|
---|
Category:Letter
MONTHYEARIR 05000482/20244202024-10-31031 October 2024 Security Baseline Inspection Report 05000482/2024420 ML24296B1902024-10-22022 October 2024 10 CFR 50.55a Requests for the Fifth Ten-Year Interval Inservice Testing Program 05000482/LER-2024-001-01, Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing2024-10-22022 October 2024 Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing 05000482/LER-2024-002, Technical Specification Required Shutdown Due to Inoperable Auxiliary Feedwater Discharge Valve2024-10-21021 October 2024 Technical Specification Required Shutdown Due to Inoperable Auxiliary Feedwater Discharge Valve ML24284A2842024-10-10010 October 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML24283A0752024-10-0909 October 2024 Notification of Commercial Grade Dedication Inspection (05000482/2025012) and Request for Information ML24199A1712024-09-17017 September 2024 Issuance of Amendment No. 241 Revise Ventilation Filter Testing Program Criteria and Administrative Correction of Absorber in Technical Specification 5.5.11 ML24260A0712024-09-12012 September 2024 License Amendment Request for a Risk-Informed Resolution to GSI-191 IR 05000482/20240102024-09-10010 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000482/2024010 (Public) ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24248A0762024-09-0404 September 2024 Containment Inservice Inspection Program Third Interval, Second Period, Refueling Outage 26 Owner’S Activity Report ML24248A2492024-09-0404 September 2024 Inservice Inspection Program Fourth Interval, Third Period, Refueling Outage 26 Owner’S Activity Report ML24241A2212024-08-29029 August 2024 Notice of Enforcement Discretion for Wolf Creek Generating Station ML24240A2642024-08-27027 August 2024 Corporation - Request for Notice of Enforcement Discretion Regarding Technical Specification 3.7.5, Auxiliary Feedwater (AFW) System ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000482/20240052024-08-14014 August 2024 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2024005) ML24227A5562024-08-14014 August 2024 Application to Revise Technical Specifications to Adopt TSTF-569-A, Revision 2, Revision of Response Time Testing Definitions ML24213A3352024-07-31031 July 2024 License Amendment Request to Revise Technical Specification 3.2.1, Heat Flux Hot Channel Factor (Fq(Z)) (Fq Methodology), to Implement the Methodology from WCAP-17661-P-A, Revision 1. ML24206A1252024-07-24024 July 2024 Revision of Three Procedures and Two Forms That Implement the Radiological Emergency Response Plan (RERP) IR 05000482/20240022024-07-18018 July 2024 Integrated Inspection Report 05000482/2024002 05000482/LER-2024-001, Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing2024-07-0202 July 2024 Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing IR 05000482/20244012024-07-0202 July 2024 Security Baseline Inspection Report 05000482/2024401 ML24178A3672024-06-26026 June 2024 Correction to 2023 Annual Radioactive Effluent Release Report – Report 47 ML24178A4142024-06-26026 June 2024 Revision of One Procedure and One Form That Implement the Radiological Emergency Response Plan (RERP) ML24162A1632024-06-11011 June 2024 Operating Corporation – Notification of Biennial Problem Identification and Resolution Inspection and Request for Information (05000482/2024010) ML24150A0562024-05-29029 May 2024 Foreign Ownership, Control or Influence (FOCI) Information – Change to Lists of Owners, Officers, Directors and Executive Personnel - Form 405F Amendment ML23345A1602024-05-0909 May 2024 Revision of Safety Evaluation for Amendment No. 237 Request for Deviation from Fire Protection Requirements ML24089A2622024-04-29029 April 2024 Financial Protection Levels ML24118A0022024-04-27027 April 2024 Wolf Generating Nuclear Station - 2023 Annual Radiological Environmental Operating Report ML24118A0032024-04-27027 April 2024 2023 Annual Radioactive Effluent Release Report - Report 