resource.

3 And finally, for impact to be considered 4 large, the effect must be clearly noticeable and 5 sufficient to destabilize important attributes of the 6 resource.

7 For example, the operation of South Texas 8 Project may cause the loss of adult and juvenile fish at 9 the intake structure. If the loss of fish is so small 10 that it does not appear to have noticeably altered 11 population of those species found in the lower Colorado 12 River, the impact will be small.

13 If losses cause some population to increase 14 or decrease and then stabilize at a different level, the 15 impact would be moderate.

16 If losses at the intake structure cause the 17 fish population to decline to the point where it cannot 18 be stabilized and continue to decline, then the impact 19 would be large.

20 For South Texas Project, the impact to the 21 fishery are small.

22 In conducting the review, an environmental 23 review team from NRC and Pacific Northwest Laboratory 24 analyzed [the] various impacts to the environment. This 25 review involves a wide range of expertise illustrated on NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

13 1 this slide. The team examined environmental justice, 2 ecology, land use, regulatory compliance, climate 3 change, et cetera, for the supplement.

4 This slide lists the site-specific issues 5 that the NRC staff reviewed for the continuing operation 6 of South Texas Project during the proposed license 7 renewal period. Each issue is assigned a level of 8 environmental impact of small, moderate, or large by the 9 environmental reviewers.

10 In addition, there are two uncategorized 11 issues. Those are environmental justice and 12 electromagnetic field chronic effect. For 13 electromagnetic field chronic effects, the staff 14 considers the Generic EIS finding of uncertain impacts 15 is still appropriate. No further review was performed 16 on the chronic effects from exposure to electromagnetic 17 fields, because currently there's no scientific 18 consensus on this issue.

19 The staff's preliminary conclusion is that 20 the site-specific impacts related to license renewal for 21 South Texas Project are small, except for the impact of 22 electromagnetic field acute effects, or current-induced 23 electric shocks that are small to moderate.

24 For license renewal, South Texas Project 25 reported that their transmission lines from South Texas NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

14 1 Project to the electric grid, which exceed the national 2 electrical safety code, South Texas Project Nuclear 3 Operating Company also listed potential mitigation 4 options to reduce or avoid impacts.

5 These options are reexamining the induced 6 current calculations for some transmission lines; 7 raising the transmission towers at potentially affected 8 road-transmission line intersections; modifying the 9 double-circuit lines to reduce the current-induced shock 10 potential, or placing caution signs under the 11 transmission lines.

12 The staff review concludes that impact of 13 electromagnetic field acute effects would be small to 14 moderate.

15 The staff also reviewed cumulative impact 16 associated with the continued operation of South Texas 17 Project. For cumulative impacts, the NRC staff looked 18 at the effects on the environment from past, present, and 19 reasonably foreseeable future human actions.

20 The impacts include both from the South 21 Texas Project operations and from other activities near 22 South Texas Project, such as the development of the 23 proposed White Stallion Energy Center, the Texas Prairie 24 Wetland Project, climate change, et cetera.

25 Past actions are those related to the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

15 1 environmental resources at the time of the power plant 2 licensing and construction. Present actions are those 3 related to the resources at the time of current 4 operations of the power plant. And future actions are 5 considered to be those that are reasonably foreseeable 6 through the end of the plant's operations, including the 7 period of extended operations.

8 In other words, the cumulative impact 9 analysis considers potential impacts through the end of 10 the current license term as well as the 20-year renewal 11 license term.

12 While the level of impacts due to the direct 13 and indirect effect associated with the continued 14 operation of South Texas Project are mostly small, the 15 staff preliminarily concluded that cumulative impacts 16 are small to moderate.

17 For the term beyond the 20-year period of 18 extended operations, the NRC addresses the management of 19 spent nuclear fuel in the waste confidence decision and 20 rule.

21 Previous license renewal Supplemental EIS 22 noted that the environmental impacts of temporary 23 storage of nuclear fuel for the period following the 24 reactor operating license term were addressed by this 25 rule.

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

16 1 The Draft Supplemental EIS does not discuss 2 the potential environmental impacts of the storing spent 3 nuclear fuel for an extended period after the plant 4 ceases operations. That address will be addressed in 5 the NRC Waste Confidence Environmental Impact Statement 6 and Rule. That document is expected to be issued by 7 September 2014.

