ML19316A037: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 21: Line 21:
                 ,.                                            (TEMPoaARY FORM)                                                  CONTROL NO: 412 6
                 ,.                                            (TEMPoaARY FORM)                                                  CONTROL NO: 412 6
FILE yaog:              Y                          DATE OF DOC:          DATE REC'D    LTR        12MO                                                        Hl'2    CfDO.d
FILE yaog:              Y                          DATE OF DOC:          DATE REC'D    LTR        12MO                                                        Hl'2    CfDO.d
       ' Duke Power Company Chcriotte, North Carolina 28201                1-12-73              1-16-73          x A. C. Thi en TO:                                                  ORIG        CC        UDER                ss;if AEC PD3                                                          e-A. Giambuss
       ' Duke Power Company Chcriotte, North Carolina 28201                1-12-73              1-16-73          x A. C. Thi en TO:                                                  ORIG        CC        UDER                ss;if AEC PD3                                                          e-A. Giambuss a                            1 sinned                                          E i2 LOCE M X CIASS:      , @ a 0P 15F0                          IliPUT        lio CIS REC'D l
      -
a                            1 sinned                                          E i2 LOCE M X CIASS:      , @ a 0P 15F0                          IliPUT        lio CIS REC'D l
                                                                                                         "~" . 2,7 no:
                                                                                                         "~" . 2,7 no:
1                50-269 50-270                                                              50-287 DESCRIF210;i:
1                50-269 50-270                                                              50-287 DESCRIF210;i:
Line 31: Line 29:
         .cntering the reactor vessel....trans the                          Babcoc~k'& Wilcox Report.. including...
         .cntering the reactor vessel....trans the                          Babcoc~k'& Wilcox Report.. including...
Atchmt I - Description & mechanical design of
Atchmt I - Description & mechanical design of
                                                                                              "
           $'? MEN                        DO X0T REMOVE                      Atchmt  2  ina"1y T of the core flooding 11tne break with the flow restrictor in PLANI NA1CS:          Oconee Units 1-2-3
           $'? MEN                        DO X0T REMOVE                      Atchmt  2  ina"1y T of the core flooding 11tne break with the flow restrictor in PLANI NA1CS:          Oconee Units 1-2-3
                                                                 -        Atchmt    3-          effect of the device on the f net aperation of ECCS for both large & small breaks.
                                                                 -        Atchmt    3-          effect of the device on the f net aperation of ECCS for both large & small breaks.
Line 42: Line 39:
W/ Copics                    U/ Copics                                          REGAN(E)                                                ,
W/ Copics                    U/ Copics                                          REGAN(E)                                                ,
W/ Copies              W/ Copies 11ILL(L)                      H. DI2f0N                  . DICiL(I:)
W/ Copies              W/ Copies 11ILL(L)                      H. DI2f0N                  . DICiL(I:)
W/ Copics                    W/ Copies                  W/ Copies
W/ Copics                    W/ Copies                  W/ Copies W/ Copies IUTERNAL DISTRIBUTION
              .
W/ Copies
_
IUTERNAL DISTRIBUTION
     # REG FILE                          TECH REVIEW        VOLU'ER                  HARLESS y.-AEC PDR                                                                                                      WADE                                                      E HENDRIE            DENTON OGC, ROOM P-506A              SCHROEDER          GRIMES SHAFER                                                    F&M F&M                              BROWN                                                      E MUITIZING/ STAFF            pMACCARY (3)adv. GAMMILL                      LTdTr2 CASE                        6 LANGE(i)          KAETNER G. WILLIAMS E NUSSBAUMER GIAMBUSSO                      PAWLICKI            BALLARD                                  v E. GOULBOURNE I{4 TA-D0YD-L(BWR)                    SHA0                                                                      A/T IND pDEYOUNG-L(P'nTt)
     # REG FILE                          TECH REVIEW        VOLU'ER                  HARLESS y.-AEC PDR                                                                                                      WADE                                                      E HENDRIE            DENTON OGC, ROOM P-506A              SCHROEDER          GRIMES SHAFER                                                    F&M F&M                              BROWN                                                      E MUITIZING/ STAFF            pMACCARY (3)adv. GAMMILL                      LTdTr2 CASE                        6 LANGE(i)          KAETNER G. WILLIAMS E NUSSBAUMER GIAMBUSSO                      PAWLICKI            BALLARD                                  v E. GOULBOURNE I{4 TA-D0YD-L(BWR)                    SHA0                                                                      A/T IND pDEYOUNG-L(P'nTt)
SPANGLER                  LIC ASST.                      LPAITI&N
SPANGLER                  LIC ASST.                      LPAITI&N gKIR7fH (,2) adv.                            SERVICE L SKOVHOLT-L                  pSTELID                                                                      SALTZMAN EUVIRO                  MASON      L P. COLLIIS                  vFDORE                                                                                                                                ,4eltier MULLER                    WIISON    L                  PLANS                                                    W/1 cy adv.
"
gKIR7fH (,2) adv.                            SERVICE L SKOVHOLT-L                  pSTELID                                                                      SALTZMAN EUVIRO                  MASON      L P. COLLIIS                  vFDORE                                                                                                                                ,4eltier MULLER                    WIISON    L                  PLANS                                                    W/1 cy adv.
HOUS' ION        DICKER Rm OPR                                                                    MAIGRLT L                    MCDONALD TEDESCO          KNIGHTON                  SMITH      L                  DUBE
HOUS' ION        DICKER Rm OPR                                                                    MAIGRLT L                    MCDONALD TEDESCO          KNIGHTON                  SMITH      L                  DUBE
: 4. WILE & REGION (2)              IDNG              YOUNGBIDOD
: 4. WILE & REGION (2)              IDNG              YOUNGBIDOD
         )DERIS GEARIN    L LAINAS            PROJ IEADER STET.T.E DIGGS      L                INFO BENAROYA                                    TEFES      L                  C. MILES REGAN m
         )DERIS GEARIN    L LAINAS            PROJ IEADER STET.T.E DIGGS      L                INFO BENAROYA                                    TEFES      L                  C. MILES REGAN m
                            .
A-IDCAL PDR Walhalla, S. C.
A-IDCAL PDR Walhalla, S. C.
EkrmNAL DTSTRT3UTron                    U l 210 -Wf                                                          ~
EkrmNAL DTSTRT3UTron                    U l 210 -Wf                                                          ~
                                                                                                                                                                          '"
M
M
                                                                                                                                                                                       'I DTIE(ABERNATHY)
                                                                                                                                                                                       'I DTIE(ABERNATHY)
(1)(5)(9)-NATIONAL LAB'S el-lGIC(BUCHANAN)                                                                              1-FDR-SAN /LA/NY 1-R. CARROLL-OC, GT-B227        1-GERALD LELIDUCHE
(1)(5)(9)-NATIONAL LAB'S el-lGIC(BUCHANAN)                                                                              1-FDR-SAN /LA/NY 1-R. CARROLL-OC, GT-B227        1-GERALD LELIDUCHE 1-ASLB-YORE /SAYRE WOODWARD [H. ST.
  ,
1-ASLB-YORE /SAYRE WOODWARD [H. ST.
1-R. CATLIN, E-256,-GT                    BROOKHAVEN NAT. LAB 16-CYT. ACRE HOLDIIG                                        1-CONSULANT'S                    1-AG'GD(WALTER K0 ESTER, NEWMARK/BLUME/AGABIAN                Pm C-427, GT) 1-RD. . . MULLER. . .F-3'@GT                                                        ;
1-R. CATLIN, E-256,-GT                    BROOKHAVEN NAT. LAB 16-CYT. ACRE HOLDIIG                                        1-CONSULANT'S                    1-AG'GD(WALTER K0 ESTER, NEWMARK/BLUME/AGABIAN                Pm C-427, GT) 1-RD. . . MULLER. . .F-3'@GT                                                        ;
                                                                                                                                                                                        .


