| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSYLVANIA 19406-2713 June 21, 2012 MEETING |
| | |
| KING OF PRUSSIA, PENNSYLVANIA 19406 | |
| -2713 June 21, 2012 MEETING | |
|
| |
|
| ==SUMMARY== | | ==SUMMARY== |
|
| |
|
| LICENSEE: EXELON GENERATION COMPANY, LLC FACILITY: OYSTER CREEK NUCLEAR GENERATING STATION | | LICENSEE: EXELON GENERATION COMPANY, LLC FACILITY: OYSTER CREEK NUCLEAR GENERATING STATION |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
|
| |
|
| ==SUMMARY== | | ==SUMMARY== |
| OF PUBLIC MEETING On June 6, 2012, from 6:00 p.m. to 8:00 p.m., the U. S. Nuclear Regulatory Commission (NRC) conducted a public meeting at the Holiday Inn in Toms River, New Jersey. This public meeting was conducted to allow citizens an opportunity to provide public comment in a public format and to discuss specific items of public interest related to the Oyster Creek Nuclear Generating Station and to the safety of the nuclear industry in general. This meeting was conducted to supplement the annual assessment meeting held on March 28, 2012, based on interest from public stakeholders and United States Senators Robert Menendez and Frank R. Lautenberg from New Jersey, and Congressman Christopher H. Smith, 4 th District, New Jersey. | | OF PUBLIC MEETING On June 6, 2012, from 6:00 p.m. to 8:00 p.m., the U. S. Nuclear Regulatory Commission (NRC) conducted a public meeting at the Holiday Inn in Toms River, New Jersey. This public meeting was conducted to allow citizens an opportunity to provide public comment in a public format and to discuss specific items of public interest related to the Oyster Creek Nuclear Generating Station and to the safety of the nuclear industry in general. This meeting was conducted to supplement the annual assessment meeting held on March 28, 2012, based on interest from public stakeholders and United States Senators Robert Menendez and Frank R. Lautenberg from New Jersey, and Congressman Christopher H. Smith, 4th District, New Jersey. |
| A public meeting notice was issued on May 16, 2012, and was posted on the NRC's external (public) Web page. The meeting notice can be found in the NRC's Agencywide Documents Access and Management System (ADAMS) with Accession No. 12137A589. ADAMS is accessible from the NRC Web page at: http://www.nrc.gov/reading | | A public meeting notice was issued on May 16, 2012, and was posted on the NRCs external (public) Web page. The meeting notice can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession No. 12137A589. ADAMS is accessible from the NRC Web page at: http://www.nrc.gov/reading-rm/adams.html. |
| -rm/adams.html. The NRC presented slides and had informational handouts available, provided the public a forum to participate, and answered questions posed by members of the public related to the Oyster Creek Nuclear Generating Station. Additional information related to the safety performance of Oyster Creek Nuclear Generating Station can be found on the NRC's web site at: www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html. Members of the public, New Jersey state and local officials, U.S. Senate and Congressional staff, and members of the media attended the meeting. NRC staff responded to questions regarding specific items of public interest related to the Oyster Creek Nuclear Generating Station and to the NRC's current and planned regulatory activities related to the nuclear industry. | | The NRC presented slides and had informational handouts available, provided the public a forum to participate, and answered questions posed by members of the public related to the Oyster Creek Nuclear Generating Station. Additional information related to the safety performance of Oyster Creek Nuclear Generating Station can be found on the NRC's web site at: www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html. |
| /RA/ Gordon K. Hunegs, Chief Projects Branch 6 Division of Reactor Projects
| | Members of the public, New Jersey state and local officials, U.S. Senate and Congressional staff, and members of the media attended the meeting. NRC staff responded to questions regarding specific items of public interest related to the Oyster Creek Nuclear Generating Station and to the NRCs current and planned regulatory activities related to the nuclear industry. |
| | /RA/ |
| | Gordon K. Hunegs, Chief Projects Branch 6 Division of Reactor Projects |
|
| |
|
| ==Enclosures:== | | ==Enclosures:== |
Line 37: |
Line 36: |
| Public Meeting Sign in Sheets (ML12170A460) | | Public Meeting Sign in Sheets (ML12170A460) |
| NRC Slide Presentation (ML12159A352) | | NRC Slide Presentation (ML12159A352) |
| EPA Slide Presentation (ML12159A358 | | EPA Slide Presentation (ML12159A358 |
|
| |
|
| ML12173A132 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE mmt RI/DRP RI/DRP NAME SBarber/SB GHunegs/SB for DATE 06/21/12 06 / 21/12 | | ML12173A132 SUNSI Review Non-Sensitive Publicly Available Sensitive Non-Publicly Available OFFICE mmt RI/DRP RI/DRP NAME SBarber/SB GHunegs/SB for DATE 06/21/12 06 / 21/12 |
|
| |
|
| Oyster Creek Public Meeting June 6, 2012 Nuclear Regulatory Commission | | Oyster Creek Public Meeting June 6, 2012 Nuclear Regulatory Commission - Region I |
| - Region I | | |
| | Meeting Agenda |
|
| |
|
| ===Introductions=== | | ===Introductions=== |
| Oyster Creek 2011 Performance Results Presentation from EPA Presentation from NRC Questions & Answers Meeting Agenda | | Oyster Creek 2011 Performance Results Presentation from EPA Presentation from NRC Questions & Answers |
|
| |
|
| NRC Annual Assessment Summary of Oyster Creek Exelon operated the plant safely Oyster Creek was in the Licensee Response Column of NRC's Action Matrix in 2011 The NRC plans to perform baseline inspections in 2012 | | NRC Annual Assessment Summary of Oyster Creek Exelon operated the plant safely Oyster Creek was in the Licensee Response Column of NRCs Action Matrix in 2011 The NRC plans to perform baseline inspections in 2012 |
