|
---|
Category:Letter
MONTHYEARML24025A0992024-01-25025 January 2024 Withdrawal of Request for Exemption from Specific 10 CFR Part 73 Requirements ML24018A0792024-01-22022 January 2024 Individual Notice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed Nshcd and Opportunity for a Hearing (EPID L-2024-LLA-0007) (Letter) ML24018A1382024-01-18018 January 2024 Inservice Inspection Request for Information ML24018A2482024-01-18018 January 2024 License Amendment Request to Modify the Implementation Date of License Amendment No. 238 IR 05000482/20230042024-01-11011 January 2024 Integrated Inspection Report 05000482/2023004 ML23356A0722024-01-0404 January 2024 Supplemental Information Needed for Acceptance of Requested Licensing Actions Exemption from Specific 10 CFR Part 73N Requirements (EPID L-2023-LLE-0048) (Redacted Version) WO 23-0002, Operating Corp., Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-0082023-12-26026 December 2023 Operating Corp., Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-008 ML23348A3662023-12-18018 December 2023 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000482 2024012) and Request for Information ML23334A2502023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23299A2662023-11-29029 November 2023 Issuance of Amendment No. 238 Modified Implementation Date of License Amendment No. 237 ML23331A4972023-11-27027 November 2023 Supplement to License Amendment Request to Modify the 90-Day Implementation of License Amendment No. 237 ML23325A2112023-11-20020 November 2023 Submittal of Request for Exemption from Specific Provisions in 10 CFR 73.55 ML23320A2772023-11-16016 November 2023 License Amendment Request to Revise Ventilation Filter Testing Program Criteria in Technical Specification 5.5.11.b and Administrative Correction of Absorber in Technical Specification 5.5.11 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23305A3472023-11-0101 November 2023 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML23292A3592023-10-19019 October 2023 License Amendment Request to Modify the 90-Day Implementation of License Amendment No. 237 ML23292A3572023-10-19019 October 2023 Operating Corporation, Request for Correction in Response to Issuance of Amendment No. 237 and Corresponding Safety Evaluation ML23277A2772023-10-11011 October 2023 Regulatory Audit Summary Concerning Review of Request Number CI3R-01 for Proposed Alternative Inspection Frequency for Containment Unbonded Post Tensioning System Components ML23284A2392023-10-11011 October 2023 NRC Initial Operator Licensing Examination Approval 05000482/2023301 ML23276B4552023-10-0303 October 2023 Technical Specification 5.6.8 Post Accident Monitoring (PAM) Report ML23264A8682023-09-21021 September 2023 Independent Spent Fuel Storage Installation Registration of Dry Storage Canister WC-EOS-37PTH-008-B4L, WC-EOS-37PTH-007-B4L, and WC-EOS-37PTH-002-B4L ML23256A2062023-09-14014 September 2023 Withdrawal of Requested Licensing Action Exemption from Specific 10 CFR Part 73 Requirements ML23165A2502023-08-31031 August 2023 Issuance of Amendment No. 237 Request for Deviation from Fire Protection Requirements ML23243A0002023-08-31031 August 2023 Wolf Generating Station - Withdrawal of Request for Exemption from Specific 10 CFR Part 73 Requirements IR 05000482/20230052023-08-23023 August 2023 Updated Inspection Plan for Wolf Creek Nuclear Operating Corporation, Unit 1 (Report 05000482/2023005) - Mid-Cycle Letter 2023 ML23232A0012023-08-19019 August 2023 Revision of One Procedure That Implements the Radiological Emergency Response Plan (Rerp). Includes EPP 06-009, Rev. 13 ML23221A3932023-08-0909 August 2023 Submittal of Request for Exemption from Specific 10 CFR Part 73 Requirements ML23220A4222023-08-0808 August 2023 Supplement to License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements ML23201A1212023-08-0707 August 2023 Issuance of Amendment No. 236 Revision to Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements ML23130A2902023-07-26026 July 2023 Issuance of Amendment No. 235 Revision to Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections IR 05000482/20230022023-07-11011 July 2023 Integrated Inspection Report 05000482/2023002 ML23167A0042023-06-26026 June 2023 Audit Plan to Support Review of Request for Alternative Containment Inservice Inspection Frequency IR 05000482/20234012023-06-21021 June 2023 Security Baseline Inspection Report 05000482/2023401 ML23171B1312023-06-20020 June 2023 Additional Supplement to License Amendment Request to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ML23151A4162023-05-31031 May 2023 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ET 23-0006, CFR 50.55a Request Number CI3R-01 for the Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded Post-Tensioning System Components2023-05-17017 May 2023 CFR 50.55a Request Number CI3R-01 for the Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded Post-Tensioning System Components WO 23-0014, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-05-17017 May 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23132A1532023-05-12012 May 2023 Transmittal of 2022 Annual Financial Reports WM 23-0009, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1)2023-05-10010 May 2023 Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1) ML23135A1172023-05-0808 May 2023 Redacted Version of Revision 36 to Updated Safety Analysis Report ML23117A2112023-04-27027 April 2023 Annual Exposure Report (2022) ML23117A1342023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report Report 46 2024-01-04
[Table view] Category:License-Operator
MONTHYEARIR 05000482/20233012023-12-19019 December 2023 NRC Examination Report 05000482/2023301 ML23284A2392023-10-11011 October 2023 NRC Initial Operator Licensing Examination Approval 05000482/2023301 ML23097A0162023-04-0707 April 2023 Notification of NRC Initial Operator Licensing Examination 05000482/2023301 ML22020A1332021-12-0707 December 2021 11 Public Forms WO 20-0020, Response to NRC Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations2020-03-18018 March 2020 Response to NRC Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML20015A5192019-12-14014 December 2019 11-WC-2019-12 Public Forms ML20007E4422019-12-14014 December 2019 10-WC-2019-12 Post-Exam Comments ML19326A7722019-11-22022 November 2019 NRC Initial Operator Licensing Examination Approval 05000482/2019301 ML19011A3712019-01-10010 January 2019 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2019 WO 18-0014, Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-16016 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18086B0842018-02-16016 February 2018 Facility Cover Letter - Riv - March 2018 - GFE ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17355A6512017-12-0404 December 2017 11 Post-Examination Comments ML17355A6452017-11-15015 November 2017 11 Draft Written Exam Comments ML18012A7472017-11-15015 November 2017 11 Public Forms ML17355A6412017-11-15015 November 2017 11 Draft Operating Test ML17355A6432017-11-15015 November 2017 11 Draft Outline Comments ML17355A6442017-11-15015 November 2017 11 Draft Outlines ML17355A6402017-11-15015 November 2017 11 Draft Operating Test Comments ML17355A6462017-11-15015 November 2017 11 Draft Written Exam ML17355A6482017-11-15015 November 2017 11 Final Operating Test ML17355A6492017-11-15015 November 2017 11 Final Outlines ML17355A6502017-11-15015 November 2017 11 Final Written Exam ML17013A5482017-01-13013 January 2017 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2017 ML16336A7892016-12-0101 December 2016 Operating Company - Notification of NRC Initial Operator Licensing Examination 05000482/2017301 WO 16-0039, Form 536 Operator Licensing Examination and Scheduling Data in Response to RIS 2106-092016-07-19019 July 2016 Form 536 Operator Licensing Examination and Scheduling Data in Response to RIS 2106-09 ML16182A2852016-06-30030 June 2016 Arkansas, Units 1 and 2,South Texas Project, Units 1 and 2, Wolf Creek, Generic Fundamentals Examination Results for June 8, 2016 ML16027A3002015-12-29029 December 2015 2015-11-POST