{{#Wiki_filter:I REGULATORY I RMATION DISTRIBUTION SYST (RIDS)ACCESSION NBRt8006200079 DOC~DATE: 80/06/13 NOTARIZED!
{{#Wiki_filter:I REGULATORY I     RMATION DISTRIBUTION SYST           (RIDS)
NO FACIL:50 250 Turkey Point Plantr'nit 3r Florida Power and Light C 50 251 Turkey Point Planti Unit qr Florida Power and Light C AUTH'AME AUTHOR AFFILIATION UHRIGr R~E, Florida Power 8 Light Co.REC IP~NAME RECIPIENT AFFILIATION ETSENHUTrD
ACCESSION NBRt8006200079           DOC   DATE: 80/06/13     NOTARIZED!     NO           DOCKET FACIL:50 250 Turkey Point       Plantr'nit
~6.Division of Licensing  
                                          ~
3r Florida Power and       Light   C   05000250 50 251 Turkey Point     Planti Unit qr Florida Power and           Light   C   05000251 AUTH'AME               AUTHOR AFFILIATION UHRIGr R ~ E,           Florida Power 8 Light Co.
REC IP ~ NAME           RECIPIENT AFFILIATION ETSENHUTrD ~ 6.         Division of Licensing


==SUBJECT:==
==SUBJECT:==
Forwards info re addi TMI r eleated requir ements per 800507 l t r,Includes shi f t manningr r evi sing scope 8 criteria of licensing examsiprocedures for feedback, of operating experience to plant staff 8 PlPR vendor reptDISTRIBUTION CODE: A039S COPIES RECEIYED:LTR g ENCL g SIZE: TITLE: Resp to Lesson Learn Task Force Nestinghouse I gr~ores.DOCKET 05000250 05000251:XTERNAL!ACRS NSIC 26 00 RECIPIENT ID CODE/NAME<CTION: BC t/RRGR]S.10 iNTERNAL;ANDERSONrN
Forwards info re addi TMI r eleated requir ements per 800507 l t r,Includes shi f t manningr r evi sing scope 8 criteria of licensing examsiprocedures for feedback, of operating experience to plant staff 8 PlPR vendor rept DISTRIBUTION CODE: A039S COPIES RECEIYED:LTR g ENCL g SIZE:
~BURDIONi J~07 FIELDS'~I8E 17 LIC QUAL BR O'REILLYi P~OLSHINSKI r J~05 0 OR 23 EG 01 ISgC~08 COPIES LTTR ENCL 7 7 1.1 1 1 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1'6 l 6 1 1 RECIPIENT ID CODE/NAME LPDR 03 AUX SYS BR 2A EMERG PREP 20 HUM FACT ENG BR KERRIGANr J~06 NRC PDR 02 OELD OP LIC BR PROC/TST REV 25 TELFORDrJeT
TITLE: Resp to Lesson Learn Task Force               Nestinghouse I
~I COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 0 1 1 1 2 2 1 1 JUN 23 1980 TOTAL NUMBER OF COPIES REQUIRED: LTTR 46 ENCL 45  
gr ores. ~
RECIPIENT          COPIES              RECIPIENT             COPIES ID CODE/NAME       LTTR ENCL          ID CODE/NAME          LTTR ENCL
<CTION:     BC t/RRGR] S. 10         7      7 iNTERNAL; ANDERSONrN ~                 1. 1     AUX SYS BR        2A      1     1 BURDIONi J ~    07      1     1     EMERG PREP        20      1     1 FIELDS' ~                1     1     HUM FACT ENG BR           1    1 I8E              17      2      2    KERRIGANr J ~     06     1 LIC QUAL BR              1      1    NRC PDR           02     1 O'REILLYiP ~              1      1    OELD                       1    0 OLSHINSKI r J  ~ 05      1      1    OP   LIC BR               1 0            OR 23      1      1    PROC/TST REV 25           1     1 EG            01      1     1     TELFORDrJeT    ~          2    2 ISgC ~    08      1     1                     I
:XTERNAL! ACRS                26    1'6    l6    LPDR              03      1     1 NSIC            00      1     1 JUN   23 1980 TOTAL NUMBER OF COPIES       REQUIRED: LTTR       46   ENCL     45


