Line 3: |
Line 3: |
| | issue date = 08/28/2017 | | | issue date = 08/28/2017 |
| | title = Updated Inspection Plan for Hope Creek Generating Station, Unit 1(Report 05000354/2017005) | | | title = Updated Inspection Plan for Hope Creek Generating Station, Unit 1(Report 05000354/2017005) |
| | author name = Bower F L | | | author name = Bower F |
| | author affiliation = NRC/RGN-I/DRP/PB3 | | | author affiliation = NRC/RGN-I/DRP/PB3 |
| | addressee name = Sena P P | | | addressee name = Sena P |
| | addressee affiliation = PSEG Nuclear, LLC | | | addressee affiliation = PSEG Nuclear, LLC |
| | docket = 05000354 | | | docket = 05000354 |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD. | | {{#Wiki_filter:August 28, 2017 |
|
| |
|
| KING OF PRUSSIA, PA 19406
| | ==SUBJECT:== |
| -2713 August 28, 2017 Mr. Peter P. Sena, III President and Chief Nuclear Officer PSEG Nuclear LLC
| | UPDATED INSPECTION PLAN FOR HOPE CREEK GENERATING STATION UNIT 1 (REPORT 05000 354/20 17 005) |
| - N09 P.O. Box 236 Hancocks Bridge, NJ 08038
| |
| | |
| SUBJECT: UPDATED INSPECTION PLAN FOR HOPE CREEK GENERATING STATION UNIT 1 (REPORT 05000 354/20 17 005) | |
|
| |
|
| ==Dear Mr. Sena:== | | ==Dear Mr. Sena:== |
| The enclosed inspection plan lists the inspections scheduled through June 30 , 20 19 , for Hope Creek Generating Station Unit 1. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. | | The enclosed inspection plan lists the inspections scheduled through June 30 , 20 19 , for Hope Creek Generating Station Unit 1. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. |
|
| |
|
| This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non | | This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence. |
| -publicly available correspondence. | |
|
| |
|
| In addition to baseline inspections, the NRC plans to conduct Inspection Procedure (IP) 92702, "Follow-up on Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, Confirmatory Orders, and Alternative Dispute Resolution Confirmatory Orders," as described in Inspection Report 05000354/2017010 (ADAMS Accession No.: | | In addition to baseline inspections, the NRC plans to conduct Inspection Procedure (IP) 92702, "Follow-up on Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, Confirmatory Orders, and Alternative Dispute Resolution Confirmatory Orders," as described in Inspection Report 05000354/2017010 (ADAMS Accession No.: |
| ML17122A282 1). Also, as previously noted in the annual assessment letter dated March 1, 2017 (Report 05000 354/2016006; ADAMS Accession No.: ML17058A408 | | ML17122A282 1). Also, as previously noted in the annual assessment letter dated March 1, 2017 (Report 05000 354/2016006; ADAMS Accession No.: ML17058A408 |
| ), in addition to baseline inspections, the NRC conducted a supplemental inspection in accordance wit h IP 95001, "Supplemental Inspection Response to Action Matrix Column 2 Inputs | | ), in addition to baseline inspections, the NRC conducted a supplemental inspection in accordance wit h IP 95001, "Supplemental Inspection Response to Action Matrix Column 2 Inputs |
| ," onsite between August 7 and 11, 2017. The results of that inspection and a follow | | ," onsite between August 7 and 11, 2017. The results of that inspection and a follow-up assessment letter are expected to be issued within 45 days of the completion of that onsite inspection |
| -up assessment letter are expected to be issued within 45 days of the completion of that onsite inspection | | . The NRC will also be performing Temporary Instruction 2515/19 1 , "Inspection o f the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders a nd Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans |
| . The NRC will also be performing Temporary Instruction 2515/19 1 , "Inspection o f the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders a nd Emergency Preparedness Communication/Staffing/Multi | |
| -Unit Dose Assessment Plans | |
| ." | | ." |
| 1 The designation in parentheses refers to an Agencywide Documents Access and Management System (ADAMS) Accession Number. Documents referenced in this letter are publicly available using the Accession Number in ADAMS. Please contact me at (610) 337 | | 1 The designation in parentheses refers to an Agencywide Documents Access and Management System (ADAMS) Accession Number. Documents referenced in this letter are publicly available using the Accession Number in ADAMS. Please contact me at (610) 337-5200 with any questions you have regarding this letter |
