Letter Sequence Other |
|---|
EPID:L-2018-LLA-0048, Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Information (Open) |
Initiation
- Request, Request, Request, Request, Request
- Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting
|
MONTHYEARML18079B1402018-02-23023 February 2018 Browns Ferry Nuclear Plant, Units 1, 2, and 3: Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus Project stage: Request CNL-18-042, Proposed Technical Specifications Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus, Supplement 12018-03-0707 March 2018 Proposed Technical Specifications Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus, Supplement 1 Project stage: Supplement ML18059A1072018-03-16016 March 2018 Maximum Extended Load Line Limit Analysis Plus License Amendment Request Project stage: Request ML18088A0252018-04-0606 April 2018 Acceptance Review Regarding Proposed Expanded Maximum Extended Load Line Limit Analysis Plus (Mellla+) Project stage: Acceptance Review ML18101A1012018-04-13013 April 2018 Summary of March 16, 2018, Meeting with Tennessee Valley Authority Regarding a License Amendment Request to Implement Maximum Extended Load Line Limit Analysis Plus for Browns Ferry Nuclear Plant Project stage: Meeting CNL-18-099, Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 2, Operator Training Results2018-07-23023 July 2018 Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 2, Operator Training Results Project stage: Supplement ML18268A0212018-09-27027 September 2018 Regulatory Audit Plan in Support of Maximum Extended Load Line Limit Analysis Plus License Amendment Request Project stage: Other ML18317A1642018-11-20020 November 2018 Request for Additional Information Regarding Maximum Extended Load Line Limit Plus License Amendment Request (EPID L-2018-LLA-0048) - Non-Proprietary Project stage: RAI ML18331A5442018-12-0606 December 2018 Request for Additional Information Regarding Maximum Extended Load Line Limit Plus License Amendment Request (EPID L-2018-LLA-0048) - (Non-Proprietary) Project stage: RAI CNL-18-140, Response to Request for Additional Information Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 42018-12-13013 December 2018 Response to Request for Additional Information Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 4 Project stage: Supplement CNL-18-111, Triennial Decommissioning Funding Plans for Independent Spent Fuel Storage Installations (Isfsis)2018-12-13013 December 2018 Triennial Decommissioning Funding Plans for Independent Spent Fuel Storage Installations (Isfsis) Project stage: Request CNL-18-139, Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Information2018-12-14014 December 2018 Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Information Project stage: Request CNL-19-007, Response to Requests for Additional Information Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus2019-01-16016 January 2019 Response to Requests for Additional Information Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus Project stage: Response to RAI CNL-19-011, Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 6, Additional Operator Training Results2019-01-16016 January 2019 Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 6, Additional Operator Training Results Project stage: Supplement CNL-19-017, Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 7, Response to Requests for Additional Information2019-01-25025 January 2019 Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 7, Response to Requests for Additional Information Project stage: Supplement ML19067A0262019-03-0707 March 2019 Notice of Forthcoming Closed Meeting with Tennessee Valley Authority (TVA) and General Electric-Hitachi (Geh), Regarding Maximum Extended Load Line Limit Analysis Plus (Mella+) License Amendment Request (LAR) for Browns Ferry Nuclear Plant, Project stage: Meeting CNL-19-032, Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 8, Additional Operator Training Information2019-03-13013 March 2019 Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 8, Additional Operator Training Information Project stage: Supplement CNL-19-045, Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 9, Additional Information Regarding Anticipate Transient Without Scram with .2019-04-24024 April 2019 Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 9, Additional Information Regarding Anticipate Transient Without Scram with . Project stage: Supplement ML19121A2242019-06-0606 June 2019 Non-Proprietary - Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Summary Report for the Audits in Support of License Amendment Request for Operation in the Expand Maximum Extended Load Line Limit Analysis Plus Operating Domain Project stage: Other ML19120A2882019-06-0606 June 2019 Summary of March 19, 2019, Closed Meeting with Tennessee Valley Authority a License Amendment Request to Implement Maximum Extended Line Limit Analysis Plus Project stage: Meeting ML19136A3282019-07-22022 July 2019 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML19136A1342019-07-22022 July 2019 Request for Additional Information from Public Disclosure Project stage: RAI ML19163A0802019-07-22022 July 2019 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML19163A1652019-08-0505 