ML081270263: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 2: Line 2:
| number = ML081270263
| number = ML081270263
| issue date = 05/05/2008
| issue date = 05/05/2008
| title = 04/24/2008 Byron End-of-Cycle Plant Performance Assessment Meeting Summary
| title = End-of-Cycle Plant Performance Assessment Meeting Summary
| author name = Skokowski R
| author name = Skokowski R
| author affiliation = NRC/RGN-III/DRP/B3
| author affiliation = NRC/RGN-III/DRP/B3

Latest revision as of 07:58, 7 December 2019

End-of-Cycle Plant Performance Assessment Meeting Summary
ML081270263
Person / Time
Site: Byron  Constellation icon.png
Issue date: 05/05/2008
From: Richard Skokowski
Region 3 Branch 3
To:
References
Download: ML081270263 (5)


Text

May 5, 2008 LICENSEE: Exelon Generation Company, LLC FACILITY: Byron Station, Units 1 and 2

SUBJECT:

SUMMARY

OF THE April 24, 2008, PUBLIC MEETING TO DISCUSS THE BYRON STATION, UNITS 1 AND 2, END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT On April 24, 2008, the Nuclear Regulatory Commission (NRC) held a public meeting at the Byron Station Training Center in Byron, IL. The meeting was between NRC Region III management and Exelon Generation Company management to discuss the NRC=s assessment of the safety performance of Byron Station, Units 1 and 2, for the period from January 1 through December 31, 2007. The meeting notice and NRC presentation can be found in the Agencywide Documents Access and Management System (ADAMS) as ML080720690 and ML081150649, respectively. A list of principal NRC and licensee meeting participants can be found in the Enclosure.

The NRC began the meeting with an overview of the NRC=s Reactor Oversight Program (ROP), national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRC=s assessment of the performance of Byron Station, Units 1 and 2, in calendar year 2007, which was documented in the March 3, 2008, End-Of-Cycle assessment letter, as ML080600260. As part of this regulatory performance meeting, Exelon briefly responded to the NRC=s assessment. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials.

Sincerely,

/RA/

Richard A. Skokowski, Chief Branch 3 Division of Reactor Projects Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66

Enclosure:

As Stated

LICENSEE: Exelon Generation Company, LLC FACILITY: Byron, Units 1 and 2

SUBJECT:

SUMMARY

OF THE April 24, 2008, PUBLIC MEETING TO DISCUSS THE BYRON STATION, UNITS 1 AND 2, END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT On April 24, 2008, the Nuclear Regulatory Commission (NRC) held a public meeting at the Byron Station Training Center in Byron, IL. The meeting was between NRC Region III management and Exelon Generation Company management to discuss the NRC=s assessment of the safety performance of Byron Station, Units 1 and 2, for the period from January 1 through December 31, 2007. The meeting notice and NRC presentation can be found in the Agencywide Documents Access and Management System (ADAMS) as ML080720690 and ML081150649, respectively. A list of principal NRC and licensee meeting participants can be found in the Enclosure.

The NRC began the meeting with an overview of the NRC=s Reactor Oversight Program (ROP), national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRC=s assessment of the performance of Byron Station, Units 1 and 2, in calendar year 2007, which was documented in the March 3, 2008, end-of-cycle assessment letter, as ML080600260. As part of this regulatory performance meeting, Exelon briefly responded to the NRC=s assessment. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials.

Sincerely, Richard A. Skokowski, Chief Branch 3 Division of Reactor Projects Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66

Enclosure:

As Stated DISTRIBUTION:

See next page DOCUMENT NAME: G:\Branch TSS\ALL EOC\EOC CY 2007\EOC Meeting Letters -

Notices\Byron EOC Mtg Summary Cy 2007.doc G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII NAME RSkokowski:Dtp DATE 05/05/08 OFFICIAL RECORD COPY

Letter to Exelon Generation Company, LLC from R. Skokowski dated May 5, 2008

SUBJECT:

SUMMARY

OF THE April 24, 2008, PUBLIC MEETING TO DISCUSS THE BYRON STATION, UNITS 1 AND 2, END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT cc w/encl: Site Vice President - Byron Station Plant Manager - Byron Station Regulatory Assurance Manager - Byron Station Chief Operating Officer and Senior Vice President Senior Vice President - Midwest Operations Senior Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs Manager Licensing - Braidwood, Byron, and LaSalle Associate General Counsel Document Control Desk - Licensing Assistant Attorney General Illinois Emergency Management Agency J. Klinger, State Liaison Officer, State of Illinois P. Schmidt, State Liaison Officer, State of Wisconsin Chairman, Illinois Commerce Commission B. Quigley, Byron Station President, Village of Leaf River President, Village of Davis Junction President, Village of Stillman Valley Ogle County Board Chairman Ogle County Sheriff/EMA Coordinator EMA Coordinator, Winnebago County Winnebago County Board Chair Winnebago County Sheriff/ESDA Mayor of Oregon Mayor of Byron President, Village of Mt. Morris Mayor of Rochelle G. Mortensen, INPO

Letter to Exelon Generation Company, LLC from R. Skokowski dated May 5, 2008

SUBJECT:

SUMMARY

OF THE April 24, 2008, PUBLIC MEETING TO DISCUSS THE BYRON STATION, UNITS 1 AND 2, END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT DISTRIBUTION:

RAG1 TEB MMT RidsNrrDirslpab JLC1 MAS KGO RML2 SRI Byron DRPIII DRSIII PLB1 TXN

Enclosure MEETING PARTICIPANTS NRC R. Skokowski, Chief, Branch 3, Division of Reactor Projects, Region III B. Bartlett, Senior Resident Inspector, Byron R. Ng, Resident Inspector, Byron M. David, Nuclear Reactor Regulation, Project Manager, Headquarters C. Scott, Reactor Engineer, Region III A. Colon, Nuclear Reactor Regulation, Headquarters P. Chandrethal, Office of Public Affairs, Region III Exelon Generation Company D. Hoots, Site Vice President B. Adams, Plant Manager W. Grundmann, Regulatory Assurance Manager T. Hulbert, Regulatory Assurance Specialist R. Kartheiser, Nuclear Communications B. Stoermer, Public Affairs Manager D. Thompson, Radiation Protection Manager A. Daniels, Nuclear Oversight Manager S. Greenlee, Site Engineering Director Illinois Emergency Management Agency C. Settles, Section Head C. Thompson, Resident Inspector Public D. Bartlett B. Yeaman N. Skokowski P. Skokowski A. Cusumano