Welcome!
This webinar will start in a few moments Nuclear Regulatory Commission - Region I 1
Todays Presenters Ho Nieh Director, Division of Reactor Projects Silas Kennedy Branch Chief, Division of Reactor Projects Niklas Floyd Reactor Inspector, Division of Reactor Safety Amar Patel Senior Resident Inspector Oyster Creek Senior Resident Inspector, Oyster Creek Brett Klukan 2
Regional Counsel (Moderator)
2014 Performance Results 2014 Performance Results Inspection Activities at Oyster Creek in 2014 Discussion of Greater than Green Findings Discussion of Greater than Green Findings Question-and-Answer Session Closing Remarks g
Agenda g
3
Exelon operated Oyster Creek safely and in a manner that preserved the public health and safety p
p y
and protected the environment.
2014 Annual Assessment Summary 4
Licensee Regulatory Degraded Multiple/Repetitive Unacceptable Action Matrix Licensee
Response
Regulatory
Response
Degraded Cornerstone Degraded Cornerstone Unacceptable Performance I
i Increasing:
Safety Significance Inspection Management Involvement Management Involvement Regulatory Action Assessment Summary (cont.):
O t
C k i i th R
l t R
Oyster Creek is in the Regulatory Response Column of the NRCs Reactor Oversight Process Action Matrix Action Matrix 5
Assessment Summary (cont.):
Action Matrix:
Regulatory Response Column Inspection Findings Performance Indicators One White performance indicator:
unplanned scrams (3Q2014)
Returned to Green in 4Q2014 and satisfactory follow up inspection One White finding: #2 emergency diesel generator fan shaft failure One Yellow finding: electromatic relief valve failures (old design satisfactory follow-up inspection (95001)
All performance indicators are currently Green relief valve failures (old design issue - no Action Matrix input)
Nine Green findings in 2014 Green White Yellow Red Increasing Safety Significance 6
6900 hours0.0799 days <br />1.917 hours <br />0.0114 weeks <br />0.00263 months <br /> of inspection and related activities 6900 hours0.0799 days <br />1.917 hours <br />0.0114 weeks <br />0.00263 months <br /> of inspection and related activities 2 Resident Inspectors on site - residents issue 2 Resident Inspectors on site residents issue four quarterly inspection reports per year and walk through the plant every day NRC Inspection Activities at Oyster Creek in 2014 C
spect o ct t es at Oyste C ee 0
7
14 regional inspections g
p 2 major team inspections Fire Protection Problem Identification and Resolution Follow-up inspection (95001) for a White unplanned scrams performance indicator NRC Inspection Activities at Oyster Creek in 2014 unplanned scrams performance indicator C
spect o ct t es at Oyste C ee 0
8
No. 2 Emergency Diesel Generator Fan Shaft Failure Electromatic Relief Valve (EMRV) Failures Greater-than-Green Findings g
9
No. 2 Emergency Diesel Generator Fan Shaft Failure Fan Shaft Failure White violation of 10 CFR 50, Appendix B, Criterion III Design Control Criterion III, Design Control Exelon did not review the suitability of a new maintenance process for tensioning the cooling maintenance process for tensioning the cooling fan belt for the diesel generators.
This resulted in the shaft being more susceptible to fatigue and subsequent failure.
Diesel 10 Generator
No. 2 Emergency Diesel Generator Fan Shaft Failure (cont )
Fan Shaft Failure (cont.)
Exelons corrective actions included:
Exelon s corrective actions included:
Replacing the fan shaft for No. 2 emergency diesel generator g
Checking for a similar problem in the identical No.1 emergency diesel generator Revising the maintenance procedure 11
No. 2 Emergency Diesel Generator Fan Shaft Failure (cont )
Fan Shaft Failure (cont.)
Background on the Issue NRC I ti R
t 05000219/2014005 (F b NRC Inspection Report 05000219/2014005 (February 11, 2015)
ADAMS Accession Number: ML15042A072 Date of follow-up supplemental inspection (95001): TBD Action Matrix Input Licensee Response Regulatory Response Degraded Cornerstone Multiple/Repetitive Degraded Cornerstone Unacceptable Performance White violation for emergency di l
t Follow-up inspection (95001) 12 diesel generator Follow up inspection (95001)
Electromatic Relief Valve (EMRV)
Failures Failures Yellow violation of 10 CFR 50, Appendix B, Criterion III, Design Control Old design issue per Inspection Manual Chapter (IMC) 0305 (IMC) 0305 The original design of the EMRV actuators was inadequate because portions of the actuator inadequate because portions of the actuator could bind when subject to vibration associated with plant operation.
Green White Yellow Red 13 Increasing Safety Significance
Electromatic Relief Valve (EMRV)
Failures (cont )
Failures (cont.)
EMRV actuator design 14
Electromatic Relief Valve (EMRV)
Failures (cont.)
Failures (cont.)
Exelons corrective actions included:
Performing a reactor shutdown and containment entry to test the currently installed EMRVs All five EMRVs stroked installed EMRVs. All five EMRVs stroked successfully 15
Electromatic Relief Valve (EMRV)
Failures (cont.)
Failures (cont.)
Corrective actions (cont.):
Replacing all five EMRV actuators with Replacing all five EMRV actuators with redesigned actuators during the refueling outage in October 2014 g
Revising applicable maintenance procedures 16
Why is this an Old Design Issue?
Identified by Exelon through voluntary as-found bench testing of EMRV actuators Exelon replaced all of the actuators with redesigned actuators, and revised applicable maintenance procedures maintenance procedures 17
Why is this an Old Design Issue (cont.)?
Not likely to be previously identified by recent ongoing licensee efforts Not a current performance deficiency associated with existing Exelon programs, policy, or procedure procedure 18
What will the NRC do with this Old Design Issue?
No input into the NRC Action Matrix (i.e., no column changes)
Our process (IMC 0305) still requires performance of a Our process (IMC 0305) still requires performance of a follow-up (supplemental) inspection to review Exelons root cause evaluation and corrective actions for this issue.
Because this issue is Yellow the NRC will perform Because this issue is Yellow, the NRC will perform supplemental inspection procedure 95002 (date TBD)
Licensee Response Regulatory Response Degraded Multiple/Repetitive Degraded Unacceptable Action Matrix Input Licensee Response Regulatory Response Cornerstone Cornerstone Performance White violation for emergency diesel generator Follow-up inspection (95001) 19 Yellow violation/old design issue for EMRVs Follow-up inspection (95002)
No Action Matrix Input
Electromatic Relief Valve (EMRV) Failures (cont.)
Background on the Issue NRC Inspection Report 05000219/2014009 (February 11 2015)
(February 11, 2015)
ADAMS Accession Number: ML15042A231 Date of follow-up supplemental inspection (95002): TBD 20
21
22
Do you have feedback on this webinar for us?
Go to the public meeting schedule on our website (http://meetings.nrc.gov/pmns/mtg), click on the [more] link f
thi ifi ti d th li k th M
ti for this specific meeting and then click on the Meeting Feedback link. Or E-mail comments to Silas Kennedy at silas.kennedy@nrc.gov