| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON , D.C. 20555-0001 June 6, 2019 LICENSEE: | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 6, 2019 LICENSEE: Tennessee Valley Authority FACILITY: Browns Ferry Nuclear Plant, Units 1, 2, and 3 |
| Tennessee Valley Authority FACILITY: Browns Ferry Nuclear Plant , Units 1 , 2 , and 3 | |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
|
| |
|
| ==SUMMARY== | | ==SUMMARY== |
| OF MARCH 19 , 2019 , CLOSED MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING A LICENSE AMENDMENT REQUEST TO IMPLEMENT MAXIMUM EXTENDED LOAD LINE LIMIT ANALYSIS PLUS FOR BROWNS FERRY NUCLEAR PLANT (EPID L-2018-LLA-0048) | | OF MARCH 19, 2019, CLOSED MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING A LICENSE AMENDMENT REQUEST TO IMPLEMENT MAXIMUM EXTENDED LOAD LINE LIMIT ANALYSIS PLUS FOR BROWNS FERRY NUCLEAR PLANT (EPID L-2018-LLA-0048) |
| By letter dated February 23 , 2018 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML180798140), Tennessee Valley Authority (TVA) submitted a license amendment request (LAR) for the Browns Ferry Nuclear Plant, Units 1, 2, and 3 (Browns Ferry). The proposed amendment would allow operation in the expanded Maximum Extended Load Line Limit Analysis Plus (MELLLA+) | | By letter dated February 23, 2018 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML180798140), Tennessee Valley Authority (TVA) submitted licensea amendment request (LAR) for the Browns Ferry Nuclear Plant, Units 1, 2, and 3 (Browns Ferry). |
| operating domain. The purpose of the meeting was for TVA to present to the U.S. Nuclear Regulatory Commission (NRC) staff its submitted LAR to implement MELLLA+. The meeting notice and agenda dated March 7, 2019, are available in ADAMS under Accession No. ML19067A026. | | The proposed amendment would allow operation in the expanded Maximum Extended Load Line Limit Analysis Plus (MELLLA+) operating domain. The purpose of the meeting was for TVA to present to the U.S. Nuclear Regulatory Commission (NRC) staff its submitted LAR to implement MELLLA+. The meeting notice and agenda dated March 7, 2019, are available in ADAMS under Accession No. ML19067A026. A list of attendees is enclosed . |
| A list of attendees is enclosed. On March 19 , 2019 , a Category 1 closed meeting was held between the NRC staff , representatives of TVA, and TVA's contractor (General Electric Hitachi) at NRC Headquarters, One White Flint North , 11555 Rockville Pike, Rockville , Maryland. | | On March 19, 2019, a Category 1 closed meeting was held between the NRC staff, representatives of TVA, and TVA's contractor (General Electric Hitachi) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The discussion was focused on the differences between the NRC Office of Research confirmatory calculation limiting results and the limiting results provided by TVA in its LAR. This meeting was closed to the public due to discussion of proprietary information. |
| The discussion was focused on the differences between the NRC Office of Research confirmatory calculation limiting results and the limiting results provided by TVA in its LAR. This meeting was closed to the public due to discussion of proprietary information. | | During the meeting, TVA representatives discussed the Anticipated Transient Without Scram with Instability (ATWS-1) analyses performed to support the Browns Ferry MELLLA+ LAR. By letter dated April 24, 2019 (ADAMS Accession No. ML19115A099), TVA submitted Supplement 9 to the LAR, which provided additional information regarding ATWS-1 analyses. |
| During the meeting, TVA representatives discussed th e Anticipated Transient Without Scram with Instability (ATWS-1) analyses performed to support the Browns Ferry MELLLA+ LAR. By letter dated April 24, 2019 (ADAMS Accession No. ML19115A099), TVA submitted Supplement 9 to the LAR, which provided additional information regarding A TWS-1 analyses. No regulatory decisions were made at the meeting. Please direct any inquiries to me at 301-415-1447 or Farideh.Saba@nrc.gov. Docket Nos. 50-259, 50-260, and 50-296 | | No regulatory decisions were made at the meeting. |
