ML063000354
| ML063000354 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 09/26/2006 |
| From: | Constellation Energy Group |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| TAC MD2844 | |
| Download: ML063000354 (12) | |
Text
Agenda e Meeting Objectives o Background
- EPU Project Organization
" Project Overview
" Preliminary Timeline
- Stakeholder Interfaces
" Project Submittal
- Related Licensing Actions and Overlaps o Summary e Questions 2
.~.-
A; :)~
- ~
Meeting Objectives
" CEG's plan and timeline for a constant pressure extended power uprate at NMP2
" Communication between the NMP2 Uprate project team and the NRC e CEG's benchmarking relative to recent submittals 3
=
Background===
- Nine Mile Point Unit 2 GE BWR 5 Operating License in 1987 - 3323 MWt In 1995, uprated to 105% OLTP - 3467 MWt Extended Power Uprate'to 120% OLTP - 3988 MWt 4
EPU Project Organization Projýect Sponsor NMP VicePrsdn NMP Steering.iei
ý,Commit_ tee
" Operations
- Implementation
- Environmental
" Maintenance
- Fuels
" Training 5
Project Overview
" Potential major equipment modifications or replacements
- High pressure turbine replacement
- Feedwater/Condensate system modifications
- Capacitor banks
" Steam dryer evaluations
- Vibration Monitoring
- Phased increases in power level
- ARTS/MELLLA e MELLLA+
6
Preliminary Timeline r irYI I
2006 2007 I
2008 2009 I
2010 I 2011 I 2012 I
I 0
00 ft.
I.
0 4E o00 0=
00
-J 0
K>
Receive NRC Approval of Alternate Source Term Start EPU conceptual phase Subn it Alternlkte,<
Source oTrm to NOC S
Subi ARTSIMI to NI aual I RecE App RFO 11 Receive NRC4 Approval of I ARTS/MELLLA Submit to NRZ ive NRC A roval of 4
-PU ubmit
- LLLA+
iNRC nit
.LLLA tc S
MI b
Concepti l
Design
-Completion of Engineering
- NRC Submi.ttal for ARTSIMELLLA
- NRC Review and Approval ARTSIMELLLA
" ARTSIMELLLA Installation (RFOli)
" EPU Modification Installation (RFO1 I /RFO1 21RFO1 3)
" MELLLA+ Implementation (RFO13)
Training
- Power Ascension Testing 7
Stakeholder Interfaces
- Stakeholder communications
- Open communication and dialogue with project stakeholders m NRC m NYS Independent System Operator (NYISO) m Transmission owners m Long Island Power Authority (LIPA)
- City and County officials 8
Project Submittal
" Use of RS-O01, Revision 0 "Review Standard for Extended Power Uprates"
" Technical rigor
- Independent Reviews
- Vendor Audit Process
" Industry lessons Learned addressed
- Steam Dryer
- Vibration monitoring
" Ensure current issues understood 9
t't
.aillioi s,.... *p
.p A
Related License Submittals and Overlaps
- ARTS/MELLLA
- Alternate Source Term (Control Room Habitability) e Setpoint Methodology
- Reactor Vessel Pressure/Temperature Limits
- MELLLA+
o Separate pre-submittal teleconferences and meetings will be conducted as needed 10
Summary
- Constellation Energy is committed to safely and reliably implement this power uprate
- Additional meetings are anticipated to maintain close communication 11
Questions?
12