|
|
Line 1: |
Line 1: |
| {{Adams | | {{Adams |
| | number = ML16028A151 | | | number = ML15181A215 |
| | issue date = 01/28/2016 | | | issue date = 06/30/2015 |
| | title = Er 05000482/2015301; 11/13/2015 - 12/29/2015; Wolf Creek Generating Station; Initial Operator Licensing Examination Report | | | title = Wolf Creek - Notification of NRC Initial Operator Licensing Examination 05000482/2015301 |
| | author name = Gaddy V G | | | author name = Gaddy V G |
| | author affiliation = NRC/RGN-IV/DRS/OB | | | author affiliation = NRC/RGN-IV/DRS/OB |
Line 10: |
Line 10: |
| | license number = NPF-042 | | | license number = NPF-042 |
| | contact person = | | | contact person = |
| | document report number = 50-482/15-301
| | | document type = Letter, License-Operator, Part 55 Examination Related Material |
| | document type = Letter, License-Operator Examination Report | | | page count = 4 |
| | page count = 13 | |
| }} | | }} |
|
| |
|
Line 18: |
Line 17: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter: | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD. ARLINGTON, TX 76011-4511 June 30, 2015 Adam C. Heflin, President and |
| [[Issue date::January 28, 2016]]
| |
| | |
| Adam C. Heflin, President and | |
|
| |
|
| Chief Executive Officer | | Chief Executive Officer |
Line 27: |
Line 23: |
| Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839 | | Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839 |
|
| |
|
| SUBJECT: WOLF CREEK GENERATING STATION - NRC EXAMINATION REPORT 05000482/2015301 | | SUBJECT: WOLF CREEK NUCLEAR OPERATING COMPANY - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000482/2015301 |
|
| |
|
| ==Dear Mr. Heflin:== | | ==Dear Mr. Heflin,== |
| On November 23, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed an initial operator license examination at Wolf Creek Generating Station. The enclosed report documents the examination results and licensing decisions. The preliminary examination results were discussed on November 19, 2015, with you and other members of your staff. A telephonic exit meeting was conducted on December 29, 2015, with Mr. J. Knapp, Superintendent, Operations Training, who wa s provided the NRC licensing decisions.
| | In a telephone conversation on June 11, 2015, between Messrs. S. Battenfield, Initial Operator License Exam Lead, and B. Larson, Chief Examiner, arrangements were made for the administration of licensing examinations at Wolf Creek Generating Station during the week of November 16, 2015. |
|
| |
|
| The examination included the evaluation of 8 applicants for reactor operator licenses and 7 applicants for an instant senior reactor operator license. The license examiners determined that 14 applicants satisfied the requirements of 10 CFR Part 55 and the appropriate licenses have been issued. However, 2 reactor operator applicants and 1 instant senior reactor operator applicant had the issuance of their license delayed until any written examination appeal can be reviewed for possible impact on their licensing decision in accordance with NUREG-1021, Revision 10, ES-501, Section D.3.c. There were no post-examination comments submitted by your staff. Enclosure 1 contains details of this report and Enclosure 2 documents one observed simulator fidelity issue.
| | As agreed during the telephone conversation, the NRC will provide the written examination outlines and your staff will prepare the ex aminations based on the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 10, and NUREG-1122, "Knowledge and Abilities Catalog for Nuclear Power Plant Operators," Revision 2, Supplement 1. The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered. |
|
| |
|
| No findings were identified during this examination.