47 ML24113A1882024-04-19019 April 2024 Foreign Ownership, Control or Influence Information - Change to Lists of Owners, Officers, Directors and Executive Personnel - Form 405F Amendment ML24109A1842024-04-18018 April 2024 Cycle 27 Core Operating Limits Report ML24109A1212024-04-18018 April 2024 (WCGS) Form 5 Exposure Report for Calendar Year 2023 IR 05000482/20240012024-04-17017 April 2024 Integrated Inspection Report 05000482/2024001 ML24114A1442024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37 ML24106A1482024-04-15015 April 2024 Notification of Inspection (NRC Inspection Report 05000482/2024003) and Request for Information ML24098A0052024-04-0707 April 2024 2023 Annual Environmental Operating Report ML24089A0972024-03-29029 March 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24089A1352024-03-29029 March 2024 10 CFR 50.46 Annual Report of Emergency Core Cooling System (ECCS) Evaluation Model Changes ML24074A3312024-03-14014 March 2024 Missed Quarterly Inspection Per 40 CFR 266 Subpart N IR 05000482/20240122024-03-11011 March 2024 Fire Protection Team Inspection Report 05000482/2024012 ML24080A3452024-03-11011 March 2024 7 of the Wolf Creek Generating Station Updated Safety Analysis Report ML24016A0702024-03-0808 March 2024 Issuance of Amendment No. 240 Removal of the Power Range Neutron Flux Rate - High Negative Rate Trip Function from Technical Specifications ML24068A1992024-03-0707 March 2024 Changes to Technical Specification Bases - Revisions 93 and 94 ML24066A0672024-03-0505 March 2024 4-2022-024 Letter - OI Closure to Licensee ML24061A2642024-03-0101 March 2024 Revision of Two Procedures That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) Commissioners IR 05000482/20230062024-02-28028 February 2024 Annual Assessment Letter for Wolf Creek Generating Station Report 05000482/2023006 ML24059A1702024-02-28028 February 2024 Annual Fitness for Duty Program Performance Report, and Annual Fatigue Report for 2023 ML24026A0212024-02-27027 February 2024 Issuance of Amendment No. 239 Modified Implementation Date of License Amendment No. 238 ML24050A0012024-02-19019 February 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) 2024-09-06
[Table view] Category:License-Operator
MONTHYEARIR 05000482/20233012023-12-19019 December 2023 NRC Examination Report 05000482/2023301 ML23346A0992023-11-16016 November 2023 Wc 2023-10 Post Exam Submittal ML24096A0302023-11-0101 November 2023 Wc 2023-10 Public Forms ML23284A2392023-10-11011 October 2023 NRC Initial Operator Licensing Examination Approval 05000482/2023301 ML23097A0162023-04-0707 April 2023 Notification of NRC Initial Operator Licensing Examination 05000482/2023301 ML22019A1462021-12-0707 December 2021 11 Draft Written Examination Comments ML22019A1452021-12-0707 December 2021 11 Draft Written Examination ML22019A1472021-12-0707 December 2021 11 Draft Operating Test ML22010A1582021-12-0707 December 2021 11 Post Examination Analysis ML22010A1562021-12-0707 December 2021 11 Final Written Examination ML22010A1572021-12-0707 December 2021 11 Final Operating Test ML22019A1382021-12-0707 December 2021 11 Draft Outlines ML22019A1482021-12-0707 December 2021 11 Draft Operating Test Comments ML22019A1622021-12-0707 December 2021 11 Final Outlines ML22020A1332021-12-0707 December 2021 11 Public Forms ML22019A1392021-11-0101 November 2021 11 Draft Outline Comments WO 20-0020, Response to NRC Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations2020-03-18018 March 2020 Response to NRC Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML20015A5192019-12-14014 December 2019 11-WC-2019-12 Public Forms ML20007E4422019-12-14014 December 2019 10-WC-2019-12 Post-Exam Comments ML19326A7722019-11-22022 November 2019 NRC Initial Operator Licensing Examination Approval 05000482/2019301 ML19011A3712019-01-10010 January 2019 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2019 WO 18-0014, Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-16016 