ML20134B090: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20134B090
| number = ML20134B090
| issue date = 11/07/1985
| issue date = 11/07/1985
| title = Forwards 2600, Assessment of Design Control Program for Sequoyah Nuclear Plant & Actions That Will Be Taken for Exceptions 3.2.1,3.2.2 & 3.2.3,per NRC 850917 Ltr
| title = Forwards 2600, Assessment of Design Control Program for Sequoyah Nuclear Plant & Actions That Will Be Taken for Exceptions 3.2.1,3.2.2 & 3.2.3,per NRC
| author name = Mccloud D
| author name = Mccloud D
| author affiliation = TENNESSEE VALLEY AUTHORITY
| author affiliation = TENNESSEE VALLEY AUTHORITY
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 8511110263
| document report number = NUDOCS 8511110263
| title reference date = 09-17-1985
| package number = ML20134B093
| package number = ML20134B093
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
Line 23: Line 24:
==Dear Ms. Adensam:==
==Dear Ms. Adensam:==


In the Matter of                            )                Docket Nos. 50-327 Tennessee Valley Authority                  )                              50-328 By C. H. Dean's November 1,1985 letter to W. J. Dircks, we provided a response to NRC concerns delineated in Mr. Dircks's letter to Mr. Dean dated September 17, 1985. Our response comitted to provide the results of the Gilbert-Commonwealth design control survey by November 8, 1985. Accordingly, we have enclosed the final report. We have also detailed the actions that will be taken to address the exceptions noted in the report (enclosure 2).
In the Matter of                            )                Docket Nos. 50-327 Tennessee Valley Authority                  )                              50-328 By C. H. Dean's {{letter dated|date=November 1, 1985|text=November 1,1985 letter}} to W. J. Dircks, we provided a response to NRC concerns delineated in Mr. Dircks's letter to Mr. Dean dated September 17, 1985. Our response comitted to provide the results of the Gilbert-Commonwealth design control survey by November 8, 1985. Accordingly, we have enclosed the final report. We have also detailed the actions that will be taken to address the exceptions noted in the report (enclosure 2).
Very truly yours.
Very truly yours.
T    ,SSEE VALLEY AUTHORITY D. E. McCloud Nuclear Engineer Sworntoandsubscribhbefore,me this    f/W day of V/ flo % /dtlk85 LUG;WYL haAtcw bo'targPublic            j/'
T    ,SSEE VALLEY AUTHORITY D. E. McCloud Nuclear Engineer Sworntoandsubscribhbefore,me this    f/W day of V/ flo % /dtlk85 LUG;WYL haAtcw bo'targPublic            j/'

Latest revision as of 20:38, 14 December 2021

Forwards 2600, Assessment of Design Control Program for Sequoyah Nuclear Plant & Actions That Will Be Taken for Exceptions 3.2.1,3.2.2 & 3.2.3,per NRC
ML20134B090
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 11/07/1985
From: Mccloud D
TENNESSEE VALLEY AUTHORITY
To: Adensam E
Office of Nuclear Reactor Regulation
Shared Package
ML20134B093 List:
References
NUDOCS 8511110263
Download: ML20134B090 (1)


Text

-

P ..

TENNESSEE VALLEY AUTHORITY CH ATTANOOGA. TENNESSEE 374o1 SN 105B Lookout Place November 7, 1985 Director of Nuclear Reactor Regulation Attention: Ms. E. Adensam, Chief Licensing Branch No. 4 Division of Licensing U.S. Nuclear Regulatory Comission Washington, D.C. 20555

Dear Ms. Adensam:

In the Matter of ) Docket Nos. 50-327 Tennessee Valley Authority ) 50-328 By C. H. Dean's November 1,1985 letter to W. J. Dircks, we provided a response to NRC concerns delineated in Mr. Dircks's letter to Mr. Dean dated September 17, 1985. Our response comitted to provide the results of the Gilbert-Commonwealth design control survey by November 8, 1985. Accordingly, we have enclosed the final report. We have also detailed the actions that will be taken to address the exceptions noted in the report (enclosure 2).

Very truly yours.

T ,SSEE VALLEY AUTHORITY D. E. McCloud Nuclear Engineer Sworntoandsubscribhbefore,me this f/W day of V/ flo % /dtlk85 LUG;WYL haAtcw bo'targPublic j/'

My Comission Expires 7/

/ '

Enclosures cc (Enclosures):

U.S. Nuclear Regulatory Comission Region II Attn: Dr. J. Nelson Grace, Regional Administrator 101 Marietta Street, NW, suite 2900 Atlanta, Georgia 30323 Mr. Carl Stahle Sequoyah Project Manager U.S. Nuclear Regulatory Comission 7920 Norfolk Avenue Bethesda, Maryland 20814 8511110263 851107 /, gd,!

PDR ADOCK 05000327 f p PDR ig l

An Equal Opport: nity Employer

.J