| | To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by August 14, 2015. The written examinations, operating tests, and supporting reference materials identified in Attachment 3 to ES-201 will be due September 4, 2015. |
|
| |
|
| In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice and Procedure," a copy of
| | Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examinations and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled. In addition, your support for on-site validation of the examinations is required during the week of October 19, 2015. |
|
| |
|
| this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
| | In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff shall retain all original simulator performance data (e.g., system pressures, temperatures, levels) generated during the dynamic operating tests until the examination results are final. Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered. |
|
| |
|
| Sincerely,/RA/
| | To permit timely NRC review and evaluation, your staff shall submit preliminary operator and senior operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed shall be submitted at least 14 days before the first examination date. |
| Vincent G. Gaddy, Chief Operations Branch Division of Reactor Safety Docket No. 50-482 License No. NPF-42
| |
|
| |
|
| ===Enclosures:===
| | This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for this collection of information is estimated to average 50 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV. The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number. |
| 1. Examination Report 05000482/2013301
| |
|
| |
|
| ===w/Attachment:===
| | In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html. Thank you for your cooperation in this matter. Mr. Battenfield has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Larson at 817-200-1172, or myself at 817-200-1159. |
| Supplemental Information
| |
|
| |
|
| 2. Simulator Fidelity Report
| | Sincerely,/RA/ |
| | Vincent G. Gaddy, Chief Operations Branch Division of Reactor Safety |
|
| |
|
| cc: Electronic Distribution for Wolf Creek
| | Docket 50-482 License NPF-42 |
|
| |
|
| Generating Station
| | SUNSI Review By: BTL ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: RGN-002 OFFICE SOE:OB C:OB NAME BLarson VGaddy SIGNATURE /RA/ /RA/ DATE 6/26/15 6/30/15 Letter to Adam from Vincent G. Gaddy, dated June 30, 2015 |
|
| |
|
| ML16028A151 SUNSI Review By: BTL ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: RGN-002 OFFICE OE:OB OE:OB SOE:OB RE:IOLB SOE:OB C:PBB C:OB NAME CCowdrey SHedger JKirkland TBuchanan BLarson NTaylor VGaddy SIGNATURE Email Email Email Email /RA/ /RA/ /RA/ DATE 1/27/16 1/27/16 1/27/16 1/27/16 1/27/16 1/27/16 1/28/16 Letter Adam from Vincent G. Gaddy, dated January 28, 2016
| | SUBJECT: WOLF CREEK NUCLEAR OPERATING COMPANY - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000482/2015301 |
|
| |
|
| SUBJECT: WOLF CREEK GENERATING STATION - NRC EXAMINATION REPORT 05000482/2015301
| | Electronic distribution by RIV |
| | : Regional Administrator (Marc.Dapas@nrc.gov) |
| | Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) |
| | DRP Director (Troy.Pruett@nrc.gov) DRP Deputy Director (Ryan.Lantz@nrc.gov) DRS Director (Anton.Vegel@nrc.gov) |
| | DRS Deputy Director (Jeff.Clark@nrc.gov) |
| | Senior Resident Inspector (Chris.Speer@nrc.gov) |
|
| |
|
| Electronic Distribution by RIV:
| | Resident Inspector (Raja.Stroble@nrc.gov) WC Administrative Assistant (Carey.Spoon@nrc.gov) Branch Chief, DRP/B (Andrew.Rosebrook@nrc.gov) |
| Regional Administrator (Marc.Dapas@nrc.gov)
| |
| Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) DRP Director (Troy.Pruett@nrc.gov) DRP Deputy Director (Ryan.Lantz@nrc.gov)
| |
| DRS Director (Anton.Vegel@nrc.gov)
| |
| DRS Deputy Director (Jeff.Clark@nrc.gov)
| |
| Senior Resident Inspector (Douglas.Dodson@nrc.gov)
| |
| Resident Inspector (Fabian.Thomas@nrc.gov)
| |
| WC Administrative Assistant (Vacant)
| |
| Branch Chief, DRP/B (Nick.Taylor@nrc.gov) | |
| Senior Project Engineer, DRP/B (David.Proulx@nrc.gov) | | Senior Project Engineer, DRP/B (David.Proulx@nrc.gov) |
| Project Engineer, DRP/B (Shawn.Money@nrc.gov) | | Project Engineer, DRP/B (Fabian.Thomas@nrc.gov) |
| Project Engineer, DRP/B (Steven.Janicki@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) | | Project Engineer, DRP/B (Steven.Janicki@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov) |
| | |
| Project Manager (Fred.Lyon@nrc.gov) | | Project Manager (Fred.Lyon@nrc.gov) |
|
| |
|
| Team Leader, DRS/TSS (Thomas.Hipschman@nrc.gov) | | Team Leader, DRS/TSS (Don.Allen@nrc.gov) |
| RITS Coordinator (Marisa.Herrera@nrc.gov) | | RITS Coordinator (Marisa.Herrera@nrc.gov) |
|
| |
|
Line 79: |
Line 71: |
| Congressional Affairs Officer (Jenny.Weil@nrc.gov) | | Congressional Affairs Officer (Jenny.Weil@nrc.gov) |
| RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) | | RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) |
| OEWEB Resource (OEWEB Resource@nrc.gov) OEWEB Resource (Sue.Bogle@nrc.gov) RIV/ETA: OEDO (Cindy.Rosales-Cooper@nrc.gov) Enclosure 1 U.S. NUCLEAR REGULATORY COMMISSION REGION IV Docket: 05000482 License: NPF-42 Report: 05000482/2015301 Licensee: Wolf Creek Nuclear Operating Corporation Facility Wolf Creek Generating Station Location: 1550 Oxen Lane NE Burlington, Kansas Dates: November 13 - December 29, 2015 Inspectors: B. Larson, Senior Operations Engineer J. Kirkland, Senior Operations Engineer
| | RIV/ETA: OEDO (Michael.Waters@nrc.gov) ROPreports |
| | |
| T. Buchanan, Reactor Engineer S. Hedger, Operations Engineer C. Cowdrey, Operations Engineer Approved By: Vincent G. Gaddy Chief, Operations Branch Division of Reactor Safety
| |
| | |
| =SUMMARY=
| |
| ER 05000482/2015301; 11/13/2015 - 12/29/2015; Wolf Creek Generating Station; Initial
| |
| | |
| Operator Licensing Examination Report.