Exam Analysis ML15351A0282015-12-17017 December 2015 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2016 ML16036A3882015-11-13013 November 2015 2015-11-PUBLIC Forms ML16036A3872015-11-13013 November 2015 2015-11-PROPOSED Written Exam Comments ML16036A3862015-11-13013 November 2015 2015-11-PROPOSED Outlines ML16036A3852015-11-13013 November 2015 2015-11 - Proposed Operating Test ML16036A3842015-11-13013 November 2015 2015-11-PROPOSED Operating Test Comments ML16036A3832015-11-13013 November 2015 2015-11-Final Outlines ML16036A3822015-11-13013 November 2015 2015-11-PROPOSED Outline Comments ML16036A3812015-11-13013 November 2015 2015-11-Proposed Written Exam ML16027A3192015-11-13013 November 2015 WC-2015-11 - Final Written Exams ML16027A3122015-11-13013 November 2015 2015-11 - Final Operating Test ML15317A1672015-11-12012 November 2015 2015-11-Examination Approval ML15181A2152015-06-30030 June 2015 Notification of NRC Initial Operator Licensing Examination 05000482/2015301 ML14345A3302014-12-11011 December 2014 Announcement of the Generic Fundamentals Section of the Written Operator Licensing Examinations for 2015 ML14181A3842014-06-30030 June 2014 Generic Fundamentals Examination Results June 2014 ML13248A5962013-07-26026 July 2013 WC-2013-07 Draft Operating Test ML13252A0302013-07-26026 July 2013 WC-2013-07 Public Forms ML13252A0292013-07-26026 July 2013 WC-2013-07 Draft Written Examination Comments ML13248A6002013-07-26026 July 2013 WC-2013-07 Draft Operating Test Comments ML13248A5982013-07-26026 July 2013 Wc 2013-07 Draft Outline Comments ML13248A5932013-07-26026 July 2013 WC-2013-07 Draft Outlines.Pdf ML13248A5942013-07-26026 July 2013 WC-2013-07 Final Outlines 2023-04-07
[Table view] Category:Part 55 Examination Related Material
MONTHYEARIR 05000482/20233012023-12-19019 December 2023 NRC Examination Report 05000482/2023301 ML23284A2392023-10-11011 October 2023 NRC Initial Operator Licensing Examination Approval 05000482/2023301 ML23097A0162023-04-0707 April 2023 Notification of NRC Initial Operator Licensing Examination 05000482/2023301 ML22020A1332021-12-0707 December 2021 11 Public Forms WO 20-0020, Response to NRC Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations2020-03-18018 March 2020 Response to NRC Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML20007E4422019-12-14014 December 2019 10-WC-2019-12 Post-Exam Comments ML20015A5192019-12-14014 December 2019 11-WC-2019-12 Public Forms ML19326A7722019-11-22022 November 2019 NRC Initial Operator Licensing Examination Approval 05000482/2019301 WO 18-0014, Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-16016 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17355A6512017-12-0404 December 2017 11 Post-Examination Comments ML17355A6482017-11-15015 November 2017 11 Final Operating Test ML17355A6412017-11-15015 November 2017 11 Draft Operating Test ML17355A6402017-11-15015 November 2017 11 Draft Operating Test Comments ML17355A6432017-11-15015 November 2017 11 Draft Outline Comments ML17355A6502017-11-15015 November 2017 11 Final Written Exam ML17355A6462017-11-15015 November 2017 11 Draft Written Exam ML17355A6442017-11-15015 November 2017 11 Draft Outlines ML17355A6452017-11-15015 November 2017 11 Draft Written Exam Comments ML17355A6492017-11-15015 November 2017 11 Final Outlines ML18012A7472017-11-15015 November 2017 11 Public Forms ML16336A7892016-12-0101 December 2016 Operating Company - Notification of NRC Initial Operator Licensing Examination 05000482/2017301 WO 16-0039, Form 536 Operator Licensing Examination and Scheduling Data in Response to RIS 2106-092016-07-19019 July 2016 Form 536 Operator Licensing Examination and Scheduling Data in Response to RIS 2106-09 ML16182A2852016-06-30030 June 2016 Arkansas, Units 1 and 2,South Texas Project, Units 1 and 2, Wolf Creek, Generic Fundamentals Examination Results for June 8, 2016 ML16027A3002015-12-29029 December 2015 2015-11-POST Exam Analysis ML15351A0282015-12-17017 December 2015 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2016 ML16036A3832015-11-13013 