ML20076J550

From kanterella
Jump to navigation Jump to search
Requests Assignment of Inspector to Verify Program for Improved Control Over Electrical Const Program Beginning 830613,per Meeting Prerequisites Outlined in 830202 Confirmatory Action Ltr
ML20076J550
Person / Time
Site: Marble Hill
Issue date: 06/10/1983
From: Shields S
PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
SVP-0100-83, SVP-100-83, NUDOCS 8307060010
Download: ML20076J550 (1)


Text

l pr j.,u,.

l LL PUBLIC SERVICE INDIANA June 10, 1983 SVP-0100-83 Mr. James G. Keppler Docket Nos.:

STN 50-546 Regional Administrator STN 50-547 U. S. Nuclear Regulatory Commission Construction Permit Nos.:

Region III CPPR -170 799 Roosevelt Road CPPR -171.

Glen Ellyn, Illinois 60137 Marble Hill Nuclear Generating Station - Units 1 and 2

Dear Mr. Keppler:

Public Service Indiana has met the prerequisites outlined in your Confirmatory Action Letter of February 2, 1983 for the resumption of electrical conduit hangers and exposed conduit installation.

I am requesting that an inspector or inspectors be assigned begin-ning Monday, June 13, 1983 to verify that the program for improved control over the electrical construction program for this work is adequate and that Items 2 through 6 in your letter have been fully addressed for electrical conduit hangers and exposed conduit installation.

Sinc ely,

/

f4 l' S. W. Shields Senior Vice President Nuclear Division SWS/ daw cc:

C. Norelius L. Spessard R. Love J. Schapker 8307060010 830610 DR ADOCK 05000 jgg j ll JUN 1 6 1983 1000 East Main Street, Plainfield, Indiana 46168 317. 839.9611