8 In August of 2012 the Commission decided 9 that the agency will not issue final licensing decisions 10 for reactors, including license renewal until the waste 11 confidence rule is completed. If at that time 12 site-specific issues related to the spent fuel storage 13 at South Texas Project remain unresolved, they will be 14 addressed separately.

15 The National Environmental Policy Act 16 mandates that each Environmental Impact Statement 17 consider alternatives to any proposed major federal 18 actions. A major step in determining whether a license 19 renewal is reasonable or not is comparing the likely 20 impacts of continued operation of nuclear power plants 21 with the likely impacts of alternatives of power 22 generation.

23 In the draft supplements, the NRC staff 24 initially considered 18 different alternatives to 25 license renewal at the South Texas Project. After this NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

17 1 initial consideration, the staff then chose the five most 2 likely alternatives and analyzed these in depth.

3 Finally the NRC staff considered what would 4 happen if no action is taken and South Texas Project shut 5 down at the end of its current license without a specific 6 replacement alternative. This alternative would not 7 provide power generation capacity, nor would it meet the 8 needs currently met by South Texas Project.

9 The NRC preliminary conclusion is that 10 there is no clear environmentally preferred alternative 11 to license renewal. All alternatives capable of meeting 12 the needs currently served by South Texas Project entail 13 impacts greater than or equal to the proposed action of 14 license renewal.

15 This slide identifies me as your primary 16 point of contact with the NRC for the preparation of the 17 Environmental Impact Statement, and it also identifies 18 where documents related to our review may be found in the 19 local area.

20 The South Texas Project Draft Supplemental 21 Environmental Impact Statement is available at the Bay 22 City Library. All documents related to the reviews are 23 also available on the NRC website listed on this slide.

24 This slide provides the status of the safety 25 review. In December 2012 the applicant requested the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

18 1 safety review be suspended until January 1, 2014. As a 2 part of the license renewal process, the Advisory 3 Committee for Reactor Safeguards will provide 4 independent review for this review.

5 The members of the Advisory Committee for 6 Reactor Safeguards consists of nuclear experts from the 7 industry and academics.

8 NRC staff will address written comments in 9 the same way we address spoken comments received today.

10 You can submit written comments either online or via 11 conventional mail, meaning Postal Service.

12 To submit written comments online, visit 13 the website regulations.gov and search for docket ID 14 nrc-2010-0375. If you have written comments today, you 15 may give them to any NRC staff member today.

16 This concludes my presentation, and I'm 17 turning the meeting over to Susan.

18 MS. SALTER: Thank you, Tam.

19 So as I said, before we go into the public 20 comment period, let me just take a few minutes for any 21 questions or clarifications you may need -- questions 22 you have or clarifications you need on what Tam has 23 presented this afternoon.

24 So we're just going to have folks raise 25 their hand. If they have a question, we'll bring you the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

19 1 mic. Do we have any?

2 (No response.)

3 MS. SALTER: Okay. So what we're going to 4 do is we're going to move right into the comment period.

5 And, again, during this period NRC staff are in a 6 listening mode.

7 And we don't have very many speakers this 8 afternoon, but if you change your mind or if you decide 9 during the course of the comments that you now would like 10 to make a comment, you can always fill out a yellow card 11 and give it to myself or to Bob.

12 I'm going to call up our first speaker, is 13 Owen Bludau. And then we have Carolyn Thames and Terry 14 Farrar, in that order.

15 Please introduce yourself with your name 16 and any affiliation you have when you're at the 17 microphone.

18 MR. BLUDAU: Okay. I am Owen Bludau, 19 executive director of the Matagorda County Economic 20 Development Corporation.

21 The results that were presented are exactly 22 as I anticipated they could be, that there were small to 23 minimal impacts of any kind. I think the proof of the 24 pudding is that STP has been here for well over 20 years 25 now, and we have an environment that we appreciate and NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

20 1 admire.

2 We went through a lot of internal furor two 3 years ago over a coal plant, and the people who opposed 4 that kept saying we have such a great environment here, 5 we don't want to destroy it. That means STP has not done 6 anything adverse to it, and I don't think renewal of this 7 permit is going to do anything that's going to change 8 that, so I firmly am in support of the findings of this 9 environmental impact study.

10 MS. SALTER: Thank you, Mr. Bludau.

11 Our next speaker is Carolyn Thames.

12 MS. THAMES: Good afternoon and welcome to 13 Bay City. My name is Carolyn Thames. I'm a business 14 consultant with Workforce Solutions, a local workforce 15 office here in Bay City, as well as a council member with 16 the City of Bay City.

