ML092940052
| ML092940052 | |
| Person / Time | |
|---|---|
| Site: | Dresden, Peach Bottom, Oyster Creek, Byron, Braidwood, Limerick, Clinton, Quad Cities, LaSalle, Crane |
| Issue date: | 10/22/2009 |
| From: | Exelon Generation Co |
| To: | Division of Operating Reactor Licensing |
| Gratton C, NRR/DORL/LPL3-2, 415-1055 | |
| References | |
| Download: ML092940052 (13) | |
Text
@
C c
ca -
- a...
U Q)....
0..
- a.
Q)..
ca..
- a.
- )..
Q)
~
0
- a.
0')
0 0 N N
N s
(1)
.c 0..,
(J 0
E co Q,)
(J Q,).....
0 '
C.
Q,)
CO
'a.
- J Q,)
~
0 c.
Agenda
./ Introduction
./ Power Uprate Organization
./ Power Uprate Overview
./ Power Uprate Scope
./ Licensing Principles
./ Projected Submittal Schedules
./ Topics of Interest
./ NRC Staff Feedback
./ Summary / Conclusions Exel n~
Introduction
./ Purpose
- Discuss Exelon Generation Company's plans to submit power uprate requests for various units in our reactor fleet
./ Exelon Participants
- Alex Javorik, Senior Director - Power Uprate
- Marvin Lohmann, Project Management Director - Power Uprate
- Mike Jesse, Licensing Manager - Power Uprate
- Darin Benyak, Licensing Director - Corporate
- Jim Armstrong, Site Regulatory Assurance Manager - Peach Bottom Exel n:~
Power Uprate Organization SVP Engineering &
[
SileVP l...
Tech Services Corp VP Project Mgmt 1
Senior Director Uprate A.\\r\\ \\{ <:Xl' (..\\1 Corp VP Engineering Project Mgmt Director 1'\\ \\...oh ~
Site Project Mgmt Power Uprate Project Mgmt Licensing Manager.....
IJ\\, ~6';) e Site Reg Assurance Manager Power Uprate Licensing Corp VP Licensing Engineering Director Site Engineering Power Uprate Engineering Site Engineer
- j. i\\{ ~".i\\1~"~
Exel n
Power Uprate Overview
./ Public announcement to perform over 1300 MWe of uprates over the next eight years
./ Exelon has installed 1100 MWe of increased nuclear capacity over the past 10 years
./ Planned uprates include:
Extended power uprates (EPUs)
Measurement uncertainty recapture (MUR) uprates Megawatt recovery - turbine retrofits and other component upgrades Exelon Nuclear Planned Uprates 1600 I*
UilO - 1.':\\1 'IWc I
I ilolal "apadl\\)
1400 Maximum Potential MWs UOOMW:
MW Recovery and 1200 I
II Component Upgrades
~ 1000 t*,
MURs I
~
800 S
IV
"-Co 600 EPUS
- J 400 1 200 II * -
- II 0
1-1 I
1999-2009 2010 2011 2012 2013 2014 2015 2016 2017 2009 2008 2017 Year Uprates Become Operational Exel n:;)
~
Power Uprate Overview Exelon Fleet Potential Generation Increase 400 350 300 C1I 250 ~---------------j
~ 200
~~~ 0 1~1~_~jJ_
BR BY CL DR LS QC LI OC PB TMI
~.DM~~
.EPU DTurbine Retrofits J MUR Uprates EPU Turbine Retrofits Site MWe Increase
% Increase in CLTP MWe Increase
% Increase in CLTP MWe Increase BR 42 1.7%
BY 42 1.7%
CL 24 DR 31 1.7%
110 LS 40 1.7%
336 12.4%
QC 31 1.7%
146 LI 41 1.7%
340 12.4%
OC PB 297 12.5%
64 TMI 15 1.7%
172 18.0%
Total 242 1169 320 Total Potential MWe Increase = 1731 Mwe
- Application of MELLLA+ to complete full EPU Exel n@
Power Uprate Scope
./ MUR Uprate License amendment request (LAR) scope defined by RIS 2002-03 (MUR guidance)
BWR approach defined in NEDC-32938P-A (Thermal Power Optimization Topical Report)
PWR LARs will follow RIS 2002-03 guidance (no approved topical report)
./ EPU LAR scope defined in RS-001 (EPU Review Standard)
BWR approach defined in NEDC-33004P-A (Constant Pressure Power Uprate) and NEDC-32424P-A (EPU Generic Guidelines)
PWR LARs will follow RS-001 guidance (no approved topical report)
EPU LARs will not be submitted during License Renewal application review period
./ BWR Power Range Neutron Monitoring System (PRNMS)
Braidwood U & U2 LAR will follow EPU approval if required Byron U&t2 Approach defined in NEDC-32410P-A Clinton lJI (PRNMS Topical Report)
