Letter Sequence RAI |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance
Results
Other: ML110872079, ML11145A064, ML11256A057, ML11256A058, ML12086A081, ML12264A642, ML13029A497, ML13063A071, ML13198A056, ML13253A163, ML16118A311, NOC-AE-12002780, Clarification of Information in Support of the Review of the License Renewal Application, NOC-AE-13002945, Update to License Renewal Application - Environmental Permits
|
MONTHYEARML1030102572010-10-25025 October 2010 Project, Units 1 & 2, Transmittal of License Renewal Application Project stage: Request ML1108720792011-04-0505 April 2011 Project Manager Change for the License Renewal of South Texas Project, Units 1 and 2 Project stage: Other ML11145A0642011-06-21021 June 2011 Plan for the Environmental Related Regulatory Audit Regarding the South Texas Project, Units 1 and 2, License Renewal Application Review (TAC Nos. ME4938 and ME4939) Project stage: Other NOC-AE-11002687, Response to Request for Additional Information for the South Texas Project License Renewal Application2011-07-0505 July 2011 Response to Request for Additional Information for the South Texas Project License Renewal Application Project stage: Response to RAI NOC-AE-11002691, Response to Request for Additional Information for the Review of the License Renewal Application2011-07-0505 July 2011 Response to Request for Additional Information for the Review of the License Renewal Application Project stage: Response to RAI ML11154A0132011-07-0606 July 2011 Summary of Telephone Conference Call Held on May 23, 2011, Between the NRC and STPNOC, Concerning Requests for Additional Information Pertaining to the South Texas Project, LRA-Future Consideration of Operating Experience Project stage: RAI ML11201A0622011-08-0404 August 2011 Request for Additional Information for the Review of the South Texas Project, License Renewal Application (TAC Nos. ME4938 and ME5122) Project stage: RAI ML11214A2072011-08-18018 August 2011 RAI for the Review of the STP, License Renewal Application (TAC No. ME4938 and ME512) Project stage: RAI ML1123000162011-08-18018 August 2011 License Renewal - Errata in AMP RAI Package Project stage: RAI NOC-AE-11002711, Response to Request for Additional Information for License Renewal Application2011-08-23023 August 2011 Response to Request for Additional Information for License Renewal Application Project stage: Response to RAI ML11256A0572011-08-31031 August 2011 Documents to Support Review of the South Texas Project License Renewal Application, List of Transmitted Documents Including Copy of Each Document, Enclosure to NOC-AE-11002720 Project stage: Other ML11256A0582011-08-31031 August 2011 Documents to Support Review of the South Texas Project License Renewal Application, WR-5, Tceq Id No. 1610103/1610051 (Operation of Public Potable Water System) Project stage: Other ML11256A0562011-08-31031 August 2011 Project, Units 1 and 2 - Transmittal of Documents to Support Review of the South Texas Project License Renewal Application Project stage: Request ML1123601142011-09-0101 September 2011 Request for Additional Information for the Review of the South Texas Project License Renewal Application Project stage: RAI NOC-AE-11002719, Response to Request for Additional Information for the License Renewal Application2011-09-0606 September 2011 Response to Request for Additional Information for the License Renewal Application Project stage: Response to RAI NOC-AE-11002734, Transmittal of Document to Support Review of the License Renewal Application2011-09-12012 September 2011 Transmittal of Document to Support Review of the License Renewal Application Project stage: Request NOC-AE-11002723, Response to Requests for Additional Information for the License Renewal Application2011-09-12012 September 2011 Response to Requests for Additional Information for the License Renewal Application Project stage: Response to RAI ML11270A0602011-09-22022 September 2011 Response to Requests for Additional Information for License Renewal Application (TAC Nos. ME4938 and ME5122) Project stage: Response to RAI ML11269A0022011-09-28028 September 2011 Requests for Additional Information for the Review of the South Texas Project License Renewal Application (TAC ME4938 and ME5122) Project stage: RAI ML11298A0852011-10-18018 