r
r
                                                     \
                                                     \
                                                                                  '
            .
Dunn Pownn COMPANY T                                Powzn Uu Lorwo                            g. g  .f...
Dunn Pownn COMPANY T                                Powzn Uu Lorwo                            g. g  .f...
                                                                                                            ,  ,
422 Sourn Cnunen SinenT, Cu ARIDTTE, N. C. eaaos                                  '
422 Sourn Cnunen SinenT, Cu ARIDTTE, N. C. eaaos                                  '
   .. N,l. ' ",: 0, ,,,
   .. N,l. ' ",: 0, ,,,
                  '
                                                                                                     ^* " *""*
                                                                                                     ^* " *""*
PAODUCTIO's ANO Taamoneesssoes January 12, 1973 r    L        v.
PAODUCTIO's ANO Taamoneesssoes January 12, 1973 r    L        v.
                                                                   /
                                                                   /
flidi{}J
flidi{}J i g, D 'j A H 1 6 W                    9.,
                                                                                            ,
                                                                '
i g, D 'j A H 1 6 W                    9.,
f S")h;
f S")h;
                                                                       -}                nzt Mr. Angelo Giambusso                                              D        '~  ...s grrrn Deputy Director for Reactor Projects                                /          1,Lj,$
                                                                       -}                nzt Mr. Angelo Giambusso                                              D        '~  ...s grrrn Deputy Director for Reactor Projects                                /          1,Lj,$
                                                                                    ,
                                                                                               /g Directorate of Licensing                                              4 U. S. Atomic Energy Commission                                                  tu ,  '
                                                                                               /g Directorate of Licensing                                              4 U. S. Atomic Energy Commission                                                  tu ,  '
Washington, D. C.            20545
Washington, D. C.            20545
Line 96: Line 74:
emergency core cooling systems are satisfied.                                                                  1 Please advise if you have additional questions.
emergency core cooling systems are satisfied.                                                                  1 Please advise if you have additional questions.
Sincerely, c)          %
Sincerely, c)          %
A.'C. Thies
A.'C. Thies N
                                '
                                               -                          C ACT:vr                                  OL-j%9913 "I      a      ~
N
                                               -                          C ACT:vr                                  OL-
                                              -
                                              -
j%9913 "I      a      ~
4 n
4 n
6                  r 8
6                  r 8
                                                                      '
e
e
                                                         ~
                                                         ~
e                                    412 l}}
e                                    412 l}}