17 I am here today to strongly support the 18 license renewal for STP Units 1 and 2 for an additional 19 20 years. STP is the largest employer in Matagorda 20 County, with approximately 1200 employees.

21 STP's license renewal will provide jobs for 22 our children and build a strong, stable economic base for 23 our community.

24 In my two terms on council, I've had the 25 opportunity to serve with several employees. These NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

21 1 people donate their time, their talents to make a 2 difference in our community.

3 We trust the employees of STP; they're 4 experts at engineering, operations, maintenance, and the 5 environment. They are our neighbors, they are our 6 friends.

7 Thank you for being here. Thank you for 8 consideration of the license renewal.

9 MS. SALTER: Thank you, Ms. Thames.

10 And our next speaker is Terry Farrar.

11 MR. FARRAR: Thank you, Susan.

12 I am Terry Farrar. I own a business in 13 town, Farrar Financial Group. I serve on the Bay City 14 ISD school board, and I am also the chairman-elect for 15 the Bay City Chamber of Commerce.

16 I've been here for 28 years. The entire 17 time I've been here, STP has been, without a doubt, the 18 lifeblood of this community. I do not know anybody who 19 donates as much money to civic purposes, fund raisers.

20 They're very good about being a part of this community 21 with the Chamber.

22 Buddy Eller is the current chairman of the 23 Chamber of Commerce. He works at STP. Tim Powell, the 24 vice president at STP, is the president of the school 25 board here. Bart Brown is the department director of my NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

22 1 Sunday School class there where I'm a Sunday School 2 teacher. Tim is a Sunday School teacher at First Baptist 3 Church.

4 The people at STP are not only -- do not only 5 just give the money that they give to make this community 6 viable, but they give their time. The leadership that 7 we experience because of the training that these people 8 have received at STP has made a difference in this 9 community. This community is what it is predominantly 10 because of STP and their influence in this community.

11 And I strongly support that we relicense 12 them and ask them to continue to participate and do what 13 they've done in this community for the last 25, 30 years.

14 Thanks.

15 MS. SALTER: Thank you, Mr. Farrar.

16 Those are all of the individuals who signed 17 up to speak.

18 I have your card, but it said the evening; 19 it didn't say -- but you are more than welcome to do both.

20 Would you like to do both?

21 Karen Hadden.

22 MS. HADDEN: Good afternoon. I'm Karen 23 Hadden, and I am the director of a statewide organization 24 called SEED Coalition, Sustainable Energy and Economic 25 Development Coalition.

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

23 1 I'm going to speak in opposition to 2 relicensing Units 1 and 2. In fact, the option that I 3 think should be pursued is not actually on the list of 4 options.

5 I understand the importance of a major 6 industry in this community. I understand the importance 7 of jobs, and our organization does as well, and we support 8 that. We want every community in Texas to be 9 economically viable and thriving.

10 But what I think should be happening, 11 instead of relicensing two nuclear reactors that are set 12 to retire in 2027 and 2028, this is the time to plan for 13 a transition, to plan for worker training, to plan to move 14 toward cleaner, safer energy for the future.

15 And with 14 and 15 years to work with, that 16 is a doable goal. It's also very doable in today's world 17 to replace the energy with renewables combined with 18 energy efficiency, and that can be backed up with natural 19 gas. This is affordable; this is real. Other 20 communities are looking at these options. It can be 21 done; it is being done.

22 For an example, right now wind turbines are 23 booming across Texas. We've already had a point in time 24 where wind was producing 25 percent and more of the power 25 that was up on the ERCOT grid. Nuclear reactors at the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

24 1 time were around 11 percent.

2 We can do this; we are doing this. Granted, 3 the wind comes in and out. That's why you combine with 4 energy storage, that's why you do backup. And ERCOT is 5 becoming very expert in making these things level out.

6 What could this do for the community?

7 There could still be jobs, and lots of them, and hopefully 8 even more. This could be growth for the community. So 9 I think the thing to do is to plan.

10 Nuclear reactors were used in this country 11 as a bridge between the time when we could get to the point 12 where renewables were viable. That day is here; that 13 time is now.

14 I'm personally using this in my own home.

15 I have solar panels on the roof that do more than I ever 16 thought they would. There are days when I can run the 17 whole house and charge an electric car, which does most 18 of my daily driving. That's possible, that's doable.