| -5200 with any questions you have regarding this letter | |
| . | | . |
|
| |
|
Line 61: |
Line 54: |
| \ROP-18 Second Quarter Process | | \ROP-18 Second Quarter Process |
| \Branch 3\ROP 18 Inspection Plan Letter HC FINAL.docx ADAMS ACCESSION NUMBER: | | \Branch 3\ROP 18 Inspection Plan Letter HC FINAL.docx ADAMS ACCESSION NUMBER: |
| ML17233A013 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME JHawkins/per email MD MDraxton FBower DATE 8/17/17 8/17/17 8/21/17 OFFICIAL RECORD CO PY Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site Hope CreekInspection / Activity Plan 08/29/2017 | | ML17233A013 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME JHawkins/per email MD MDraxton FBower DATE 8/17/17 8/17/17 8/21/17 OFFICIAL RECORD CO PY Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site Hope CreekInspection / Activity Plan 08/29/2017-06/30/2019 Page 1 of 2 08/29/2017 09:29:392/12EXAM-HOPE CREEK INITIAL OL EXAM 5 1 FY18 HOPE CREEK EXAM (FEBRUARY 2018) |
| -06/30/2019 Page 1 of 2 08/29/2017 09:29:392/12EXAM-HOPE CREEK INITIAL OL EXAM 5 1 FY18 HOPE CREEK EXAM (FEBRUARY 2018) | |
| U01958 01/08/2018 01/12/2018 1 FY18 HOPE CREEK EXAM (FEBRUARY 2018) | | U01958 01/08/2018 01/12/2018 1 FY18 HOPE CREEK EXAM (FEBRUARY 2018) |
| U01958 02/12/2018 02/23/201871124-RAD PROTECTION 1 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 09/18/2017 09/22/2017 1 IP Occupational ALARA Planning and Controls71124.02 09/18/2017 09/22/2017 1 IP Occupational Exposure Control Effectiveness71151-OR01 09/18/2017 09/22/2017 1 IP RETS/ODCM Radiological Effluent Occurrences71151-PR01 09/18/2017 09/22/2017T1-191-FUKUSHIMA LESSONS-LEARNED 4 1 IP Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 2515/191 09/18/2017 09/22/201771124.08-RADWASTE 1 1 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.08 10/16/2017 10/20/201771124-BASELINE HP 1 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 01/22/2018 01/26/2018 1 IP Occupational ALARA Planning and Controls71124.02 01/22/2018 01/26/2018 1 IP Occupational Dose Assessment71124.04 01/22/2018 01/26/2018 U1 ISI-UNIT 1 INSERVICE INSPECTION 2 1 IP Inservice Inspection Activities - BWR7111108G 04/23/2018 04/27/201871124-BASELINE HP 1 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 04/30/2018 05/04/2018 1 IP Occupational ALARA Planning and Controls71124.02 04/30/2018 05/04/2018 1 IP Occupational Dose Assessment71124.04 04/30/2018 05/04/20187111121M-DESIGN BASES ASSURANCE INSPECTION (TEAM) | | U01958 02/12/2018 02/23/201871124-RAD PROTECTION 1 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 09/18/2017 09/22/2017 1 IP Occupational ALARA Planning and Controls71124.02 09/18/2017 09/22/2017 1 IP Occupational Exposure Control Effectiveness71151-OR01 09/18/2017 09/22/2017 1 IP RETS/ODCM Radiological Effluent Occurrences71151-PR01 09/18/2017 09/22/2017T1-191-FUKUSHIMA LESSONS-LEARNED 4 1 IP Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 2515/191 09/18/2017 09/22/201771124.08-RADWASTE 1 1 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.08 10/16/2017 10/20/201771124-BASELINE HP 1 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 01/22/2018 01/26/2018 1 IP Occupational ALARA Planning and Controls71124.02 01/22/2018 01/26/2018 1 IP Occupational Dose Assessment71124.04 01/22/2018 01/26/2018 U1 ISI-UNIT 1 INSERVICE INSPECTION 2 1 IP Inservice Inspection Activities - BWR7111108G 04/23/2018 04/27/201871124-BASELINE HP 1 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 04/30/2018 05/04/2018 1 IP Occupational ALARA Planning and Controls71124.02 04/30/2018 05/04/2018 1 IP Occupational Dose Assessment71124.04 04/30/2018 05/04/20187111121M-DESIGN BASES ASSURANCE INSPECTION (TEAM) |