|
| |
|
| NRC Inspection Activities at Oyster Creek for 2011 5589 hours of direct inspection Two resident inspectors on site Event response Inspect over 20 areas of plant performance Examples include operator performance, risk management, equipment issues, and fire protection | | NRC Inspection Activities at Oyster Creek for 2011 5589 hours of direct inspection Two resident inspectors on site Event response Inspect over 20 areas of plant performance Examples include operator performance, risk management, equipment issues, and fire protection |
|
| |
|
| Nine regional inspections Four team inspections Triennial Fire Protection EP Exercise Evaluation Operator Licensing Examinations Security Baseline NRC Inspection Activities at Oyster Creek for 2011 | | NRC Inspection Activities at Oyster Creek for 2011 Nine regional inspections Four team inspections Triennial Fire Protection EP Exercise Evaluation Operator Licensing Examinations Security Baseline |
| | |
| | Environmental Protection Agency (EPA) |
| | Region 2 |
|
| |
|
| Environmental Protection Agency (EPA) Region 2 Fukushima Lessons Learned July 2011 Near-Term Task Force (NTTF) report issued September/October 2011 NTTF recommendations prioritized into 3 tiers March 2012 The NRC staff issued the Tier 1 orders and requests for information
| | Fukushima Lessons Learned July 2011 Near-Term Task Force (NTTF) report issued September/October 2011 NTTF recommendations prioritized into 3 tiers March 2012 The NRC staff issued the Tier 1 orders and requests for information |
|
| |
|
| Orders The NRC staff ordered licensees to: | | Orders The NRC staff ordered licensees to: |
| Develop strategies and procure additional equipment to address beyond | | Develop strategies and procure additional equipment to address beyond-design-basis natural phenomena and multiunit events Include a reliable hardened vent in Mark I and Mark II containments Enhance spent fuel pool instrumentation for beyond design basis accidents |
| -design-basis natural phenomena and multiunit events Include a reliable hardened vent in Mark I and Mark II containments Enhance spent fuel pool instrumentation for beyond design basis accidents | |
|
| |
|
| Requests for Information The NRC staff requested information on: | | Requests for Information The NRC staff requested information on: |
| Whether facility configurations, as confirmed by seismic and flooding walkdowns, are in compliance with current facility design bases The adequacy of facility design bases with respect to seismic and flooding hazards Current communications system power supplies and their availability during a prolonged SBO event The required staffing necessary to respond to a multiunit, prolonged SBO event | | Whether facility configurations, as confirmed by seismic and flooding walkdowns, are in compliance with current facility design bases The adequacy of facility design bases with respect to seismic and flooding hazards Current communications system power supplies and their availability during a prolonged SBO event The required staffing necessary to respond to a multiunit, prolonged SBO event |
|
| |
|
| Rulemaking Activities On March 20, 2011, the NRC issued an advanced notice of proposed rulemaking regarding a potential revision to the Station Blackout rule. | | Rulemaking Activities On March 20, 2011, the NRC issued an advanced notice of proposed rulemaking regarding a potential revision to the Station Blackout rule. |
Line 67: |
Line 69: |
| Next Steps on Tier 1 Orders and Request for Information Develop implementation guidance for the orders and requests for information Review licensee responses to the orders and requests for information Conduct follow up inspections | | Next Steps on Tier 1 Orders and Request for Information Develop implementation guidance for the orders and requests for information Review licensee responses to the orders and requests for information Conduct follow up inspections |
|
| |
|
| More Information NRC's public website: | | More Information NRCs public website: |
| http://www.nrc.gov/japan/japan | | http://www.nrc.gov/japan/japan-info.html Frequently Asked Questions Contact Scott Burnell, Public Affairs Officer, at 301-415-8204 NRC is accepting public comments on any of the recommendations Please send comments to JLD_Public.Resource@nrc.gov |
| -info.html Frequently Asked Questions Contact Scott Burnell, Public Affairs Officer, at 301 | | |
| -415-8204 NRC is accepting public comments on any of the recommendations Please send comments to JLD_Public.Resource@nrc.gov | | NRC Social Media Channels Blog: http://public-blog.nrc-gateway.gov/ |
| | Flickr: http://www.flickr.com/photos/nrcgov/ |
| | Twitter: https://twitter.com/#!/nrcgov YouTube: http://www.youtube.com/user/NRCgov RSS: http://www.nrc.gov/public-involve/listserver.html#rss 13 |
|
| |
|
| NRC Social Media Channels Blog: http://public
| | Contacting the NRC Report an emergency (301) 816-5100 (call collect) |
| -blog.nrc-gateway.gov/
| |
| Flickr: http://www.flickr.com/photos/nrcgov/
| |
| Twitter: https://twitter.com/#!/nrcgov YouTube: http://www.youtube.com/user/NRCgov RSS: http://www.nrc.gov/public
| |
| -involve/listserver.html#rss 13 Contacting the NRC Report an emergency (301) 816-5100 (call collect)
| |
| Report a safety concern (800) 695-7403 Allegation@nrc.gov General information or questions www.nrc.gov | | Report a safety concern (800) 695-7403 Allegation@nrc.gov General information or questions www.nrc.gov |
|
| |
|
| References http://www.state.nj.us/ | | References http://www.state.nj.us/ |