October 2011 Response to Requests for Additional Information for License Renewal Application (TAC No. ME4938 and ME5122) Project stage: Response to RAI NOC-AE-11002761, Clarification to Response to Request for Additional Information for License Renewal Application (TAC No. ME4938 & ME5122)2011-11-17017 November 2011 Clarification to Response to Request for Additional Information for License Renewal Application (TAC No. ME4938 & ME5122) Project stage: Response to RAI NOC-AE-12002780, Clarification of Information in Support of the Review of the License Renewal Application2012-01-10010 January 2012 Clarification of Information in Support of the Review of the License Renewal Application Project stage: Other NOC-AE-11002773, Supplemental Response to Requests for Additional Information for the South Texas Project License Renewal Application - SAMA2012-01-19019 January 2012 Supplemental Response to Requests for Additional Information for the South Texas Project License Renewal Application - SAMA Project stage: Response to RAI ML12033A1342012-02-14014 February 2012 January 31, 2012, Summary of Telephone Conference Call Held Between the NRC and STP Nuclear Operating Company, Concerning Requests for Additional Information Pertaining to the South Texas Project License Renewal Application Project stage: RAI NOC-AE-12002795, Clarification to Supplemental Response to Request for Additional Information for the South Texas Project License Renewal Application - SAMA2012-02-16016 February 2012 Clarification to Supplemental Response to Request for Additional Information for the South Texas Project License Renewal Application - SAMA Project stage: Response to RAI ML12017A1282012-02-29029 February 2012 RAI for the Review of the STP LRA (TAC Nos. ME4938 and ME5122) Project stage: RAI ML12047A2852012-02-29029 February 2012 January 17, 2012, Summary of Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission & STP Nuclear Operating Company, Concerning Requests for Additional Information Pertaining to the South Texas Project License Renewal Project stage: RAI NOC-AE-12002818, Response to Requests for Additional Information for the Review of the South Texas Project License Renewal Application2012-03-12012 March 2012 Response to Requests for Additional Information for the Review of the South Texas Project License Renewal Application Project stage: Response to RAI ML11290A2262012-03-19019 March 2012 Revision of Schedule for the Conduct of Environmental Review of the South Texas Project License Renewal Application Project stage: Approval NOC-AE-12002840, Renewal of the Wastewater Discharge Permit2012-04-17017 April 2012 Renewal of the Wastewater Discharge Permit Project stage: Request ML12128A0612012-05-0404 May 2012 NRR E-mail Capture - NEPA Consultation - Waterborne Outbreak Project stage: Request ML12142A0022012-05-18018 May 2012 NRR E-mail Capture - Environmental Permit Updated Status Project stage: Request ML12144A4432012-06-25025 June 2012 Request for Additional Information for the Review of the South Texas Project, Units 1 and 2, License Renewal Application- Aging Management, Set 20 TAC Nos. ME4939 and ME4937) STP-RAIs-Set 20-RAI Project stage: RAI ML12171A4832012-08-10010 August 2012 Revision of Schedule for the Conduct of Environmental Review of the South Texas Project License Renewal Application (TAC Nos. ME5122, ME5123, ME4938, and ME4939) Project stage: Approval ML11153A0822012-11-14014 November 2012 Issuance of Environmental Scoping Summary Report Associated with the Staff'S Review of the Application by STP Nuclear Operating Company for Renewal of the Operating License for South Texas Project, Units 1 and 2 Project stage: Approval ML12086A0812012-11-14014 November 2012 Environmental Impact Statement Scoping Process Summary Report for South Texas Project, Units 1 and 2 Project stage: Other ML12264A6422012-11-14014 November 2012 STP Scoping Report_Paula Cooper Project stage: Other ML12324A0492012-11-30030 November 2012 NUREG-1437 Supp 48 Dfc Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding South Texas Project, Units 1 and 2 (Draft for Comment) Project stage: Draft Other ML12339A2652012-12-0505 December 2012 Notice of Availability of the Draft Plant-Specific Supplement 48 to the GEIS for License Renewal of Nuclear Plants