Slides for Constellation Energy Nine Mile Point 2 Extended Power Uprate Meeting
ML063000354
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 09/26/2006
From:
Constellation Energy Group
To:
Office of Nuclear Reactor Regulation
References
TAC MD2844
Download: ML063000354 (12)


Text

Agenda e Meeting Objectives o Background

  • EPU Project Organization

" Project Overview

" Preliminary Timeline

  • Stakeholder Interfaces

" Project Submittal

  • Related Licensing Actions and Overlaps o Summary e Questions 2

.~.-

A;  :)~ *~

Meeting Objectives

" CEG's plan and timeline for a constant pressure extended power uprate at NMP2

" Communication between the NMP2 Uprate project team and the NRC e CEG's benchmarking relative to recent submittals 3

=

Background===

  • Nine Mile Point Unit 2

- GE BWR 5 Operating License in 1987 - 3323 MWt

- In 1995, uprated to 105% OLTP - 3467 MWt

- Extended Power Uprate'to 120% OLTP - 3988 MWt 4

EPU Project Organization Projýect Sponsor NMP VicePrsdn NMP Steering .iei

ý,Commit_ tee

" Operations

  • Implementation
  • Environmental

" Maintenance

  • Fuels

" Training 5

Project Overview

" Potential major equipment modifications or replacements

- High pressure turbine replacement

- Feedwater/Condensate system modifications

- Capacitor banks

" Steam dryer evaluations

  • Vibration Monitoring
  • Phased increases in power level
  • ARTS/MELLLA e MELLLA+

6

Preliminary Timeline r irYI I 2006 2007 I 2008 I 0 2009 I 2010 I 2011 I 2012 0 I. 0 I o0 0 0 0 0 0 ft. 0= -J 4E Receive NRC Subn it Submit Approval of Alternate Source Term K>

Alternlkte ,< to NRZ RecE ive NRC A Source oTrm App roval of 4 to NOC RFO -PU 11 Receive NRC4 Approval of I Start EPU S Subi nit ARTS/MELLLA conceptual ARTSIMI .LLLA phase to NItc S ubmit MI:LLLA+

b iNRC Concepti aual I Design l

-Completion of Engineering

  • NRC Submi.ttal for " ARTSIMELLLA Installation (RFOli)

ARTSIMELLLA " EPU Modification Installation (RFO1 I /RFO1 21RFO1 3)

  • NRC Review and Approval " MELLLA+ Implementation (RFO13)

ARTSIMELLLA Training

  • Power Ascension Testing 7

Stakeholder Interfaces

  • Stakeholder communications

- Open communication and dialogue with project stakeholders mNRC mNYS Independent System Operator (NYISO) mTransmission owners mLong Island Power Authority (LIPA)

  • NYS Department of Environmental Conservation (DEC)
  • City and County officials 8

Project Submittal

" Use of RS-O01, Revision 0 "Review Standard for Extended Power Uprates"

" Technical rigor

- Independent Reviews

- Vendor Audit Process

" Industry lessons Learned addressed

- Steam Dryer

- Vibration monitoring

" Ensure current issues understood 9

s,....*pt't - .aillioi.... .p A Related License Submittals and Overlaps

  • ARTS/MELLLA
  • Reactor Vessel Pressure/Temperature Limits
  • MELLLA+

o Separate pre-submittal teleconferences and meetings will be conducted as needed 10

Summary

  • Constellation Energy is committed to safely and reliably implement this power uprate
  • Additional meetings are anticipated to maintain close communication 11

Questions?

12