| http://www.nrc.gov/reading | | http://www.nrc.gov/reading-rm/doc-collections/fact-sheets/buried-pipes-tritium.html |
| -rm/doc-collections/fact | |
| -sheets/buried | |
| -pipes-tritium.html | |
|
| |
|
| End of Presentation Nuclear Regulatory Commission Region I Toms River, NJ June 6, 2012 | | End of Presentation Nuclear Regulatory Commission Region I Toms River, NJ June 6, 2012 |
|
| |
|
| Michael F. DeBonis Radiation and Indoor Air Branch U.S. Environmental Protection Agency, Region 2 290 Broadway, New York NY June 6, 2012 | | Michael F. DeBonis Radiation and Indoor Air Branch U.S. |
| | Environmental Protection Agency, Region 2 290 Broadway, New York NY June 6, 2012 |
|
| |
|
| EPA is the Federal agency mandated to protect human health and the environment. | | EPA is the Federal agency mandated to protect human health and the environment. |
| Major activities: | | Major activities: |
| Homeland security/ emergency response Public protective action recommendations Cleanup/waste management Emissions regulation RadNet Science and technology Information and outreach Protecting People and the Environment from Radiation Pg 2 Types of Radiological Incidents and Emergencies Nuclear facility accidents Nuclear weapon and device accidents Nuclear terrorism Sabotage 3 Three Mile Island Space Launches Los Alamos Wildfires Lost Sources Contaminated imports Transportation accidents Satellite Reentry Orphan sources Foreign incidents | | Homeland security/ emergency response Public protective action recommendations Cleanup/waste management Emissions regulation RadNet Science and technology Information and outreach Protecting People and the Environment from Radiation Pg 2 |
| | |
| | Types of Radiological Incidents and Emergencies Los Alamos Lost Wildfires Sources Three Mile Island Space Launches Nuclear facility accidents Contaminated imports Nuclear weapon and device Transportation accidents accidents Satellite Reentry Nuclear terrorism Orphan sources Sabotage Foreign incidents 3 |
|
| |
|
| Putting Fukushima Risk in Perspective Calculate your estimated annual radiation dose: | | Putting Fukushima Risk in Perspective Calculate your estimated annual radiation dose: |
| http://www.epa.gov/radiation/understand/calculate.html 4 | | http://www.epa.gov/radiation/understand/calculate.html 4 |
| EPA RadNet System Currently, 125 permanent RadNet stations Deployable stations set up in Alaska, Hawaii, Guam, and Northern Marianas Islands Capable of detecting above background levels, but do not expect any harmful levels Real-time data have shown only typical background fluctuations For daily RadNet data: www.epa.gov/japan 2011 | | |
| | EPA RadNet System Currently, 125 permanent RadNet stations Deployable stations set up in Alaska, Hawaii, Guam, and Northern Marianas Islands Capable of detecting above background levels, but do not expect any harmful levels Real-time data have shown only typical background fluctuations For daily RadNet data: www.epa.gov/japan 2011 |
|
| |
|
| EPA's RadNet monitors across the US show typical fluctuations in background radiation levels. | | EPA's RadNet monitors across the US show typical fluctuations in background radiation levels. |
| Additional Deployable Monitors were sent to the Aleutian islands, Hawaii, Guam and Saipan to improve monitoring coverage for this event. | | Additional Deployable Monitors were sent to the Aleutian islands, Hawaii, Guam and Saipan to improve monitoring coverage for this event. |
| The levels detected are far below levels of concern | | The levels detected are far below levels of concern |
|
| |
|
| http://www.epa.gov/radiation/understand/perspective.html Trace levels of radioactive isotopes measured are consistent with the Japanese nuclear incident and far below levels of public health concern.
| | Trace levels of radioactive isotopes measured are consistent with the Japanese nuclear incident and far below levels of public health concern. |
| Additional exposure from well below 1 mrem for individuals in US and Territories Measured levels hundreds to thousands of times lower than FDA Derived Intervention Levels (DILS) | | Additional exposure from well below 1 mrem for individuals in US and Territories Measured levels hundreds to thousands of times lower than FDA Derived Intervention Levels (DILS) |
| Greater risk from Radon | | Greater risk from Radon - 257 mrem/yr NCRP 160, 2009 Bottom line? Test your house for radon! |
| - 257 mrem/yr NCRP 160, 2009 Bottom line? Test your house for radon! | | http://www.epa.gov/radiation/understand/perspective.html |
|
| |
|
| "While we do not expect radiation from the damaged Japanese reactors to reach the United States at harmful levels, I want to assure you that EPA will continue our coordination with our federal partners to monitor the air, milk, precipitation and drinking water for any changes, and we will continue our outreach to the public and the elected officials to provide information on our monitoring results."
| | While we do not expect radiation from the damaged Japanese reactors to reach the United States at harmful levels, I want to assure you that EPA will continue our coordination with our federal partners to monitor the air, milk, precipitation and drinking water for any changes, and we will continue our outreach to the public and the elected officials to provide information on our monitoring results. |
| - Administrator Lisa P. Jackson}}
| | - Administrator Lisa P. Jackson}} |
|