Regarding South Texas Project, Units 1 and 2, (TAC ME5122, ME5123, ME4938, and ME4939) Project stage: Draft Other ML12195A0852012-12-0505 December 2012 Notice of Availability of the Draft Plant-Specific Supplement 48 to the GEIS for License Renewal of Nuclear Plants Regarding South Texas Project, Units 1 and 2, (TAC Nos. ME5122, ME5123, ME4938, and ME4939) Project stage: Draft Other ML13029A4972013-01-15015 January 2013 Slides - Preliminary Site-Specific Results of the Environmental Review for South Texas Project License Renewal Project stage: Other ML13029A7552013-01-15015 January 2013 Transcript of South Texas Project License Renewal Public Meeting: Afternoon Session, January 15, 2013, Pages 1-34 Project stage: Meeting NOC-AE-13002945, Update to License Renewal Application - Environmental Permits2013-01-21021 January 2013 Update to License Renewal Application - Environmental Permits Project stage: Other ML13011A1312013-02-11011 February 2013 Revision of Schedule for the Conduct of Environmental Review of the South Texas Project License Renewal Application (TAC Nos. ME5122, ME5123, ME4938, and ME939) Project stage: Approval ML13023A3342013-02-25025 February 2013 1/15/2013 Summary of Public Meetings Conducted to Discuss Draft Supplemental Environmental Impact Statement Related to Review of South Texas Project, Units 1 & 2, License Renewal Application ML13063A0712013-03-0101 March 2013 Efh Consultation W/ NRC for South Texas Nuclear Plant License Renewal Project stage: Other NOC-AE-13002969, Response to Requests for Additional Information for Review of License Renewal Application Concerning Wildlife Management (TAC Nos. ME5122 and ME5123)2013-03-0606 March 2013 Response to Requests for Additional Information for Review of License Renewal Application Concerning Wildlife Management (TAC Nos. ME5122 and ME5123) Project stage: Response to RAI ML13077A1172013-03-14014 March 2013 NRR E-mail Capture - South Texas NRC Informal Consultation Project stage: Request NOC-AE-13002999, Annual Environmental Operating Report, Chapter 5 Through End2013-04-30030 April 2013 Annual Environmental Operating Report, Chapter 5 Through End Project stage: Request NOC-AE-13003000, Radioactive Effluent Release Report2013-04-30030 April 2013 Radioactive Effluent Release Report Project stage: Request 2012-11-30
[Table View] |
|
---|
Category:Letter
MONTHYEARML24029A2752024-01-29029 January 2024 Request to Reschedule Evaluated Force-on-Force Drill IR 05000498/20230042024-01-29029 January 2024 Integrated Inspection Report 05000498/2023004 and 05000499/2023004 ML24024A1162024-01-24024 January 2024 STP Unit 2 Request for Information IR 05000498/20244042024-01-18018 January 2024 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000498/2024404; 05000499/2024404 IR 05000498/20230032023-12-28028 December 2023 Acknowledgment of Reply to a Notice of Violation (NRC Inspection Report 05000498/2023003 and 05000499/2023003) ML23360A1692023-12-26026 December 2023 FEMA, Submittal of Radiological Emergency Preparedness Final Report for the South Texas Project Medical Services Drill Evaluated on August 31, 2023 NOC-AE-230040, Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06)2023-12-14014 December 2023 Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06) NOC-AE-230039, Docket Nos. Stn 50-498, Stn 50-499 - Reply to a Notice of Violation, NRC Inspection Report 05000498/2023003 and 05000499/20230032023-12-12012 December 2023 Docket Nos. Stn 50-498, Stn 50-499 - Reply to a Notice of Violation, NRC Inspection Report 05000498/2023003 and 05000499/2023003 ML23326A2592023-12-0505 December 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report ML23339A1902023-12-0505 December 2023 Update Foreign Ownership, Control, or Influence (FOCI) IR 05000498/20234012023-12-0404 December 2023 Security Baseline Inspection Report 05000498/2023401 and 05000499/2023401 ML23324A0102023-11-16016 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23310A2282023-11-13013 November 2023 Integrated Inspection Report 05000498/2023003 and 05000499/2023003, and Notice of Violation ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23298A0002023-11-0101 November 2023 the Associated Independent Spent Fuel Storage Installation - Issuance of Amendment Nos. 226 and 211 Related to Order