ML24096A030

From kanterella
Jump to navigation Jump to search
Wc 2023-10 Public Forms
ML24096A030
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 11/01/2023
From: Heather Gepford
NRC/RGN-IV/DORS/OB
To:
Wolf Creek
References
Download: ML24096A030 (1)


Text

EXAM ASSIGNMENT TICKLER

Chief: Kelly Clayton Facility: WC 11/1/2023Date of Written Exam:

U/I: Start of Op Test: 10/16/2023 10/20/2023End of Op Test:

Written Exam Developed By: Facility Operating Test Developed By: Facility Due Date Date Complete InitialsDescriptionNotes

Examination administration date confirmed (A.1-5). For NRC 2/13/2023 2/7/2023 KCprepared examinations, arrangements are made for the facility licensee to submit reference materials (B.4, C.4.g and F).

3/20/2023 2/7/2023 KCNRC examiners and facility licensee contact assigned (B.1 and C.1-3)

Facility licensee contact briefed on examination security and other requirements (D.4). As applicable, the facility licensee contact 3/20/2023 2/7/2023 KCsubmits to the NRC any prescreened K/As for elimination from the written examination outline, with a description of the facility licensees prescreening process (ES-4.1 A.1.a and ES-4.1 B.2).

3/20/2023 NA NAReference material due for NRC prepared examinations (F) Facility authored exam

Examination kick-off call held (C.4). The NRC sends the corporate Delay requested by WC for call due to exam 3/20/2023 3/20/2023 KCnotification letter (A.5)security not set yet.

Letter 2.1-1 produced by CE

Written examination outline developed by the NRC and sent to 4/3/2023 3/30/2023 KCthe facility licensee contact (must be on the examination security Form ES-4.1 agreement) (B.2, ES-4.1 A.1.b and ES-4.1 A.2.a).

Operating test outlines and checklists due: Forms 1.3-1, 2.3-1, 5/15/2023 5/11/2023 KC3.2-1, 3.2-2, 3.3-1, and 3.4-1, as applicable (B.6). Facility 4/22 actual date wth no margin. Requested 4/25 licensee provides a draft operating test administration schedule to to work over weekend on it. I agreed.

the NRC (B.18).

5/29/2023 5/30/2023 KCOperating test outlines reviewed by the NRC and feedback Form 2.3-1 signed by CE and BC at full submittal provided to the facility licensee (ES-2.3). due to changes required on outlines

7/3/2023 NA NANRC-prepared examinations approved by the NRC supervisor and forwarded for facility licensee review (ES-2.3). Facility authored exam

Proposed examinations (written, JPMs, and scenarios, as 7/31/2023 7/25/2023 KCapplicable) and outline forms; quality checklists and supporting requested 7/27 verbally, CE agreed documentation (including Forms 2.3-2 and 2.3-4 and any Form 2.3-1, 1.3-1, and 3.4-1 updates); and reference materials due.

8/17/2023 NA KCPreliminary waiver/excusal requests due (ES-2.2 E.1). none Written examination and operating test reviews completed (ES-8/27/2023 8/28/2023 KC2.3). The NRC supervisors authorization to proceed with the Document review on Form 2.3-5 facility review granted (ES-2.3 D).

8/27/2023 8/28/2023 KCExamination review results discussed between the NRC and the facility licensee (B.14).

9/11/2023 8/28/2023 KCExamination review results discussed between NRC and facility licensee written review completed

9/18/2023 9/11/2023 KCPreliminary license applications & waiver/excusal requests due NRC Forms 398/396- reviewed onsite with licensee

9/11/2023 9/11/2023 KCOn-site validation & 10% audit of license applications (I)

9/16/2023 9/11/2023 KCPreliminary license applications, including any waiver/excusal requests, due (ES-2-2 C.1). no waivers or excusals

10/2/2023 10/3/2023 KCFinal license applications, including any waiver/excusal requests, Form 2.2-1 prepared-licensee requested two day due and Form 2.2-1 prepared (ES-2.2 C and E). delay

10/9/2023 10/10/2023 KCWritten examinations and operating tests approved by the NRC supervisor (C.9) 10/9/2023 10/16/2023 KCFacility licensee management feedback on the examination BC requested by the NRC supervisor (C.10).