P.O.BOX 529100, MIAMI, FL 33152 g4l~b~FLORIDA POWER&LIGHT COMPANY June 13, 1980 L-80-186 Office of Nuclear Reactor Regu1 a ti on Attention:;
P.O. BOX 529100, MIAMI, FL 33152 g4l~b~
Mr.Darrell G.Eisenhut, Director Division of Licensing U.S.Nuclear Regulatory Commission Washington, D.C.
FLORIDA POWER & LIGHT COMPANY June 13, 1980 L-80-186 Office of Nuclear Reactor Regu1 a ti on Attention:; Mr. Darrell G. Eisenhut, Director Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C.


==Dear MT.Eisenhut:==
==Dear MT. Eisenhut:==
Re: Turkey Point Units 3 8 4 Docket Nos.50-250/50-251 Additional TMI-Related Re uirements The attached information is submitted in response to your letter of May 7, 1980.Very truly yours,.~de%>~Robert E.Uhrig Vice President Advanced Systems 5 Technology REU/MAS/paf Attachment cc: J.P.O'Reilly, Region II Harold F.Reis, Esquire Poxt 5 ii)5 6 0 6 2 p p g'7q PEOPLE...SERVING PEOPLE RKEY POINT UNITS 3 8i 4 1-C.5 Title Shift Manning Revise Scope 8 Criteria of Licensing Examinations, Procedures for Feedback of Operating Experience to Plant Staff Inst al 1 at i on and Test i ng of Automatic PORV Isolation System PklR Vendor Report on PORV Failure Reduction Reportirg Safety 8 Relief Valve Failures and Challenges Automatic Trip of Reactor Coolant Pumps During LOCA Re~sense The requirements of this item are to be supplied by the NRC.To date, we have not received the correspondence on this item referenced in th'e Hay 7, 1980 letter.FPL will respond to this item following receipt of the letter.FPL has not yet completed the review and assessment.
 
of the requirements of the referenced March 28, 1980 letter.4!e will respond to this item by August 1, 1980.FPL intends to comply" with the requirements of this item.However, the commitment to the implementation sched41e must be qualified pending our ability to provide additional man'power required to administer an appropriate operati ng experience feedback program.The implementat',on of this action item has been delayed until after the studies specified in item II.K.3.2 have been ccmpleted.
Re:   Turkey Point Units 3 8 4 Docket Nos. 50-250/50-251 Additional TMI-Related Re uirements The attached information is submitted in response to your   letter of May 7, 1980.
FPL will respond further at that time.FPL will support the vendor effort in this area, and submi t the required report.FPL intends to comply with the requirements of it's II.K.3.3>JCAP-9584 documents FPL'and Mestinghouse's position on the subject.FPL sees no need for further evaluation of the subject.Proportional Integral Derivative (PID)Controller Modification I'he controller used at Turkey Point 3 8 4 does not have the derivative function.Therefore, this item is not applicable.
Very truly yours,
IRKEY POINT UNITS 3&&Item II.K.3-10 I I-K~3~12 II.K.3.17 II.K.3.25 II.K.3-29 I I.Y..3.30 I I~K~3.31" II-V..3.44 I I-D.3.4 Ti tl e Proposed Antic i patory Trip Modification Confirm Existence of Anticipatory Trip Upon Turbine Trip Report on Outages of ECC Systems-Licensee Report and Proposed Technical Specification Changes Effect of Loss of AC Power on Pump Seals Study to Demonstrate Performance of Isolation Condensers with Non-Condens ib1 es Revised Small Break LOCA Methods to Show Compliance with 10CFf(50, App.f: Plant Specific Calculations to Show Compl i ance wi th 10CFR 50.46 Anticipated Transients with Single Failure to Verify No Fuel Failure Control Room Habitability Response This item is not applicable to Turkey Point 3 8 4.FPL will respond if modification is desired at a later date.FPL has confirmed the existence of the anticipatory trip upon turbine tri p.FPL intends to comply with the requiremetns of itei~I I.K.3.17.This item is identified in NUREG-0660 as applicable only to G.E.plants.This item is identified in iNUREG-0660 as applicable only to G~E.plants.f.PL intends to comply with the requirements of item II.K.3~30 subject to vendors ability to meet the schedule.FPl.intends to comply with the requirements of item II.K.3.31.
.~de%>~
This item is identified in NUREG-0660 as applicable only ta G.E.Plants.FPL intends to comply with the requirements of item III.D.3.4.
Robert E. Uhrig Vice President Advanced Systems   5 Technology REU/MAS/paf Attachment cc:   J. P. O'Reilly, Region     II Harold F. Reis, Esquire Poxt 5
i)OTE: The following items are applicable to thl 5 subml i.'cal~I I.K.3.13 through I I.K.3.16 II.V,.3.18 through II.K.3.22 I I.K.3.24 I I.K.3.27 I I.Y..3.28 II.K.3.45 I I.V" 3.46 I I.K.3~57, BMRs and are not addressed in}}
ii) 5 6 0 6 2 p p g'7q PEOPLE... SERVING PEOPLE
 
