ML062860482: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 40: | Line 40: | ||
: 2. Licensee Handout (slides) cc w/encls: See next page | : 2. Licensee Handout (slides) cc w/encls: See next page | ||
ML062860482 OFFICE LPLI-1\PE LPLI-1\PM LPLI-1\LA LPLI-1\BC NAME NMorgan TColburn SLittle RLaufer DATE 10/19/06 10/19/06 10/19/06 10/20/06 | ML062860482 OFFICE LPLI-1\PE LPLI-1\PM LPLI-1\LA LPLI-1\BC NAME NMorgan TColburn SLittle RLaufer DATE 10/19/06 10/19/06 10/19/06 10/20/06 DISTRIBUTION: | ||
DISTRIBUTION: | |||
PUBLIC PDI-1 Reading RidsNrrDorlLpla RidsNrrLASLittle RidsNrrPMTColburn NMorgan RidsOgcRp RidsAcrsAcnwMailCenter Belkys Sosa, EDO, Region I RJasinski, NRR RidsRgn1MailCenter SWerts GArmstrong JWu HGarg TScarbrough YDiaz RidsNrrDssSbwb TAlexion RidsNrrDraAadb | PUBLIC PDI-1 Reading RidsNrrDorlLpla RidsNrrLASLittle RidsNrrPMTColburn NMorgan RidsOgcRp RidsAcrsAcnwMailCenter Belkys Sosa, EDO, Region I RJasinski, NRR RidsRgn1MailCenter SWerts GArmstrong JWu HGarg TScarbrough YDiaz RidsNrrDssSbwb TAlexion RidsNrrDraAadb | ||
Latest revision as of 23:51, 13 March 2020
ML062860482 | |
Person / Time | |
---|---|
Site: | Nine Mile Point |
Issue date: | 10/20/2006 |
From: | Colburn T NRC/NRR/ADRO/DORL/LPLI-1 |
To: | |
Colburn T, NRR/DORL/LPLI-1, 415-1402 | |
References | |
TAC MD2844 | |
Download: ML062860482 (6) | |
Text
October 20, 2006 LICENSEE: Constellation Energy Group (CEG)
FACILITY: Nine Mile Point Nuclear Station, Unit No. 2 (NMP2)
SUBJECT:
SUMMARY
OF SEPTEMBER 26, 2006, CATEGORY 1 PRE-APPLICATION MEETING WITH CEG TO DISCUSS NMP2 EXTENDED POWER UPRATE (EPU)
APPLICATION TO BE SUBMITTED DURING THE FIRST QUARTER 2008 (TAC NO. MD2844)
On September 26, 2006, a public meeting was held between the U.S. Nuclear Regulatory Commission (NRC), and representatives of CEG, the licensee for NMP2 at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, MD. The purpose of the meeting was to conduct a discussion of the NMP2 EPU application to be submitted during the first quarter 2008.
The licensee presented information on a plan and preliminary timeline for the EPU at NMP2.
The licensee also presented the EPU Project Organization, potential major equipment modifications/replacements, method of preparing the EPU application, and related license submittals that will overlap.
Members of the public represented Dominion, GE Energy Nuclear, and MPR Associates.
Members of the public chose not to complete any Public Meeting Feedback Forms (NRC Form 659), which were available at the meeting.
A list of meeting attendees and a copy of the licensees slides are provided as Enclosure 1 and , respectively.
Please direct any inquiries to Timothy G. Colburn, Senior Project Manager, at 301-415-1402, or tgc@nrc.gov.
