DUQUESNE LIGHT COMPAhT Beaver Valley Power Station NARRATIVE | DUQUESNE LIGHT COMPAhT Beaver Valley Power Station NARRATIVE | ||
==SUMMARY== | ==SUMMARY== | ||
OF MONTHLY OPERATING EXPERIENCE - JULY 1980 July 1 Station in Operational Mode 5 with the reactor Through coolant system vented to atmosphere and a system July 31 temperature approximately 90F. | OF MONTHLY OPERATING EXPERIENCE - JULY 1980 July 1 Station in Operational Mode 5 with the reactor Through coolant system vented to atmosphere and a system July 31 temperature approximately 90F. | ||
MAJOR SAFETY RELATED MAINTENANCE - JULY 1980 Beaver Valley Power Station is presentl' shut down for major system modifications required by the Nuclear Regulatory Commission. These modifications are performed as construction activities. The following major modifications were performed or in progress during July 1980. | MAJOR SAFETY RELATED MAINTENANCE - JULY 1980 Beaver Valley Power Station is presentl' shut down for major system modifications required by the Nuclear Regulatory Commission. These modifications are performed as construction activities. The following major modifications were performed or in progress during July 1980. | ||
: 1. Final inspection of the re-installed Bergen-Patterson large-bore snubbers was in progress. | : 1. Final inspection of the re-installed Bergen-Patterson large-bore snubbers was in progress. | ||
Line 30: | Line 29: | ||
: 4. The modification to increase the capacity of the quench spray pumps re-installation and proof-testing was completed. | : 4. The modification to increase the capacity of the quench spray pumps re-installation and proof-testing was completed. | ||
: 5. Inspection and modification, on a continual basis as required, of pipe hangers, supports and baseplates are in progress. | : 5. Inspection and modification, on a continual basis as required, of pipe hangers, supports and baseplates are in progress. | ||
: 6. Inspection, internal cleaning and modification of the reactor coolant pump motor thrust runners are in progress. | : 6. Inspection, internal cleaning and modification of the reactor coolant pump motor thrust runners are in progress. | ||
: 7. Inspection and installation of the Unit 2 low pressure turbine rotors into the Unit 1 main turbine has been completed. | : 7. Inspection and installation of the Unit 2 low pressure turbine rotors into the Unit 1 main turbine has been completed. | ||
8008190g] | 8008190g] | ||
OPERATING DATA RIPORT DOCKET NO. 50-334 DATE 8/4/50 COMPLETED BY D. R. Tinko TELEPHONE. D '-C-9308 OPERATING STATUS | OPERATING DATA RIPORT DOCKET NO. 50-334 DATE 8/4/50 COMPLETED BY D. R. Tinko TELEPHONE. D '-C-9308 OPERATING STATUS | ||
: 1. Unit Name: 3eaver Valley Power Station. Unit #1 Not:s | : 1. Unit Name: 3eaver Valley Power Station. Unit #1 Not:s | ||
Line 51: | Line 46: | ||
: 9. Power Level To which Restricted. If Any (Net MWe): None | : 9. Power Level To which Restricted. If Any (Net MWe): None | ||
: 10. Reasons For Restrictions. If Any: _ | : 10. Reasons For Restrictions. If Any: _ | ||
N/A | N/A 11 tis Month Yr. to.Date Cumulative * | ||
11 tis Month Yr. to.Date Cumulative * | |||
.; | .; | ||
!!. Hours In Reporting Period 744 5111 '37.271 | !!. Hours In Reporting Period 744 5111 '37.271 | ||
Line 76: | Line 69: | ||
l _ _ . _ _ _ _ . . _ _ _ _ . . _ . . . . _ _ . . . . _ _ _ _ . ._. _. ._.. _ _ __ ._ _.____ _ ._...___ _. . _ _ , . . _ _ , __ _. _ ..,___. | l _ _ . _ _ _ _ . . _ _ _ _ . . _ . . . . _ _ . . . . _ _ _ _ . ._. _. ._.. _ _ __ ._ _.____ _ ._...___ _. . _ _ , . . _ _ , __ _. _ ..,___. | ||
AVERAGE D AILY UNIT POWER LEVEL DOCKET NO. | AVERAGE D AILY UNIT POWER LEVEL DOCKET NO. | ||
50-334 UNIT 3'''?S Uni: 41 DATE 8/5/80 U | 50-334 UNIT 3'''?S Uni: 41 DATE 8/5/80 U | ||
Line 85: | Line 75: | ||
* 0 0 | * 0 0 | ||
* 13 0 0 3 19 0 | * 13 0 0 3 19 0 | ||
' 4 00 0 0 | ' 4 00 0 0 5 :1 l | ||
5 :1 l | |||
0 0 6 = | 0 0 6 = | ||
0 ~0 7 3 0 | 0 ~0 7 3 0 | ||
Line 98: | Line 86: | ||