Final applications reviewed; 10% of applications audited to produced Exam Approval Letter Form 2.3-1-BC 10/9/2023 10/9/2023 KCconfirm qualifications/eligibility (ES-2.2 G); and examination needs to sign on 10/10 or 10/11 due to holiday approval letter (Letter 2.3-1) and waiver/excusal letters sent. on 10/9

10/9/2023 10/9/2023 KCWritten examination administration guidelines reviewed with the facility licensee (D.14).

10/9/2023 10/9/2023 KCApproved scenarios and job performance measures distributed to NRC examiners (D.12).

10/16/2023 10/16/2023 KCAdminister Operating Test

10/27/2023 11/6/2023 KCExaminer's document op test results on ES 303's

Received post examination package from facility licensee and Forms to BC (20 days from date of last exam 11/21/2023 11/16/2021 KCverified complete. (ES-4.4)activ ity-if written is last activ ity, this is when clock starts)

Reviewed and incorporated any necessary facility and applicant 11/29/2023 12/1/2023 KCwritten examination comments. NRC grading of written examination completed. (ES-4.4)

Reviewed and incorporated any necessary facility and applicant 11/29/2023 12/1/2023 KCoperating test comments. NRC grading of operating test completed. (ES-3.6) 12/6/2023 12/6/2023 KCCompleted NRC chief examiner review of operating test and Forms 5.1-2 complete for all applicants written examination grading. (ES-3.6 and ES-4.4)

12/1/2023 12/8/2023 KCCompleted licensing official review. (BC signs licenses)

12/1/2023 N/A KCWaivers/deferrals reviewed for impact on licensing decision

12/1/2023 12/12/2023 KCMailed licenses, preliminary results, and pass letters. uploaded to BOX by OLA

12/1/2023 12/8/2023 KCNotified facility licensee of results. RPS/IP number of examinees updated print Report-21

12/22/2023 NA KCFinal Denial Letters mailed (if no request for informal review)1 aapplicant requested informal review

1/17/2024 12/19/2023 KCIssued the examination report (refer to Operator Licensing Manual produced by CE Chapter (OLMC) 510, Operator Licensing Examination Reports).

1/24/2024 4/5/2024 KCReturned reference material after final resolution of any informal in informal review process now-final letter on NRC staff reviews, hearing demands, or both. 3/28/2024

Performed examination recordkeeping activities (refer to OLMC 2/21/2024 4/5/2024 KC520, Operator Licensing Examination Records and Documentation, and Management Directive 3.53, NRC Records and Document Management Program).

Replaces NUREG-1021, Revision 12, Forms ES-2.1-1 and ES-5.1-1

Rev. 12

IP 21 Operator Licensing Exam Schedule

From 10/01/2023 to 10/20/2023

Phase Code: 5 - Operational

Region: 4

By Date # Candidates Exam StaartExam End Site Docket # Insp Rpt Cac # RO LSRO SROI SROU Type Exam Chief Examiner

  1. Author Examiner 10/15/202310/21/2023 Wolf Creek 05000482 2023301 000500 5 0 3 3 FB-OR-INITIAL NFF Clayton, Clayton, Kelly; LICENSE EXAM Kelly Hernandez, ADMINISTRATI Nick; ON (EXAD) Osterholtz, Clyde; Hedger, Sean

Sites: WC

Orgs: ALL

Exam Author: ALL

Activity Codes: EXAD

Prepared on 10/11/2023 7:31:50 AM IP 21 Operator Licensing Exam Schedule

Region/Site Summary RO SROI SROU LSRO Total 4 5 3 3 0 11

Exam Date/Site Summary RO SROI SROU LSRO Total 10/15/2023 5 3 3 0 11

Region/Docket Summary RO SROI SROU LSRO Total 4 5 3 3 0 11

Exam Date/Docket Summary RO SROI SROU LSRO Total 10/15/2023 5 3 3 0 11

Sites: WC

Orgs: ALL

Exam Author: ALL

Activity Codes: EXAD

Prepared on 10/11/2023 7:31:50 AM