ML19350C618: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
Line 19: Line 19:
{{#Wiki_filter:e- ~s Alibtm3 Powrr Comptny 600 North 18th Street Post Omc2 Box 2641 Birmingham, Alabama 35291 Telepnone 205 250-1000 F. L CLAYToN, JR.
{{#Wiki_filter:e- ~s Alibtm3 Powrr Comptny 600 North 18th Street Post Omc2 Box 2641 Birmingham, Alabama 35291 Telepnone 205 250-1000 F. L CLAYToN, JR.
m Senior Vice Presicent                                              Alabama Power t% sournem decinc sys:em March 30, 1981
m Senior Vice Presicent                                              Alabama Power t% sournem decinc sys:em March 30, 1981
{{ 3Og
(( 3Og
                                                                                                 'l Mr. Darrel G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation n[m g
                                                                                                 'l Mr. Darrel G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation n[m g
{y                p U. S. Nuclear Regulatory Commission                              4 g        9 Washington, D.C. 20555
{y                p U. S. Nuclear Regulatory Commission                              4 g        9 Washington, D.C. 20555

Latest revision as of 08:19, 27 February 2020

Forwards Central Files Version of Revision to Farley Nuclear Site Emergency Planning Zone Evacuation Time Estimate Study, Addressing NUREG-0654 Criteria in NRC 801209 Ltr
ML19350C618
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 03/30/1981
From: Clayton F
ALABAMA POWER CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
Shared Package
ML19350C619 List:
References
NUDOCS 8104060433
Download: ML19350C618 (1)


Text

e- ~s Alibtm3 Powrr Comptny 600 North 18th Street Post Omc2 Box 2641 Birmingham, Alabama 35291 Telepnone 205 250-1000 F. L CLAYToN, JR.

m Senior Vice Presicent Alabama Power t% sournem decinc sys:em March 30, 1981

(( 3Og

'l Mr. Darrel G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation n[m g

{y p U. S. Nuclear Regulatory Commission 4 g 9 Washington, D.C. 20555

Dear Mr. Eisenhut:

Forwarded herewith are revised evacuation time estimates based on the requirements of NUREG-0654, Revision 1, as specified in your letter to ALL LICENSEES et al dated December 9,1980.

The large vic 11ty map and Emergency Planning Zone (EPZ) map are pro-vided as an aid to ,Sur reviewer.

If you have fur ter questions, please advise.

Very truly yours,

&F. L. hUd Clayton',' Jr.

FLCJr/JRC:nac I

Enclosures KOO $

,// 7bre Air n_ i__ n--

pyc q ua c M!Eh Tu,iQ:N= A -

M DGLSV em3 g

& Lf9L M NSIL NI16 8104060 i Q

L