| 6 1 IP Design Bases Assurance Inspection (Teams)7111121M 06/04/2018 06/08/2018 1 IP Design Bases Assurance Inspection (Teams)7111121M 06/18/2018 06/22/201871124.07-REMP 1 1 IP Radiological Environmental Monitoring Program71124.07 06/25/2018 06/29/2018REQUAL-HC REQUAL INSP WITH P/F RESULTS 2 1 IP Licensed Operator Requalification Program - Annual Review7111111A 10/08/2018 10/12/2018 1 IP Licensed Operator Requalification Program7111111B 10/08/2018 10/12/201871124-BASELINE HP 1 1 IP Radiological Hazard Assessment and Exposure Controls71124.0111/26/201811/30/2018 1 IP Occupational ALARA Planning and Controls71124.0211/26/201811/30/2018 1 IP In-Plant Airborne Radioactivity Control and Mitigation71124.0311/26/201811/30/2018 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures. | | 6 1 IP Design Bases Assurance Inspection (Teams)7111121M 06/04/2018 06/08/2018 1 IP Design Bases Assurance Inspection (Teams)7111121M 06/18/2018 06/22/201871124.07-REMP 1 1 IP Radiological Environmental Monitoring Program71124.07 06/25/2018 06/29/2018REQUAL-HC REQUAL INSP WITH P/F RESULTS 2 1 IP Licensed Operator Requalification Program - Annual Review7111111A 10/08/2018 10/12/2018 1 IP Licensed Operator Requalification Program7111111B 10/08/2018 10/12/201871124-BASELINE HP 1 1 IP Radiological Hazard Assessment and Exposure Controls71124.0111/26/201811/30/2018 1 IP Occupational ALARA Planning and Controls71124.0211/26/201811/30/2018 1 IP In-Plant Airborne Radioactivity Control and Mitigation71124.0311/26/201811/30/2018 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures. |
|
| |
|
| Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site Hope CreekInspection / Activity Plan 08/29/2017 | | Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site Hope CreekInspection / Activity Plan 08/29/2017-06/30/2019 Page 2 of 2 08/29/2017 09:29:3971124-BASELINE HP 1 1 IP Occupational Exposure Control Effectiveness71151-OR0111/26/201811/30/2018 1 IP RETS/ODCM Radiological Effluent Occurrences71151-PR0111/26/201811/30/201871124-HP 1 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 01/07/201901/11/2019 1 IP Occupational ALARA Planning and Controls71124.02 01/07/201901/11/2019 EP-EP PROGRAM INSPECTION 2 1 IP A lert and Notification System Testing711140202/11/2019 02/15/2019 1 IP Emergency Preparedness Organization Staffing and Augmentation System711140302/11/2019 02/15/2019 1 IP Correction of Emergency Preparedness Weaknesses and Deficiencies711140502/11/2019 02/15/2019 1 IP Performance Indicator Verification7115102/11/2019 02/15/20197111105T-TRIENNIAL FIRE PROTECTION 4 1 IP Fire Protection [Triennial]7111105T03/11/2019 03/15/2019 1 IP Fire Protection [Triennial]7111105T 03/25/2019 03/29/201971124.06-RETS 1 1 IP Radioactive Gaseous and Liquid Effluent Treatment71124.06 06/24/2019 06/28/2019 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures. |
| -06/30/2019 Page 2 of 2 08/29/2017 09:29:3971124-BASELINE HP 1 1 IP Occupational Exposure Control Effectiveness71151-OR0111/26/201811/30/2018 1 IP RETS/ODCM Radiological Effluent Occurrences71151-PR0111/26/201811/30/201871124-HP 1 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 01/07/201901/11/2019 1 IP Occupational ALARA Planning and Controls71124.02 01/07/201901/11/2019 EP-EP PROGRAM INSPECTION 2 1 IP A lert and Notification System Testing711140202/11/2019 02/15/2019 1 IP Emergency Preparedness Organization Staffing and Augmentation System711140302/11/2019 02/15/2019 1 IP Correction of Emergency Preparedness Weaknesses and Deficiencies711140502/11/2019 02/15/2019 1 IP Performance Indicator Verification7115102/11/2019 02/15/20197111105T-TRIENNIAL FIRE PROTECTION 4 1 IP Fire Protection [Triennial]7111105T03/11/2019 03/15/2019 1 IP Fire Protection [Triennial]7111105T 03/25/2019 03/29/201971124.06-RETS 1 1 IP Radioactive Gaseous and Liquid Effluent Treatment71124.06 06/24/2019 06/28/2019 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures. | |
| }} | | }} |
|
---|
Category:Inspection Plan