| | |
| | Please direct any inquiries to me at 301-415-1447 or Farideh.Saba@nrc.gov. |
| | Farideh E. Saba, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-259, 50-260, and 50-296 |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
|
| |
|
| List of Attendees cc: Listserv Far i deh E. Saba , Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation LIST OF ATTENDEES MARCH 19, 2019, CLOSED MEETING WITH TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT, UNITS 1, 2, AND 3 REGARDING MAXIMUM EXTENDED LOAD LINE LIMIT ANALYSIS PLUS LICENSE AMENDMENT REQUEST Name Organization Farideh Saba U.S. Nuclear Regulatory Commission (NRC) Joshua Borromeo NRC Undine Shoop NRC Chris Hoxie NRC Peter Yarsky NRC Andrew Bielen NRC Nathanael Hudson NRC Ian Porter NRC Aaron Wysocki NRC Consultant Pete Donahue TVA Dan Green Tennessee Valley Authority (TVA) Barry Myers TVA Michael Dick TVA Larry King. General Electric Hitachi (GEH) Mike Cook GEH Enclosure | | List of Attendees cc: Listserv |
| | |
| | LIST OF ATTENDEES MARCH 19, 2019, CLOSED MEETING WITH TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT, UNITS 1, 2, AND 3 REGARDING MAXIMUM EXTENDED LOAD LINE LIMIT ANALYSIS PLUS LICENSE AMENDMENT REQUEST Name Organization Farideh Saba U.S. Nuclear Regulatory Commission (NRC) |
| | Joshua Borromeo NRC Undine Shoop NRC Chris Hoxie NRC Peter Yarsky NRC Andrew Bielen NRC Nathanael Hudson NRC Ian Porter NRC Aaron Wysocki NRC Consultant Pete Donahue TVA Dan Green Tennessee Valley Authority (TVA) |
| | Barry Myers TVA Michael Dick TVA Larry King . General Electric Hitachi (GEH) |
| | Mike Cook GEH Enclosure |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
|
| |
|
| ==SUMMARY== | | ==SUMMARY== |
| OF MARCH 19 , 2019, CLOSED MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING A LICENSE AMENDMENT REQUEST TO IMPLEMENT MAXIMUM EXTENDED LOAD LINE LIMIT ANALYSIS PLUS FOR BROWNS FERRY NUCLEAR PLANT (EPID L-2018-LLA-0048) | | OF MARCH 19, 2019, CLOSED MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING A LICENSE AMENDMENT REQUEST TO IMPLEMENT MAXIMUM EXTENDED LOAD LINE LIMIT ANALYSIS PLUS FOR BROWNS FERRY NUCLEAR PLANT (EPID L-2018-LLA-0048) |
| DATED MAY 6 , 2019 DISTRIBUTION: | | DATED MAY 6 , 2019 DISTRIBUTION: |
| PUBLIC PM File Copy RidsRgn2MailCenter Resource RidsNrrPMBrownsFerry Resource RidsNrrDorlLpl2-2 Resource RidsNrrDssSnpb Resource RidsNrrDra Resource RidsNrrDssSrxb Resource JJohnston, NRR AHon, NRR JQuichocho, OEDO CHoxie, RES !Porter, RES MPanicker, NRR ADAMS A ccess1on N ML19120A288 o.: RidsNrrLABClayton Resource RidsACRS_MailCTR Resource RidsNrrDss Resource RidsNrrDorl Resource RidsNrrDssStsb Resource RidsNrrDe Resource MMcCoppin , OEDO JBorromeo, NRR DWoodyatt , NRR PYarsky , RES NHudson, RES ABielen, RES *b 1y e-ma1 OFFICE DORL/LPL2-2/PM DORL/LPL2-2/LA DSS/SRXB/BC(A) | | PUBLIC PM File Copy RidsNrrLABClayton Resource RidsRgn2MailCenter Resource RidsACRS_MailCTR Resource RidsNrrPMBrownsFerry Resource RidsNrrDss Resource RidsNrrDorlLpl2-2 Resource RidsNrrDorl Resource RidsNrrDssSnpb Resource RidsNrrDssStsb Resource RidsNrrDra Resource RidsNrrDe Resource RidsNrrDssSrxb Resource MMcCoppin , OEDO JJohnston, NRR JBorromeo, NRR AHon, NRR DWoodyatt, NRR JQuichocho, OEDO PYarsky, RES CHoxie, RES NHudson, RES |
| * DORL/LPL2-2/BC NAME FSaba LRonewicz JWhitman UShoop DATE 05/16/2019 05/15/2019 05/08/2019 06/05/2019 OFFICIAL RECORD COPY DORL/LPL2-2/PM FSaba 06/06/2019}} | | !Porter, RES ABielen, RES MPanicker, NRR ADAMS A ccess1on N o.: ML19120A288 *b1y e-ma1 OFFICE DORL/LPL2-2/PM DORL/LPL2-2/LA DSS/SRXB/BC(A)* DORL/LPL2-2/BC DORL/LPL2-2/PM NAME FSaba LRonewicz JWhitman UShoop FSaba DATE 05/16/2019 05/15/2019 05/08/2019 06/05/2019 06/06/2019 OFFICIAL RECORD COPY}} |
