Line 13: Line 13:
| document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE
| page count = 5
| page count = 5
| project = TAC:M97241
| stage = RAI
}}
}}


Line 30: Line 32:


==Dear Mr. McGaha:==
==Dear Mr. McGaha:==
i By letter dated November 6, 1996, Entergy Operations, Inc. requested a                                            -
i By {{letter dated|date=November 6, 1996|text=letter dated November 6, 1996}}, Entergy Operations, Inc. requested a                                            -
1 deviation from its commitment to the requirements of Section III.G.2 of
1 deviation from its commitment to the requirements of Section III.G.2 of
;                        Appendix R to 10 CFR Part 50 of the Code of Federal Regulations for the use of 4                        a partial area automatic suppression system in lieu of a full area automatic                                      :
;                        Appendix R to 10 CFR Part 50 of the Code of Federal Regulations for the use of 4                        a partial area automatic suppression system in lieu of a full area automatic                                      :
Line 67: Line 69:
==Dear Mr. McGaha:==
==Dear Mr. McGaha:==


By letter dated November 6, 1996, Entergy Operations, Inc. requested a deviation from its commitment to the requirements of Section III.G.2 of Appendix R to 10 CFR Part 50 of the Code of Federal Regulations for the use of a partial area automatic suppression system in lieu of a full area automatic suppression system in fire area C-16.
By {{letter dated|date=November 6, 1996|text=letter dated November 6, 1996}}, Entergy Operations, Inc. requested a deviation from its commitment to the requirements of Section III.G.2 of Appendix R to 10 CFR Part 50 of the Code of Federal Regulations for the use of a partial area automatic suppression system in lieu of a full area automatic suppression system in fire area C-16.
We have identified additional information that we will need to complete our                        l review. Enclosed is our request for additional information. Please respond                        i within 45 days so that we may complete our review. If you have any questions on our request, please let us know.                                                                -
We have identified additional information that we will need to complete our                        l review. Enclosed is our request for additional information. Please respond                        i within 45 days so that we may complete our review. If you have any questions on our request, please let us know.                                                                -
Sincerely,
Sincerely,
Line 90: Line 92:
                                                                                     \
                                                                                     \
*.                                                                                  j REQUEST FOR INFORMATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION DIVISION OF SYSTEMS SAFETY AND ANALYSIS PLANT SYSTEMS BRANCH REQUEST FOR DEVIATION FROM SECTION III.G.2 0F APPENDIX R TO 10 CFR PART 50 RIVER BEND STATION - UNIT 1 DOCKET NO. 50-458
*.                                                                                  j REQUEST FOR INFORMATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION DIVISION OF SYSTEMS SAFETY AND ANALYSIS PLANT SYSTEMS BRANCH REQUEST FOR DEVIATION FROM SECTION III.G.2 0F APPENDIX R TO 10 CFR PART 50 RIVER BEND STATION - UNIT 1 DOCKET NO. 50-458
: 1. BACKGROUND By letter dated November 6, 1996, Entergy Operations, Inc. (E01), the licensee for River Bend Station, Unit 1, requested a deviation from its commitment to meet the requirements of Section III.G to Appendix R of 10 CFR Part 50. The requested deviation is for the use of a partial automatic suppression system in lieu of a full area suppression system in Fire Area C-16. This fire area contains both Division I and Division II post-fire safe shutdown cables. Automatic fire detection capability is provided for the fire area.
: 1. BACKGROUND By {{letter dated|date=November 6, 1996|text=letter dated November 6, 1996}}, Entergy Operations, Inc. (E01), the licensee for River Bend Station, Unit 1, requested a deviation from its commitment to meet the requirements of Section III.G to Appendix R of 10 CFR Part 50. The requested deviation is for the use of a partial automatic suppression system in lieu of a full area suppression system in Fire Area C-16. This fire area contains both Division I and Division II post-fire safe shutdown cables. Automatic fire detection capability is provided for the fire area.
In lieu of providing a 3-hour fire barrier  !
In lieu of providing a 3-hour fire barrier  !
for one division of the required post-fire safe shutdown cables, the        l licensee is proposing to 5rovide a 1-hour fire barrier with a partial area automatic sprinkler system.
for one division of the required post-fire safe shutdown cables, the        l licensee is proposing to 5rovide a 1-hour fire barrier with a partial area automatic sprinkler system.