MONTHYEARML24255A8042024-09-11011 September 2024 Notification of Conduct of a Fire Protection Team Inspection IR 05000354/20240052024-08-29029 August 2024 Updated Inspection Plan for Hope Creek Generating Station (Report 05000354/2024005) IR 05000354/20240102024-05-0707 May 2024 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000354/2024010 IR 05000272/20244032024-03-20020 March 2024 And Hope Creek Generating Station - Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000272/2024403, 05000311/2024403, and 05000354/2024403 IR 05000354/20230052023-08-31031 August 2023 Updated Inspection Plan for Hope Creek Generating Station (Report 05000354/2023005) ML23118A1032023-04-28028 April 2023 PI&R Inspection Document Request IR 05000354/20220062023-03-0101 March 2023 Annual Assessment Letter for Hope Creek Generating Station (Report 05000354/2022006) IR 05000354/20220052022-08-31031 August 2022 Updated Inspection Plan for Hope Creek Generating Station (Report 05000354/2022005) IR 05000354/20220122022-04-13013 April 2022 Information Request to Support Design-Basis Capability of Power-Operated Valves Inspection; Inspection Report 05000354/2022012 IR 05000354/20210062022-03-0202 March 2022 Annual Assessment Letter for Hope Creek Generating Station (Report 05000354/2021006) ML21300A0222021-10-27027 October 2021 Notification of Conduct of a Fire Protection Team Inspection IR 05000354/20210052021-09-0101 September 2021 Updated Inspection Plan for the Hope Creek Nuclear Generating Station (Report 05000354/2021005) IR 05000354/20200052020-08-31031 August 2020 Updated Inspection Plan (Inspection Report 05000354/2020005) IR 05000354/20190062020-03-0303 March 2020 Annual Assessment Letter for Hope Creek Generating Station, Unit 1 (Report 05000354/2019006) IR 05000354/20190052019-08-28028 August 2019 Updated Inspection Plan (Inspection Report 05000354/2019005) ML19136A1852019-05-15015 May 2019 Byron Station, Clinton Power Station, Dresden Nuclear Power Station, LaSalle County Station, and Quad Cities Nuclear Power Station-Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency IR 05000354/20180062019-03-0404 March 2019 Annual Assessment Letter for Hope Creek Generating Station, Unit 1 (Report 05000354/2018006) ML18340A2492018-12-0303 December 2018 Notification of Conduct of a Triennial Fire Protection Baseline Inspection and Request for Information IR 05000354/20180052018-08-28028 August 2018 Updated Inspection Plan (Inspection Report 05000354/2018005) IR 05000354/20170062018-02-28028 February 2018 Annual Assessment Letter for Hope Creek Generating Station Unit 1 (Reports 05000354/2017006, 05000354/2017402, and 05000354/2017501) IR 05000354/20170052017-08-28028 August 2017 Updated Inspection Plan for Hope Creek Generating Station, Unit 1(Report 05000354/2017005) IR 05000354/20160062017-03-0101 March 2017 Annual Assessment Letter for Hope Creek Generating Station (Report 05000354/2016006) IR 05000354/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Hope Creek Generating Station Report (05000354/2016005) IR 05000354/20150062016-03-0202 March 2016 ROP 16 Annual Assessment Letter for Hope Creek Generating Station (Report 05000354/2015006) IR 05000354/20150052015-09-0101 September 2015 ROP-16 Mid-Cycle Assessment Letter for Hope Creek Generating Station (Report 05000354/2015005) IR 05000354/20140012015-03-0404 March 2015 ROP 15 Annual Assessment Letter for Hope Creek Generating Station (Report 05000354/2014001) IR 05000354/20140062014-09-0202 September 2014 ROP-15 Mid-Cycle Performance Review and Inspection Plan Report 05000354/2014006 IR 05000354/20130012014-03-0404 March 2014 ROP-14 2013 Hope Creek Generating Station Annual Assessment Letter, Report 05000354-13-001, and Inspection Plan IR 05000354/20130062013-09-0303 September 2013 ROP-14 Mid-Cycle Performance Review and Inspection Plan Report 05000354-13-006 IR 05000354/20120012013-03-0404 March 2013 Annual Assessment Letter for Hope Creek Generating Station (Report 05000354-12-001) ML12334A0052012-11-28028 November 2012 Notification of Conduct of a Triennial Fire Protection Baseline Inspection ML12248A0422012-09-0404 September 2012 Mid-Cycle Performance Review and Inspection Plan 2012 - Hope Creek Generating Station, Unit 1 IR 05000354/20110012012-03-0505 March 2012 Annual Assessment Letter for Hope Creek Generating Station Unit 1 (Report 05000354/2011001) ML1124113152011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan 2011 - Hope Creek Generating Station IR 05000354/20100012011-03-0404 March 2011 Annual Assessment Letter for Hope Creek Generating Station, EOC-11 (05000354-10-001) ML1024403372010-09-0101 September 2010 Mid-Cycle Performance Review and Inspection Plan 2010 - Hope Creek Generating Station ML1006208502010-03-0303 March 2010 2009 EOC Hope Creek Annual Assessment Letter and Report 22 IR 05000354/20090012009-03-0404 March 2009 Annual Assessment