| |
| | |
| NRC examiners evaluated the competency of eight applicants for reactor operator licenses and seven applicants for an instant senior reactor operator license at Wolf Creek Generating Station.
| |
| | |
| The licensee developed the examinations using NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 10. The written examination was administered by the licensee on November 13, 2015. The NRC examiners administered the operating tests November 16-23, 2015.
| |
| | |
| The examiners determined that 14 of the 15 applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses have been issued. However, 2 reactor operator applicants and 1 instant senior reactor operator applicant had the issuance of their license delayed until any written examination appeal can be reviewed for possible impact on their licensing decision in accordance with NUREG-1021, Revision 10, ES-501, Section D.3.c.
| |
| | |
| ===A. NRC-Identified and Self-Revealing Findings===
| |
| | |
| None
| |
| | |
| ===B. Licensee-Identified Violations===
| |
| | |
| None
| |
| | |
| =REPORT DETAILS=
| |
| | |
| ==OTHER ACTIVITIES (OA)==
| |
| {{a|4OA5}}
| |
| ==4OA5 Other Activities (Initial Operator License Examination)==
| |
| | |
| ===.1 License Applications===
| |
| | |
| ====a. Scope====
| |
| NRC examiners reviewed all license applications submitted to ensure each applicant satisfied relevant license eligibility requirements. The examiners also audited four of the license applications in detail to confirm that they accurately reflected the subject applicant's qualifications. This audit focused on the applicant's experience and on-the-job training, including control manipulations that provided significant reactivity changes.
| |
| | |
| ====b. Findings====
| |
| No findings were identified.
| |
| | |
| ===.2 Examination Development===
| |
| | |
| ====a. Scope====
| |
| NRC examiners reviewed integrated examination outlines and proposed examinations submitted by the licensee against the requirements of NUREG-1021. The NRC examination team conducted an onsite validation of the operating tests.
| |
| | |
| ====b. Findings====
| |
| No findings were identified.
| |
| | |
| NRC examiners provided outline, proposed ex amination, and post-validation comments to the licensee. The licensee satisfactorily completed comment resolution prior to examination administration.
| |
| | |
| For the written examinations initially submitted by the licensee, NRC examiners determined that the reactor operator (RO) written examination was within the range of acceptability expected for a proposed examination but the senior reactor operator-only (SRO-only) portion of the written examination was not within the range of acceptability expected for a proposed examination.
| |
| | |
| The NUREG-1021 standard for an acceptable submittal requires that 20 percent or fewer of questions submitted for the RO and SRO-only written examinations (assessed separately) require replacement or significant modification. For this submittal, the SRO-only portion of the examination contained 8 questions (32 percent) that required replacement or significant modifications. The major issue was questions that did not match the selected knowledge and ability statement; other errors included questions not written at an SRO-only level, two or more distracters that were not credible and questions that had multiple correct answers. As identified in NUREG-1021, future written examination submittals should incorporate any lessons learned stemming from this examination effort. The licensee wrote Condition Report 00102279 to address
| |
| | |
| these issues.
| |
| | |
| NRC examiners determined the operating tests initially submitted by the licensee were within the range of acceptability expected for a proposed examination.
| |
| | |
| ===.3 Operator Knowledge and Performance===
| |
| | |
| ====a. Scope====
| |
| On November 13, 2015, the licensee proctored the administration of the written examinations to all 15 applicants. The licensee staff graded the written examinations, analyzed the results, and presented their analysis to the NRC on December 1, 2015.
| |
| | |
| The NRC examination team administered the various portions of the operating tests to all 15 applicants on November 16-23, 2015.
| |
| | |
| ====b. Findings====
| |
| No findings were identified.
| |
| | |
| All 15 applicants passed all portions of the operating test. Fourteen of the 15 applicants passed the written examination. The final written examinations and post-examination analysis may be accessed in the ADAMS system under the accession numbers noted in the attachment. There were no post-examination comments submitted by the licensee. The licensee requested and received approval by the NRC to withhold the written examinations from the public document room for 24 months after the administration date.
| |
| | |
| The examination team noted a generic weakness during the administration of the job performance measure associated with the ability to develop a Protective Action Recommendation. Seven out of seven instant senior reactor operator applicants failed to complete one or more portions of the emergency notification form correctly and within the established time limit. The licensee wrote Condition Report 00102021 to address
| |
| | |
| this issue.