Latest revision as of 20:44, 11 December 2021

Forwards RAI Re 961106 Request for Deviation from Commitment to Requirements of 10CFR50,App R,Section III.G.2,for Use of Partial Area Automatic Suppression Sys in Lieu of Full Area Automatic Suppression Sys in Fire Area C-16
ML20148J771
Person / Time
Site: River Bend Entergy icon.png
Issue date: 06/16/1997
From: Wigginton D
NRC (Affiliation Not Assigned)
To: Mcgaha J
ENTERGY OPERATIONS, INC.
References
TAC-M97241, NUDOCS 9706170262
Download: ML20148J771 (5)


Text

- - - - - . - - - - -. - - - .. - . - - - . . - . . - - . - . - . . - . - . -

June 16, 1997 i

  • i Mr. John R. McGaha, Jr. '

Vice President - Operations Entergy Operations, Inc.

River Bend Station ,

P. O. Box 220 l

St. Francisville, LA 70775 -

SUBJECT:

RIVER BEND STATION, UNIT 1 - REQUEST FOR DEVIATION FROM 10 CFR

PART 50, APPENDIX R, REQUEST FOR ADDITIONAL INFORMATION (TAC N0.

M97241) i

Dear Mr. McGaha:

i By letter dated November 6, 1996, Entergy Operations, Inc. requested a -

1 deviation from its commitment to the requirements of Section III.G.2 of

Appendix R to 10 CFR Part 50 of the Code of Federal Regulations for the use of 4 a partial area automatic suppression system in lieu of a full area automatic

suppression system in fire area C-16. <

We have identified additional information that we will need to complete our

review. Enclosed is our request for additional information. Please respond
within 45 days so that we may complete our review. If you have any questions

j on our request, please.let us know.

I Siricerely, I i ORIGINAL SIGNED BY:

David L. Wigginton, Senior Pisject Manager  ;

i Project Directorate IV-1 '

I Division of Reactor Projects III/IV

, Office of Nuclear Reactor Regulation 4

Docket No. 50-458

Enclosure:

Request for Additional Information cc w/ encl: See next page lg DISTRIBUTION:

Docket File PUBLIC PD4-1 r/f C. Hawes J. Roe D. Wigginton )

T. Gwynn, RIV ACRS OGC (15818)

E. Adensam (EGA1) MSalley Document Name: RB97241.RAI 0FC PM/Ph n/ LA/PD4-1 NAME DWiki[In/vw CHawes k [g

[ //,/97 b DATE 4 //6 /97 p 'p] I} h h COPY [ES)NO YES/NO b

" 0FFICIAL RECORD COPY i, g t 9 3ca ~

9706170262 970616 PDR ADOCK 05000458 F PDR

  • , UNITED STATES g NUCLEAR RE2ULATORY COMMISSION j 2 WASHINGTON, D.C. 20066-0001

%,*****,e June 16, 1997 I

l l

Mr. John R. McGaha, Jr.  !

Vice President - Operations  !

Entergy Operations, Inc. I River bend Station i P. O. Box 220 St. Francisville, LA 70775 l

l

SUBJECT:

RIVER BEND STATION, UNIT 1 - REQUEST FOR DEVIATION FROM 10 CFR PART 50, APPENDIX R, REQUEST FOR ADDITIONAL INFORMATION (TAC NO. i M97241)

Dear Mr. McGaha:

By letter dated November 6, 1996, Entergy Operations, Inc. requested a deviation from its commitment to the requirements of Section III.G.2 of Appendix R to 10 CFR Part 50 of the Code of Federal Regulations for the use of a partial area automatic suppression system in lieu of a full area automatic suppression system in fire area C-16.

We have identified additional information that we will need to complete our l review. Enclosed is our request for additional information. Please respond i within 45 days so that we may complete our review. If you have any questions on our request, please let us know. -

Sincerely,

~,

David L. inton, Senior Project Manager Project Directorate IV-1 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Docket No. 50-458

Enclosure:

Request for Additional Information cc w/ encl: See next page

Mr. John R. McGaha Entergy Operations, Inc. River Bend Station ,

CC*

Winston & Strawn Executive Vice President and i 1400 L Street, N.W. Chief Operating Officer Washington, DC 20005-3502 Entergy Operations, Inc.