Letter - Hope Creek Nuclear Generating Station (05000354-09-001) ML0824607952008-09-0202 September 2008 2008 Mid-Cycle Performance Review and Inspection Plan - Hope Creek Generating Station IR 05000354/20080012008-03-0303 March 2008 2007 Annual Assessment Letter - Hope Creek (05000354/2008001) ML0724309452007-08-31031 August 2007 Mid-Cycle Review and Inspection Plan IR 05000354/20070012007-03-0202 March 2007 Annual Assessment Letter EOC 2006 - Hope Creek Generating Station (Report 05000354-07-001) IR 05000354/20060012006-03-0202 March 2006 Annual Assessment Letter - Hope Creek Nuclear Generating Station (Report 05000354/2006001) ML0424402332004-08-30030 August 2004 Hope Creek ROP5 Mid-Cycle Performance Review and Inspection Plan LR-N04-0036, Correction PSEG Letter LR-N04-0036, Risk-Informed Inservice Inspection Submittal2004-03-11011 March 2004 Correction PSEG Letter LR-N04-0036, Risk-Informed Inservice Inspection Submittal ML0406308562004-03-0303 March 2004 2003-04 Annual Assessment Letter - Hope Creek ML0323904242003-08-27027 August 2003 2003 Mid-Cycle Performance Review and Inspection Plan for Hope Creek Generating Station ML0306207722003-03-0303 March 2003 2003 Annual Assessment Letter - Hope Creek Nuclear Generating Station ML0223501752002-08-23023 August 2002 2002 Hope Creek Mid-Cycle Performance Review and Inspection Plan IR 05000354/20020012002-03-0101 March 2002 2002 Annual Assessment Letter - Hope Creek Nuclear Plant (Report 50-354/02-001) 2024-09-11
[Table view] Category:Inspection Report
MONTHYEARIR 05000354/20240032024-10-23023 October 2024 Integrated Inspection Report 05000354/2024003 IR 05000272/20244022024-09-23023 September 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024402, 05000272/2024402, and 05000311/2024402 (Cover Letter Only) IR 05000354/20240052024-08-29029 August 2024 Updated Inspection Plan for Hope Creek Generating Station (Report 05000354/2024005) IR 05000354/20240022024-07-30030 July 2024 Integrated Inspection Report 05000354/2024002 IR 05000272/20245012024-06-12012 June 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Emergency Preparedness Biennial Exercise Inspection Report 05000354/2024501, 05000272/2024501 and 05000311/2024501 IR 05000354/20240012024-05-0808 May 2024 Integrated Inspection Report 05000354/2024001 IR 05000354/20240102024-05-0707 May 2024 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000354/2024010 IR 05000354/20243012024-04-10010 April 2024 Initial Operator Licensing Examination Report 05000354/2024301 IR 05000272/20240112024-04-0101 April 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Plant Modification and Annual Problem Identification and Resolution Inspection Report 05000354/2024011, 05000272/2024011, and 05000311/2024011 IR 05000272/20244032024-03-20020 March 2024 And Hope Creek Generating Station - Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000272/2024403, 05000311/2024403, and 05000354/2024403 IR 05000354/20230062024-02-28028 February 2024 Annual Assessment Letter for Hope Creek Generating Station (Report 05000354/2023006) IR 05000272/20244012024-02-26026 February 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024401, 05000272/2024401 and 05000311/2024401 (Cover Letter Only) IR 05000354/20230042024-02-0101 February 2024 Integrated Inspection Report 05000354/2023004 IR 05000354/20234012024-01-22022 January 2024 Material Control and Accounting Program Inspection Report 05000354/2023401 IR 05000354/20230032023-11-0707 November 2023 Integrated Inspection Report 05000354/2023003 IR 05000272/20234022023-10-12012 October 2023 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2023402, 05000272/2023402 and 05000311/2023402 (Cover Letter Only) IR 05000354/20230052023-08-31031 August 2023 Updated Inspection Plan for Hope Creek Generating Station (Report 05000354/2023005) IR 05000354/20230022023-08-0303 August 2023 Integrated Inspection Report 05000354/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200048/2023001 IR 05000354/20230102023-08-0303 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000354/2023010 IR 05000272/20230402023-05-0202 May 2023 And Salem Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2023420, 05000272/202340 and 05000311/2023420 IR 05000354/20230112023-05-0101 May 2023 Commercial