16 IN53UCT10NS On this forrnst.hst the netage daily unit pimer icsd tn MWe-Net for es: . day in the reporttec :nonth. Compute io the nearest whole meg 2 watt. | 16 IN53UCT10NS On this forrnst.hst the netage daily unit pimer icsd tn MWe-Net for es: . day in the reporttec :nonth. Compute io the nearest whole meg 2 watt. | ||
(4/77) | (4/77) | ||
I E NO. S H4 UNIT SilUIDOWNS AND POWER REDUC 110NS g unit #1 DATE /HO COMPl EIED BY lmko RLPORI AIONill. July, 1980 II.I rl ONE J.412-6 M . /.{- | I E NO. S H4 UNIT SilUIDOWNS AND POWER REDUC 110NS g unit #1 DATE /HO COMPl EIED BY lmko RLPORI AIONill. July, 1980 II.I rl ONE J.412-6 M . /.{- | ||
3 5308_ | 3 5308_ | ||
= c jg | = c jg | ||
.$ g 3 j E T.; I nensee ,E e, ^ | .$ g 3 j E T.; I nensee ,E e, ^ | ||
Cau e A Ciusesene 4 | Cau e A Ciusesene 4 | ||
%+. Da'e -h 3? 4,4 255 l've n 3,1 e! As ia..n ti. | %+. Da'e -h 3? 4,4 255 l've n 3,1 e! As ia..n ti. | ||
6-3: Repine = ao E' l'oevens Retussense 3 | 6-3: Repine = ao E' l'oevens Retussense 3 | ||
e ;g =! o d | e ;g =! o d | ||
1 010180 5 5111 11 1 N/A ZZ ZZZZZZ Unit shutdown for major modifications as reiluired by the Nuclear Regulatory Cormaission, including NRC !!ullet ins IEli 79-02 and 79-14 i | 1 010180 5 5111 11 1 N/A ZZ ZZZZZZ Unit shutdown for major modifications as reiluired by the Nuclear Regulatory Cormaission, including NRC !!ullet ins IEli 79-02 and 79-14 i | ||
i a | i a | ||
i | i I 2 3 4 l': l'.used Itcason: Meihini: 131nbit G Instiussions S Sc hedu!cil A-l guipment I ailure(i.xplain) 1 Manual fine l'ecp.uali.ri og Data D Maintenance air Test 2 Manual Scrain. I'nin Sheces ein I.isensec C. Refueling .l Autonutic Si sani. I sent Rep.us il i Rll sic INilRI G D itcyulating Reusittion -l Other 11: uplain t Oltil i I Opciasin l'eaining A liscnw I'xamination 1 l Ailnunesisaisvc G Openaliinial I a os 11 aplain t l'sinbis 1 Sainc'S..uisc l'7/77) II Othes 11 splain) | ||
I 2 3 4 l': l'.used Itcason: Meihini: 131nbit G Instiussions S Sc hedu!cil A-l guipment I ailure(i.xplain) 1 Manual fine l'ecp.uali.ri og Data D Maintenance air Test 2 Manual Scrain. I'nin Sheces ein I.isensec C. Refueling .l Autonutic Si sani. I sent Rep.us il i Rll sic INilRI G D itcyulating Reusittion -l Other 11: uplain t Oltil i I Opciasin l'eaining A liscnw I'xamination 1 l Ailnunesisaisvc G Openaliinial I a os 11 aplain t l'sinbis 1 Sainc'S..uisc l'7/77) II Othes 11 splain) | |||
.}} | .}} |
Revision as of 17:31, 31 January 2020
ML19331C740 | |
Person / Time | |
---|---|
Site: | Beaver Valley |
Issue date: | 08/04/1980 |
From: | Timko D DUQUESNE LIGHT CO. |
To: | |
Shared Package | |
ML19331C711 | List: |
References | |
NUDOCS 8008190473 | |
Download: ML19331C740 (4) | |
Text
4 e
v)
DUQUESNE LIGHT COMPAhT Beaver Valley Power Station NARRATIVE
SUMMARY
OF MONTHLY OPERATING EXPERIENCE - JULY 1980 July 1 Station in Operational Mode 5 with the reactor Through coolant system vented to atmosphere and a system July 31 temperature approximately 90F.
MAJOR SAFETY RELATED MAINTENANCE - JULY 1980 Beaver Valley Power Station is presentl' shut down for major system modifications required by the Nuclear Regulatory Commission. These modifications are performed as construction activities. The following major modifications were performed or in progress during July 1980.
- 1. Final inspection of the re-installed Bergen-Patterson large-bore snubbers was in progress.
- 2. Modifications to the refueling water storage tank are. in progress. These modifications provide additional quench spray system capacity and incorporate additional controls required for automatic change-over from injection mode to recirculation mode.
- 3. Installation of the chemical addition pumps, which add sodium hydroxide solution to the quench spray during containment depressurization, has been started.
- 4. The modification to increase the capacity of the quench spray pumps re-installation and proof-testing was completed.
- 5. Inspection and modification, on a continual basis as required, of pipe hangers, supports and baseplates are in progress.
- 6. Inspection, internal cleaning and modification of the reactor coolant pump motor thrust runners are in progress.