---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML19269B6892019-10-0303 October 2019 NEIMA Section 108 Public Meeting Slides - Oyster Creek - October 3, 2019 ML18347B3142018-12-19019 December 2018 Bwrvip/Asme Relief Request Discussion December 19, 2018 ML18334A2162018-11-30030 November 2018 Presentation Slides: Exelon BWR MSIV (Boiling-Water Reactor - Main Steam Isolation Valve) Leakage Optimization for NRC Pre-Submittal Meeting of December 6, 2018 ML18319A1272018-11-19019 November 2018 Slides for 11/19/18 Public Meeting - Exelon Fleet LAR for Common Language for TS 5.7 High Radiation Areas ML18225A1752018-08-15015 August 2018 Decommissioning License Transfer Application NRC Pre-Submittal Meeting ML18201A2372018-07-17017 July 2018 Slides 7/17/2018 PSDAR Meeting ML18201A2842018-07-17017 July 2018 PSDAR Public Meeting the NRC Review Process ML18201A3072018-07-17017 July 2018 Post Shutdown Decommissioning Activities Report (PSDAR) Public Meeting Presentation ML18054B3592018-02-27027 February 2018 Slide: NRC Pre-Submittal Meeting for Exelon Fleet LAR to Relocate TS Unit Staff Qualification ANSI Requirements to the QATR, February 27, 2018, Profile Info: Submitted by Frank Mascitelli ML17142A2382017-05-25025 May 2017 OEDO-17-00280 - Briefing Package for Drop-In Visit on June 9, 2017, by Senior Management of Exelon Generation Company, LLC with Chairman Svinicki, Commissioner Baran, and Commissioner Burns ML17062A5522017-03-0909 March 2017 E EMRV Failure Slides for Regulatory Conference Meeting Notice for 03/09/17 ML16314E4812016-11-14014 November 2016 Part 37 Applicability to Reactor Vessels and Associated Structures, Systems, and Components While in Safstor Awaiting Active Decommissioning Activities - November 14, 2016 ML16092A1402016-04-0606 April 2016 4/6/16, Meeting Slide for Pre-Submittal Meeting with NRC Regarding Oyster Creek Decommissioning Post-Shutdown Emergency Plan License Amendment Request ML16075A3292016-03-16016 March 2016 OEDO-16-00165 - Briefing Package for Drop-In Visit on March 23, 2016, by Senior Management of Exelon Generation Company, LLC with the NRC Executive Director for Operations ML15265A3592015-09-21021 September 2015 NRC Oyster Creek Decommissioning Pre-Submittal Meeting Slides 09-21-15 ML15118A8042015-05-0505 May 2015 Webinar 2015 Slides Presentation ML15265A3742015-02-21021 February 2015 NRC Pre-Submittal Meeting 09-21-15 - Decommissioning Submittal List ML12173A1322012-06-21021 June 2012 Summary of Public Meeting with Exelon Generation Company, LLC Regarding Items of Public Interest Related to Oyster Creek Nuclear Generating Station ML12110A3402012-04-19019 April 2012 Annual Assessment Meeting - 2011 ROP-NRC Slides ML1208701402012-03-27027 March 2012 Licensee Slides for Exelon Fleet Pre-Submittal Public Meeting 4-10-12 Licensed Operator Eligibility Requirements LAR ML1012300492010-05-0303 May 2010 Slides for the Oyster Creek Annual Assessment Public Meeting ML0934102382009-12-0404 December 2009 Meeting Presentation, ACRS Meeting with the U.S. Nuclear Regulator Commission ML0928701922009-10-0909 October 2009 FEMA Public Meeting at Oyster Creek Slides, October 2009 ML0919803632009-08-20020 August 2009 Summary of Licensing Counterparts Meeting with Exelon Generation Company, to Discuss Licensing Practices and Processes ML0919801452009-06-17017 June 2009 NRC Discussions with Nj DEP Engineers ML0919605452009-06-17017 June 2009 10/01/2008 Senior Management Briefing Oyster Creek License Renewal Regulatory Footprint, to Describe Current Regulatory Footprint, Additional Options & Actions, and Gov'T & Public Outreach Needs ML0919605462009-06-17017 June 2009 10/01/2008 Senior Management Briefing Oyster Creek License Renewal Regulatory Footprint, Working Discussion of Issues and Options in Response to RA Questions ML0919605472009-06-17017 June 2009 10/01/2008 Senior Management Briefing Oyster Creek License Renewal Regulatory Footprint, Working Discussion of Issues and Options in Response to RA Questions ML0919605572009-06-17017 June 2009 10/01/2008 Senior Management Briefing Oyster Creek License Renewal Regulatory Footprint, to Describe Current Regulatory Footprint, Additional Options & Actions, and Gov'T & Public Outreach Needs ML0919605582009-06-17017 June 2009 10/01/2008 Senior Management Briefing Oyster Creek License Renewal Regulatory Footprint, to Describe Current Regulatory Footprint, Additional Options & Actions, and Gov'T & Public Outreach Needs ML0919605592009-06-17017 June 2009 09/23/2008 DRS Management Briefing Oyster Creek License Renewal Regulatory Footprint, Working Discussion of Issues and Options in Response to RA Questions on a Lr Regulatory Foodprint ML0919605602009-06-17017 June 2009 09/23/2008 DRS Management Briefing Oyster Creek License Renewal Regulatory Footprint, Working Discussion of Issues and Options, in Response to RA Questions ML0919805202009-06-17017 June 2009 Brief for Ora Oyster Creek Commitment Inspection Results and Related Issues ML0916802102009-05-28028 May 2009 Oc Aam Public Feedback Form, 05/28/2009, 2008 Annual Assessment Meeting ML0913205742009-05-12012 May 2009 Meeting Slides, Oyster Creek Annual Assessment Meeting 2008 Reactor Oversight Process ML0912702392009-05-0404 May 2009 Calvert County Sheriff- Special Operations Team ML0912406092009-04-23023 April 2009 Meeting, Slides, New Jersey State Police Response to Hostile Action at Nuclear Power Plants, National Radiological Emergency Preparedness Conference ML0919801442008-12-22022 December 2008 Brief for Ora Oyster Creek Commitment Inspection Results and Related Issues with Handwritten Notes ML0919801392008-12-22022 December 2008 Brief for Ora Oyster Creek Commitment Inspection Results and Related Issues ML0919801402008-12-22022 December 2008 Brief for Ora Oyster Creek Commitment Inspection Results and Related Issues ML0919801422008-12-22022 December 2008 Brief for Ora Oyster Creek Commitment Inspection Results and Related Issues ML0919801432008-12-22022 December 2008 Brief for Ora Oyster Creek Commitment Inspection Results and Related Issues