/RA/
Timothy G. Colburn, Senior Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-410
Enclosures:
- 1. List of attendees
- 2. Licensee Handout (slides) cc w/encls: See next page
ML062860482 OFFICE LPLI-1\PE LPLI-1\PM LPLI-1\LA LPLI-1\BC NAME NMorgan TColburn SLittle RLaufer DATE 10/19/06 10/19/06 10/19/06 10/20/06 DISTRIBUTION:
PUBLIC PDI-1 Reading RidsNrrDorlLpla RidsNrrLASLittle RidsNrrPMTColburn NMorgan RidsOgcRp RidsAcrsAcnwMailCenter Belkys Sosa, EDO, Region I RJasinski, NRR RidsRgn1MailCenter SWerts GArmstrong JWu HGarg TScarbrough YDiaz RidsNrrDssSbwb TAlexion RidsNrrDraAadb
LIST OF ATTENDEES CATEGORY 1 PUBLIC MEETING WITH CONSTELLATION ENERGY GROUP REGARDING NINE MILE POINT NUCLEAR STATION, UNIT NO. 2 PRE-APPLICATION EXTENDED POWER UPRATE MEETING SEPTEMBER 26, 2006 1:00 p.m.- 4:30 p.m.
NAME ORGANIZATION
- 1. T. Colburn NRC/NRR/ADRO/DORL
- 2. C. Haney NRC/NRR/ADRO/DORL
- 3. C. Holden NRC/NRR/ADRO/DORL
- 4. R. Laufer NRC/NRR/ADRO/DORL
- 5. N. Morgan NRC/NRR/ADRO/DORL
- 6. S. Werts NRC/NRR/ADRO/DLR/REBA
- 7. G. Armstrong NRC/NRR/ADRO/DIRS
- 8. J. Wu NRC/NRR/ADES/DE/EEMB
- 9. H. Garg NRC/NRR/ADES/DE/EICB
- 10. T. Scarbrough NRC/NRR/ADES/DCI/CPTB
- 11. Y. Diaz NRC/NRR/ADES/DCI/CSGB
- 12. G. Cranston NRC/NRR/ADES/DSS/SBWB
- 13. T. Alexion NRC/NRR/ADRA/DPR
- 14. M. Kotzalas NRC/NRR/ADRA/DRA
- 15. G. Pavis Constellation Energy Group
- 16. K. Picciott Constellation Energy Group
- 17. M. Schimmez Constellation Energy Group
- 18. L. Larragoite Constellation Energy Group
- 19. J. Dosa Constellation Energy Group
- 20. J. Carlin Constellation Energy Group
- 21. R. Thomas Dominion
- 22. M. OConnor Dominion
- 23. P. Willoughby Dominion
- 24. M. Dick GE Energy Nuclear
- 25. J. Simons MPR Associates
- 26. C. Schlaseman MPR Associates Enclosure 1
MEETING SLIDES Enclosure 2
Nine Mile Point Nuclear Station, Unit No. 2 cc:
Regional Administrator, Region I 750 East Pratt Street, 17th Floor U. S. Nuclear Regulatory Commission Baltimore, MD 21202 475 Allendale Road King of Prussia, PA 19406 Mr. Peter R. Smith, President New York State Energy, Research, Resident Inspector and Development Authority Nine Mile Point Nuclear Station 17 Columbia Circle P.O. Box 126 Albany, NY 12203-6399 Lycoming, NY 13093 Mr. Timothy J. OConnor Mr. James R. Evans Vice President Nine Mile Point LIPA Nine Mile Point Nuclear Station, LLC P.O. Box 129 P.O. Box 63 Lycoming, NY 10393 Lycoming, NY 13093 Supervisor Town of Scriba Route 8, Box 382 Oswego, NY 13126 Mr. Paul D. Eddy Electric Division NYS Department of Public Service Agency Building 3 Empire State Plaza Albany, NY 12223 Charles Donaldson, Esquire Assistant Attorney General New York Department of Law 120 Broadway New York, NY 10271 Mark J. Wetterhahn, Esquire Winston & Strawn 1700 K Street, NW.
Washington, DC 20006 Mr. Michael J. Wallace President Nine Mile Point Nuclear Station, LLC c/o Constellation Energy Group 750 East Pratt Street Baltimore, MD 21202 Mr. Carey W. Fleming, Esquire Senior Counsel Constellation Generation Group, LLC