Letter Sequence Meeting |
---|
EPID:L-2018-LLA-0048, Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Information (Open) |
|
MONTHYEARCNL-18-042, Proposed Technical Specifications Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus, Supplement 12018-03-0707 March 2018 Proposed Technical Specifications Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus, Supplement 1 Project stage: Supplement ML18101A1012018-04-13013 April 2018 Summary of March 16, 2018, Meeting with Tennessee Valley Authority Regarding a License Amendment Request to Implement Maximum Extended Load Line Limit Analysis Plus for Browns Ferry Nuclear Plant Project stage: Meeting CNL-18-099, Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 2, Operator Training Results2018-07-23023 July 2018 Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 2, Operator Training Results Project stage: Supplement ML18268A0212018-09-27027 September 2018 Regulatory Audit Plan in Support of Maximum Extended Load Line Limit Analysis Plus License Amendment Request Project stage: Other ML18317A1642018-11-20020 November 2018 Request for Additional Information Regarding Maximum Extended Load Line Limit Plus License Amendment Request (EPID L-2018-LLA-0048) - Non-Proprietary Project stage: RAI ML18331A5442018-12-0606 December 2018 Request for Additional Information Regarding Maximum Extended Load Line Limit Plus License Amendment Request (EPID L-2018-LLA-0048) - (Non-Proprietary) Project stage: RAI CNL-18-140, Response to Request for Additional Information Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 42018-12-13013 December 2018 Response to Request for Additional Information Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 4 Project stage: Supplement CNL-18-139, Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Information2018-12-14014 December 2018 Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Information Project stage: Request CNL-19-011, Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 6, Additional Operator Training Results2019-01-16016 January 2019 Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 6, Additional Operator Training Results Project stage: Supplement CNL-19-007, Supplement 5, Response to Requests for Additional Information Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus2019-01-16016 January 2019 Supplement 5, Response to Requests for Additional Information Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus Project stage: Supplement CNL-19-017, Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 7, Response to Requests for Additional Information2019-01-25025 January 2019 Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 7, Response to Requests for Additional Information Project stage: Supplement ML19067A0262019-03-0707 March 2019 Notice of Forthcoming Closed Meeting with Tennessee Valley Authority (TVA) and General Electric-Hitachi (Geh), Regarding Maximum Extended Load Line Limit Analysis Plus (Mella+) License Amendment Request (LAR) for Browns Ferry Nuclear Plant, Project stage: Meeting CNL-19-032, Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 8, Additional Operator Training Information2019-03-13013 March 2019 Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 8, Additional Operator Training Information Project stage: Supplement CNL-19-045, Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 9, Additional Information Regarding Anticipate Transient Without Scram with ...2019-04-24024 April 2019 Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 9, Additional Information Regarding Anticipate Transient Without Scram with ... Project stage: Supplement ML19121A2242019-06-0606 June 2019 Non-Proprietary - Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Summary Report for the Audits in Support of License Amendment Request for Operation in the Expand Maximum Extended Load