Grade Dedication Report 05000354/2023011 IR 05000354/20230012023-04-26026 April 2023 Integrated Inspection Report 05000354/2023001 IR 05000354/20220062023-03-0101 March 2023 Annual Assessment Letter for Hope Creek Generating Station (Report 05000354/2022006) IR 05000354/20220042023-01-24024 January 2023 Integrated Inspection Report 05000354/2022004 ML22335A0412022-12-0101 December 2022 Notification of Commercial Grade Dedication Inspection (05000354/2023011) and Request for Information IR 05000354/20220032022-11-0303 November 2022 Integrated Inspection Report 05000354/2022003 IR 05000354/20223012022-10-24024 October 2022 Initial Operator Licensing Examination Report 05000354/2022301 IR 05000354/20220052022-08-31031 August 2022 Updated Inspection Plan for Hope Creek Generating Station (Report 05000354/2022005) IR 05000354/20220022022-08-10010 August 2022 Integrated Inspection Report 05000354/2022002 IR 05000272/20224012022-07-21021 July 2022 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2022401, 05000272/2022401, and 05000311/2022401 (Cover Letter Only) IR 05000272/20225012022-06-14014 June 2022 And Salem Nuclear Generating Station, Units 1 and 2 - Emergency Preparedness Biennial Exercise Inspection Report 05000354/2022501, 05000272/2022501, and 05000311/2022501 IR 05000354/20220012022-05-0202 May 2022 Integrated Inspection Report 05000354/2022001 IR 05000354/20224022022-04-14014 April 2022 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000354/2022402 IR 05000354/20220122022-04-13013 April 2022 Information Request to Support Design-Basis Capability of Power-Operated Valves Inspection; Inspection Report 05000354/2022012 IR 05000354/20220102022-03-16016 March 2022 Triennial Fire Protection Inspection Report 05000354/2022010 IR 05000272/20210132022-03-10010 March 2022 Evaluation of Changes, Tests, and Experiments Baseline IR 05000354/2021013, 05000272/2021013 and 05000311/2021013 & ISFSI IR 07200048/2021001 Related to PSEG Evals of Stations & Planned Wind Port Manufacturing Facility IR 05000354/20210062022-03-0202 March 2022 Annual Assessment Letter for Hope Creek Generating Station (Report 05000354/2021006) IR 05000354/20210042022-02-0707 February 2022 Integrated Inspection Report 05000354/2021004 IR 05000272/20215012021-11-30030 November 2021 And Salem Nuclear Generating Station, Units 1 and 2 - Emergency Preparedness Biennial Exercise Inspection Report 05000354/2021501, 05000272/2021501 and 05000311/2021501 IR 05000272/20214022021-11-19019 November 2021 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2021402, 05000272/2021402 and 05000311/2021402 IR 05000354/20210032021-11-0202 November 2021 Integrated Inspection Report 05000354/2021003 IR 05000272/20210122021-10-28028 October 2021 And Salem Nuclear Generating Station, Units 1 and 2 - Biennial Problem Identification and Resolution Inspection Report 05000354/2021012, 05000272/2021012 and 05000311/2021012 IR 05000272/20214032021-10-28028 October 2021 And Salem Nuclear Generating Station, Units 1 and 2 - Biennial Problem Identification and Resolution Inspection Report (Security-Related Information) 05000354/2021403, 05000272/2021403 and 05000311/2021403 (Cover Letter Only IR 05000354/20210112021-09-30030 September 2021 Temporary Instruction 2515/194 Inspection Report 05000354/2021011 IR 05000354/20210102021-09-16016 September 2021 Design Bases Assurance Inspection (Teams) Inspection Report 05000354/2021010 IR 05000354/20210052021-09-0101 September 2021 Updated Inspection Plan for the Hope Creek Nuclear Generating Station (Report 05000354/2021005) IR 05000354/20210022021-08-10010 August 2021 Integrated Inspection Report 05000354/2021002 IR 05000354/20210012021-05-0404 May 2021 Integrated Inspection Report 05000354/2021001 IR 05000354/20213012021-04-0101 April 2021 Initial Operator Licensing Examination Report 05000354/2021301 IR 05000354/20200062021-03-0303 March 2021 Annual Assessment Letter for Hope Creek Generating Station Unit 1 (Report 05000354/2020006) 2024-09-23
[Table view] Category:Letter
