ML19305D340: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:t -
{{#Wiki_filter:t -
NSID NORTHERN                STATES            POWER            COMPANY
NSID NORTHERN                STATES            POWER            COMPANY M I N N E A PO LI S. MI N N E S OTA 9 9401 April 9, 1980 Mr J G Keppler Office of Inspection & Enforcement U S Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL      60137
              '
M I N N E A PO LI S. MI N N E S OTA 9 9401 April 9, 1980 Mr J G Keppler Office of Inspection & Enforcement U S Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL      60137


==Dear Mr Keppler:==
==Dear Mr Keppler:==
Line 26: Line 24:
PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket No. 50-282          License No. DPR-42 Temporary NIS Channel IN44 Inoperebility 1
PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket No. 50-282          License No. DPR-42 Temporary NIS Channel IN44 Inoperebility 1
The Licensee Event Report for thir, occurrence is reproduced on the back of this letter. Enclosed are three copies.
The Licensee Event Report for thir, occurrence is reproduced on the back of this letter. Enclosed are three copies.
                                                                                      ,
This event is reported in compliance with Technical Specification 6.7.B.2.(b) in that the loss of the NIS channel resulted in opera-tion in a degraded mode permitted by Technical Specification 3.5.
This event is reported in compliance with Technical Specification 6.7.B.2.(b) in that the loss of the NIS channel resulted in opera-tion in a degraded mode permitted by Technical Specification 3.5.
Yours very truly, h
Yours very truly, h

Latest revision as of 13:37, 1 February 2020

Forwards LER 80-009/03L-0
ML19305D340
Person / Time
Site: Prairie Island Xcel Energy icon.png
Issue date: 04/09/1980
From: Mayer L
NORTHERN STATES POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19305D341 List:
References
NUDOCS 8004140435
Download: ML19305D340 (1)


Text

t -

NSID NORTHERN STATES POWER COMPANY M I N N E A PO LI S. MI N N E S OTA 9 9401 April 9, 1980 Mr J G Keppler Office of Inspection & Enforcement U S Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137

Dear Mr Keppler:

PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket No. 50-282 License No. DPR-42 Temporary NIS Channel IN44 Inoperebility 1

The Licensee Event Report for thir, occurrence is reproduced on the back of this letter. Enclosed are three copies.

This event is reported in compliance with Technical Specification 6.7.B.2.(b) in that the loss of the NIS channel resulted in opera-tion in a degraded mode permitted by Technical Specification 3.5.

Yours very truly, h

A  % g Mayer, PE Manager of Nuclear Support Services LOM/ JAG /jh cc: Director, IE, USNRC (30)

Director, MIPC, USNRC (3)

MPCA Attn: J W Ferman

-over- b-V

-s

a 3 004140 < ) j) l