Approving Indirect Transfer of Licenses and Conforming License Amendments ML23303A0782023-10-30030 October 2023 Submittal of Supplemental Information in Response to Order Consenting to License Transfers and Approval of Draft Conforming License Amendments ML23279A0342023-10-30030 October 2023 Associated Independent Spent Fuel Storage Installation - Order Approving Indirect Transfer of Licenses and Draft Conforming License Amendments (EPID L-2023-LLM-0004) (Letter) IR 05000498/20234032023-10-26026 October 2023 Material Control and Accounting Program Inspection Report 05000498/2023403 and 05000499/2023403 (Cover Letter) ML23317A1262023-10-12012 October 2023 South. Texas Project Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program Revision 26 ML23279A1382023-10-0505 October 2023 Responses to Requests for Additional Information Related to Application for Order Approving Indirect Transfer of Control of Licenses ML23271A1942023-10-0303 October 2023 Notification of Commercial Grade Dedication Inspection (05000498/2024013 and 05000499/2024013) and Request for Information ML23270B2592023-09-27027 September 2023 Update Foreign Ownership, Control, or Influence ML23263B1132023-09-20020 September 2023 Operator Licensing Examination Schedule Revision 1 IR 05000498/20243012023-09-0707 September 2023 Notification of NRC Initial Operator Licensing Examination 05000498/2024301; 05000499/2024301 IR 05000498/20233012023-09-0101 September 2023 NRC Examination Report 05000498/2023301 and 05000499/2023301 ML23243B0562023-08-31031 August 2023 Supplemental Information to Application for Order Approving Indirect Transfer of Control of Licenses ML23236A6042023-08-24024 August 2023 Annual Dose Report for 2022 IR 05000498/20230052023-08-22022 August 2023 Updated Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2023005 and 05000499/2023005) - Mid Cycle Letter ML23229A5262023-08-17017 August 2023 Inservice Inspection Summary Report - 1 RE24, ML23229A5892023-08-17017 August 2023 Voluntary Response to Regulatory Issue Summary (RIS) 2023-02, Scheduling Information for the Licensing of Accident Tolerant, Increased Enrichment, and Higher Burnup Fuels ML23229A4992023-08-17017 August 2023 Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06) ML23228A2102023-08-15015 August 2023 Closure of Investigation (OI 4-22-19) ML23222A0322023-08-10010 August 2023 Report of Changes Made to Quality Assurance Program for Radioactive Material Packages ML23221A3002023-08-0909 August 2023 RE22 Inspection Summary Report for Steam Generator Tubinq, Rev. 1 (Epld L-2023-LRO-0029) ML23222A2792023-08-0909 August 2023 Submittal of Update Foreign Ownership, Control, or Influence (FOCI) IR 05000498/20230022023-07-28028 July 2023 Integrated Inspection Report 05000498/2023002 and 05000499/2023002 ML23198A0532023-07-24024 July 2023 Request for Withholding Information from Public Disclosure ML23188A1612023-07-14014 July 2023 the Associated ISFSI - Notice of Consideration of Approval of Indirect Transfer of Licenses and Conforming Amendments and Opportunity to Request a Hearing (EPID L-2023-LLM-0004) - Letter ML23193A9932023-07-11011 July 2023 Submittal of Update Foreign Ownership, Control or Influence (FOCI) ML23192A0482023-07-11011 July 2023 NRC Initial Operator Licensing Examination Approval 05000498/2023301; 05000499/2023301 NOC-AE-230039, Submittal of Update Foreign Ownership, Control or Influence (FOCI)2023-07-11011 July 2023 Submittal of Update Foreign Ownership, Control or Influence (FOCI) ML23180A2822023-06-29029 June 2023 Operator Licensing Examination Schedule ML23177A2522023-06-26026 June 2023 Units 1, 2 & Independent Spent Fuel Storage Installation - Biennial Submittal of Technical Specification Bases Changes, Commitment Changes, 10 CFR 50.59 Evaluation Summary, and 10 CFR 72.48 Evaluation Summary ML23166B0802023-06-14014 June 2023 Update Foreign Ownership, Control, or Influence (FOCI) ML23163A1762023-06-12012 June 2023 Application for Order Approving Indirect Transfer of Control of Licenses 2024-01-29
