IR 05000266/2024420: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 119: Line 119:
PBSRP 1.4.1 Point Beach Nuclear Plant Security Response Procedure Rev 65;
PBSRP 1.4.1 Point Beach Nuclear Plant Security Response Procedure Rev 65;
01/23/2024
01/23/2024
Power Point 17- Site Responder TimeLine Development Standardization March 21,
Power Point 17-Site Responder TimeLine Development Standardization March 21,
014 2017
014 2017
Security Position Evaluation of Safe Standoff Distances for CAS, SAS, and 10/06/2004
Security Position Evaluation of Safe Standoff Distances for CAS, SAS, and 10/06/2004

Revision as of 13:32, 4 October 2024

Security Baseline Inspection Report 05000266/2024420 and 05000301/2024420
ML24156A113
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 06/05/2024
From: Clark J
Security Performance Evaluation Branch
To: Durbin M
Point Beach
References
DPR-024, DPR-027 IR 2024420
Download: ML24156A113 (1)


Text

SUBJECT:

POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 - SECURITY BASELINE INSPECTION REPORT 05000266/2024420 AND 05000301/2024420

Dear Michael Durbin:

On April 25, 2024, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Point Beach Nuclear Plant, Units 1 and 2 and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Jefferson K. Clark, Chief Security Performance Evaluation Branch Division of Security Operations Docket Nos. 05000266 and 05000301 License Nos. DPR-24 and DPR-27

Enclosure:

As stated

Inspection Report

Docket Numbers: 05000266 and 05000301

License Numbers: DPR-24 and DPR-27

Report Numbers: 05000266/2024420 and 05000301/2024420

Enterprise Identifier: I-2024-420-0004

Licensee: NextEra Energy Point Beach, LLC

Facility: Point Beach Nuclear Plant, Units 1 and 2

Location: Two Rivers, WI

Inspection Dates: April 01, 2024, to April 26, 2024

Inspectors: C. Roundtree, Team Leader, NSIR T. Barry, Senior Physical Security Inspector, NSIR C. Bustamante, Physical Security Inspector, NSIR N. Egan, Senior Physical Security Inspector, RIII

Approved By: Jefferson K. Clark, Chief Security Performance Evaluation Branch Division of Security Operations

Enclosure

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Point Beach Nuclear Plant, Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.

Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.03 - Contingency Response - Force-On-Force Testing

Contingency Response - Force-On-Force Testing (1 Sample)

(1) NRC inspectors completed the Contingency Response - Force-on-Force (FOF)

Testing inspection procedure by evaluating the licensees performance in implementing the physical protection program to detect, assess, interdict, and neutralize threats up to, and including, the design basis threat of radiological sabotage. Two NRC-evaluated FOF exercises were conducted for the evaluation.

REPORT ATTACHMENTS

Supplemental Information for the report is considered Safeguards Information and is located separately within the NRCs Safeguards Information Local Area Network and Electronic Safe database (SLES), under NS126128.

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On April 25, 2024, the inspectors presented the security baseline inspection results to Michael Durbin and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection Type Designation Description or Title Revision or

Procedure Date

71130.03 Corrective Action A/R 02480325 2024 Security Force On Force Action Items 03/04/2024

Documents 01-02480325 22

A/R 02483092 Procedure Terminology Enhancement 04/02/2024

A/R 02483093 Security Training Needs Analysis NFS LP-Room Clearing 04/02/2024

A/R 02484784 Controller/Player Actions Not In Accordance With 04/23/2024

Expectations

A/R 02484787 Gai-Tronics Needs To Have Adjustment 04/23/2024

A/R 02484788 Gai-Tronics Needs Maintenance 04/24/2024

A/R 02484789 Roof Hatch On the Training Building Not Securing 04/24/2024

A/R 02484867 Standardize Hotwash Participants 04/24/2024

A/R 02484868 Security Drills and Exercise Procedure Violation 04/24/2024

Procedures 2024 FOF Preparations - 2024 PBNP Triennial Rehearsal

Exercises

Target Set Index Book 1 Rev 18, Aug

28, 2023

Target Set Index Book 2 Rev 15, Aug

28, 2018

Point Beach Nuclear Plant Protective Strategy Briefing 01/05/24

Point Beach Nuclear Plant, Units 1 and 2 Physical Security Revision 19,

Plan 09/25/2023

C8-89K External BREs Rev 17 Aug

04, 2023

CS-89g Delay Barriers Revision 6,

Feb 15, 2018

PBSRP 1.4.1 Point Beach Nuclear Plant Security Response Procedure Rev 65;

01/23/2024

Power Point 17-Site Responder TimeLine Development Standardization March 21,

014 2017

Security Position Evaluation of Safe Standoff Distances for CAS, SAS, and 10/06/2004

Paper: 04-003 External Security Positions

Security Position Kontek BBRE Blast Analysis 01/23/2024

Paper: 21-008

Inspection Type Designation Description or Title Revision or

Procedure Date

SY-AA-102-1008 Security Drills and Exercise Procedure Revision 15;

11/09/20

VAM Book 1 Target Set Documents Updated

09/03/19

VAM Book 2 Target Set Basis Documents 01/25/17

ML24156A113

OFFICE NSIR/DSO/SPEB R-III/DRS/PSB NSIR/DSO/SPEB/ETA NSIR/DSO/SPEB

/ETA

NAME CBustamante CB NEgan NECRoundtree CR JClark JC

DATE Jun 4, 2024 Jun 4, 2024 Jun 4, 2024 Jun 5, 2024