Dresden 12&LJ LaSalle II & t2
./ BWR MELLLA Plus Limerick lJ I & L2 LAR will follow EPU (or PRNMS) approval Peach Bottom U2 & U3
- Approach defined in NEDC-33006 Quad Cities II & L2 (MELLLA Plus Topical Report)
Three \\1i1e Island LI MUR EPU PRNMS MELLLA+
tI tI tI
.r II l/
tI tI tI llc V
tI tI tI V
tI tI n.~
Exel
.OJ
Licensing Principles
./ Power Uprate Group is incorporating lessons learned from recent submittals and from industry power uprate experience
- Increased focus on LAR quality
-- Ensure adherence to L1C-109 acceptance review criteria Extensive use of independent third party review Plan for adequate NRC review time
- Take advantage of lessons learned
--- Incorporate previous RAls as applicable
-- Power uprate lessons learned database for industry experience
-- Implement industry recommendations for excellence in performance of plant uprates (INPO 09-05, NEI 08-10)
- Communicate with NRC
-- Effective pre-submittal meetings Routine communication with NRC Project Manager
-. Ensure reviewer issues resolved - raise concerns early Exel nco
Projected Submittal Schedules NRC Reviews MUR Uprate 2009 2010 2011 2012 2013 2014 2015 Braidwood LI & \\2 I
nnHlnths --
I Braidwood lJl&12 B~ron LI & L2 I lnooths '_
B) ron 1JI&12 Dresdt'n L2&l!3 II! muilths :_
Dresden lJ2&l!3 LaSalle 1'1&U2 Jil mO~lhs LaSalle lJl&C2 Limerick 10 I *unlh Limerick 1'1&U2 lJ 1 & LJ2 Quad Cities LI & U2 I
fIlOl!lhs I
1_ -
Quad Cities l'1 & LJ2 Th ret' '\\1i1e Island l'1 I
I 1TI"lllh, --
Three Mile Island LJI Exel n;9 Durations include acceptance review
Projected Submittal Schedules NRC Reviews EPU, PRNMS, MELLLA+
Clinton Ll LaSalle lit & lJ2 Limerick Ll&L2 Peach Bottom L2&lJ3 2009 2010 I
2011 2012 2013 2014 2015
.... ~2 m=hS~ '~!12 mbnth IS u\\u1I1 h
... 1.... * *** *,,*.
I 1~ rhnoi
.*,**I**t**t**t*"
_:12 month~
\\
~
12 mJnths.~.. ~..
181lwIllh,
- 1.
-i
- r**~**re
)2 month.!.
Clinton UI LaSalle UI & L2 Limerick Ul&L2 Peach BoUom lJ2 & U3 Three \\lile Island L I
.1 l~ In/m!ll' L
L I
..*.**t**J**I*****
Til ret' 1\\1i Ie Island l'l EPL.....
PRNiVIS 1\\1 ELLL\\ +
- Exel n@
Durations include acceptance review
Projected Submittal Schedules NRC Reviews 2009 2010 2011 2012 2013 2014 2015 Braid".ood Ll & L j
2" io nuinths.. -
i B.raidwood Ll & L'2 Byron Ul&l'2 I mohths L-.
Byron U/&U2 Clinton L I
, bml/nths Clinton L I Dresden III llIu~ths Dresden L'2&n j-U2&U3
- 18 [lIonlh!;
'I' i
h LaSalle 1.- Ii) mouths. - ;
... ":::t.........
LaSalll' LI & [2 1-
.-J2 month,.-
UI & U2 I
- ,e Lnneflck
.-' 10 IIwnths 1:8 months j
LlIl1enck U & L2 2 m?~
L'l & L'2 18 oOWs' j
- *-4t I
Peach Bottom Peach Bottom L2 & l'3 I
.-'12 n\\(lDths U2 & L3 Quad Cities l(lmoOII,s.-
Quad Cities Ll&L2 UI&U2 IX m nth 4"*........*.*
Three 'Iile 111100 tlls -. '
Three Mill' Island L I Island II EPL ****
PR'\\MS Exel nif;
- \\ILR.
MELLLA+.
Durations include acceptance review
Topics of Interest v" Steam Dryers
- Will use 8 (Continuum Dynamics, Inc.) approach applied on recent BWR EPUs Will use applicable elements of approach for MU Rs v" TSTF-493, Setpoint Methodology Potential NRC approval in late 2009 LaSalle/limerick MUR submittals in Jan-Feb 2010 will adopt TSTF for revised setpoints Remaining power uprate submittals will adopt TSTF for all setpoints v" Containment Overpressure (COP) Credit LaSalle and Limerick not expected to require COP credit Peach Bottom current licensing basis credits COP Will monitor resolution of current ACRS recommendations
../ LaSalle AST Approval Pending RAls will need resolution LaSalle MUR submittal was developed using AST methods Exel n~
f/)
C Q)
E E
0 (J--
f/)
C 0
f/)
Q):s a
.::t::.
0 ro
..c
-0 Q)
Q)
LL q
co (f)
U 0:::
Z
~
w CJ) c 0.
CJ)
-::J 0 c 0
0
~
"ro E
E
- J (f)
">