- 7. Inspection and installation of the Unit 2 low pressure turbine rotors into the Unit 1 main turbine has been completed.
8008190g]
OPERATING DATA RIPORT DOCKET NO. 50-334 DATE 8/4/50 COMPLETED BY D. R. Tinko TELEPHONE. D '-C-9308 OPERATING STATUS
- 1. Unit Name: 3eaver Valley Power Station. Unit #1 Not:s
- 2. Reporting Period. July of 1980
~'
Licensed Thermal Power (MWt): W
- 4. ameplate Rating (Gross MWe): 923
- 5. Ddgn Electrical Rating (Net MWe): 852
- 6. Maximum Dependable Capacity (Gross MWe):
d'3
- 7. Maximum Dependable Capacity (Net MWe): 810
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To which Restricted. If Any (Net MWe): None
- 10. Reasons For Restrictions. If Any: _
N/A 11 tis Month Yr. to.Date Cumulative *
.;
!!. Hours In Reporting Period 744 5111 '37.271
.o 0 13,744.71
- 12. Number Of Hours Reactor Was Critical 0 0 -4,482.8
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator 0n.Line 0 0 13.105.07 IS. Unit Reserve Shutdown Hours 0 0 o 0 0 26.974.253.33
- 16. Gross Thermal Energy Generated (MWH)
- 17. Gross E!ectrical Energy Generated (M%H) 0 , , , ,
0 8.277,940
- 18. Net Electrical Energy Generated (MWH) 0 0 7,570.743
- 19. Unit Service Factor 0 0 36.5
- 20. Unit Availability Factor 0 0 36.5
- 21. Unit Capacity Factor t Using MDC Net) 0 0 28.6
- 22. Unit Capacity Factor iUsing DER Net) 0 0 27.2
- 23. Unit Forced Outage Rat, 0 0 46.4
- 24. Shutdowns Scheduled Over Nest 6 Months (Type.Date and Duration of Eaetti:
Maior Modifications Outage (December,1979 through August, 1980)
- 25. If Shut Down At End Of Report Period. Estimated Date of Surtup: At cc"cletion of -'odifications.
- 26. Units in Test Status iPrior to Commercial Operations: Forecast Achieved INITIAL CRITICA LITY 'I / A 'I /A l INITIAL ELECTRICITY _ N/A N/A i
COMMERCIAL OPERATION N/A N/A (9/77) l l
l _ _ . _ _ _ _ . . _ _ _ _ . . _ . . . . _ _ . . . . _ _ _ _ . ._. _. ._.. _ _ __ ._ _.____ _ ._...___ _. . _ _ , . . _ _ , __ _. _ ..,___.
AVERAGE D AILY UNIT POWER LEVEL DOCKET NO.
50-334 UNIT 3?S Uni: 41 DATE 8/5/80 U
- A
- MO COMPLETED BY TELEPHONE 412-4 3-5309 MONDI F*1 r 1000 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) IMWe-Net) 0 17 0 1
- 0 0
- 13 0 0 3 19 0
' 4 00 0 0 5 :1 l
0 0 6 =
0 ~0 7 3 0
8 ;4 0 0 9 25 0 0 10 . 6 O
II 2;
O 0 y ,~ :S 0
I :9 l 0 0 14 30 l
1 0 0
' 15 31 0
16 IN53UCT10NS On this forrnst.hst the netage daily unit pimer icsd tn MWe-Net for es: . day in the reporttec :nonth. Compute io the nearest whole meg 2 watt.
(4/77)
I E NO. S H4 UNIT SilUIDOWNS AND POWER REDUC 110NS g unit #1 DATE /HO COMPl EIED BY lmko RLPORI AIONill. July, 1980 II.I rl ONE J.412-6 M . /.{-
3 5308_
= c jg
.$ g 3 j E T.; I nensee ,E e, ^
Cau e A Ciusesene 4
%+. Da'e -h 3? 4,4 255 l've n 3,1 e! As ia..n ti.
6-3: Repine = ao E' l'oevens Retussense 3
e ;g =! o d
1 010180 5 5111 11 1 N/A ZZ ZZZZZZ Unit shutdown for major modifications as reiluired by the Nuclear Regulatory Cormaission, including NRC !!ullet ins IEli 79-02 and 79-14 i
i a
i I 2 3 4 l': l'.used Itcason: Meihini: 131nbit G Instiussions S Sc hedu!cil A-l guipment I ailure(i.xplain) 1 Manual fine l'ecp.uali.ri og Data D Maintenance air Test 2 Manual Scrain. I'nin Sheces ein I.isensec C. Refueling .l Autonutic Si sani. I sent Rep.us il i Rll sic INilRI G D itcyulating Reusittion -l Other 11: uplain t Oltil i I Opciasin l'eaining A liscnw I'xamination 1 l Ailnunesisaisvc G Openaliinial I a os 11 aplain t l'sinbis 1 Sainc'S..uisc l'7/77) II Othes 11 splain)
.