November 2015 2015-11-Final Outlines ML16027A3122015-11-13013 November 2015 2015-11 - Final Operating Test ML16027A3192015-11-13013 November 2015 WC-2015-11 - Final Written Exams ML16036A3812015-11-13013 November 2015 2015-11-Proposed Written Exam ML16036A3822015-11-13013 November 2015 2015-11-PROPOSED Outline Comments ML16036A3842015-11-13013 November 2015 2015-11-PROPOSED Operating Test Comments ML16036A3852015-11-13013 November 2015 2015-11 - Proposed Operating Test ML16036A3862015-11-13013 November 2015 2015-11-PROPOSED Outlines ML16036A3872015-11-13013 November 2015 2015-11-PROPOSED Written Exam Comments ML16036A3882015-11-13013 November 2015 2015-11-PUBLIC Forms ML15317A1672015-11-12012 November 2015 2015-11-Examination Approval ML15181A2152015-06-30030 June 2015 Notification of NRC Initial Operator Licensing Examination 05000482/2015301 ML14345A3302014-12-11011 December 2014 Announcement of the Generic Fundamentals Section of the Written Operator Licensing Examinations for 2015 ML14181A3842014-06-30030 June 2014 Generic Fundamentals Examination Results June 2014 ML13248A5982013-07-26026 July 2013 Wc 2013-07 Draft Outline Comments ML13252A0302013-07-26026 July 2013 WC-2013-07 Public Forms ML13252A0292013-07-26026 July 2013 WC-2013-07 Draft Written Examination Comments ML13248A6002013-07-26026 July 2013 WC-2013-07 Draft Operating Test Comments ML13248A5932013-07-26026 July 2013 WC-2013-07 Draft Outlines.Pdf ML13248A5942013-07-26026 July 2013 WC-2013-07 Final Outlines ML13248A5962013-07-26026 July 2013 WC-2013-07 Draft Operating Test ML13198A0112013-07-17017 July 2013 Operating Company - NRC Initial Operator Licensing Examination Approval ML1204704362012-01-18018 January 2012 WC-2012-01-Final OP Test ML1204704452012-01-18018 January 2012 2012-01-Final Outlines 2023-04-07
[Table view] |
See also: IR 05000482/2023301
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
1600 E. LAMAR BLVD
ARLINGTON, TX 76011-4511
April 07, 2023
Cleve Reasoner, Chief Executive Officer
and Chief Nuclear Officer
Wolf Creek Nuclear Operating Corp.
P.O. Box 411
Burlington, KS 66839
SUBJECT: WOLF CREEK - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING
EXAMINATION 05000482/2023301
Dear Cleve Reasoner:
In a telephone conversation on March 20, 2023, between myself, Kelly Clayton, Senior
Operations Engineer, and Andrew Servaes, Initial Exam Supervisor, arrangements were made
for the administration of the operator licensing examinations at Wolf Creek during the week of
October 16, 2023.
As agreed during the telephone conversation, your staff will prepare the examinations based on
the guidelines in Revision 12 of NUREG-1021, Operator Licensing Examination Standards for
Power Reactors. The NRCs regional office will discuss with your staff any changes that might
be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the operating test
outlines by May 11, 2023. The NRC staff provided the written examination outlines on March
30, 2023. The written examinations, operating tests, and supporting reference materials
identified in NUREG 1021, Examination Standard (ES)-2.1, Preparing for Operator Licensing
Examinations, will be due by July 27, 2023. Pursuant to Title 10, Section 55.40(b)(3), of the
Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility
licensee shall approve the examinations, and tests before they are submitted to the NRC for
review and approval. All materials shall be complete and ready-to-use.
We request that any personal, proprietary, sensitive unclassified, or safeguards information in
your response be contained in a separate enclosure and appropriately marked. Delays in
receiving the required materials, or the submittal of inadequate or incomplete materials, may
cause the examinations to be rescheduled. Also, your staff should inform me as soon as
possible concerning any changes to procedures and/or training materials that could impact the
contents of the examinations. In addition, your support for onsite validation of the examinations
is required the week of September 11, 2023.
