i uThorras J. Martin                                    Public Service Electric and Gas Company 80 Park Plaza Newark, N.J. 07101 201/4304316
        - Vice PresWent '
Engineering and Construction February 24, 1984 Dr. Thomas E. Murley, Administrator U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region I
                    '631 Park Avenue
                    ' King of Prussia,_ Pennsylvania 19406
 
==Dear Dr. Murley:==
 
JCONSTRUCTION DEFICIENCY GE TYPE AKR-30 CIRCUIT BREAKERS HOPE CREEK GENERATING STATION On December 23, 1983, a verbal report was made to Region I, Office'of Inspection and Enforcement representative, Mr. W.
Cook, advising of a potentially significant construction deficiency concerning the failure of several General Electric AKR-30 circuit breakers to operate properly. On January 18, 1984,'an interim report was sent to your office. 'The following supplemental information is provided in accordance with 10CFR50.55(e).
During on-site rework of the subject AKR-30 circuit breakers, performed under the guidance of General Electric representatives, additional fabrication deficiencies in the breakers were identified, including:
: 1.      Loose buffer assembly hardware
: 2.      Short motor spacers
: 3.      Broken solder joints
'..                          4.      Defective spring charging motor b;:                            5.      Broken driving pawl shear pin l4                            6.      Improperly installed cut off switch plate K.                            7.      Cut-off and closing circuit switches becoming loose in
(                                      cperation v
W
                            ' 9403210118 840224                                                                                                    $
DR ADOCK 05 g
fi    6 '
 
f.i cs Q% ~
{;                                                    <
Dr.:T. E. Murley-2                  2/24/84 Consequently, General Electric has agreed tu) ' completely reinspect all~ Hope. Creek AKR-30 circuit breakers in accordance with detailed
          !. inspection procedures reviewed by Public Service and our Architect /
:Sngineer, Bechtel-Power Corporation.
We'have also instructed'Bechtel to press General Electric to identify the cause of the breakdown in their quality program that-permitted these_ fabrication deficiencies.to leave their shop.
          -- An additional interim report will be provided by May 14, 1984, if
          .the final' report is not available' prior to that date.
Very truly yours,
                                                                                            /            /
l 4
cc:    Office of Inspection and Enforcement Division of Reactor Construction Inspection F                : Washington, D. C. 20555 h
NRC Resident Inspector - Hope Creek P. 0. Box 241 Hancocks: Bridge, NJ 08038 i'
L
: l.                  Records Center-
[-                  Institute of Nuclear Power Operations
[                .1100~ Circle-75 Parkway, Suite 1500 Atlanta, GA 30339 k'
                                          . . . . - -  _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _          _ _ _  _          ]}}

Latest revision as of 00:53, 16 April 2020

Interim Deficiency Rept Re Failure of GE Type AKR-30 Circuit Breakers.Initially Reported on 831223.Breakers Reinspected. Next Rept Will Be Submitted by 840514
ML20087H664
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 02/24/1984
From: Martin T
Public Service Enterprise Group
To: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 8403210118
Download: ML20087H664 (2)


Text

- _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ - _ _ - _ - _ - _ _ - _ _ _ _

11:

' _ W4 .

i uThorras J. Martin Public Service Electric and Gas Company 80 Park Plaza Newark, N.J. 07101 201/4304316

- Vice PresWent '

Engineering and Construction February 24, 1984 Dr. Thomas E. Murley, Administrator U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region I

'631 Park Avenue

' King of Prussia,_ Pennsylvania 19406

Dear Dr. Murley:

JCONSTRUCTION DEFICIENCY GE TYPE AKR-30 CIRCUIT BREAKERS HOPE CREEK GENERATING STATION On December 23, 1983, a verbal report was made to Region I, Office'of Inspection and Enforcement representative, Mr. W.

Cook, advising of a potentially significant construction deficiency concerning the failure of several General Electric AKR-30 circuit breakers to operate properly. On January 18, 1984,'an interim report was sent to your office. 'The following supplemental information is provided in accordance with 10CFR50.55(e).

During on-site rework of the subject AKR-30 circuit breakers, performed under the guidance of General Electric representatives, additional fabrication deficiencies in the breakers were identified, including:

1. Loose buffer assembly hardware
2. Short motor spacers
3. Broken solder joints

'.. 4. Defective spring charging motor b;: 5. Broken driving pawl shear pin l4 6. Improperly installed cut off switch plate K. 7. Cut-off and closing circuit switches becoming loose in

( cperation v

W

' 9403210118 840224 $

DR ADOCK 05 g

fi 6 '

f.i cs Q% ~

{; <

Dr.:T. E. Murley-2 2/24/84 Consequently, General Electric has agreed tu) ' completely reinspect all~ Hope. Creek AKR-30 circuit breakers in accordance with detailed

!. inspection procedures reviewed by Public Service and our Architect /

Sngineer, Bechtel-Power Corporation.

We'have also instructed'Bechtel to press General Electric to identify the cause of the breakdown in their quality program that-permitted these_ fabrication deficiencies.to leave their shop.

-- An additional interim report will be provided by May 14, 1984, if

.the final' report is not available' prior to that date.

Very truly yours,

/ /

l 4

cc: Office of Inspection and Enforcement Division of Reactor Construction Inspection F  : Washington, D. C. 20555 h

NRC Resident Inspector - Hope Creek P. 0. Box 241 Hancocks: Bridge, NJ 08038 i'