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18086B0842018-02-16016 February 2018 Facility Cover Letter - Riv - March 2018 - GFE ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17355A6512017-12-0404 December 2017 11 Post-Examination Comments ML18012A7472017-11-15015 November 2017 11 Public Forms ML17355A6502017-11-15015 November 2017 11 Final Written Exam ML17355A6492017-11-15015 November 2017 11 Final Outlines ML17355A6482017-11-15015 November 2017 11 Final Operating Test ML17355A6462017-11-15015 November 2017 11 Draft Written Exam ML17355A6452017-11-15015 November 2017 11 Draft Written Exam Comments ML17355A6402017-11-15015 November 2017 11 Draft Operating Test Comments ML17355A6442017-11-15015 November 2017 11 Draft Outlines ML17355A6412017-11-15015 November 2017 11 Draft Operating Test ML17355A6432017-11-15015 November 2017 11 Draft Outline Comments ML17013A5482017-01-13013 January 2017 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2017 ML16336A7892016-12-0101 December 2016 Operating Company - Notification of NRC Initial Operator Licensing Examination 05000482/2017301 WO 16-0039, Form 536 Operator Licensing Examination and Scheduling Data in Response to RIS 2106-092016-07-19019 July 2016 Form 536 Operator Licensing Examination and Scheduling Data in Response to RIS 2106-09 ML16182A2852016-06-30030 June 2016 Arkansas, Units 1 and 2,South Texas Project, Units 1 and 2, Wolf Creek, Generic Fundamentals Examination Results for June 8, 2016 ML16027A3002015-12-29029 December 2015 2015-11-POST Exam Analysis ML15351A0282015-12-17017 December 2015 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2016 ML16036A3872015-11-13013 November 2015 2015-11-PROPOSED Written Exam Comments ML16027A3122015-11-13013 November 2015 2015-11 - Final Operating Test ML16027A3192015-11-13013 November 2015 WC-2015-11 - Final Written Exams ML16036A3812015-11-13013 November 2015 2015-11-Proposed Written Exam ML16036A3822015-11-13013 November 2015 2015-11-PROPOSED Outline Comments ML16036A3832015-11-13013 November 2015 2015-11-Final Outlines ML16036A3842015-11-13013 November 2015 2015-11-PROPOSED Operating Test Comments ML16036A3852015-11-13013 November 2015 2015-11 - Proposed Operating Test ML16036A3862015-11-13013 November 2015 2015-11-PROPOSED Outlines 2023-04-07
[Table view] Category:Part 55 Examination Related Material
MONTHYEARIR 05000482/20233012023-12-19019 December 2023 NRC Examination Report 05000482/2023301 ML23346A0992023-11-16016 November 2023 Wc 2023-10 Post Exam Submittal ML24096A0302023-11-0101 November 2023 Wc 2023-10 Public Forms ML23284A2392023-10-11011 October 2023 NRC Initial Operator Licensing Examination Approval 05000482/2023301 ML23097A0162023-04-0707 April 2023 Notification of NRC Initial Operator Licensing Examination 05000482/2023301 ML22010A1582021-12-0707 December 2021 11 Post Examination Analysis ML22019A1452021-12-0707 December 2021 11 Draft Written Examination ML22010A1572021-12-0707 December 2021 11 Final Operating Test ML22019A1382021-12-0707 December 2021 11 Draft Outlines ML22010A1562021-12-0707 December 2021 11 Final Written Examination ML22019A1462021-12-0707 December 2021 11 Draft Written Examination Comments ML22019A1472021-12-0707 December 2021 11 Draft Operating Test ML22019A1622021-12-0707 December 2021 11 Final Outlines ML22019A1482021-12-0707 December 2021 11 Draft Operating Test Comments ML22020A1332021-12-0707 December 2021 11 Public Forms ML22019A1392021-11-0101 November 2021 11 Draft Outline Comments WO 20-0020, Response to NRC Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations2020-03-18018 March 2020 Response to NRC Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML20007E4422019-12-14014 December 2019 10-WC-2019-12 Post-Exam Comments ML20015A5192019-12-14014 December 2019 11-WC-2019-12 Public Forms ML19326A7722019-11-22022 November 2019 NRC Initial Operator Licensing Examination Approval 05000482/2019301 WO 18-0014, Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-16016 