August 2019 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML19135A5572019-08-26026 August 2019 Request for Withholding Information from Public Disclosure (EPID L-2018-LLA-00488) Project stage: Withholding Request Acceptance ML19133A1192019-08-26026 August 2019 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML19136A0582019-08-26026 August 2019 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML19136A2542019-08-26026 August 2019 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML19136A2782019-08-26026 August 2019 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance CNL-19-125, Proposed Technical Specifications (TS) Change 510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 12, Additional License Condition2019-12-19019 December 2019 Proposed Technical Specifications (TS) Change 510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 12, Additional License Condition Project stage: Supplement 05000260/LER-2019-001-01, Traversing In-core Probe Purge Header Check Valve Leak Rate in Excess of Technical Specifications Limits2019-12-19019 December 2019 Traversing In-core Probe Purge Header Check Valve Leak Rate in Excess of Technical Specifications Limits Project stage: Request ML19210C3082019-12-26026 December 2019 Redacted - Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Issuance of Amendment Nos. 310, 333, and 293 Regarding Maximum Extended Load Line Limit Analysis Plus Project stage: Approval ML19360A0442019-12-30030 December 2019 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance 2019-01-16
[Table View] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. Joseph W. Shea Vice President, Nuclear Regulatory Affairs and Support Services Tennessee Valley Authority 1101 Market Street, LP 4A Chattanooga, TN 37 402-2801 September 27, 2018
SUBJECT:
BROWNS FERRY NUCLEAR PLANT, UNITS 1, 2, AND 3-REGULATORY AUDIT PLAN IN SUPPORT OF MAXIMUM EXTENDED LOAD LINE LIMIT ANALYSIS PLUS LICENSE AMENDMENT REQUEST (EPID L-2018-LLA-0048)
Dear Mr. Shea:
By letter dated February 23, 2018, as supplemented by letters dated March 7, and July 23, 2018, Tennessee Valley Authority (the licensee) submitted a license amendment request (LAR) to Renewed Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 for the Browns Ferry Nuclear Plant Units 1, 2, and 3 (Browns Ferry). The proposed amendments would allow operation of Browns Ferry in the expanded Maximum Extended Load Line Limit Analysis Plus (MELLLA+) operating domain.
To support its safety evaluations, the Nuclear Regulatory Commission staff has determined the need for a regulatory audit to be conducted in accordance with the Office of Nuclear Reactor Regulation Office Instruction LIC-111, "Regulatory Audits," for the staff to gain a better understanding of the licensee's approach, calculations, and other aspects of the LAR. The audit plan to support the review of this LAR is enclosed.
If you have any questions, please contact me at (301) 415-1447 or Farideh.Saba@nrc.gov.
Docket Nos. 50-259, 50-260, and 50-296
Enclosure:
Audit Plan for EPU LAR cc: Listserv Sincerely, r-~rt civh z;, 5:l~
Farideh E. Saba, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
BACKGROUND UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 REGULATORY AUDIT PLAN TO SUPPORT REVIEW OF MAXIMUM EXTENDED LOAD LINE LIMIT ANALYSIS PLUS LICENSE AMENDMENT REQUEST TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT, UNITS 1, 2, AND 3 DOCKET NOS. 50-259, 50-260, AND 50-296 By letter dated February 23, 2018 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML180796140), as supplemented by letters dated March 7 and July 23, 2018 (ADAMS Accession Nos. ML18067A495 and ML18205A498, respectively),
Tennessee Valley Authority (TVA, the licensee) submitted a license amendment request (LAR) for maximum extended load line limit analysis plus (MELLLA+) for Browns Ferry Nuclear Plant (Browns Ferry), Units 1, 2, and 3. The proposed LAR would allow operation for Browns Ferry in the expanded MELLLA+ domain.
The Nuclear Regulatory Commission (NRC) staff has determined that regulatory audits of the Browns Ferry LAR should be conducted in accordance with the Nuclear Reactor Regulation (NRR) Office Instruction LIC-111, "Regulatory Audits," for the NRC staff to gain a better understanding of the licensee's calculations and other aspects of the LAR.
Regulatory Audit Basis The audits will provide information necessary to complete the NRC staff's evaluation of the proposed LAR submitted by the licensee to allow for Browns Ferry operation in the MELLLA+
operating domain.
Regulatory Audit Scope The scope of this regulatory audits includes a detailed discussion of the LAR with particular focus on the following topics:
General Electric Hitachi (GEH) Applicability to ATRIUM 10XM Fuel Anticipate Transient Without Scram (ATWS)
Anticipated Transient Without Scram Instability (A TWSI)
Detect and Suppress Solution - Confirmation Density (DSS-CD)
Enclosure
Loss-of-Coolant Accident (LOCA)
Anticipated Operational Occurrences (AOOs)
Framatome Method Applicability in MELLLA+
Containment Analysis Human Performance Details related to the above focused topics will be transmitted to the TV A point of contact by e-mails prior to the audit.