| |
| | |
| ===.4 Simulation Facility Performance===
| |
| | |
| ====a. Scope====
| |
| The NRC examiners observed simulator performanc e with regard to plant fidelity during examination validation and administration.
| |
| | |
| ====b. Findings====
| |
| No findings were identified.
| |
| | |
| During the performance of one simulator job performance measure, NRC examiners observed a possible simulator hardware issue. While performing actions to restore power to a vital bus following a loss of all ac power, the normal feeder breaker NB HIS-4 failed to close, tripping on the attempt. With the assistance of a simulator engineer, a fix was identified and administration of the operating test continued with minimal delay. It is noted that during NRC validation of the operating test, this job performance measure was performed as scripted. See Enclosure 2 for additional details.
| |
| | |
| ===.5 Examination Security===
| |
| | |
| ====a. Scope====
| |
| The NRC examiners reviewed examination security during both the onsite preparation week and examination administration week for compliance with 10 CFR 55.49 and NUREG-1021. Plans for simulator security and applicant control were reviewed and discussed with licensee personnel.
| |
| | |
| ====b. Findings====
| |
| No findings were identified.
| |
| | |
| During administration of the operating test scenarios, the examiners were informed of three issues affecting examination integrity. Because none of the issues resulted in replacing or modifying any test items, the issues were evaluated as not more than minor, but are identified here per guidance in NUREG-1021, ES-501, Section E.3.a.
| |
| | |
| Issue 1: Scenario #1: A book containing several abnormal (off-normal)procedures was not updated after the first scenario run but was returned to the simulator for use in subsequent runs. As a result, one BOP applicant discovered one event procedure was missing and in subsequent event, the same BOP applicant discovered a procedure that had place-keeping marks from the previous scenario run. NRC examiners determined the impact as minor since a replacement procedure was readily available to the BOP applicant and the place-keeping marks offered no discernable advantage to the applicant. The licensee wrote Condition Report 00101585 to address this issue.
| |
| | |
| Issue 2: Scenario #3: A cue was given by the booth operator to the CRS applicant without prior concurrence of the lead examiner. The cue was inappropriately given prior to the CRS applicant identifying that a load reduction was required. However, NRC examiners determined the impact as minor since the applicant had multiple other opportunities to be evaluated in the Directing Operations competency. The licensee wrote Condition Report 00101586 to address this issue.
| |
| | |
| Issue 3: Scenario #2: A laminated copy of EMG E-0, REACTOR TRIP OR SAFETY INJECTION, Foldout Page, grease pencil markings were not wiped clean between the 2 nd and 3 rd applicant crews. NRC examiners determined the impact as minor since the grease pencil markings offered no discernable advantage to the applicant who identified the markings. The licensee wrote Condition Report 00101587 to address this issue. In addition, the licensee wrote Condition Report 00101655, Trending CR for OPS Exam Security Issues, to track corrective actions for an adverse Operations examination security trend.
| |
| | |
| {{a|4OA6}}
| |
| ==4OA6 Meetings, Including Exit==
| |
| | |
| ===Exit Meeting Summary===
| |
| | |
| The chief examiner presented the preliminary examination results to Mr. A. Heflin, President and Chief Executive Officer, and other members of his staff on November 19, 2015. A telephonic exit meeting was conducted on December 29, 2015, between Mr. B. Larson, Chief Examiner, and Mr. J. Knapp, Superintendent, Operations Training.
| |
| | |
| All proprietary information and materials used during the examination were returned to the
| |
| | |
| licensee.
| |
| | |
| A-1 Attachment
| |
| | |
| =SUPPLEMENTAL INFORMATION=
| |
| | |
| ==KEY POINTS OF CONTACT==
| |
| | |
| ===Licensee Personnel===
| |
| : [[contact::J. Yunk]], Manager, Training
| |
| : [[contact::W. Brandt]], Exam Licensing Representative
| |
| : [[contact::J. Knapp]], Superintendent, Operations Training
| |
| : [[contact::R. Meyer]], Supervisor, Simulator and Exam Group
| |
| : [[contact::M. Mitchell]], Exam Group
| |
| : [[contact::A. Servaes]], Exam Group
| |
| : [[contact::W. Isom]], Licensed Supervisor Instructor, Initial
| |
| : [[contact::L. Rockers]], Licensing Engineer
| |
| | |
| ===NRC Personnel===
| |
| : [[contact::D. Dodson]], Senior Resident Inspector
| |
| : [[contact::F. Thomas]], Resident Inspector
| |
| | |
| ==ADAMS DOCUMENTS REFERENCED==
| |
| Accession No. ML16027A319 - [DO NOT RELEASE FOR TWO YEARS]
| |
| : WC-2015-11-Final
| |
| : Written Exams Accession No. ML16027A312 -
| |
| : WC-2015-11-Final Operating Test
| |
| : Accession No. ML16027A300 -
| |
| : WC-2015-11-Post Exam Analysis
| |
| : Attachment
| |
| : ES-501 Simulator Fidelity Report Enclosure 2
| |
| : Facility Licensee: __Wolf Creek Generating Station__
| |
| : Facility Docket No.: __50-482__
| |
| : Operating Tests Administered on: __November 16-23, 2015__
| |
| : This form is to be used only to report observations.
