ML19350C618

From kanterella
Jump to navigation Jump to search
Forwards Central Files Version of Revision to Farley Nuclear Site Emergency Planning Zone Evacuation Time Estimate Study, Addressing NUREG-0654 Criteria in NRC
ML19350C618
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 03/30/1981
From: Clayton F
ALABAMA POWER CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
Shared Package
ML19350C619 List:
References
NUDOCS 8104060433
Download: ML19350C618 (1)


Text

e-

~s Alibtm3 Powrr Comptny 600 North 18th Street Post Omc2 Box 2641 Birmingham, Alabama 35291 Telepnone 205 250-1000 m

F. L CLAYToN, JR.

Senior Vice Presicent Alabama Power t% sournem decinc sys:em March 30, 1981

(( 3 g O

'l n[m Mr. Darrel G. Eisenhut, Director

{y g

Division of Licensing p

Office of Nuclear Reactor Regulation 4

U. S. Nuclear Regulatory Commission g

9 Washington, D.C.

20555

Dear Mr. Eisenhut:

Forwarded herewith are revised evacuation time estimates based on the requirements of NUREG-0654, Revision 1, as specified in your letter to ALL LICENSEES et al dated December 9,1980.

The large vic 11ty map and Emergency Planning Zone (EPZ) map are pro-vided as an aid to,Sur reviewer.

If you have fur ter questions, please advise.

Very truly yours,

& hUd F. L. Clayton',' Jr.

FLCJr/JRC:nac I

Enclosures KOO

,//

7bre Air n_

i__

n-pyc q ua c M!Eh Tu,iQ:N=

A M

DGLSV em3 g

Lf9L M

NSIL NI16 Q

8104060 i L