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24024A1162024-01-24024 January 2024 STP Unit 2 Request for Information ML23334A0062023-11-29029 November 2023 NRR E-mail Capture - South Texas Project - Request for Additional Information - Proposed Alternative to ASME BPV Code Requirements ML23319A4442023-11-15015 November 2023 NRR E-mail Capture - South Texas Project - Draft Request for Additional Information - Proposed Alternative to ASME BPV Code Requirements ML23278A1532023-10-0505 October 2023 NRR E-mail Capture - South Texas Project Request for Additional Information - Request for Indirect Transfer of Licenses and Conforming Amendments (L-2023-LLM-0004) ML23264A0972023-09-21021 September 2023 NRR E-mail Capture - South Texas Project - Request for Additional Information - License Amendment Request to Revise the Alternate Source Term Dose Calculation (L-2023-LLA-0047) ML23255A2862023-09-12012 September 2023 NRR E-mail Capture - South Texas Project Draft Request for Additional Information License Amendment Request to Revise the Alternate Source Term Dose Calculation (L-2023-LLA-0047) ML23145A1872023-05-24024 May 2023 July 2023 Emergency Preparedness Program Inspection - Request for Information ML22255A1542022-09-13013 September 2022 Operating Company Information Request for the Cyber Security Baseline Inspection 05000498/2022401 and 05000499/2022401 ML22206A0142022-07-20020 July 2022 NRR E-mail Capture - South Texas Project - Request for Additional Information - 10 CFR 20.2002 Alternate Disposal Request ML22194A0502022-07-0707 July 2022 NRR E-mail Capture - South Texas Project - Updated Draft Request for Additional Information - 10 CFR 20.2002 Alternate Disposal Request ML22194A0492022-06-0808 June 2022 NRR E-mail Capture - South Texas Project - Draft Request for Additional Information - 10 CFR 20.2002 Alternate Disposal Request ML22123A3272022-05-0303 May 2022 STP EP Exercise Inspection July 2022 RFI ML22084A0762022-04-0404 April 2022 Notification of NRC Design Bases Assurance Inspection (Team) (05000498/2022012 and 05000499/2022012) and Request for Information ML21286A5732021-10-18018 October 2021 Notification of NRC Design Bases Assurance Inspection (Programs) (05000498/2022011 and 05000499/2022011) and Request for Information ML21166A2392021-06-16016 June 2021 Notification of Inspection (NRC Inspection Report 05000498/2021003 and 05000499/2021003) and Request for Information ML21160A1522021-06-0909 June 2021 Request for Information NRC Inspection 2021-003 Public Radiation Safety ML21133A2372021-05-0505 May 2021 Request for Additional Information: STP EP Exercise Inspection - July 2021 ML21039A8902021-02-0808 February 2021 NRR E-mail Capture - South Texas Project - Request for Additional Information - 1RE22 Inspection Summary Report for Steam Generator Tubing ML21029A3312021-01-29029 January 2021 NRR E-mail Capture - South Texas Project - Draft Request for Additional Information - 1RE22 Inspection Summary Report for Steam Generator Tubing ML20280A5452020-08-17017 August 2020 STP 2020 PIR Request for Information ML20111A0052020-04-17017 April 2020 NRR E-mail Capture - South Texas Project - Request for Additional Information - Proposed Alternative to ASME OM Code 2012 Edition - Relief Request PRR-01 ML20070N0222020-03-10010 March 2020 NRC Selection for Onsite Review ML20057G4612020-02-26026 February 2020 05000498/499 Request for Information - Occupational Radiation Safety Inspection ML20045E2172020-02-13013 February 2020 Licensed Operator Positive Fitness-For-Duty Test ML20036F5862020-02-0404 February 2020 Request for Additional Information - Proposed Alternative to ASME Code Requirements for the Repair of Essential Cooling Water System Class 3 Buried Piping (EPID L-2019-LLR-0096)Redacted ML19165A1032019-06-14014 June 2019 NRR E-mail Capture - Draft RAI for STP TS 3.8.1.1 Sbdg SR Change ML19081A1512019-03-21021 March 2019 NRR E-mail Capture - Draft Round 2 RAI - Sbdg Voltage and Frequency LAR (L-2018-LLA-0078) ML18283B9522018-10-10010 October 2018 NRR E-mail Capture - Final RAI - South Texas Standby DG TS Change (L-2018-LLA-0078) ML18263A1432018-09-12012 September 2018 NRR E-mail Capture - Final RAI for South Texas Project RR-ENG-E-16 (L-2018-LLR-0097) ML18197A4172018-07-17017 July 2018 Notification of NRC Triennial Heat Sink Performance Inspection (05000498/2018003 and 05000499/2018003) and Request for Information ML18003B4222018-01-0303 January 2018 NRR E-mail Capture - Final Request for Additional Information Amendment Request to Modify the Emergency Response Organization