| |
| : These observations do not constitute audit or inspection findings and, without further verification and review in accordance with
| |
| : IP 71111.11, are not indicative of noncompliance with 10
| |
| : CFR 55.46, "Simulation Facilities."
| |
| : No licensee action is required in response to these observations.
| |
| : While conducting the simulator portion of the operating tests, examiners observed the following item:
| |
| : Item Description SMP A16-008 NRC initial license examination administration (week of November 16, 2015):
| |
| : During performance of Job Performance Measure (JPM) S5, it was observed that normal feeder breaker NB
| |
| : HIS-4 failed to close
| |
| (tripping on the attempt) while performing actions to restore power to a dead vital bus following a loss of all AC power condition.
| |
| : For JPM S5, the simulator setup was
| |
| : IC 315 (see JPM for details).
| |
| : Since the simulator performed without issue during NRC validation of this JPM, a possible hardware issue is suspected.
| |
| }} | | }} |
|
---|
Category:Letter
MONTHYEARIR 05000482/20244202024-10-31031 October 2024 Security Baseline Inspection Report 05000482/2024420 ML24296B1902024-10-22022 October 2024 10 CFR 50.55a Requests for the Fifth Ten-Year Interval Inservice Testing Program 05000482/LER-2024-001-01, Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing2024-10-22022 October 2024 Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing 05000482/LER-2024-002, Technical Specification Required Shutdown Due to Inoperable Auxiliary Feedwater Discharge Valve2024-10-21021 October 2024 Technical Specification Required Shutdown Due to Inoperable Auxiliary Feedwater Discharge Valve ML24284A2842024-10-10010 October 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML24283A0752024-10-0909 October 2024 Notification of Commercial Grade Dedication Inspection (05000482/2025012) and Request for Information ML24199A1712024-09-17017 September 2024 Issuance of Amendment No. 241 Revise Ventilation Filter Testing Program Criteria and Administrative Correction of Absorber in Technical Specification 5.5.11 ML24260A0712024-09-12012 September 2024 License Amendment Request for a Risk-Informed Resolution to GSI-191 IR 05000482/20240102024-09-10010 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000482/2024010 (Public) ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24248A0762024-09-0404 September 2024 Containment Inservice Inspection Program Third Interval, Second Period, Refueling Outage 26 Owner’S Activity Report ML24248A2492024-09-0404 September 2024 Inservice Inspection Program Fourth Interval, Third Period, Refueling Outage 26 Owner’S Activity Report ML24241A2212024-08-29029 August 2024 Notice of Enforcement Discretion for Wolf Creek Generating Station ML24240A2642024-08-27027 August 2024 Corporation - Request for Notice of Enforcement Discretion Regarding Technical Specification 3.7.5, Auxiliary Feedwater (AFW) System ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000482/20240052024-08-14014 August 2024 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2024005) ML24227A5562024-08-14014 August 2024 Application to Revise Technical Specifications to Adopt TSTF-569-A, Revision 2, Revision of Response Time Testing Definitions ML24213A3352024-07-31031 July 2024 License Amendment Request to Revise Technical Specification 3.2.1, Heat Flux Hot Channel Factor (Fq(Z)) (Fq Methodology), to Implement the Methodology from WCAP-17661-P-A, Revision 1. ML24206A1252024-07-24024 July 2024 Revision of Three Procedures and Two Forms That Implement the Radiological Emergency Response Plan (RERP) IR 05000482/20240022024-07-18018 July 2024 Integrated Inspection Report 05000482/2024002 05000482/LER-2024-001, Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing2024-07-0202 July 2024 Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing IR 05000482/20244012024-07-0202 July 2024 Security Baseline Inspection Report 05000482/2024401 ML24178A3672024-06-26026 June 2024 Correction to 2023 Annual Radioactive Effluent Release Report – Report 47 ML24178A4142024-06-26026 June 2024 Revision of One Procedure and One Form That Implement the Radiological Emergency Response Plan (RERP) ML24162A1632024-06-11011 June 2024 Operating Corporation – Notification of Biennial Problem Identification and Resolution Inspection and Request for Information (05000482/2024010) ML24150A0562024-05-29029 May 2024 Foreign Ownership, Control or Influence (FOCI) Information – Change to Lists of Owners, Officers, Directors and Executive Personnel - Form 405F Amendment ML23345A1602024-05-0909 May 2024 Revision of Safety Evaluation