19 We're doing it. It's here today.

20 There are many ways to move forward. The 21 risks of continuing with nuclear power are great, and 22 that's because of the inherent nature of nuclear power.

23 There are accidents; there are fires. We've just been 24 through that.

25 There's an increasing amount of fracking, NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

25 1 and fracking has been linked to earthquakes, and who 2 knows what will be happening over time. I think the 3 environmental impact research needs to look further at 4 that question.

5 In the case of Fukushima, reactor number 1 6 had been set to retire one month before the accident 7 there, which, you know, involved their diesel 8 generators, to large extent, as well as tsunami and 9 earthquake.

10 So if that plant had been shut down as it 11 should have been -- they were given 10 more years, not 12 20, like we're looking at in this case -- then that would 13 be one less reactor that had a meltdown. And the whole 14 world is feeling the impacts of that disaster in many 15 different ways, including radiation that travels around 16 the globe and impacts fisheries, it impacts products and 17 workers' lives and people who live in Japan, as well as 18 in the US it's been measured. This radiation does reach 19 the US.

20 I'm concerned about at the plant -- and I 21 think there needs to be further look at tritium. There 22 are tritium problems at the site. There's monitoring 23 wells that show that.

24 When you combine that with the fact that the 25 bottom of the main cooling reservoir has some leakage NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

26 1 going on -- this is documented; this was in the 2 application for South Texas Project 3 and 4 -- okay, 3 where is the research? Where is that tritium going? Is 4 it going out the bottom of the cooling reservoir and going 5 into the Gulf of Mexico?

6 Is it going into fish? Is it going into the 7 food chain? Is it impacting animals that feed upon these 8 species? Could it be a factor impacting whooping 9 cranes, which are endangered?

10 Nobody has looked at this, and it needs to 11 be looked at. This is part of the environmental impact 12 assessment. You've already got the factor that the huge 13 amount of water being used to cool these reactors means 14 less fresh water can reach the Gulf of Mexico; less blue 15 crabs. That impacts birds.

16 But in addition to that, we need to be 17 looking at, at this point in time, whether the radiation 18 is getting into these species; not just the numbers of 19 fish. There needs to be additional analysis.

20 There have been problems with this reactor 21 over the years, and they seem to be increasing. While 22 we read about great safety reports and great numbers of 23 days without shutting down, well, that's good, and great 24 worker safety; that's what the reports say.

25 But when you look across the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

27 1 country -- there's an expert by the name of David 2 Lochbaum; he has worked for the NRC; he's also worked for 3 the Union of Concerned Scientists, and he did a report 4 called The Nuclear Tightrope.

5 And he looked at plants where they had 6 year-long outages. What he found was a typical pattern, 7 that in a reactor that had a serious accident, serious 8 problem, there would be glowing reports, right up until 9 the accident happened. Nothing was wrong, everything 10 was perfect, and then all of a sudden, catastrophic 11 problem that had been missed all along that just wasn't 12 showing up. And then we had this major problem.

13 So this has happened over and over, and I 14 think it's time for this report and for the NRC in general 15 to look deeply into what's going on.

16 Now, in 2003 there was leakage of 17 radioactive material outside the reactor, at the base of 18 it. That's not where radioactive material's supposed to 19 be, ever.

20 And I remember when these reactors got 21 built. We were told there was a backup system and then 22 another backup system and then another. In fact, there 23 were 12 -- there used to be 12 backup systems, and 24 radioactivity would never escape, and yet it did. It 25 has, within this operating lifetime.

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

28 1 We still have quite a ways to go before the 2 retirement dates of these reactors, and we've got these 3 problems.

4 Recently there have been problems with the 5 control rods getting stuck, not being able to function 6 properly. We had an outage just last week that involved 7 that, control rods dropping when they're not supposed to.

8 That is unsafe. That means that we don't 9 have full control of this reactor. I'm concerned. I 10 personally live in Austin, Texas, and Austin is an owner 11 of this reactor. I'm happy that we get some power from 12 it, but I'm very concerned about this safety aspect, for 13 the people who live here, for people downwind and around 14 the state.

15 Metal fatigue increases as reactors age.

16 The most dangerous years are the early startup years and 17 the final years of a reactor. So to consider giving a 18 nuclear reactor 20 more years of time to operate 14 and 19 15 years ahead of time, to me this is like telling 20 somebody you're going to sell them a used car, but you're 21 going to sell it to them today, and they're going to 22 receive it 14 and 15 years later. That doesn't make 23 sense.