for South Texas Project ML17229B4672017-08-16016 August 2017 Notification of NRC Inspection 05000499/2017008 and Request for Information ML17132A0712017-05-15015 May 2017 Information Request the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000498/2017407; 05000499/2017407 ML17103A6272017-04-13013 April 2017 Notification of Evaluations of Changes, Tests, and Experiments Inspection (05000498/2017007 and 05000499/2017007) and Request for Information ML16351A1502016-12-16016 December 2016 Correction Letter Closeout of Request for Information Questions That Are No Longer Applicable Associated with the Resolution of Generic Safety Issue 191 (CAC Nos. MF2400 - MF2409) ML16302A4532016-12-12012 December 2016 Closeout of Request for Additional Information Questions That Are No Longer Applicable, Resolution of Generic Safety Issue (GSI) 191 (CAC Nos. MF2400-MF2409) ML16343A0422016-12-0808 December 2016 Request for Additional Information for the Review of the South Texas Project, Units 1 and 2 License Renewal Application (CAC NOS. ME4936, ME4937) ML16340A1022016-12-0505 December 2016 Requests for Additional Information for the Review of the South Texas Project License Renewal Application (CAC Nos. ME4936 and ME4937) ML16246A0952016-09-15015 September 2016 Correction to 8/26/16 Request for Additional Information Enclosure, License Amendment Request to Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies ML16214A2912016-08-26026 August 2016 Summary of June 28-30, 2016, Regulatory Audit at Westinghouse in Rockville, MD, License Amendment Request to Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies ML16187A0522016-07-0707 July 2016 Request for Additional Information Regarding License Renewal Application ML16141B0812016-05-31031 May 2016 Audit Summary, Risk Audit on April 12-13, 2016, at Alumni Center at the University of Texas, Austin, Tx; Pilot Generic Safety Issue 191 Submittal and Exemption Request, and Draft Request for Additional Information ML16125A2902016-05-26026 May 2016 Request for Additional Information, Risk Review, Exemption and License Amendment Request for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 (CAC Nos. MF2400-MF2409) ML16127A4522016-05-12012 May 2016 Supplemental Information Needed for Acceptance of Requested Licensing Action, Amendment Request to Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies ML16104A3522016-04-22022 April 2016 Requests for Additional Information Set 35 for the Review of the South Texas Project License Renewal Application (Tac Nos. ME4936, ME4937) ML16082A5072016-04-11011 April 2016 Request for Additional Information, Phased Response Requested, Exemption and License Amendment Request for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 (CAC Nos. MF2400-MF2409) ML16082A4842016-03-22022 March 2016 NRR E-mail Capture - South Texas Project Units 1 & 2, Draft Request for Additional Information for Risk Review for GSI-191 ML16081A0042016-03-18018 March 2016 NRR E-mail Capture - South Texas Project Units 1 & 2, Draft Request for Additional Information for Thermal-hydraulic Review for GSI-191 ML16053A1872016-03-0101 March 2016 Request for Additional Information, Request to Revise Technical Specification 6.8.3.j, Containment Leakage Rate Testing Program, to Extend Integrated Leak Rate Test Interval from 10 to 15 Years (CAC MF6176-MF6177) ML16060A2872016-02-29029 February 2016 NRR E-mail Capture - Request for Additional Information - STP LRA Safety Review 2024-01-24
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 28,2011 Mr. G. T. Powell, Vice President Technical Support and Oversight STP Nuclear Operating Company P.O. Box 289 VVadsworth, TX 77483
SUBJECT:
REQUESTS FOR ADDITIONAL INFORMATION FOR THE REVIEVV OF THE SOUTH TEXAS PROJECT LICENSE RENEVVAL APPLICATION (TAC NOS. ME4938 AND ME5122)
Dear Mr. Powell:
By letter dated October 25, 2010, STP Nuclear Operating Company submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54 to renew operating licenses NPF-76 and NPF-80 for South Texas Project for review by the U.S. Nuclear Regulatory Commission (NRC or the staff). The staff is reviewing the information contained in the license renewal application and has identified, in the enclosure, areas where additional information is needed to complete the review.