RKEY POINT UNITS 3 8i 4 Title                             Re~sense Shift  Manning                    The requirements of this item are to   be supplied by the NRC. To date,   we have not received the correspondence     on this item referenced in th'e     Hay 7, 1980 letter. FPL will respond to this item following receipt of the letter.
Revise Scope      8                FPL has     not yet completed the Criteria of Licensing              review and assessment. of the Examinations,                      requirements of the referenced March 28, 1980     letter. 4!e will respond to this item by August 1, 1980.
1-C.5 Procedures      for  Feedback      FPL   intends to comply" with the of Operating Experience            requirements of this item.
to Plant Staff                      However, the commitment to the implementation sched41e must be qualified pending our ability to provide additional man'power required to administer an appropriate operati ng experience feedback program.
Inst al 1 at i on and Test i ng    The implementat',on of     this action of Automatic      PORV  Isolation  item has been delayed       until after System                              the studies specified in item II.K.3.2 have been ccmpleted. FPL will respond further at that time.
PklR Vendor Report on      PORV    FPL will support the vendor effort Failure Reduction                  in this area, and submi t the required report.
Reportirg Safety 8 Relief          FPL   intends to comply with the Valve Failures and                  requirements of it's II.K.3.3 Challenges Automatic Trip of Reactor          >JCAP-9584 documents     FPL' Coolant Pumps During LOCA          and Mestinghouse's       position   on the subject. FPL sees       no need for further evaluation of the subject.
Proportional Integral               I'he controller   used at Turkey Point Derivative (PID) Controller        3 8 4 does     not have the derivative Modification                        function.     Therefore, this item is not applicable.
 