24 This decision is being looked at and this 25 meeting is being held way, way too early. This is wrong NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

29 1 timing, and it needs to hold, it needs to wait.

2 Short of declaring that it's time to look 3 at transition away, I would urge you to do no action for 4 now and to delay until we know more. With the current 5 problems with the reactor, with the current fire, that 6 needs to be fully investigated.

7 And it's good that it appears that no 8 radioactivity got released, but what if this fire was 9 bigger? What if it was elsewhere? What if 10 circumstances had somehow been different?

11 It concerns me that reactors are operating 12 in a community that, after all of these years, still has 13 no paid professional fire department. I'm sure the 14 volunteers are very good people and probably trained, but 15 if you've got nuclear reactor in your backyard, that 16 means that there should be a paid professional fire 17 department that can be called on.

18 Furthermore, I think everyone should be 19 asking the question, if this was a very large fire, 20 extensive, how long would it take to get backup fire 21 departments here; for example, from Houston? -- because 22 I have a feeling that it's longer than just the drive to 23 get here.

24 These are serious safety concerns.

25 There are questions about the impacts of NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

30 1 when the reactor is down. It becomes expensive. With 2 the 16 percent ownership of Austin Energy, the months 3 that they were down, roughly from November till almost 4 April of 2012 -- November 2011 to almost April, that cost 5 Austin 42 million, and so I think it's increasingly 6 expensive as we have these outages. These reactors have 7 been part of the year-long outages in years past.

8 Preliminary findings of small to moderate 9 in terms of cumulative impacts, that should be none.

10 There's a serious problem here. If this community was 11 hosting wind energy or solar, I don't think you would be 12 having these same impacts.

13 Moderate is not acceptable. And it matters 14 to whom? Who is it moderate for? To whom is it low?

15 The workers on site? I'm concerned about the fact that 16 as contract employees get laid off, as some of the 17 existing workers are impacted in the world of job cuts, 18 that safety is taking a backseat to economics and trying 19 to shave costs.

20 That means workers on the site have to work 21 longer hours, have to work more, and potentially are 22 exposed to more radioactivity. That is of great 23 concern, and these things need to be addressed in the 24 Environmental Impact Statement.

25 And so for a worker, that impact might not NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

31 1 be moderate; that impact might be huge. It depends on 2 who we're talking about.

3 I think I'll wrap up my remarks at this point 4 in time, and I thank you for this opportunity.

5 MS. SALTER: Thank you, Ms. Hadden.

6 So that was all of the folks that signed up 7 to make a comment. I'll give one last chance.

8 (No response.)

9 MS. SALTER: All right. Well, thank you 10 again for coming out this afternoon. We will be having 11 another meeting this evening at 7:00. You're welcome to 12 join us again for that. It will be the same meeting as 13 this was but with probably different folks making 14 comments.

15 I also want to let you know that we had 16 feedback forms at the front table when you came in, and 17 the NRC is always looking to improve their public meeting 18 format and process, so please take some time to fill those 19 out on your way out. You can leave them here or drop them 20 in the mail to the NRC.

21 So with that, I'd like to turn the meeting 22 over to Dave Wrona, Branch Chief in the Division of 23 License Renewal in the NRC's Office of Nuclear Reactor 24 Regulation, for some closing remarks.

25 MR. WRONA: Thank you, Susan.

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

32 1 Tam, would you mind going back to the slide 2 that shows the various ways that folks can comment on our 3 Draft Environmental Impact Statement.

4 First of all, I want to thank you all for 5 coming out tonight -- this afternoon and taking some time 6 out of your schedule to actually contribute to the 7 process to help us make our Final Environmental Impact 8 Statement the best that it can be.

9 I want to let everybody know it doesn't 10 matter whether you commented today, you comment in the 11 evening, you write us a letter, you go on the internet.

12 All the comments are treated the same.

13 The NRC will consider all these comments, 14 go through them as we develop our final impact -- Final 15 Environmental Impact Statement.

16 If you get your comments in by February 22, 17 we can guarantee that they will be considered. We will 18 include them all in the final report, and responses to 19 all those comments.

20 Again, I just want to thank everybody for 21 the time and coming out and helping us with our 22 environmental review process.

23 Thank you.

24 MS. SALTER: Be back at seven o'clock; open 25 house at 6:00 if you'd like to join us again this evening.

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

33 1 (Whereupon, at 2:47 p.m., the hearing was 2 concluded.)