for Amendment No. 237 Request for Deviation from Fire Protection Requirements ML24089A2622024-04-29029 April 2024 Financial Protection Levels ML24118A0022024-04-27027 April 2024 Wolf Generating Nuclear Station - 2023 Annual Radiological Environmental Operating Report ML24118A0032024-04-27027 April 2024 2023 Annual Radioactive Effluent Release Report - Report 47 ML24113A1882024-04-19019 April 2024 Foreign Ownership, Control or Influence Information - Change to Lists of Owners, Officers, Directors and Executive Personnel - Form 405F Amendment ML24109A1842024-04-18018 April 2024 Cycle 27 Core Operating Limits Report ML24109A1212024-04-18018 April 2024 (WCGS) Form 5 Exposure Report for Calendar Year 2023 IR 05000482/20240012024-04-17017 April 2024 Integrated Inspection Report 05000482/2024001 ML24114A1442024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37 ML24106A1482024-04-15015 April 2024 Notification of Inspection (NRC Inspection Report 05000482/2024003) and Request for Information ML24098A0052024-04-0707 April 2024 2023 Annual Environmental Operating Report ML24089A0972024-03-29029 March 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24089A1352024-03-29029 March 2024 10 CFR 50.46 Annual Report of Emergency Core Cooling System (ECCS) Evaluation Model Changes ML24074A3312024-03-14014 March 2024 Missed Quarterly Inspection Per 40 CFR 266 Subpart N IR 05000482/20240122024-03-11011 March 2024 Fire Protection Team Inspection Report 05000482/2024012 ML24080A3452024-03-11011 March 2024 7 of the Wolf Creek Generating Station Updated Safety Analysis Report ML24016A0702024-03-0808 March 2024 Issuance of Amendment No. 240 Removal of the Power Range Neutron Flux Rate - High Negative Rate Trip Function from Technical Specifications ML24068A1992024-03-0707 March 2024 Changes to Technical Specification Bases - Revisions 93 and 94 ML24066A0672024-03-0505 March 2024 4-2022-024 Letter - OI Closure to Licensee ML24061A2642024-03-0101 March 2024 Revision of Two Procedures That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) Commissioners IR 05000482/20230062024-02-28028 February 2024 Annual Assessment Letter for Wolf Creek Generating Station Report 05000482/2023006 ML24059A1702024-02-28028 February 2024 Annual Fitness for Duty Program Performance Report, and Annual Fatigue Report for 2023 ML24026A0212024-02-27027 February 2024 Issuance of Amendment No. 239 Modified Implementation Date of License Amendment No. 238 ML24050A0012024-02-19019 February 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) 2024-09-06
[Table view] Category:License-Operator
MONTHYEARIR 05000482/20233012023-12-19019 December 2023 NRC Examination Report 05000482/2023301 ML23346A0992023-11-16016 November 2023 Wc 2023-10 Post Exam Submittal ML24096A0302023-11-0101 November 2023 Wc 2023-10 Public Forms ML23284A2392023-10-11011 October 2023 NRC Initial Operator Licensing Examination Approval 05000482/2023301 ML23097A0162023-04-0707 April 2023 Notification of NRC Initial Operator Licensing Examination 05000482/2023301 ML22019A1462021-12-0707 December 2021 11 Draft Written Examination Comments ML22019A1452021-12-0707 December 2021 11 Draft Written Examination ML22019A1472021-12-0707 December 2021 11 Draft Operating Test ML22010A1582021-12-0707 December 2021 11 Post Examination Analysis ML22010A1562021-12-0707 December 2021 11 Final Written Examination ML22010A1572021-12-0707 December 2021 11 Final Operating Test ML22019A1382021-12-0707 December 2021 11 Draft Outlines ML22019A1482021-12-0707 December 2021 11 Draft Operating Test Comments ML22019A1622021-12-0707 December 2021 11 Final Outlines ML22020A1332021-12-0707 December 2021 11 Public Forms ML22019A1392021-11-0101 November 2021 11 Draft Outline Comments WO 20-0020, Response to NRC Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations2020-03-18018 March 2020 Response to NRC Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML20015A5192019-12-14014 December 2019 11-WC-2019-12 Public Forms ML20007E4422019-12-14014 December 2019 10-WC-2019-12 Post-Exam Comments ML19326A7722019-11-22022 November 2019 NRC Initial Operator Licensing Examination Approval 05000482/2019301 ML19011A3712019-01-10010 January 2019 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2019 WO 18-0014, Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-16016 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18086B0842018-02-16016 February 2018 Facility Cover Letter - Riv - March 2018 - GFE ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17355A6512017-12-0404 December 2017 11 Post-Examination Comments ML18012A7472017-11-15015 November 2017 11 Public Forms