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17355A6512017-12-0404 December 2017 11 Post-Examination Comments ML18012A7472017-11-15015 November 2017 11 Public Forms ML17355A6402017-11-15015 November 2017 11 Draft Operating Test Comments ML17355A6432017-11-15015 November 2017 11 Draft Outline Comments ML17355A6492017-11-15015 November 2017 11 Final Outlines ML17355A6452017-11-15015 November 2017 11 Draft Written Exam Comments ML17355A6442017-11-15015 November 2017 11 Draft Outlines ML17355A6462017-11-15015 November 2017 11 Draft Written Exam ML17355A6502017-11-15015 November 2017 11 Final Written Exam ML17355A6482017-11-15015 November 2017 11 Final Operating Test ML17355A6412017-11-15015 November 2017 11 Draft Operating Test ML16336A7892016-12-0101 December 2016 Operating Company - Notification of NRC Initial Operator Licensing Examination 05000482/2017301 WO 16-0039, Form 536 Operator Licensing Examination and Scheduling Data in Response to RIS 2106-092016-07-19019 July 2016 Form 536 Operator Licensing Examination and Scheduling Data in Response to RIS 2106-09 ML16182A2852016-06-30030 June 2016 Arkansas, Units 1 and 2,South Texas Project, Units 1 and 2, Wolf Creek, Generic Fundamentals Examination Results for June 8, 2016 ML16027A3002015-12-29029 December 2015 2015-11-POST Exam Analysis ML15351A0282015-12-17017 December 2015 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2016 ML16036A3882015-11-13013 November 2015 2015-11-PUBLIC Forms ML16036A3872015-11-13013 November 2015 2015-11-PROPOSED Written Exam Comments ML16036A3862015-11-13013 November 2015 2015-11-PROPOSED Outlines ML16036A3852015-11-13013 November 2015 2015-11 - Proposed Operating Test ML16036A3842015-11-13013 November 2015 2015-11-PROPOSED Operating Test Comments ML16036A3832015-11-13013 November 2015 2015-11-Final Outlines ML16036A3822015-11-13013 November 2015 2015-11-PROPOSED Outline Comments ML16036A3812015-11-13013 November 2015 2015-11-Proposed Written Exam ML16027A3192015-11-13013 November 2015 WC-2015-11 - Final Written Exams ML16027A3122015-11-13013 November 2015 2015-11 - Final Operating Test ML15317A1672015-11-12012 November 2015 2015-11-Examination Approval ML15181A2152015-06-30030 June 2015 Notification of NRC Initial Operator Licensing Examination 05000482/2015301 2023-04-07
[Table view] |
See also: IR 05000482/2023301
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
1600 E. LAMAR BLVD
ARLINGTON, TX 76011-4511
April 07, 2023
Cleve Reasoner, Chief Executive Officer
and Chief Nuclear Officer
Wolf Creek Nuclear Operating Corp.
P.O. Box 411
Burlington, KS 66839
SUBJECT: WOLF CREEK - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING
EXAMINATION 05000482/2023301
Dear Cleve Reasoner:
In a telephone conversation on March 20, 2023, between myself, Kelly Clayton, Senior
Operations Engineer, and Andrew Servaes, Initial Exam Supervisor, arrangements were made
for the administration of the operator licensing examinations at Wolf Creek during the week of
October 16, 2023.
As agreed during the telephone conversation, your staff will prepare the examinations based on
the guidelines in Revision 12 of NUREG-1021, Operator Licensing Examination Standards for
Power Reactors. The NRCs regional office will discuss with your staff any changes that might
be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the operating test
outlines by May 11, 2023. The NRC staff provided the written examination outlines on March
30, 2023. The written examinations, operating tests, and supporting reference materials
identified in NUREG 1021, Examination Standard (ES)-2.1, Preparing for Operator Licensing
Examinations, will be due by July 27, 2023. Pursuant to Title 10, Section 55.40(b)(3), of the
Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility
licensee shall approve the examinations, and tests before they are submitted to the NRC for
review and approval. All materials shall be complete and ready-to-use.