Information Necessary for the Regulatory Audit The NRC staff requests the licensee to make the appropriate personnel or contractors who are familiar with the proposed MELLLA+ LAR available for the audits (either in-person or on the phone). The NRC staff also requests the licensee to have the supporting documents related to the above topics available and be prepared to discuss them with the staff during the audit. The documents could be provided by paper copies or electronically. However, for those documents that are provided electronically, the NRC audit team may ask for printed copies during the audit.
Additional information needs identified during the audit will be communicated to the TVA designated point of contact.
Team Assignments Josh Borromeo (audit lead), Reactor Systems Engineer, NRR Diana Woodyatt, Reactor Systems Engineer, NRR Mathew Panicker, Reactor Engineer, NRR Aaron Wysocki, Consultant / Contractor, Oak Ridge National Laboratory John Hughey, Human Factors Engineer, NRR Ahsan Sallman, Senior Reactor Systems Engineer, NRR Farideh Saba, Senior Project Manager, NRR Logistics The audit will be conducted with the licensee at the EXCEL Services Corporation facility in Rockville, Maryland, at Browns Ferry in Athens, Alabama, or at other locations as appropriate.
TVA should make relevant information available in an online information portal or hard copies, as appropriate, and provide rooms and space as necessary if site visits are needed. Meetings, site visits, and teleconferences will be held as necessary for clarification of information and determination of supplemental information to be docketed to support the NRC staff's review.
The first face-to-face audit will be conducted at the EXCEL Services Corporation facility in Rockville, Maryland, from October 9 to October 12, 2018. Entrance and exit briefings will be held at the beginning and the end of this audit, respectively. The licensee is requested to provide a room for the use by the audit team.
The audit will start at 8:30 a.m. on Tuesday, October 9, 2018, and conclude on Friday, October 12, 2018. The NRC staff tentative schedule 1 for this audit is as follows:
October 9 8:30 a.m.
9:00 a.m.
12:00 p.m.
1:00 p.m.
3:30 p.m.
4:00 p.m.
4:30 p.m.
October 10 8:30 a.m.
9:30 a.m.
12:00 p.m.
1:00 p.m.
3:30 p.m.
4:00 p.m.
4:30 p.m.
October 11 8:30 a.m.
12:00 p.m.
1:00 p.m.
2:15 p.m.
3:30 p.m.
4:00 p.m.
4:30 p.m.
October 12 8:30 a.m.
11 :00 a.m.
Deliverables Entrance Meeting - introductions, audit activities, goals, and logistics.
Licensee Discusses GEH Methods Applicability to ATRIUM 10XM Fuel and ATWSI Lunch NRC Team Discusses GEH Methods Applicability to ATRIUM 10XM Fuel and ATWSI and Calculation Note Review NRC Audit Team Caucus NRC / Licensee Interim Meeting Audit Team Daily Closeout Licensee Discusses DSS-CD Licensee Discusses A TWS Lunch NRC Team Discusses ATWS and DSS-CD and Calculation Note Review NRC Audit Team Caucus NRC / Licensee Interim Meeting Audit Team Daily Closeout Licensee Discusses LOCA, AOOs, and Framatome Methods Lunch NRC Team Discusses Containment Analysis NRC Team Discusses Human Performance NRC Audit Team Caucus NRC / Licensee Interim Meeting Audit Team Daily Closeout NRC follow-up on open items Audit Exit At the conclusion of this audit, the NRC staff will conduct an exit briefing and will discuss a summary of audit results in each subject area discussed during the audit. Additionally, the results of this audit will be utilized to focus the scope of any requests for additional information issued in the course of this review. An audit report/summary, which includes discussions about 1 This is a proposed schedule that is subject to change as a result of discussion between the NRC staff and Licensee/ Vendors. The finalized schedule may not reflect the proposed schedule herein.
all the audit related activities, will be issued to the licensee prior to completion of the NRC review of the LAR.
ML18268A021
- b email OFFICE NRR/DORL/LPL2-2/PM NRR/DORL/LPL2-2/LA NRR/DSS/SRXB/BC NAME FSaba BClayton JWhitman DATE 09/26/18 09/26/18 09/26/18 OFFICE NRR/DSS/SNPB/BC NRR/DORL/LPL2-2/BC{A)
NRR/DORL/LPL2-2/PM NAME Rlukes BVenkataraman FSaba DATE 09/26/18 09/27/18 09/27/18