Line Limit Analysis Plus Operating Domain Project stage: Other ML19120A2882019-06-0606 June 2019 Summary of March 19, 2019, Closed Meeting with Tennessee Valley Authority a License Amendment Request to Implement Maximum Extended Line Limit Analysis Plus Project stage: Meeting ML19163A0802019-07-22022 July 2019 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML19136A3282019-07-22022 July 2019 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML19136A1342019-07-22022 July 2019 Request for Additional Information from Public Disclosure Project stage: RAI ML19163A1652019-08-0505 August 2019 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML19136A2782019-08-26026 August 2019 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML19136A2542019-08-26026 August 2019 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML19135A5572019-08-26026 August 2019 Request for Withholding Information from Public Disclosure (EPID L-2018-LLA-00488) Project stage: Withholding Request Acceptance ML19133A1192019-08-26026 August 2019 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML19136A0582019-08-26026 August 2019 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance CNL-19-125, Proposed Technical Specifications (TS) Change 510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 12, Additional License Condition2019-12-19019 December 2019 Proposed Technical Specifications (TS) Change 510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 12, Additional License Condition Project stage: Supplement 2019-01-16
[Table View] |
|
---|
Category:Meeting Summary
MONTHYEARML24008A1592024-01-18018 January 2024 Summary of December 13, 2023, Meeting with Tennessee Valley Authority Regarding a Proposed Change to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML23270A0702023-09-26026 September 2023 SLRA Pre-Application Meeting Summary 09-13-2023 ML23157A1272023-06-13013 June 2023 Meeting Summary for Environmental Pre-Submittal Meeting for Subsequent License Renewal Application on May 11, 2023 ML23142A2132023-05-22022 May 2023 Public Meeting Summary - 2022 Annual Assessment Meetings for Browns Ferry, Sequoyah and Watts Bar Nuclear Plants ML22319A1952022-12-0202 December 2022 Summary of October 13, 2022, Meeting with Tennessee Valley Authority to Discuss Planned Alternative Requests for the Fifth 10-Year Inservice Testing Program Interval for Brown'S Ferry Nuclear Plant, Units 1, 2, and 3 ML22298A1612022-11-17017 November 2022 Summary of Public Meeting on SAMA with TVA ML22266A2742022-09-28028 September 2022 Summary of September 22, 2022, Public Meeting with Tennessee Valley Authority to Discuss a Request to Use a Later Edition of the ASME OM Code ML22108A1842022-04-18018 April 2022 TVA 2021 Annual Assessment Public Meeting Summary ML22103A2472022-04-14014 April 2022 Summary of April 12, 2022, Closed Meeting with Tennessee Valley Authority to Discuss Recently Identified Errors Potentially Affecting the Browns Ferry Revised Criticality Analysis License Amendment Request ML22094A1112022-04-0404 April 2022 Public Meeting Summary 2021 Annual Assessment Meeting Catawba Dockets Nos. 50-413 and 50-414; McGuire No. 50-369 and 50-370; Oconee. 50-269, 50-270, and 50-287 ML22083A0762022-03-24024 March 2022 Summary of March 17, 2022, Closed Meeting with Tennessee Valley Authority to Discuss Recently Identified Errors Potentially Affecting the Browns Ferry Atrium 11 License Amendment Request (EPID L-2021-LLA-0132 ML21291A0092021-11-0303 November 2021 Tennessee Valley Authority Fleet - Summary of October 13, 2021, Teleconference with Tennessee Valley Authority to Discuss Planned License Amendment Requests Related to the Emergency Action Level Scheme ML21266A0532021-10-20020 October 2021 Summary of September 22, 2021, Meeting with Tennessee Valley Authority Regarding Planned License Amendment Request to Adopt Technical Specifications Task Force (TSTF)-205 and TSTF-563 