ML13142A431

From kanterella
Jump to navigation Jump to search
Summary of Annual Assessment Meeting, Oyster Creek
ML13142A431
Person / Time
Site: Oyster Creek
Issue date: 05/22/2013
From: Hunegs G
NRC/RGN-I/DRP/PB6
To:
HUNEGS, GK
References
Download: ML13142A431 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSYLVANIA 19406-2713 May 22, 2013 MEETING

SUMMARY

LICENSEE: Exelon Generation Company, LLC FACILITY: Oyster Creek Nuclear Generating Station

SUBJECT:

SUMMARY

OF PUBLIC MEETING On May 15, 2013, at 6:00 pm to 9:00 pm, the U. S. Nuclear Regulatory Commission (NRC) conducted a public meeting and open-house at the Holiday Inn in Manahawkin, NJ. The NRC conducted the public meeting and open-house to discuss its assessment of the safety performance at Oyster Creek for 2012.

A notice of the public meeting and open-house was issued on April 8, 2013, and was posted on the NRCs external (public) Web page. The meeting notice can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession No. ML13098A037. ADAMS is accessible from the NRC Web page at: http://www.nrc.gov/reading-rm/adams.html.

The NRC presented poster boards and slides and was available to discuss its assessment of the safety performance of Oyster Creek for the period of January 1 through December 31, 2012, as documented in our letter dated March 4, 2013 (ADAMS Accession No. ML13057A284).

The NRC poster boards and slides presented included background on the Reactor Oversight Process (ROP). Additional information relative to the NRC's Annual Assessment Process and the safety performance of Oyster Creek can be found on the NRC's web site at:

www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Members of the public, state officials, and members of the media attended the meeting and were offered the opportunity to question the NRC regarding Oyster Creeks performance and the role of the agency in ensuring safe plant operations.

/RA/

Gordon K. Hunegs, Chief Projects Branch 6 Division of Reactor Projects

ML13057A284).

The NRC poster boards and slides presented included background on the Reactor Oversight Process (ROP). Additional information relative to the NRC's Annual Assessment Process and the safety performance of Oyster Creek can be found on the NRC's web site at:

www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Members of the public, state officials, and members of the media attended the meeting and open-house and were offered the opportunity to question the NRC regarding Oyster Creeks performance and the role of the agency in ensuring safe plant operations.

/RA/

Gordon K. Hunegs, Chief Projects Branch 6 Division of Reactor Projects Distribution: (via email) J.Kulp, DRP G. Hunegs, DRP A. Patel, DRP B.Bickett, DRP J.DeVries, DRP A.Dugandzic, DRP RidsNRRPMOysterCreek Resource DOC NAME: G:\DRP\BRANCH6\ROP Assessment Folders\ROP 13\End-of-Cycle\OC\OC Annual Assessment Meeting Summary 2013.docx ADAMS Accession No.: ML13142A431 SUNSI Review Non-Sensitive Publicly Available Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME BBickett/BB GHunegs/GKH DATE 05/22 /12 05/ 22 /12