MONTHYEARML24295A3742024-10-23023 October 2024 Project Manager Assignment IR 05000354/20240032024-10-23023 October 2024 Integrated Inspection Report 05000354/2024003 ML24291A0572024-10-17017 October 2024 License Amendment Request (LAR) – Hope Creek Technical Specification Conversion to NUREG-1433, Revision 5, Supplement 1 LR-N24-0063, Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF)2024-10-0707 October 2024 Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF) LR-N24-0059, 2024 Annual 10 CFR 50.46 Report2024-09-30030 September 2024 2024 Annual 10 CFR 50.46 Report LR-N24-0056, Response to Request for Additional Information Associated with License Amendment Request - Revise Hope Creek Generating Station Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle2024-09-26026 September 2024 Response to Request for Additional Information Associated with License Amendment Request - Revise Hope Creek Generating Station Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle IR 05000272/20244022024-09-23023 September 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024402, 05000272/2024402, and 05000311/2024402 (Cover Letter Only) ML24255A8042024-09-11011 September 2024 Notification of Conduct of a Fire Protection Team Inspection LR-N24-0057, In-Service Inspection Activities2024-09-10010 September 2024 In-Service Inspection Activities 05000354/LER-2024-001-01, Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) Supplement2024-09-0505 September 2024 Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) Supplement ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000354/20240052024-08-29029 August 2024 Updated Inspection Plan for Hope Creek Generating Station (Report 05000354/2024005) LR-N24-0044, Relief Request VR-042024-08-0606 August 2024 Relief Request VR-04 IR 05000354/20240022024-07-30030 July 2024 Integrated Inspection Report 05000354/2024002 ML24200A0572024-07-18018 July 2024 Request for Withholding Information from Public Disclosure for License Amendment Request to Revise Technical Specification Lift Settings for Reactor Coolant System Safety/Relief Valves NUREG-1433, – Acceptance of License Amendment Request Concerning Technical Specification Conversion to NUREG-1433, Revision 52024-07-16016 July 2024 – Acceptance of License Amendment Request Concerning Technical Specification Conversion to NUREG-1433, Revision 5 ML24145A1772024-07-15015 July 2024 And Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 236, 349, and 331 Modify Exclusion Area Boundary ML24197A0552024-07-15015 July 2024 Requalification Program Inspection 05000354/LER-2024-001, Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT)2024-07-0202 July 2024 Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) LR-N24-0030, License Amendment Request to Revise Technical Specification Lift Settings for Reactor Coolant System Safety/Relief Valves2024-06-28028 June 2024 License Amendment Request to Revise Technical Specification Lift Settings for Reactor Coolant System Safety/Relief Valves IR 05000272/20245012024-06-12012 June 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Emergency Preparedness Biennial Exercise Inspection Report 05000354/2024501, 05000272/2024501 and 05000311/2024501 ML24150A1002024-05-28028 May 2024 Core Operating Limits Report, Reload 25, Cycle 26, Revision 23 ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement LR-N24-0041, Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response2024-05-22022 May 2024 Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response LR-N24-0004, License Amendment Request – Revise Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle2024-05-20020 May 2024 License Amendment Request – Revise Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle ML24142A4072024-05-20020 May 2024 License Amendment Request (LAR) - Hope Creek Technical Specification Conversion to NUREG-1433, Revision 5 IR 05000354/20240012024-05-0808 May 2024 Integrated Inspection Report 05000354/2024001 IR 05000354/20240102024-05-0707 May 2024 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000354/2024010 LR-N24-0035, 2023 Annual Radiological Environmental Operating Report (AREOR)2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report (AREOR) LR-N24-0034, 2023 Annual Radioactive Effluent Release Report (ARERR)2024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report (ARERR) LR-N24-0024, Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-26026 April 2024 Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000354/20243012024-04-10010 