ML17355A6502017-11-15015 November 2017 11 Final Written Exam ML17355A6492017-11-15015 November 2017 11 Final Outlines ML17355A6482017-11-15015 November 2017 11 Final Operating Test ML17355A6462017-11-15015 November 2017 11 Draft Written Exam ML17355A6452017-11-15015 November 2017 11 Draft Written Exam Comments ML17355A6402017-11-15015 November 2017 11 Draft Operating Test Comments ML17355A6442017-11-15015 November 2017 11 Draft Outlines ML17355A6412017-11-15015 November 2017 11 Draft Operating Test ML17355A6432017-11-15015 November 2017 11 Draft Outline Comments ML17013A5482017-01-13013 January 2017 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2017 ML16336A7892016-12-0101 December 2016 Operating Company - Notification of NRC Initial Operator Licensing Examination 05000482/2017301 WO 16-0039, Form 536 Operator Licensing Examination and Scheduling Data in Response to RIS 2106-092016-07-19019 July 2016 Form 536 Operator Licensing Examination and Scheduling Data in Response to RIS 2106-09 ML16182A2852016-06-30030 June 2016 Arkansas, Units 1 and 2,South Texas Project, Units 1 and 2, Wolf Creek, Generic Fundamentals Examination Results for June 8, 2016 ML16027A3002015-12-29029 December 2015 2015-11-POST Exam Analysis ML15351A0282015-12-17017 December 2015 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2016 ML16036A3872015-11-13013 November 2015 2015-11-PROPOSED Written Exam Comments ML16027A3122015-11-13013 November 2015 2015-11 - Final Operating Test ML16027A3192015-11-13013 November 2015 WC-2015-11 - Final Written Exams ML16036A3812015-11-13013 November 2015 2015-11-Proposed Written Exam ML16036A3822015-11-13013 November 2015 2015-11-PROPOSED Outline Comments ML16036A3832015-11-13013 November 2015 2015-11-Final Outlines ML16036A3842015-11-13013 November 2015 2015-11-PROPOSED Operating Test Comments ML16036A3852015-11-13013 November 2015 2015-11 - Proposed Operating Test ML16036A3862015-11-13013 November 2015 2015-11-PROPOSED Outlines 2023-04-07
[Table view] Category:Part 55 Examination Related Material
MONTHYEARIR 05000482/20233012023-12-19019 December 2023 NRC Examination Report 05000482/2023301 ML23346A0992023-11-16016 November 2023 Wc 2023-10 Post Exam Submittal ML24096A0302023-11-0101 November 2023 Wc 2023-10 Public Forms ML23284A2392023-10-11011 October 2023 NRC Initial Operator Licensing Examination Approval 05000482/2023301 ML23097A0162023-04-0707 April 2023 Notification of NRC Initial Operator Licensing Examination 05000482/2023301 ML22010A1582021-12-0707 December 2021 11 Post Examination Analysis ML22019A1452021-12-0707 December 2021 11 Draft Written Examination ML22010A1572021-12-0707 December 2021 11 Final Operating Test ML22019A1382021-12-0707 December 2021 11 Draft Outlines ML22010A1562021-12-0707 December 2021 11 Final Written Examination ML22019A1462021-12-0707 December 2021 11 Draft Written Examination Comments ML22019A1472021-12-0707 December 2021 11 Draft Operating Test ML22019A1622021-12-0707 December 2021 11 Final Outlines ML22019A1482021-12-0707 December 2021 11 Draft Operating Test Comments ML22020A1332021-12-0707 December 2021 11 Public Forms ML22019A1392021-11-0101 November 2021 11 Draft Outline Comments WO 20-0020, Response to NRC Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations2020-03-18018 March 2020 Response to NRC Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML20007E4422019-12-14014 December 2019 10-WC-2019-12 Post-Exam Comments ML20015A5192019-12-14014 December 2019 11-WC-2019-12 Public Forms ML19326A7722019-11-22022 November 2019 NRC Initial Operator Licensing Examination Approval 05000482/2019301 WO 18-0014, Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-16016 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17355A6512017-12-0404 December 2017 11 Post-Examination Comments ML18012A7472017-11-15015 November 2017 11 Public Forms ML17355A6402017-11-15015 November 2017 11 Draft Operating Test Comments ML17355A6432017-11-15015 November 2017 11 Draft Outline Comments ML17355A6492017-11-15015 November 2017 11 Final Outlines ML17355A6452017-11-15015 November 2017 11 Draft Written Exam Comments ML17355A6442017-11-15015 November 2017 11 Draft Outlines ML17355A6462017-11-15015 November 2017 11 Draft Written Exam ML17355A6502017-11-15015 November 2017 11 Final Written Exam ML17355A6482017-11-15015 November 2017 11 Final Operating Test ML17355A6412017-11-15015 November 2017 11 Draft Operating Test ML16336A7892016-12-0101 December 2016 Operating Company - Notification of NRC Initial Operator Licensing Examination 05000482/2017301 WO 16-0039, Form 536 Operator Licensing Examination and Scheduling Data in Response to RIS 2106-092016-07-19019 