ML083310073

From kanterella
Jump to navigation Jump to search
Summary of Meeting with Exelon to Review the Results of Security Organization Safety Conscious Work Environment (SCWE) Surveys at Exelon Nuclear Operating Reactors
ML083310073
Person / Time
Site: Dresden, Peach Bottom, Oyster Creek, Byron, Three Mile Island, Braidwood, Limerick, Clinton, Quad Cities, LaSalle
Issue date: 11/26/2008
From: Paul Krohn
Reactor Projects Region 1 Branch 4
To:
KROHN P, RI/DRP/PB4/610-337-5120
References
Download: ML083310073 (2)


Text

November 26, 2008 MEETING

SUMMARY

LICENSEE: EXELON GENERATING COMPANY, LLC FACILITIES: Peach Bottom Atomic Power Station, Units 2 and 3; 50-277; 50-278 Braidwood Station, Units 1 and 3; 50-456; 50-457 Byron Station, Units 1 and 2; 50-454; 50-455 Clinton Power Station, Unit 1; 50-461 Dresden Nuclear Power Station, Units 2 and 3; 50-237; 50-249 LaSalle County Station, Units 1 and 2; 50-373; 50-374 Limerick Generating Station, Units 1 and 2; 50-352; 50-353 Oyster Creek Nuclear Generating Station; 50-219 Quad Cities Nuclear Power Station, Units 1 and 2; 50-254; 50-265 Three Mile Island Nuclear Station, Unit 1; 50-289

SUBJECT:

SUMMARY

OF NOVEMBER 17, 2008, MEETING WITH EXELON TO REVIEW THE RESULTS OF SECURITY ORGANIZATION SAFETY CONSCIOUS WORK ENVIRONMENT (SCWE) SURVEYS AT EXELON NUCLEAR OPERATING REACTORS On November 17, 2008 at 1:00 p.m., a closed meeting was conducted at the Exelon office located in Kennett Square, PA between the Nuclear Regulatory Commission (NRC) Regions I and III and Exelon Generating Company (Exelon). The NRC requested the meeting with Exelon to review the results of security organization SCWE surveys at Exelon Nuclear operating reactors. This meeting discussed an Exelon commitment documented in a NRC Confirmatory Action Letter (ML072920283) that was issued as a result of Peach Bottom inattentive security officer events that were identified in September 2007. The commitment was for Exelon to conduct SCWE surveys of the security organizations at all Exelon sites after the transition from Wackenhut to Exelon security organization management.

Exelon presented and discussed its assessment of the SCWE survey results. Exelon stated that, overall, the survey results indicated that the SCWE within the security organizations was highly rated and that respondents understood SCWE expectations and would raise safety concerns to supervision and management. The NRC questioned the scope of the surveys; probed the basis for the results; asked site-specific questions; and explored corrective actions, both taken and planned. Specifically, the NRC questioned survey results related to the system of rewards and discipline; employees feeling valued; the general trust and openness of communications; management receptivity to inputs and feedback; and supervision and management practicing visible leadership in the field.

The notice associated with this meeting can be located in ADAMS, Accession No. ML083110593. Exelon slides presented at the meeting are attached to this summary and can be located in Adams, Accession No. ML083290241.

/RA/

Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects

Distribution: S. Schmitt, DRP, OA D. Lew, DRP J. Hughey, NRR J. Clifford, DRP S. West, RIII, DRS M. Gamberoni, DRS A. Boland, RIII, DRS D. Roberts, DRS E. Duncan, RIII, DRS P. Krohn, DRP M. Ring, RIII, DRP J. Trapp, DRS C. Pederson, RIII, DRP R. Bellamy, DRP G. Shear, RIII, DRP R. Fuhrmeister, DRP K. Riemer, RIII, DRP T. Setzer, DRP R. Skokowski, RIII, DRP F. Bower, DRP, SRI S. Williams, OEDO M. Brown, DRP, RI ML083310073 SUNSI Review Complete: PGK (Reviewers Initials)

DOCUMENT NAME: G:\DRP\BRANCH4\PEACH BOTTOM\PEACH BOTTOM Inattentive officer 9_07\RI-RIII SCWE Survey Inspections\NRC-Exelon 11_17_08 Sec Org SCWE Meeting Summary.doc After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" Copy with attachment/enclosure "N" = No copy OFFICE RI / DRP RI / DRS RII / DRS NAME PKrohn/PGK JTrapp/JT EDuncan/PGK for DATE 11/21/08 11/24 /08 11/25 /08