We request that any personal, proprietary, sensitive unclassified, or safeguards information in
your response be contained in a separate enclosure and appropriately marked. Delays in
receiving the required materials, or the submittal of inadequate or incomplete materials, may
cause the examinations to be rescheduled. Also, your staff should inform me as soon as
possible concerning any changes to procedures and/or training materials that could impact the
contents of the examinations. In addition, your support for onsite validation of the examinations
is required the week of September 11, 2023.
C. Reasoner 2
To conduct the requested written examinations and operating tests, it will be necessary for your
staff to provide adequate space and accommodations in accordance with NUREG 1021, and to
make the simulation facility available on the dates noted above. In accordance with ES-3.5,
Administering Operating Tests, your staff should retain the original simulator performance data
(e.g., system pressures, temperatures, and levels) generated during the dynamic operating
tests until the NRC takes its licensing action on all the applications and any adjudicatory actions
on any hearing demands are complete.
ES-1.2, Guidelines for Taking NRC Examinations, contains NRC guidelines for the written
examinations and operating tests as they are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
operator and senior reactor operator waiver or excusal requests (if any) (Office of Management
and Budget (OMB) approval number 3150-0090) at least 60 days before the first examination
date (if possible). I should be contacted to determine the method for submission of the waiver
and/or excusal requests. Preliminary reactor operator and senior reactor operator license
applications (OMB approval number 3150-0090) and, medical certifications (OMB approval
number 3150-0024) should be submitted at least 30 days before the first examination date. If
the preliminary applications are not received at least 30 days before the examination date, a
postponement may be necessary. Final, signed applications certifying that all training has been
completed and requesting any waivers or excusals, as applicable, should be submitted at least
14 days before the first examination date.
Although the guidelines for receiving waiver or excusal requests is 30 days before the first
examination date (preliminary) and 14 days before the first examination date (final), the
requests should be submitted as early in the process as possible (see the 60-day guideline,
above). Resolutions resulting from verbal inquiries by the licensee to the NRC are not binding.
Submittals addressing waivers and/or excusals should be in writing (i.e., on NRC Form 398, or
as directed when I am contacted to determine the method for submission). The NRC will
document its final decision on whether to grant a waiver or excusal on the final (not preliminary)
NRC Form 398 submitted for the applicant. The NRC will not provide its decision until the final
application is submitted to the agency.
Paperwork Reduction Act Statement
This letter contains information collection requirements that are subject to the Paperwork
Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved
by the Office of Management and Budget, approval number 3150-0018.
The burden to the public for these mandatory information collections is estimated to average
400 hours0.00463 days <br />0.111 hours <br />6.613757e-4 weeks <br />1.522e-4 months <br /> per examination or response, including the time for reviewing instructions, searching
existing data sources, gathering and maintaining the data needed, and completing and
reviewing the information collection. Send comments regarding this information collection to the
FOIA, Library, and Information Collections Branch (T-6 A10M), U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001, or by e-mail to Infocollects.Resource@nrc.gov, and
to the OMB reviewer at: OMB Office of Information and Regulatory Affairs Desk Officer, Office
of Information and Regulatory Affairs (3150-0018), Attn: Desk Officer for the Nuclear Regulatory
Commission, 725 17 th Street, NW Washington, DC 20503, e-mail:
oria_submission@omb.eop.gov.
C. Reasoner 3
Public Protection Notification
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection
of information unless the document requesting or requiring the collection displays a currently
valid OMB approval number.
In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding,
a copy of this letter will be made available electronically for public inspection through the NRCs
Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible on
the NRCs website at http://www.nrc.gov/reading-rm/adams.html.
Thank you for your cooperation in this matter. Andrew Servaes has been advised of the policies
and guidelines referenced in this letter. If you have any questions regarding the NRCs
examination procedures and guidelines, please contact me at 817-200-1216.
Sincerely,
Kelly D. Clayton, Chief Examiner
Operations Branch
Division of Reactor Safety
Docket No. 50-482
License No. NPF-42
cc:
Electronic Distribution for Wolf Creek ListServ
Signed by Clayton, Kelly
on 04/07/23
ML23097A016
SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword:
By: KDC Yes No Publicly Available Sensitive NRR-079
OFFICE SOE:OB
NAME KClayton
SIGNATURE KDC
DATE 04/07/2023