ML21273A1922021-10-12012 October 2021 September 27, 2021, Summary of Meeting with Browns Ferry Nuclear Plant, Units 1 & 2 Related to a Planned Alternative Request Per American Society of Mechanical Engineers (Asmee) Code Case N-526, Alternative Requirements for Successive Sect ML21251A1122021-09-14014 September 2021 Summary of September 7, 2021, Teleconference with Tennessee Valley Authority to Discuss a Planned License Amendment ML21165A1482021-06-30030 June 2021 Summary of Closed Meeting with Tennessee Valley Authority to Discuss Planned Requests for Exemption from Certain Requirements of 10 CFR Part 37 ML21155A0212021-06-0808 June 2021 Summary of Teleconference with Tennessee Valley Authority to Discuss a Planned License Amendment ML21137A0022021-05-17017 May 2021 Public Meeting Summary - Browns Ferry, Sequoyah and Watts Bar Nuclear Plants, Docket Nos. 50-259, 50-260, 50-296, 50-327, 50-328, 50-390, and 50-391, Meeting Number 20210392 ML20357A0092021-01-19019 January 2021 Summary of December 17, 2020, Teleconference with Tennessee Valley Authority Regarding Planned License Amendment Request Related to Use of Alternate Probability of Detection at Watts Bar Nuclear Plant, Unit 2 ML20175A8012020-08-11011 August 2020 Summary of June 23, 2020, Public Meeting with Tennessee Valley Authority to Discuss a Planned License Amendment ML20162A1532020-06-25025 June 2020 Summary of June 8, 2020, Partially Closed Meeting with Tennessee Valley Authority to Discuss a Planned License Amendment ML20127H8412020-05-0606 May 2020 Public Meeting Summary - Browns Ferry, Sequoyah and Watts Bar Nuclear Plant, Meeting No. 20200384 ML20094M9012020-04-13013 April 2020 Summary of April 2, 2020 Public Meeting with Tennessee Valley Authority Regarding the Future Submittal of a License Amendment Request Adoption of 10 CFR 50.69 ML19120A2882019-06-0606 June 2019 Summary of March 19, 2019, Closed Meeting with Tennessee Valley Authority a License Amendment Request to Implement Maximum Extended Line Limit Analysis Plus ML19120A3692019-04-30030 April 2019 Public Meeting Summary - Browns Nuclear Plant, Docket No. 50-259, 50-260, and 50-296 ML18242A4882018-09-24024 September 2018 Summary of Pre-Application Conference Call with Tennessee Valley Authority to Discuss Proposed Changes to Modifications Associated with Approved NFPA 805 for Browns Ferry Nuclear Plant, Units 1, 2, and 3 ML18101A1012018-04-13013 April 2018 Summary of March 16, 2018, Meeting with Tennessee Valley Authority Regarding a License Amendment Request to Implement Maximum Extended Load Line Limit Analysis Plus for Browns Ferry Nuclear Plant ML18068A0792018-03-15015 March 2018 Summary of Pre-Application Meeting with Tennessee Valley Authority Regarding a Planned License Amendment Request Associated with Modifications to the Control Bay Chillersystems at Browns Ferry Units 1, 2 and 3 ML18053A5362018-03-0101 March 2018 Summary of February 7, 2018, Pre-Application Conference Call with TVA a Planned License Amendment Request to Change the Emergency Response Organization Staffing ML17278A8972017-10-17017 October 2017 Summary of Meeting with TVA Regarding Hydrology-Related Licensing Actions, Browns Ferry, Units 1, 2, and 3, Sequoyah Nuclear, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2(EPID L2016-TOP-0011; CAC Nos. MF8391-MF8397 ML17227A5142017-09-0101 September 2017 Summary of August 1, 2017, Pre-Submittal Public Meeting with TVA Regarding a Class 1E Unbalanced Voltage Relay Licensing Amendment Request for Browns Ferry Nuclear Plant, Sequoyah Nuclear Plant, and Watts Bar Nuclear Plant ML17131A2512017-05-11011 May 2017 Summary of Public Meeting Concerning Annual Assessment of Browns Ferry Nuclear Plant, Units 1, 2, and 3 ML17061A6722017-04-0606 April 2017 Summary of February 15, 2017, Meeting with Tennessee Valley Authority on Updates to the Transmission System Regarding Extended Power Uprate for Browns Ferry Nuclear