Latest revision as of 09:06, 1 February 2020

Advises of Installation of Flow Restrictors in Core Flooding Nozzles Entering Reactor Vessel.Addl Info Re 730129 FSAR Revision Filing Transmitted Under Separate Cover
ML19316A037
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 01/12/1973
From: Thies A
DUKE POWER CO.
To: Giambusso A
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML19316A038 List:
References
NUDOCS 7911210598
Download: ML19316A037 (2)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

AEC DIF"!IGTION FOR ?Ain "O DOCKET !W2F *AL ~

,. (TEMPoaARY FORM) CONTROL NO: 412 6

FILE yaog: Y DATE OF DOC: DATE REC'D LTR 12MO Hl'2 CfDO.d

' Duke Power Company Chcriotte, North Carolina 28201 1-12-73 1-16-73 x A. C. Thi en TO: ORIG CC UDER ss;if AEC PD3 e-A. Giambuss a 1 sinned E i2 LOCE M X CIASS: , @ a 0P 15F0 IliPUT lio CIS REC'D l

"~" . 2,7 no:

1 50-269 50-270 50-287 DESCRIF210;i:

~

E iCLOSURES:

Ltr advising of the installation of flow reatrictors in each core flooding nozzles Ltr 1-15-73 fm B6W to Giambusso w/ attached....

.cntering the reactor vessel....trans the Babcoc~k'& Wilcox Report.. including...

Atchmt I - Description & mechanical design of

$'? MEN DO X0T REMOVE Atchmt 2 ina"1y T of the core flooding 11tne break with the flow restrictor in PLANI NA1CS: Oconee Units 1-2-3

- Atchmt 3- effect of the device on the f net aperation of ECCS for both large & small breaks.