IRKEY     POINT UNITS 3 & &
Item                               Ti tl e                            Response II.K.3-10               Proposed Antic i patory             This item is not applicable to Trip Modification                    Turkey Point 3 8 4. FPL will respond   if modification is desired at a later date.
I I- K ~ 3 ~ 12        Confirm Existence of                  FPL has   confirmed the existence of Anticipatory Trip        Upon        the anticipatory     trip upon turbine Turbine Trip                          tri p.
II.K.3.17              Report on Outages of ECC              FPL intends to comply with the Systems-Licensee Report and          requiremetns of itei~ I I.K.3.17.
Proposed Technical Specification        Changes II.K.3.25              Effect of Loss of      AC  Power    This item is identified in on Pump Seals                        NUREG-0660 as applicable only to G.E. plants.
II.K.3-29              Study to Demonstrate                This item is identified in Performance of Isolation            iNUREG-0660 as applicable only to Condensers with                      G~ E. plants.
Non-Condens ib1 es I I.Y.. 3. 30          Revised Small Break LOCA            f.PL intends to comply with the Methods      to Show Compliance      requirements of item II.K.3 30  ~
with 10CFf( 50, App. f:              subject to vendors ability to meet the schedule.
II  ~ K~ 3. 31"        Plant Specific Calculations          FPl. intends to comply with the to Show Compl i ance wi th          requirements of item II.K.3.31.
10CFR    50.46 II-V..3.44              Anticipated Transients with          This item is identified in Single Failure to Verify No          NUREG-0660 as     applicable only ta Fuel Failure                        G.E. Plants.
I I- D. 3.4            Control    Room  Habitability      FPL   intends to comply with the requirements of item III.D.3.4.
i)OTE:       The   following items are applicable to         BMRs and    are not addressed  in thl 5 subml i.'cal ~
I I.K.3.13 through I I.K. 3.16 II.V,.3.18 through II.K.3.22 I I. K. 3. 24 I I .K. 3. 27 I I.Y.. 3. 28 II.K.3.45 I I. V" 3. 46 I I. K. 3 57,
                                  ~}}

Latest revision as of 11:15, 22 October 2019

Forwards Info Re Addl TMI-related Requirements Per 800507 Ltr.Includes Shift Manning,Revising Scope & Criteria of Licensing Exams,Procedures for Feedback of Operating Experience to Plant Staff & PWR Vendor Rept
ML17339B125
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 06/13/1980
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
TASK-1.A.1.1, TASK-2.K.3.09, TASK-2.K.3.10, TASK-2.K.3.12, TASK-TM L-80-186, NUDOCS 8006200479
Download: ML17339B125 (5)


Text

I REGULATORY I RMATION DISTRIBUTION SYST (RIDS)

ACCESSION NBRt8006200079 DOC DATE: 80/06/13 NOTARIZED! NO DOCKET FACIL:50 250 Turkey Point Plantr'nit

~

3r Florida Power and Light C 05000250 50 251 Turkey Point Planti Unit qr Florida Power and Light C 05000251 AUTH'AME AUTHOR AFFILIATION UHRIGr R ~ E, Florida Power 8 Light Co.

REC IP ~ NAME RECIPIENT AFFILIATION ETSENHUTrD ~ 6. Division of Licensing

SUBJECT:

Forwards info re addi TMI r eleated requir ements per 800507 l t r,Includes shi f t manningr r evi sing scope 8 criteria of licensing examsiprocedures for feedback, of operating experience to plant staff 8 PlPR vendor rept DISTRIBUTION CODE: A039S COPIES RECEIYED:LTR g ENCL g SIZE:

TITLE: Resp to Lesson Learn Task Force Nestinghouse I

gr ores. ~

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL

<CTION: BC t/RRGR] S. 10 7 7 iNTERNAL; ANDERSONrN ~ 1. 1 AUX SYS BR 2A 1 1 BURDIONi J ~ 07 1 1 EMERG PREP 20 1 1 FIELDS' ~ 1 1 HUM FACT ENG BR 1 1 I8E 17 2 2 KERRIGANr J ~ 06 1 LIC QUAL BR 1 1 NRC PDR 02 1 O'REILLYiP ~ 1 1 OELD 1 0 OLSHINSKI r J ~ 05 1 1 OP LIC BR 1 0 OR 23 1 1 PROC/TST REV 25 1 1 EG 01 1 1 TELFORDrJeT ~ 2 2 ISgC ~ 08 1 1 I

XTERNAL! ACRS 26 1'6 l6 LPDR 03 1 1 NSIC 00 1 1 JUN 23 1980 TOTAL NUMBER OF COPIES REQUIRED: LTTR 46 ENCL 45

P.O. BOX 529100, MIAMI, FL 33152 g4l~b~

FLORIDA POWER & LIGHT COMPANY June 13, 1980 L-80-186 Office of Nuclear Reactor Regu1 a ti on Attention:; Mr. Darrell G. Eisenhut, Director Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C.