Plant, Units 1, 2, and 3 ML17017A4552017-02-0303 February 2017 Summary of Meeting with Tennessee Valley Authority Regarding Maximum Extended Load Line Limit Plus Pre-Application Meeting for Browns Ferry Nuclear Plant ML16350A2962016-12-14014 December 2016 Enclosure 3- Reactor Oversight Process Task Force FAQ Log- November 16, 2016 ML16280A2912016-10-31031 October 2016 September 23, 2016, Summary of Public Meeting with TVA Regarding Hydrology-Related Licensing Actions, Browns Ferry Nuclear Plant, Units 1, 2, and 3, Sequoyah Nuclear Plant, Units 1 & 2 and Watts Bar Nuclear Plant, Units 1 & 2 (CAC Nos. MF83 ML16279A2332016-10-0505 October 2016 Summary of Closed Pre-Decisional Enforcement Conference with Tennessee Valley Authority Regarding Browns Ferry Nuclear Plant ML16210A4532016-08-16016 August 2016 07/19/2016 Summary of Meeting with Tennessee Valley Authority Regarding Extended Power Uprate License Amendment Request for Browns Ferry Nuclear Plant (CAC Nos. MF6741, MF6742, and MF6743) ML16193A4602016-07-21021 July 2016 June 23, 2016, Summary of Closed Meeting with Tennessee Valley Authority Regarding the Structural Adequacy of Steam Dryers for Extended Power Uprate License Amendment Request for Browns Ferry Nuclear Plant, Units 1, 2, and 3 (MF6741, MF6742 ML16153A1982016-06-0101 June 2016 2015 EOC Meeting Summary ML16043A2772016-03-14014 March 2016 Summary of Meeting with Tennessee Valley Authority Regarding a License Amendment Request to Modify Browns Ferry Technical Specifications (TS) by Adding New TS 3.3.8.3 (CAC Nos. MF6738, MF6739 and MF6740) ML15321A4942015-11-30030 November 2015 Summary of Public Meeting with Tennessee Valley Authority Regarding the Planned Extended Power Uprate License Amendment Request for Browns Ferry Nuclear Plant ML15295A2602015-11-0404 November 2015 July 14, 2015, Summary of Public Meeting with Tennessee Valley Authority to Discuss Topics Regarding Seismic Risk Evaluations Related to the Seismic Hazard Reevaluation for Browns Ferry Nuclear Plant (TACs MF3764, MF3765 and MF3766) ML15146A2792015-05-21021 May 2015 Bf EOC Meeting Summary 2015 ML14204A2672014-08-15015 August 2014 Summary of July 10, 2014, Meeting Between the Tennessee Valley Authority and the Nuclear Regulatory Commission to Discuss Near-Term Task Force Recommendation 2.1 Flooding Hazard Reevaluation Report and Improved Mitigation System Quarterly U ML14197A6082014-08-0606 August 2014 July 1, 2014, Summary of Category 1 Public Meeting with Tennessee Valley Authority to Discuss Seismic Hazard Reevaluations Associated with Implementation of Japan Lessons-Learned Near-Term Task Force Recommendation 2.1 ML14147A3222014-05-27027 May 2014 Public Meeting Summary 05/21/2014 to Present Annual Assessment ML14090A4582014-03-31031 March 2014 Public Meeting Summary TVA Synergy Safety Culture Survey Results ML14036A3872014-02-0505 February 2014 Summary of Meeting with Public to Discuss the Results of the Follow-up Inspection of the Items Identified in Confirmatory Action Letter (ML13232A105) of August 22, 2013, and the Status of Nrc'S Performance Assessment of Browns Ferry Unit 1 ML13225A2932013-08-12012 August 2013 7/23-24/2013, Summary of Meeting 2013 U.S. Nuclear Regulatory Commission (NRC) Initial Exam Writers' Workshop 2024-01-18
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 6, 2019 LICENSEE: Tennessee Valley Authority FACILITY: Browns Ferry Nuclear Plant, Units 1, 2, and 3
SUBJECT:
SUMMARY
OF MARCH 19, 2019, CLOSED MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING A LICENSE AMENDMENT REQUEST TO IMPLEMENT MAXIMUM EXTENDED LOAD LINE LIMIT ANALYSIS PLUS FOR BROWNS FERRY NUCLEAR PLANT (EPID L-2018-LLA-0048)
By letter dated February 23, 2018 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML180798140), Tennessee Valley Authority (TVA) submitted licensea amendment request (LAR) for the Browns Ferry Nuclear Plant, Units 1, 2, and 3 (Browns Ferry).