July 2016 Form 536 Operator Licensing Examination and Scheduling Data in Response to RIS 2106-09 ML16182A2852016-06-30030 June 2016 Arkansas, Units 1 and 2,South Texas Project, Units 1 and 2, Wolf Creek, Generic Fundamentals Examination Results for June 8, 2016 ML16027A3002015-12-29029 December 2015 2015-11-POST Exam Analysis ML15351A0282015-12-17017 December 2015 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2016 ML16036A3882015-11-13013 November 2015 2015-11-PUBLIC Forms ML16036A3872015-11-13013 November 2015 2015-11-PROPOSED Written Exam Comments ML16036A3862015-11-13013 November 2015 2015-11-PROPOSED Outlines ML16036A3852015-11-13013 November 2015 2015-11 - Proposed Operating Test ML16036A3842015-11-13013 November 2015 2015-11-PROPOSED Operating Test Comments ML16036A3832015-11-13013 November 2015 2015-11-Final Outlines ML16036A3822015-11-13013 November 2015 2015-11-PROPOSED Outline Comments ML16036A3812015-11-13013 November 2015 2015-11-Proposed Written Exam ML16027A3192015-11-13013 November 2015 WC-2015-11 - Final Written Exams ML16027A3122015-11-13013 November 2015 2015-11 - Final Operating Test ML15317A1672015-11-12012 November 2015 2015-11-Examination Approval ML15181A2152015-06-30030 June 2015 Notification of NRC Initial Operator Licensing Examination 05000482/2015301 2023-04-07
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD. ARLINGTON, TX 76011-4511 June 30, 2015 Adam C. Heflin, President and
Chief Executive Officer
Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839
SUBJECT: WOLF CREEK NUCLEAR OPERATING COMPANY - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000482/2015301
Dear Mr. Heflin,
In a telephone conversation on June 11, 2015, between Messrs. S. Battenfield, Initial Operator License Exam Lead, and B. Larson, Chief Examiner, arrangements were made for the administration of licensing examinations at Wolf Creek Generating Station during the week of November 16, 2015.
As agreed during the telephone conversation, the NRC will provide the written examination outlines and your staff will prepare the ex aminations based on the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 10, and NUREG-1122, "Knowledge and Abilities Catalog for Nuclear Power Plant Operators," Revision 2, Supplement 1. The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by August 14, 2015. The written examinations, operating tests, and supporting reference materials identified in Attachment 3 to ES-201 will be due September 4, 2015.
Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examinations and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled. In addition, your support for on-site validation of the examinations is required during the week of October 19, 2015.
In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff shall retain all original simulator performance data (e.g., system pressures, temperatures, levels) generated during the dynamic operating tests until the examination results are final. Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff shall submit preliminary operator and senior operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed shall be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for this collection of information is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV. The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html. Thank you for your cooperation in this matter. Mr. Battenfield has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Larson at 817-200-1172, or myself at 817-200-1159.
Sincerely,/RA/
Vincent G. Gaddy, Chief Operations Branch Division of Reactor Safety
Docket 50-482 License NPF-42
SUNSI Review By: BTL ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: RGN-002 OFFICE SOE:OB C:OB NAME BLarson VGaddy SIGNATURE /RA/ /RA/ DATE 6/26/15 6/30/15 Letter to Adam from Vincent G. Gaddy, dated June 30, 2015
SUBJECT: WOLF CREEK NUCLEAR OPERATING COMPANY - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000482/2015301
Electronic distribution by RIV
- Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov) DRP Deputy Director (Ryan.Lantz@nrc.gov) DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Chris.Speer@nrc.gov)
Resident Inspector (Raja.Stroble@nrc.gov) WC Administrative Assistant (Carey.Spoon@nrc.gov) Branch Chief, DRP/B (Andrew.Rosebrook@nrc.gov)
Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)
Project Engineer, DRP/B (Fabian.Thomas@nrc.gov)
Project Engineer, DRP/B (Steven.Janicki@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Fred.Lyon@nrc.gov)
Team Leader, DRS/TSS (Don.Allen@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Michael.Waters@nrc.gov) ROPreports