ML19316A038

From kanterella
Jump to navigation Jump to search
Advises of Installation of Flow Restrictors in Core Flooding Nozzles Entering Reactor Vessel.Addl Info Re 730129 FSAR Revision Filing Transmitted Under Separate Cover
Date released: 11/26/2019 Download: ML19316A038


Core Flooding Nozzle Mechanical Design.
ML19316A040
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 01/15/1973
From:
BABCOCK & WILCOX CO.
To:
References
Download: ML19316A040 (65)
Forwards Description & Mechanical Design of Core Flooding Nozzle Flow Restrictor,Analysis of Core Flooding Line Break W/Flow Restrictor in Place & Charts Showing Effect of Device on ECCS Operation for Both Large & Small Breaks
ML19316A039
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 01/15/1973
From: Mallay J
BABCOCK & WILCOX CO.
To: GIAMBUSSO A
US ATOMIC ENERGY COMMISSION (AEC)
References
Download: ML19316A039 (1)
Advises of Installation of Flow Restrictors in Core Flooding Nozzles Entering Reactor Vessel.Addl Info Re 730129 FSAR Revision Filing Transmitted Under Separate Cover
ML19316A037
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 01/12/1973
From: Thies A
DUKE POWER CO.
To: GIAMBUSSO A
US ATOMIC ENERGY COMMISSION (AEC)
References
Download: ML19316A037 (2)