{{#Wiki_filter:0905790085
{{#Wiki_filter:0905790085
~.PUBLIC SERVICE INDIANA September 5, 1979 1 W. Shields N ice Presx2ent Electnc Svstem Mr. James G. Keppler, Director U.S. Nuclear Regulatory Ccemission Docket Nos.: STN 50-546 STN 50-547 Region III 799 Roosevelt Road Construction Per=it Nos.:
                                                                                              ~
Glen Ellyn, Illinois 60137 CPPR-170 CPPR-171 Marble Hill Nuclear Generating Station Units 1 & 2
                                                                                                .
PUBLIC SERVICE INDIANA                                                     September 5, 1979 1 W. Shields N ice Presx2ent Electnc Svstem Mr. James G. Keppler, Director U.S. Nuclear Regulatory Ccemission                           Docket Nos.: STN 50-546 Region III                                                                STN 50-547 799 Roosevelt Road                                           Construction Per=it Nos.:
Glen Ellyn, Illinois 60137                                                 CPPR-170 CPPR-171 Marble Hill Nuclear Generating Station Units 1 & 2


==Dear Mr. Keppler:==
==Dear Mr. Keppler:==


On August 6, 1979, Mr. J. U. Bott of Public Service Company of Indiana, Inc.(PSI) telephoned your office to notify you of a potentially reportable in-cident as required by 10CFR50.55(e) . In November 1978 Co==onwealth-Lord J.V. installed temporary lighting in the Auxiliary Building by utilizing approxi=ately 220 "Hilti" type shot-on studs. These studs were installed into e= bedded safety-related grade A-36 steel plates without an approved procedure or an evaluation as to the potantial effects on the embedded plates.In most cases, these shot-on studs were placed en the edge or in a corner of the embedded plates so as not to interfere with any per=anent fixtures to be welded to the plate. These subject studs are shot onto the embedded plate using a .22 caliber or a .45 caliber shell which forces the approximately 1/8" dia=eter stud shaft into the plate.
On August 6, 1979, Mr. J. U. Bott of Public Service Company of Indiana, Inc.
(PSI) telephoned your office to notify you of a potentially reportable in-cident as required by 10CFR50.55(e) . In November 1978 Co==onwealth-Lord J.V. installed temporary lighting in the Auxiliary Building by utilizing approxi=ately 220 "Hilti" type shot-on studs. These studs were installed into e= bedded safety-related grade A-36 steel plates without an approved procedure or an evaluation as to the potantial effects on the embedded plates.       In most cases, these shot-on studs were placed en the edge or in a corner of the embedded plates so as not to interfere with any per=anent fixtures to be welded to the plate. These subject studs are shot onto the embedded plate using a .22 caliber or a .45 caliber shell which forces the approximately 1/8" dia=eter stud shaft into the plate.
PSI was unable to determine that this incident was not significant and there-fore elected to report it as potentially significant under 10CFR50.55(e) .
PSI was unable to determine that this incident was not significant and there-fore elected to report it as potentially significant under 10CFR50.55(e) .
The following corrective actions have been taken to insure proper installa-tion of such studs in the future by Ccenonwealth-Lord:
The following corrective actions have been taken to insure proper installa-tion of such studs in the future by Ccenonwealth-Lord:
1.No attach =ents are to be made to safety category I structures until written authorization is available.
: 1. No attach =ents are to be made to safety category I structures until written authorization is available.
2.All attachments to safety category I structures are to be installed in accordance with approved procedures.
: 2. All attachments to safety category I structures are to be installed in accordance with approved procedures.
b I I'.\{.7 9091104T9
b I'     .
:CCO East Main Street s'ainfiec, incrana 26168 317 339 9611}}
I
{
                                                                                  .   \
7 9091104T9
:CCO East Main Street s'ainfiec, incrana 26168                       317 339 9611}}

Revision as of 14:30, 19 October 2019

Confirms 790806 Telcon of Reportable Incident Re Installation of Studs in safety-related Steel Plates W/O Approved Procedure or Evaluation.Procedures Have Been Revised & QA Indoctrination Session Held
ML19207C448
Person / Time
Site: Marble Hill
Issue date: 09/05/1979
From: Shields S
PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 7909110634
Download: ML19207C448 (2)


Text

0905790085

~

.

PUBLIC SERVICE INDIANA September 5, 1979 1 W. Shields N ice Presx2ent Electnc Svstem Mr. James G. Keppler, Director U.S. Nuclear Regulatory Ccemission Docket Nos.: STN 50-546 Region III STN 50-547 799 Roosevelt Road Construction Per=it Nos.:

Glen Ellyn, Illinois 60137 CPPR-170 CPPR-171 Marble Hill Nuclear Generating Station Units 1 & 2

Dear Mr. Keppler:

On August 6, 1979, Mr. J. U. Bott of Public Service Company of Indiana, Inc.

(PSI) telephoned your office to notify you of a potentially reportable in-cident as required by 10CFR50.55(e) . In November 1978 Co==onwealth-Lord J.V. installed temporary lighting in the Auxiliary Building by utilizing approxi=ately 220 "Hilti" type shot-on studs. These studs were installed into e= bedded safety-related grade A-36 steel plates without an approved procedure or an evaluation as to the potantial effects on the embedded plates. In most cases, these shot-on studs were placed en the edge or in a corner of the embedded plates so as not to interfere with any per=anent fixtures to be welded to the plate. These subject studs are shot onto the embedded plate using a .22 caliber or a .45 caliber shell which forces the approximately 1/8" dia=eter stud shaft into the plate.

PSI was unable to determine that this incident was not significant and there-fore elected to report it as potentially significant under 10CFR50.55(e) .

The following corrective actions have been taken to insure proper installa-tion of such studs in the future by Ccenonwealth-Lord:

1. No attach =ents are to be made to safety category I structures until written authorization is available.
2. All attachments to safety category I structures are to be installed in accordance with approved procedures.

b I' .

I

{

. \

7 9091104T9

CCO East Main Street s'ainfiec, incrana 26168 317 339 9611