ML0812007842008-06-0202 June 2008 Meeting Slides, Nrc/Exelon Licensing Counterparts Meeting. ML0810606002008-04-15015 April 2008 Meeting Slides, NRC Annual Performance Assessment of Oyster Creek 2007 Reactor Oversight Program. ML0715204362007-05-23023 May 2007 Feedback Forms, List of Attendees, & Final Slides from the Oyster Creek 2007 Annual Assessment Meeting (Aam) ML0634206092006-11-0404 November 2006 Powerpoint: Oyster Creek 1R21 Outage Startup PORC Update on Drywell Shell Inspections November 4, 2006 (PA) ML0622301292006-07-12012 July 2006 Powerpoint Presentation Associated with Oyster Creek Draft EIS Public Meetings ML0610003702006-04-10010 April 2006 NRC Slides for Annual Assessment Public Meeting with Amergen Reference CY2005 Oyster Creek Station Performance ML0509800822005-04-0808 April 2005 05/12/2005 - Oyster Creek Annual Assessment Meeting Slides for Meeting with Amergen ML0430302762004-09-27027 September 2004 Attendance List for Oyster Creek EDG Cooling Fan Regulatory Conference 2019-10-03
[Table view] Category:Meeting Summary
MONTHYEARML23324A4332024-01-23023 January 2024 10/16-17/2023 Summary of Routine NRC Site Visit at the Oyster Creek Nuclear Generating Station to Discuss License Termination Plans and Other Technical Topics ML22290A0572022-10-17017 October 2022 Summary of September 27-28, 2022, Routine NRC Site Visit to Discuss License Termination Plans ML20128J2732020-05-0707 May 2020 Summary of April 28, 2020, Teleconference with the National Marine Fisheries Service Regarding Oyster Creek Endangered Species Act Section 7 Consultation ML19295G4922019-10-24024 October 2019 Summary of the October 3, 2019, Public Meeting Near the Oyster Creek Nuclear Generating Station Regarding the Establishment and Operation of Community Advisory Boards ML19170A1182019-06-19019 June 2019 Summary of Teleconference with NMFS Regarding Oyster Creek Endangered Species Act Section 7 Consultation ML18354B1712019-01-0202 January 2019 Summary of December 19, 2018, Meeting with Exelon Generation Company, LLC Regarding the Use of Boiling Water Reactor Vessel and Internals Project Guidelines ML18228A5342018-08-31031 August 2018 Summary of 8/15/2018 Pre-Submittal Meeting with Exelon Generation Company, LLC Regarding the License Transfer of Oyster Creek Nuclear Generating Station to Holtec International ML18201A2632018-08-31031 August 2018 Summary of Public Meeting in Forked River, Nj, to Discuss Oyster Creek Nuclear Generating Station Post-Shutdown Decommissioning Activities Report ML18102A1072018-04-18018 April 2018 Annual Assessment Meeting Summary 2018 ML18065A8362018-03-0707 March 2018 Summary of February 27, 2018, Meeting with Exelon Generation Company, LLC Planned Fleet License Amendment Request to Relocate Staff Qualification Requirements from TSs to the Quality Assurance Topical Report ML18058A5232018-03-0101 March 2018 Summary of February 26, 2018, Meeting with Exelon Generation Company, LLC Regarding Proposed Alternative to the Main Steam Isolation Valve Testing Requirements ML17184A0092017-07-10010 July 2017 Summary of June 29, 2017, Meeting with Exelon Generation Company, LLC, on Proposed Changes to Emergency Plans to Revise Emergency Action Levels (CAC Nos. MF9779-MF9801) ML17151A2702017-05-31031 May 2017 Annual Assess Meeting Summary and Attendees ML17075A0172017-03-16016 March 2017 Meeting Summary Memorandum - Regulatory Conference March 9, 2017 ML16307A3162016-11-28028 November 2016 Summary of Public Meeting with Exelon to Discuss Pre-Submittal License Amendment Requests And/Or Exemptions to Part 37 for Decommissioning Plans for Clinton, Quad Cities, and Oyster Creek ML16252A2852016-09-13013 September 2016 Summary of Closed Meeting with the U.S. Nuclear Regulatory Commission & Exelon Generation Company, LLC Regarding Pre-Submittal of Physical Security Licensing Actions Regarding Decommissioning for Oyster Creek Nuclear Generating Station ML16244A0692016-09-0707 September 2016 Summary of August 25, 2016, Closed Meeting with the U.S. Nuclear Regulatory Commission and Exelon Generation Company, LLC Regarding Physical Security Plan, Revision 15 ML16228A0622016-08-15015 August 2016 Summary of July 26, 2016, Public Meeting on Status of Associated Effects Submittals Related to the Reevaluated Flood Hazards at Exelon Generation Company, LLC Sites as Part of the Response to Near-Term Task Force Recommendation 2.1, Floodin ML16195A4482016-07-22022 July 2016 Summary of July 12, 2016, Public Meeting with Exelon to Discuss Decommissioning Transition Plans for Clinton, Quad Cities, and Oyster Creek ML16168A3552016-06-16016 June 2016 Summary of Annual Assessment Public Meeting for Oyster Creek 2016 ML16102A1832016-04-14014 April 2016 Summary of April 6, 2016, Public Meeting with Exelon Generation Company, LLC Regarding Pre-Submittal of Decommissioning Licensing Action Related to Emergency Preparedness for Oyster Creek Nuclear Generating Station (Cac. No. MF7551) ML16040A2182016-02-11011 February 2016 January 21, 2016, Summary of Meeting with Exelon Generation Company, LLC Licensing Managers ML16035A1762016-02-11011 February 2016 Summary of January 7, 2016, Meeting with Exelon Generation Company, LLC on It'S Planned Fleet License Amendment Request to Revise the Minimum Staffing Requirements for Emergency Response (CAC Nos. MF7162 - MF7183) ML16035A0362016-02-0505 February 2016 February 3, 2016, Summary of Closed Meeting with the U.S. Nuclear Regulatory Commission and Exelon Generation Company, LLC, Regarding Security Plan Change for the Oyster Creek Nuclear Generating Station ML15271A1272015-10-23023 October 2015 4 Summary of Meeting with Exelon Generation Company Pre-Submittal of Decommissioning Licensing Actions for Oyster Creek Nuclear Generating Station ML15153A4972015-08-0303 August 