These requests for additional information were discussed with Mr. Arden Aldridge and a mutually agreeable date for the response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-3617 or bye-mail at Tam.Tran@nrc.gov.
Sincerely,
,)v~~/( ;h~
Tam M. Tran, Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-498 and 50-499
Enclosure:
As stated cc w/encl: Listserv
SOUTH TEXAS PROJECT LICENSE RENEWAL APPLICATION REQUESTS FOR ADDITIONAL INFORMATION Issue:
Clarification is needed on inconsistent labeling of transmission lines in submitted information.
Background:
Section 2.1.7 of NUREG-1555 Supplement 1, Environmental Standard Review Plan for Operating License Renewal specifies the requirement: "the power transmission system description is consistent, accurate, and given in sufficient detail," for the analysis in the draft supplemental environmental impact statement. The staff requests clarification since the transmission lines appear to be inconsistently labeled. Section 3.1.3 of STP Nuclear Operating Company's license renewal environmental report describes seven 345-kV lines that connect South Texas Project (STP), Units 1 and 2, to the regional electric grid: Velasco, Blessing, Hillje, Holman, Hill Country, Sky Line, and White Point loop. However, Section 3.7 of the STP combined license environmental report (ER) describes nine 345-kV transmission lines that connect STP, Units 1 and 2, to the regional power grid. The nine lines described are given different names than those in the license renewal application ER: DOW 18, DOW 27, WAP 39, Elm Creek 18, Hillje 64, Blessing 44, Elm Creek 27, Hillje 44, and Whitepoint 39.
Requested information:
Please provide the following clarifications:
(a) how many lines connect STP to the regional power grid (b) the names of each line ENCLOSURE
September 28,2011 Mr. G. T. Powell, Vice President Technical Support and Oversight STP Nuclear Operating Company P.O. Box 289 VVadsworth, TX 77483
SUBJECT:
REQUESTS FOR ADDITIONAL INFORMATION FOR THE REVIEVV OF THE SOUTH TEXAS PROJECT LICENSE RENEVVAL APPLICATION (TAC NOS. ME4938 AND ME5122)
Dear Mr. Powell:
By letter dated October 25, 2010, STP Nuclear Operating Company submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54 to renew operating licenses NPF-76 and NPF-80 for South Texas Project for review by the U.S. Nuclear Regulatory Commission (NRC or the staff). The staff is reviewing the information contained in the license renewal application and has identified, in the enclosure, areas where additional information is needed to complete the review.
These requests for additional information were discussed with Mr. Arden Aldridge and a mutually agreeable date for the response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-3617 or bye-mail at Tam.Tran@nrc.gov.
Sincerely, IRA!
Tam M. Tran, Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-498 and 50-499
Enclosure:
As stated cc w/encl: Listserv DISTRIBUTION:
See next page
..
ADAMS Accession No' ML11269A002 *concurred via email OFFICE i LA: DLRIRPB2* PM:DLR/RPB2 BC:DLR/RERB BC:DLR/RPB2 IPM:DLR/RPB21 NAME IKing TTran Almboden DVVrona TTran '
(LRegner for), ~
DATE 09/26/2011 109/26/2011 09/27/2011 09/28/2011 I09/28/2011 OFFICIAL RECORD COpy
Letter to G. T. Powell from Tam M. Tran dated September 28, 2011
SUBJECT:
REQUESTS FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE SOUTH TEXAS PROJECT LICENSE RENEWAL APPLICATION (TAC NOS. ME4938 AND ME5122)
DISTRIBUTION:
E-MAIL:
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource RidsNrrDraApla Resource RidsOgcMailCenter JDaily TIran ICouret, OPA BSingal, DORL WWalker, RIV
~'Dixon, RIV BTharakan, RIV WMaier, RIV VDricks, RIV NO'Keefe, RIV AVegel, RIV SGraves, RIV