Exelon Nuclear Byron Generating Station U.S. NRC End-of-Cycle Public Meeting April 24, 2008

Byron Generating Station April 24, 2008 2

Byron 2007 Accomplishments

  • Successful Unit 2 Refueling Outage
  • Major inspections completed without findings or violation:

- Security Force-On-Force

- PI&R Inspection

- Triennial Fire Protection Inspection

Byron Generating Station April 24, 2008 3

Byron 2007 Accomplishments

  • Material Condition Improvements

- Replaced all eight SX riser piping sections

- Raw water inspections on equipment replacements

- Completion of Unit 2 pressurizer weld overlay

- Installation of containment sump modification

- Completed reactor head volumetric inspection with boat sample of indication on penetration #68

Byron Generating Station April 24, 2008 4

Performance Issues

  • NRC Performance Indicators

- All indicators are Green with the exception of AF Heat Removal. The Unit 2 indicator is White due to three 2B AF functional failures in March and November 2005 and January 2006. Supplemental 95001 inspection complete. Expected return to green by April 2008.

- Potential White finding in 2Q2008 due to Oct 2007 dual unit shutdown caused by the SX riser degradation. This will be followed up by a 95001 inspection after completion of corrective actions.

Byron Generating Station April 24, 2008 5

Performance Issues

  • NRC Findings

- Entered into the Station Corrective Action Program

Byron Generating Station April 24, 2008 6

Byron Environmental Stewardship

  • Received ISO 14001 Environmental Certification
  • Continue to perform quarterly IEMA /

IEPA Inspections for tritium per House Bill 1620

Byron Generating Station April 24, 2008 7

Byron Key Events - 2008

  • Units 1 and 2 Refueling Outages
  • Summer operations
  • Maintenance & Technical Training Program INPO Accreditation visit
  • Construction of dry cask spent fuel storage unit in preps for 2Q2009 initial loading
  • Continually monitor and improve human performance
  • Third quarter new licensed operator graduation

Byron Generating Station April 24, 2008 8

Byron Focus Areas - 2008

  • Destination Excellence

- Safety

- Flawless Execution

- Teamwork

- ALARA Leadership

- Talent Development