2015 Annual Assessment Meeting Summary 2015 ML15125A0262015-05-0505 May 2015 April 27, 2015 Summary of Public Webinar Meeting - Oyster Creek Nuclear Generating Station ML14304A7852014-11-14014 November 2014 Closed Meeting with the Nuclear Regulatory Commission and Exelon Generation Company, LLC Regarding the Physical Security License Amendment Request for Oyster Creek Nuclear Generating Station ML14220A5122014-09-0303 September 2014 Summary - Site Visit Regarding Physical Security License Amendment Request for Oyster Creek Nuclear Generating Station ML14175A5182014-08-11011 August 2014 Summary of Category 1 Public Meeting with Exelon to Discuss Seismic Hazard Reevaluations Associated with Implementation of Japan Lessons Learned Near-Term Task Force Recommendation 2.1, Seismic ML13142A4312013-05-22022 May 2013 Summary of Annual Assessment Meeting, Oyster Creek ML12173A1322012-06-21021 June 2012 Summary of Public Meeting with Exelon Generation Company, LLC Regarding Items of Public Interest Related to Oyster Creek Nuclear Generating Station ML12110A3112012-05-0303 May 2012 4/10/2012 Summary of Public Meeting with Exelon Generation Company, LLC Regarding Its Future Submittal of Technical Specification Changes of Licensed Operator Eligibility Requirements ML12114A0472012-04-23023 April 2012 Summary of Public Meeting with Exelon Generation Company, on March 28, 2012 ML11292A1612011-10-20020 October 2011 Summary of Meeting with Beyond Nuclear Regarding Their 10 CFR 2.206 Petition to Suspend Operating Licenses of General Electric Mark I Boiling Water Reactors ML11166A1342011-06-22022 June 2011 Meeting Summary with the Beyond Nuclear Petitioners Regarding Their 2.206 Petition to Suspend Operating Licenses (Ols) of General Electric (GE) Boiling Water Reactors (Bwrs) Mark I (Bwrs) ML1036305532011-01-0606 January 2011 Summary of Meeting (Teleconference) with Exelon to Discuss RAI Regarding the Implementation of an Emergency Action Level Scheme Based on NEI 99-01, Rev. 5 ML1020700252010-07-27027 July 2010 Summary of Category 1 Meeting with Exelon to Discuss Re-Submittal of Its Cyber Security Plan ML1015401502010-06-0202 June 2010 Summary of Annual Assessment Meeting, for Oyster Creek ML0930804802009-11-19019 November 2009 Meeting Summary of 10/22/2009 Meeting Regarding Its Power Uprate Project Plan ML0930705002009-11-0505 November 2009 Summary of Meeting with Exelon to Discuss Oyster Creek Nuclear Generating Station and Exelon Fleet Lessons-Learned on Buried Piping Issues ML0927400612009-10-22022 October 2009 Summary of Meeting with Exelon to Discuss Proposed License Amendment Regarding Secondary Containment Operability ML0919803632009-08-20020 August 2009 Summary of Licensing Counterparts Meeting with Exelon Generation Company, to Discuss Licensing Practices and Processes ML0915301992009-06-0202 June 2009 Summary of Annual Assessment Public Meeting, 5/28/09, with Sign-in Sheets ML0920200532008-12-0505 December 2008 Drop-in Visit- December 5, 2008, Rev 2 ML0833100732008-11-26026 November 2008 Summary of Meeting with Exelon to Review the Results of Security Organization Safety Conscious Work Environment (SCWE) Surveys at Exelon Nuclear Operating Reactors ML0812007572008-06-0202 June 2008 Summary of Category 1 Meeting with Exelon to Discuss Current and Planned Licensing Activities and Processes ML0814105622008-05-20020 May 2008 Summary of Annual Assessment Meeting with Amergen Energy Company, LLC ML0802503822008-01-23023 January 2008 Summary - Drop-in Visit from Exelon/Amergen, 1/15/08 ML0709303792007-06-11011 June 2007 Summary of Category 1 Meeting with Exelon to Discuss Current and Planned Licensing Activities and Processes to Discuss Topics of Common Interest to the Reactor Licensing Programs for Exelon and the NRC Staff 2024-01-23
[Table view] Category:Slides and Viewgraphs
MONTHYEARML19269B6892019-10-0303 October 2019 NEIMA Section 108 Public Meeting Slides - Oyster Creek - October 3, 2019 ML18347B3142018-12-19019 December 2018 Bwrvip/Asme Relief Request Discussion December 19, 2018 ML18334A2162018-11-30030 November 2018 Presentation Slides: Exelon BWR MSIV (Boiling-Water Reactor - Main Steam Isolation Valve) Leakage Optimization for NRC Pre-Submittal Meeting of December 6, 2018 ML18319A1272018-11-19019 November 2018 Slides for 11/19/18 Public Meeting - Exelon Fleet LAR for Common Language for TS 5.7 High Radiation Areas ML18226A0022018-08-14014 August 2018 Holtec Revised Slides for NRC LTA Pre-Submittal Meeting (Oyster Creek Nuclear Generating Station) ML18201A2372018-07-17017 July 2018 Slides 7/17/2018 PSDAR Meeting ML18054B3592018-02-27027 February 2018 Slide: NRC Pre-Submittal Meeting for Exelon Fleet LAR to Relocate TS Unit Staff Qualification ANSI Requirements to the QATR, February 27, 2018, Profile Info: Submitted by Frank Mascitelli ML17062A5522017-03-0909 March 2017 E EMRV Failure Slides for Regulatory Conference Meeting Notice for 03/09/17 ML16314E4812016-11-14014 November 2016 Part 37 Applicability to Reactor Vessels and Associated Structures, Systems, and Components While in Safstor Awaiting Active Decommissioning Activities - November 14, 2016 ML16092A1402016-04-0606 April 2016 4/6/16, Meeting Slide for Pre-Submittal Meeting with NRC Regarding Oyster Creek Decommissioning Post-Shutdown Emergency Plan License Amendment Request ML15265A3592015-09-21021 September 2015 NRC Oyster Creek Decommissioning Pre-Submittal Meeting Slides 09-21-15 ML15153A1372015-05-28028 May 2015 Aam - NRC Slide Presentation May 28 2015 ML15118A8042015-05-0505 May 2015 Webinar 2015 Slides Presentation ML15265A3742015-02-21021 February 2015 NRC Pre-Submittal Meeting 09-21-15 - Decommissioning Submittal List ML12173A1322012-06-21021 June 2012 Summary of Public Meeting with Exelon Generation