The proposed amendment would allow operation in the expanded Maximum Extended Load Line Limit Analysis Plus (MELLLA+) operating domain. The purpose of the meeting was for TVA to present to the U.S. Nuclear Regulatory Commission (NRC) staff its submitted LAR to implement MELLLA+. The meeting notice and agenda dated March 7, 2019, are available in ADAMS under Accession No. ML19067A026. A list of attendees is enclosed .
On March 19, 2019, a Category 1 closed meeting was held between the NRC staff, representatives of TVA, and TVA's contractor (General Electric Hitachi) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The discussion was focused on the differences between the NRC Office of Research confirmatory calculation limiting results and the limiting results provided by TVA in its LAR. This meeting was closed to the public due to discussion of proprietary information.
During the meeting, TVA representatives discussed the Anticipated Transient Without Scram with Instability (ATWS-1) analyses performed to support the Browns Ferry MELLLA+ LAR. By letter dated April 24, 2019 (ADAMS Accession No. ML19115A099), TVA submitted Supplement 9 to the LAR, which provided additional information regarding ATWS-1 analyses.
No regulatory decisions were made at the meeting.
Please direct any inquiries to me at 301-415-1447 or Farideh.Saba@nrc.gov.
Farideh E. Saba, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-259, 50-260, and 50-296
Enclosure:
List of Attendees cc: Listserv
LIST OF ATTENDEES MARCH 19, 2019, CLOSED MEETING WITH TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT, UNITS 1, 2, AND 3 REGARDING MAXIMUM EXTENDED LOAD LINE LIMIT ANALYSIS PLUS LICENSE AMENDMENT REQUEST Name Organization Farideh Saba U.S. Nuclear Regulatory Commission (NRC)
Joshua Borromeo NRC Undine Shoop NRC Chris Hoxie NRC Peter Yarsky NRC Andrew Bielen NRC Nathanael Hudson NRC Ian Porter NRC Aaron Wysocki NRC Consultant Pete Donahue TVA Dan Green Tennessee Valley Authority (TVA)
Barry Myers TVA Michael Dick TVA Larry King . General Electric Hitachi (GEH)
Mike Cook GEH Enclosure
SUBJECT:
SUMMARY
OF MARCH 19, 2019, CLOSED MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING A LICENSE AMENDMENT REQUEST TO IMPLEMENT MAXIMUM EXTENDED LOAD LINE LIMIT ANALYSIS PLUS FOR BROWNS FERRY NUCLEAR PLANT (EPID L-2018-LLA-0048)
DATED MAY 6 , 2019 DISTRIBUTION:
PUBLIC PM File Copy RidsNrrLABClayton Resource RidsRgn2MailCenter Resource RidsACRS_MailCTR Resource RidsNrrPMBrownsFerry Resource RidsNrrDss Resource RidsNrrDorlLpl2-2 Resource RidsNrrDorl Resource RidsNrrDssSnpb Resource RidsNrrDssStsb Resource RidsNrrDra Resource RidsNrrDe Resource RidsNrrDssSrxb Resource MMcCoppin , OEDO JJohnston, NRR JBorromeo, NRR AHon, NRR DWoodyatt, NRR JQuichocho, OEDO PYarsky, RES CHoxie, RES NHudson, RES
!Porter, RES ABielen, RES MPanicker, NRR ADAMS A ccess1on N o.: ML19120A288 *b1y e-ma1 OFFICE DORL/LPL2-2/PM DORL/LPL2-2/LA DSS/SRXB/BC(A)* DORL/LPL2-2/BC DORL/LPL2-2/PM NAME FSaba LRonewicz JWhitman UShoop FSaba DATE 05/16/2019 05/15/2019 05/08/2019 06/05/2019 06/06/2019 OFFICIAL RECORD COPY