C. Reasoner 2
To conduct the requested written examinations and operating tests, it will be necessary for your
staff to provide adequate space and accommodations in accordance with NUREG 1021, and to
make the simulation facility available on the dates noted above. In accordance with ES-3.5,
Administering Operating Tests, your staff should retain the original simulator performance data
(e.g., system pressures, temperatures, and levels) generated during the dynamic operating
tests until the NRC takes its licensing action on all the applications and any adjudicatory actions
on any hearing demands are complete.
ES-1.2, Guidelines for Taking NRC Examinations, contains NRC guidelines for the written
examinations and operating tests as they are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
operator and senior reactor operator waiver or excusal requests (if any) (Office of Management
and Budget (OMB) approval number 3150-0090) at least 60 days before the first examination
date (if possible). I should be contacted to determine the method for submission of the waiver
and/or excusal requests. Preliminary reactor operator and senior reactor operator license
applications (OMB approval number 3150-0090) and, medical certifications (OMB approval
number 3150-0024) should be submitted at least 30 days before the first examination date. If
the preliminary applications are not received at least 30 days before the examination date, a
postponement may be necessary. Final, signed applications certifying that all training has been
completed and requesting any waivers or excusals, as applicable, should be submitted at least
14 days before the first examination date.
Although the guidelines for receiving waiver or excusal requests is 30 days before the first
examination date (preliminary) and 14 days before the first examination date (final), the
requests should be submitted as early in the process as possible (see the 60-day guideline,
above). Resolutions resulting from verbal inquiries by the licensee to the NRC are not binding.
Submittals addressing waivers and/or excusals should be in writing (i.e., on NRC Form 398, or
as directed when I am contacted to determine the method for submission). The NRC will
document its final decision on whether to grant a waiver or excusal on the final (not preliminary)
NRC Form 398 submitted for the applicant. The NRC will not provide its decision until the final
application is submitted to the agency.
Paperwork Reduction Act Statement
This letter contains information collection requirements that are subject to the Paperwork
Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved
by the Office of Management and Budget, approval number 3150-0018.
The burden to the public for these mandatory information collections is estimated to average
400 hours0.00463 days <br />0.111 hours <br />6.613757e-4 weeks <br />1.522e-4 months <br /> per examination or response, including the time for reviewing instructions, searching
existing data sources, gathering and maintaining the data needed, and completing and
reviewing the information collection. Send comments regarding this information collection to the
FOIA, Library, and Information Collections Branch (T-6 A10M), U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001, or by e-mail to Infocollects.Resource@nrc.gov, and
to the OMB reviewer at: OMB Office of Information and Regulatory Affairs Desk Officer, Office
of Information and Regulatory Affairs (3150-0018), Attn: Desk Officer for the Nuclear Regulatory
Commission, 725 17th Street, NW Washington, DC 20503, e-mail:
oria_submission@omb.eop.gov.
C. Reasoner 3
Public Protection Notification
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection
of information unless the document requesting or requiring the collection displays a currently
valid OMB approval number.
In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding,
a copy of this letter will be made available electronically for public inspection through the NRCs
Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible on
the NRCs website at http://www.nrc.gov/reading-rm/adams.html.
Thank you for your cooperation in this matter. Andrew Servaes has been advised of the policies
and guidelines referenced in this letter. If you have any questions regarding the NRCs
examination procedures and guidelines, please contact me at 817-200-1216.
Sincerely,
Signed by Clayton, Kelly
on 04/07/23
Kelly D. Clayton, Chief Examiner
Operations Branch
Division of Reactor Safety
Docket No. 50-482
License No. NPF-42
cc:
Electronic Distribution for Wolf Creek ListServ
ML23097A016
SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword:
By: KDC Yes No Publicly Available Sensitive NRR-079
OFFICE SOE:OB
NAME KClayton
SIGNATURE KDC
DATE 04/07/2023