1.1 A 7't FOR ACTION /INFOR:MTIO 144 cys rec'd)

BUTLER (L) pSCHWENCER(L)

W/ Copics SCHEGL(L) KNIGICON(E)

W/A) Copies W/ Copies W/ Copies CLARK (L) STOLZ(L) ZIEMANN(L)

W/ Copics W/ Copies W/ Copies YOUNGBIDOD(E)

W/ Copics GOLLER(L) VASSALID(L) CHITWOOD(FM)

W/ Copics U/ Copics REGAN(E) ,

W/ Copies W/ Copies 11ILL(L) H. DI2f0N . DICiL(I:)

W/ Copics W/ Copies W/ Copies W/ Copies IUTERNAL DISTRIBUTION

  1. REG FILE TECH REVIEW VOLU'ER HARLESS y.-AEC PDR WADE E HENDRIE DENTON OGC, ROOM P-506A SCHROEDER GRIMES SHAFER F&M F&M BROWN E MUITIZING/ STAFF pMACCARY (3)adv. GAMMILL LTdTr2 CASE 6 LANGE(i) KAETNER G. WILLIAMS E NUSSBAUMER GIAMBUSSO PAWLICKI BALLARD v E. GOULBOURNE I{4 TA-D0YD-L(BWR) SHA0 A/T IND pDEYOUNG-L(P'nTt)

SPANGLER LIC ASST. LPAITI&N gKIR7fH (,2) adv. SERVICE L SKOVHOLT-L pSTELID SALTZMAN EUVIRO MASON L P. COLLIIS vFDORE ,4eltier MULLER WIISON L PLANS W/1 cy adv.

HOUS' ION DICKER Rm OPR MAIGRLT L MCDONALD TEDESCO KNIGHTON SMITH L DUBE

4. WILE & REGION (2) IDNG YOUNGBIDOD

)DERIS GEARIN L LAINAS PROJ IEADER STET.T.E DIGGS L INFO BENAROYA TEFES L C. MILES REGAN m

A-IDCAL PDR Walhalla, S. C.

EkrmNAL DTSTRT3UTron U l 210 -Wf ~

M

'I DTIE(ABERNATHY)

(1)(5)(9)-NATIONAL LAB'S el-lGIC(BUCHANAN) 1-FDR-SAN /LA/NY 1-R. CARROLL-OC, GT-B227 1-GERALD LELIDUCHE 1-ASLB-YORE /SAYRE WOODWARD [H. ST.

1-R. CATLIN, E-256,-GT BROOKHAVEN NAT. LAB 16-CYT. ACRE HOLDIIG 1-CONSULANT'S 1-AG'GD(WALTER K0 ESTER, NEWMARK/BLUME/AGABIAN Pm C-427, GT) 1-RD. . . MULLER. . .F-3'@GT  ;

r

\

Dunn Pownn COMPANY T Powzn Uu Lorwo g. g .f...

422 Sourn Cnunen SinenT, Cu ARIDTTE, N. C. eaaos '

.. N,l. ' ",: 0, ,,,

^* " *""*

PAODUCTIO's ANO Taamoneesssoes January 12, 1973 r L v.

/

flidi{}J i g, D 'j A H 1 6 W 9.,

f S")h;

-} nzt Mr. Angelo Giambusso D '~ ...s grrrn Deputy Director for Reactor Projects / 1,Lj,$

/g Directorate of Licensing 4 U. S. Atomic Energy Commission tu , '

Washington, D. C. 20545

  • Re: Oconee Nuclear ion Docket Nos. 26 -270, and -287

Dear Mr. Giambusso:

Duke Power Company is installing flow restrictors in each of the core flooding nozzles entering the reactor vessel at Oconee Nuclear Station.

The purpoce of these restrictors is to limit the magnitude of the blowdown and retain more water in the reactor vessel during a core flood line break loss-of-coolant accident. As discussed with members of your staff in Bethesda, Maryland on January 4, 1973, we will file a revision to the Final Safety Analysis Report by January 29, 1973 to document necessary information for your review on the core flood line restrictors. The purpose of this letter is to provide you with the substance of the information that will be filed on January 29 at an earlier date for your review.

The information, which has been transmitted to you under separate cover, provides a description of the mechanical design of the flow restrictor, provides an analysis of the core flood line break with the flow restrictor in place, and shows the effect ofithe restrictor on the operation of the emergency core cooling system for both large and sms11 breaks. These resultsdemonstratethatalloft$eAECinterimacceptancecriteriafor {

emergency core cooling systems are satisfied. 1 Please advise if you have additional questions.

Sincerely, c)  %

A.'C. Thies N

- C ACT:vr OL-j%9913 "I a ~

4 n

6 r 8

e

~

e 412 l