Company, LLC Regarding Items of Public Interest Related to Oyster Creek Nuclear Generating Station ML12159A3522012-06-0606 June 2012 June 6 2012 Public Meeting - NRC Slides ML12159A3582012-06-0606 June 2012 Public Meeting, 6/6/12 - Slides - EPA Role in NPPs - Debonis ML12110A3402012-04-19019 April 2012 Annual Assessment Meeting - 2011 ROP-NRC Slides ML1208701402012-03-27027 March 2012 Licensee Slides for Exelon Fleet Pre-Submittal Public Meeting 4-10-12 Licensed Operator Eligibility Requirements LAR ML1115201902011-05-26026 May 2011 Assessment Meeting - NRC Slides ML1012300492010-05-0303 May 2010 Slides for the Oyster Creek Annual Assessment Public Meeting ML0934102382009-12-0404 December 2009 Meeting Presentation, ACRS Meeting with the U.S. Nuclear Regulator Commission ML0929400522009-10-22022 October 2009 Meeting Power Uprate Meeting Slides ML0929407012009-10-21021 October 2009 Slides for October 22, 2009, Public Meeting, Buried Piping Experience ML0928701922009-10-0909 October 2009 FEMA Public Meeting at Oyster Creek Slides, October 2009 ML0913206522009-05-13013 May 2009 Annual Assessment Meeting, Slides for May 28, 2009 Public Meeting ML0913205742009-05-12012 May 2009 Meeting Slides, Oyster Creek Annual Assessment Meeting 2008 Reactor Oversight Process ML0912702392009-05-0404 May 2009 Calvert County Sheriff- Special Operations Team ML0912406092009-04-23023 April 2009 Meeting, Slides, New Jersey State Police Response to Hostile Action at Nuclear Power Plants, National Radiological Emergency Preparedness Conference ML0812007842008-06-0202 June 2008 Meeting Slides, Nrc/Exelon Licensing Counterparts Meeting. ML0810606002008-04-15015 April 2008 Meeting Slides, NRC Annual Performance Assessment of Oyster Creek 2007 Reactor Oversight Program. ML0802501172008-01-15015 January 2008 1/15/2008 Slides from Drop-in Visit Exelon/Amergen ML0715204362007-05-23023 May 2007 Feedback Forms, List of Attendees, & Final Slides from the Oyster Creek 2007 Annual Assessment Meeting (Aam) ML0716601022007-03-20020 March 2007 Slides to Counterparts Meeting with Exelon to Discuss Current and Planned Licensing Activities and Process - Correction ML0726804132006-12-31031 December 2006 Katz, B., and R. Puentes, May 2006, Prosperity at Risk: Toward a Competitive New Jersey, the Brookings Institute ML0634206092006-11-0404 November 2006 Powerpoint: Oyster Creek 1R21 Outage Startup PORC Update on Drywell Shell Inspections November 4, 2006 (PA) ML0634206282006-10-24024 October 2006 E-MAIL: (PA) Fwd: Slides ML0622301292006-07-12012 July 2006 Powerpoint Presentation Associated with Oyster Creek Draft EIS Public Meetings ML0610003702006-04-10010 April 2006 NRC Slides for Annual Assessment Public Meeting with Amergen Reference CY2005 Oyster Creek Station Performance ML0534003822005-11-0101 November 2005 Environmental Scoping Meeting Oyster Creek Nuclear Generating Station, U.S. Nuclear Regulatory Commission and National Environmental Policy Act, November 1, 2005 ML0534003912005-11-0101 November 2005 the NRC: Who We Are and What We Do and How We Regulate ML0514001792005-05-12012 May 2005 NRC Slides for Annual Assessment Meeting with Amergen Regarding Oyster Creek Station ML0509800822005-04-0808 April 2005 05/12/2005 - Oyster Creek Annual Assessment Meeting Slides for Meeting with Amergen ML0430302502004-09-27027 September 2004 Slides for Oyster Creek EDG Regulatory Conference from Amergen ML0726803592003-12-31031 December 2003 Private Property and the Common Good, Anonymous, 2003, Powerpoint Presentation ML0323000332003-07-30030 July 2003 Exelon Nuclear State of the Fleet Presentation ML0310405012003-03-28028 March 2003 Notice of Meeting Slides Annual Assessment of Safety Performance of Oyster Creek Station 2019-10-03
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSYLVANIA 19406-2713 June 21, 2012 MEETING
SUMMARY
LICENSEE: EXELON GENERATION COMPANY, LLC FACILITY: OYSTER CREEK NUCLEAR GENERATING STATION
SUBJECT:
SUMMARY
OF PUBLIC MEETING On June 6, 2012, from 6:00 p.m. to 8:00 p.m., the U. S. Nuclear Regulatory Commission (NRC) conducted a public meeting at the Holiday Inn in Toms River, New Jersey. This public meeting was conducted to allow citizens an opportunity to provide public comment in a public format and to discuss specific items of public interest related to the Oyster Creek Nuclear Generating Station and to the safety of the nuclear industry in general. This meeting was conducted to supplement the annual assessment meeting held on March 28, 2012, based on interest from public stakeholders and United States Senators Robert Menendez and Frank R. Lautenberg from New Jersey, and Congressman Christopher H. Smith, 4th District, New Jersey.
A public meeting notice was issued on May 16, 2012, and was posted on the NRCs external (public) Web page. The meeting notice can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession No. 12137A589. ADAMS is accessible from the NRC Web page at: http://www.nrc.gov/reading-rm/adams.html.
The NRC presented slides and had informational handouts available, provided the public a forum to participate, and answered questions posed by members of the public related to the Oyster Creek Nuclear Generating Station. Additional information related to the safety performance of Oyster Creek Nuclear Generating Station can be found on the NRC's web site at: www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.
Members of the public, New Jersey state and local officials, U.S. Senate and Congressional staff, and members of the media attended the meeting. NRC staff responded to questions regarding specific items of public interest related to the Oyster Creek Nuclear Generating Station and to the NRCs current and planned regulatory activities related to the nuclear industry.
