Agenda e Meeting Objectives o Background

  • EPU Project Organization

" Project Overview

" Preliminary Timeline

  • Stakeholder Interfaces

" Project Submittal

  • Related Licensing Actions and Overlaps o Summary e Questions 2

.~.-

A; :)~

  • ~

Meeting Objectives

" CEG's plan and timeline for a constant pressure extended power uprate at NMP2

" Communication between the NMP2 Uprate project team and the NRC e CEG's benchmarking relative to recent submittals 3

=

Background===

  • Nine Mile Point Unit 2 GE BWR 5 Operating License in 1987 - 3323 MWt In 1995, uprated to 105% OLTP - 3467 MWt Extended Power Uprate'to 120% OLTP - 3988 MWt 4

EPU Project Organization Projýect Sponsor NMP VicePrsdn NMP Steering.iei

ý,Commit_ tee

" Operations

  • Implementation
  • Environmental

" Maintenance

  • Fuels

" Training 5

Project Overview

" Potential major equipment modifications or replacements

- High pressure turbine replacement

- Feedwater/Condensate system modifications

- Capacitor banks

" Steam dryer evaluations

  • Vibration Monitoring
  • Phased increases in power level
  • ARTS/MELLLA e MELLLA+

6

Preliminary Timeline r irYI I

2006 2007 I

2008 2009 I

2010 I 2011 I 2012 I

I 0

00 ft.

I.

0 4E o00 0=

00

-J 0

K>

Receive NRC Approval of Alternate Source Term Start EPU conceptual phase Subn it Alternlkte,<

Source oTrm to NOC S

Subi ARTSIMI to NI aual I RecE App RFO 11 Receive NRC4 Approval of I ARTS/MELLLA Submit to NRZ ive NRC A roval of 4

-PU ubmit

LLLA+

iNRC nit

.LLLA tc S

MI b

Concepti l

Design

-Completion of Engineering

  • NRC Submi.ttal for ARTSIMELLLA
  • NRC Review and Approval ARTSIMELLLA

" ARTSIMELLLA Installation (RFOli)

" EPU Modification Installation (RFO1 I /RFO1 21RFO1 3)

" MELLLA+ Implementation (RFO13)

Training

  • Power Ascension Testing 7

Stakeholder Interfaces

  • Stakeholder communications

- Open communication and dialogue with project stakeholders m NRC m NYS Independent System Operator (NYISO) m Transmission owners m Long Island Power Authority (LIPA)

  • NYS Department of Environmental Conservation (DEC)
  • City and County officials 8

Project Submittal

" Use of RS-O01, Revision 0 "Review Standard for Extended Power Uprates"

" Technical rigor

- Independent Reviews

- Vendor Audit Process

" Industry lessons Learned addressed

- Steam Dryer

- Vibration monitoring

" Ensure current issues understood 9

t't

.aillioi s,.... *p

.p A

Related License Submittals and Overlaps

  • ARTS/MELLLA
  • Reactor Vessel Pressure/Temperature Limits
  • MELLLA+

o Separate pre-submittal teleconferences and meetings will be conducted as needed 10

Summary

  • Constellation Energy is committed to safely and reliably implement this power uprate
  • Additional meetings are anticipated to maintain close communication 11

Questions?