P. O. Box 31995 Manager - Licensing Jackson, MS 39286 Entergy Operations, Inc.

River Bend Station General Manager - Plant Operations l P. O. Box 220 Entergy Operations, Inc.

St. Francisville,-LA 70775 River Bend Station 1

P. O. Box 220 l Director St. Francisville, LA 70775 l Joint Operations Cajun 10719 Airline Highway Director - Nuclear Safety P. O. Box 15540 Entergy Operations, Inc. l Baton Rouge, LA 70895 River Bend Station i P. O. Box 220 '

Senior Resident Inspector St. Francisville, LA 70775 P. O. Box 1050 St. Francisville, LA 70775 Vice President - Operations Support  !

Entergy Operations, Inc.

President of West Feliciana P. O. Box 31995 Police Jury Jackson, MS 39286-1995 P. O. Box 1921 St. Francisville, LA 70775 Attorney General State of Louisiana Regional ~ Administrator, Region IV P. O. Box 94095 U.S. Nuclear Regulatory Commission Baton Rouge, LA 70804-9095 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011 Wise, Carter, Child & Caraway P. O. Box 651 i Ms. H. Anne Plettinger Jackson, MS 39205 3456 Villa Rose Drive Baton Rouge, LA 70806 Vice President & Controller j Cajun Electric Power Cooperative Administrator 10719 Airline Highway Louisiana Radiation Protection Division P.O. Box 15540 j P. O. Box 82135 Baton Rouge, LA 70895 -

Baton Rouge, LA 70884-2135 l

\

  • . j REQUEST FOR INFORMATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION DIVISION OF SYSTEMS SAFETY AND ANALYSIS PLANT SYSTEMS BRANCH REQUEST FOR DEVIATION FROM SECTION III.G.2 0F APPENDIX R TO 10 CFR PART 50 RIVER BEND STATION - UNIT 1 DOCKET NO. 50-458
1. BACKGROUND By letter dated November 6, 1996, Entergy Operations, Inc. (E01), the licensee for River Bend Station, Unit 1, requested a deviation from its commitment to meet the requirements of Section III.G to Appendix R of 10 CFR Part 50. The requested deviation is for the use of a partial automatic suppression system in lieu of a full area suppression system in Fire Area C-16. This fire area contains both Division I and Division II post-fire safe shutdown cables. Automatic fire detection capability is provided for the fire area.

In lieu of providing a 3-hour fire barrier  !

for one division of the required post-fire safe shutdown cables, the l licensee is proposing to 5rovide a 1-hour fire barrier with a partial area automatic sprinkler system.

The staff has reviewed the licensee's deviation request and has concluded that it needs additional information in order to complete its review.

The following is the staff's request for additional information:

2. REQUEST FOR ADDITIONAL INFORMATION
a. Justify why a full area automatic suppression system cannot be installed in Fire Area C-16.-
b. Justify why a rated three hour fire barrier cannot be installed to protect the required Division II cables,
c. The request for deviation states: " Automatic smoke detection is l already provided in the area (Fire Area C-16)." The request for l deviation also states: " Area wide zone detection is provided by six l ionization detectors and three photo-electric detectors located in the fire area and arranged to alarm locally in the Main Control i' Room." Provide an engineering evaluation which demonstrates that the fire detection system meets the applicable fire protection industry codes and standards (e.g., National Fire Protection Association Fire Codes). This engineering evaluation should specifically address detector placement, detector selection i criteria, type and classification of detection and alarm circuit supervision.

ENCLOSURE l

e 2

d. Provide design details regarding the partial area suppression system.

Include the design basis and an engineering evaluation which demonstrates that this system conforms with applicable fire protection industry codes and standards. In addition, the engineering evaluation should demonstrate that the system design and its distribution of sprinkler heads is adequate to control all potential fires that could occur in the area of concern.

e. The RBS Calculation G13.18.12.2-22 " River Bend Station Combustible Loading" determines an average fuel loading that produces a " worst case theoretical fire duration of 31 minutes." The calculation also uses the term " unidentified combustibles". Explain what these combustibles are and how they impact the accuracy of the calculation. Based on this Fire Hazard Analysis average fuel loading justify how the partial area sprinkler coverage will provide the same level of fire safety as that of full sprinkler protection through out the fire area or area of concern.