Dear MT. Eisenhut:

Re: Turkey Point Units 3 8 4 Docket Nos. 50-250/50-251 Additional TMI-Related Re uirements The attached information is submitted in response to your letter of May 7, 1980.

Very truly yours,

.~de%>~

Robert E. Uhrig Vice President Advanced Systems 5 Technology REU/MAS/paf Attachment cc: J. P. O'Reilly, Region II Harold F. Reis, Esquire Poxt 5

ii) 5 6 0 6 2 p p g'7q PEOPLE... SERVING PEOPLE

RKEY POINT UNITS 3 8i 4 Title Re~sense Shift Manning The requirements of this item are to be supplied by the NRC. To date, we have not received the correspondence on this item referenced in th'e Hay 7, 1980 letter. FPL will respond to this item following receipt of the letter.

Revise Scope 8 FPL has not yet completed the Criteria of Licensing review and assessment. of the Examinations, requirements of the referenced March 28, 1980 letter. 4!e will respond to this item by August 1, 1980.

1-C.5 Procedures for Feedback FPL intends to comply" with the of Operating Experience requirements of this item.

to Plant Staff However, the commitment to the implementation sched41e must be qualified pending our ability to provide additional man'power required to administer an appropriate operati ng experience feedback program.

Inst al 1 at i on and Test i ng The implementat',on of this action of Automatic PORV Isolation item has been delayed until after System the studies specified in item II.K.3.2 have been ccmpleted. FPL will respond further at that time.

PklR Vendor Report on PORV FPL will support the vendor effort Failure Reduction in this area, and submi t the required report.

Reportirg Safety 8 Relief FPL intends to comply with the Valve Failures and requirements of it's II.K.3.3 Challenges Automatic Trip of Reactor >JCAP-9584 documents FPL' Coolant Pumps During LOCA and Mestinghouse's position on the subject. FPL sees no need for further evaluation of the subject.

Proportional Integral I'he controller used at Turkey Point Derivative (PID) Controller 3 8 4 does not have the derivative Modification function. Therefore, this item is not applicable.

IRKEY POINT UNITS 3 & &

Item Ti tl e Response II.K.3-10 Proposed Antic i patory This item is not applicable to Trip Modification Turkey Point 3 8 4. FPL will respond if modification is desired at a later date.

I I- K ~ 3 ~ 12 Confirm Existence of FPL has confirmed the existence of Anticipatory Trip Upon the anticipatory trip upon turbine Turbine Trip tri p.

II.K.3.17 Report on Outages of ECC FPL intends to comply with the Systems-Licensee Report and requiremetns of itei~ I I.K.3.17.

Proposed Technical Specification Changes II.K.3.25 Effect of Loss of AC Power This item is identified in on Pump Seals NUREG-0660 as applicable only to G.E. plants.

II.K.3-29 Study to Demonstrate This item is identified in Performance of Isolation iNUREG-0660 as applicable only to Condensers with G~ E. plants.

Non-Condens ib1 es I I.Y.. 3. 30 Revised Small Break LOCA f.PL intends to comply with the Methods to Show Compliance requirements of item II.K.3 30 ~

with 10CFf( 50, App. f: subject to vendors ability to meet the schedule.

II ~ K~ 3. 31" Plant Specific Calculations FPl. intends to comply with the to Show Compl i ance wi th requirements of item II.K.3.31.

10CFR 50.46 II-V..3.44 Anticipated Transients with This item is identified in Single Failure to Verify No NUREG-0660 as applicable only ta Fuel Failure G.E. Plants.

I I- D. 3.4 Control Room Habitability FPL intends to comply with the requirements of item III.D.3.4.

i)OTE: The following items are applicable to BMRs and are not addressed in thl 5 subml i.'cal ~

I I.K.3.13 through I I.K. 3.16 II.V,.3.18 through II.K.3.22 I I. K. 3. 24 I I .K. 3. 27 I I.Y.. 3. 28 II.K.3.45 I I. V" 3. 46 I I. K. 3 57,

~