/RA/
Gordon K. Hunegs, Chief Projects Branch 6 Division of Reactor Projects
Enclosures:
Public Meeting Sign in Sheets (ML12170A460)
NRC Slide Presentation (ML12159A352)
EPA Slide Presentation (ML12159A358
ML12173A132 SUNSI Review Non-Sensitive Publicly Available Sensitive Non-Publicly Available OFFICE mmt RI/DRP RI/DRP NAME SBarber/SB GHunegs/SB for DATE 06/21/12 06 / 21/12
Oyster Creek Public Meeting June 6, 2012 Nuclear Regulatory Commission - Region I
Meeting Agenda
Introductions
Oyster Creek 2011 Performance Results Presentation from EPA Presentation from NRC Questions & Answers
NRC Annual Assessment Summary of Oyster Creek Exelon operated the plant safely Oyster Creek was in the Licensee Response Column of NRCs Action Matrix in 2011 The NRC plans to perform baseline inspections in 2012
NRC Inspection Activities at Oyster Creek for 2011 5589 hours0.0647 days <br />1.553 hours <br />0.00924 weeks <br />0.00213 months <br /> of direct inspection Two resident inspectors on site Event response Inspect over 20 areas of plant performance Examples include operator performance, risk management, equipment issues, and fire protection
NRC Inspection Activities at Oyster Creek for 2011 Nine regional inspections Four team inspections Triennial Fire Protection EP Exercise Evaluation Operator Licensing Examinations Security Baseline
Environmental Protection Agency (EPA)
Region 2
Fukushima Lessons Learned July 2011 Near-Term Task Force (NTTF) report issued September/October 2011 NTTF recommendations prioritized into 3 tiers March 2012 The NRC staff issued the Tier 1 orders and requests for information
Orders The NRC staff ordered licensees to:
Develop strategies and procure additional equipment to address beyond-design-basis natural phenomena and multiunit events Include a reliable hardened vent in Mark I and Mark II containments Enhance spent fuel pool instrumentation for beyond design basis accidents
Requests for Information The NRC staff requested information on:
Whether facility configurations, as confirmed by seismic and flooding walkdowns, are in compliance with current facility design bases The adequacy of facility design bases with respect to seismic and flooding hazards Current communications system power supplies and their availability during a prolonged SBO event The required staffing necessary to respond to a multiunit, prolonged SBO event
Rulemaking Activities On March 20, 2011, the NRC issued an advanced notice of proposed rulemaking regarding a potential revision to the Station Blackout rule.
On April 18, 2011, the NRC issued an advanced notice of proposed rulemaking regarding the integration of EOPs, SAMGs, and EDMGs.
Next Steps on Tier 1 Orders and Request for Information Develop implementation guidance for the orders and requests for information Review licensee responses to the orders and requests for information Conduct follow up inspections
More Information NRCs public website:
http://www.nrc.gov/japan/japan-info.html Frequently Asked Questions Contact Scott Burnell, Public Affairs Officer, at 301-415-8204 NRC is accepting public comments on any of the recommendations Please send comments to JLD_Public.Resource@nrc.gov
NRC Social Media Channels Blog: http://public-blog.nrc-gateway.gov/
Flickr: http://www.flickr.com/photos/nrcgov/
Twitter: https://twitter.com/#!/nrcgov YouTube: http://www.youtube.com/user/NRCgov RSS: http://www.nrc.gov/public-involve/listserver.html#rss 13
Contacting the NRC Report an emergency (301) 816-5100 (call collect)
Report a safety concern (800) 695-7403 Allegation@nrc.gov General information or questions www.nrc.gov
References http://www.state.nj.us/
http://www.nrc.gov/reading-rm/doc-collections/fact-sheets/buried-pipes-tritium.html
End of Presentation Nuclear Regulatory Commission Region I Toms River, NJ June 6, 2012
Michael F. DeBonis Radiation and Indoor Air Branch U.S.
Environmental Protection Agency, Region 2 290 Broadway, New York NY June 6, 2012
EPA is the Federal agency mandated to protect human health and the environment.
Major activities:
Homeland security/ emergency response Public protective action recommendations Cleanup/waste management Emissions regulation RadNet Science and technology Information and outreach Protecting People and the Environment from Radiation Pg 2
Types of Radiological Incidents and Emergencies Los Alamos Lost Wildfires Sources Three Mile Island Space Launches Nuclear facility accidents Contaminated imports Nuclear weapon and device Transportation accidents accidents Satellite Reentry Nuclear terrorism Orphan sources Sabotage Foreign incidents 3
Putting Fukushima Risk in Perspective Calculate your estimated annual radiation dose:
http://www.epa.gov/radiation/understand/calculate.html 4
EPA RadNet System Currently, 125 permanent RadNet stations Deployable stations set up in Alaska, Hawaii, Guam, and Northern Marianas Islands Capable of detecting above background levels, but do not expect any harmful levels Real-time data have shown only typical background fluctuations For daily RadNet data: www.epa.gov/japan 2011
EPA's RadNet monitors across the US show typical fluctuations in background radiation levels.
Additional Deployable Monitors were sent to the Aleutian islands, Hawaii, Guam and Saipan to improve monitoring coverage for this event.
The levels detected are far below levels of concern
Trace levels of radioactive isotopes measured are consistent with the Japanese nuclear incident and far below levels of public health concern.
Additional exposure from well below 1 mrem for individuals in US and Territories Measured levels hundreds to thousands of times lower than FDA Derived Intervention Levels (DILS)
Greater risk from Radon - 257 mrem/yr NCRP 160, 2009 Bottom line? Test your house for radon!
http://www.epa.gov/radiation/understand/perspective.html
While we do not expect radiation from the damaged Japanese reactors to reach the United States at harmful levels, I want to assure you that EPA will continue our coordination with our federal partners to monitor the air, milk, precipitation and drinking water for any changes, and we will continue our outreach to the public and the elected officials to provide information on our monitoring results.
- Administrator Lisa P. Jackson