April 2024 Initial Operator Licensing Examination Report 05000354/2024301 LR-N24-0011, Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-0505 April 2024 Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20240112024-04-0101 April 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Plant Modification and Annual Problem Identification and Resolution Inspection Report 05000354/2024011, 05000272/2024011, and 05000311/2024011 LR-N24-0028, And Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal2024-03-28028 March 2024 And Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal IR 05000272/20244032024-03-20020 March 2024 And Hope Creek Generating Station - Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000272/2024403, 05000311/2024403, and 05000354/2024403 LR-N24-0021, And Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2024-03-20020 March 2024 And Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums 05000354/LER-2023-003-01, Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram2024-03-19019 March 2024 Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram LR-N24-0027, Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram2024-03-19019 March 2024 Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram LR-N24-0020, Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report2024-03-0707 March 2024 Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report IR 05000354/20230062024-02-28028 February 2024 Annual Assessment Letter for Hope Creek Generating Station (Report 05000354/2023006) IR 05000272/20244012024-02-26026 February 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024401, 05000272/2024401 and 05000311/2024401 (Cover Letter Only) LR-N24-0010, Technical Specification 6.9.1.5.b: 2023 Annual Report of SRV Challenges2024-02-22022 February 2024 Technical Specification 6.9.1.5.b: 2023 Annual Report of SRV Challenges 05000354/LER-2023-003, Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram2024-02-12012 February 2024 Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram IR 05000354/20230042024-02-0101 February 2024 Integrated Inspection Report 05000354/2023004 ML24030A8752024-02-0101 February 2024 Operator Licensing Examination Approval ML24009A1022024-01-26026 January 2024 – Exemption from Select Requirements of 10 CF Part 73 (EPID L-2023-LLE-0045 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000354/20234012024-01-22022 January 2024 Material Control and Accounting Program Inspection Report 05000354/2023401 ML23341A1372024-01-16016 January 2024 Issuance of Amendment No. 235 Revise Trip and Standby Auto-Start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning ML23335A1122023-12-15015 December 2023 Retest Schedule for Drywell to Suppression Chamber Vacuum Breakers 2024-09-05
[Table view] |
Text
August 28, 2017
SUBJECT:
UPDATED INSPECTION PLAN FOR HOPE CREEK GENERATING STATION UNIT 1 (REPORT 05000 354/20 17 005)
Dear Mr. Sena:
The enclosed inspection plan lists the inspections scheduled through June 30 , 20 19 , for Hope Creek Generating Station Unit 1. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence.
In addition to baseline inspections, the NRC plans to conduct Inspection Procedure (IP) 92702, "Follow-up on Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, Confirmatory Orders, and Alternative Dispute Resolution Confirmatory Orders," as described in Inspection Report 05000354/2017010 (ADAMS Accession No.:
ML17122A282 1). Also, as previously noted in the annual assessment letter dated March 1, 2017 (Report 05000 354/2016006; ADAMS Accession No.: ML17058A408
), in addition to baseline inspections, the NRC conducted a supplemental inspection in accordance wit h IP 95001, "Supplemental Inspection Response to Action Matrix Column 2 Inputs
," onsite between August 7 and 11, 2017. The results of that inspection and a follow-up assessment letter are expected to be issued within 45 days of the completion of that onsite inspection
. The NRC will also be performing Temporary Instruction 2515/19 1 , "Inspection o f the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders a nd Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans
."
1 The designation in parentheses refers to an Agencywide Documents Access and Management System (ADAMS) Accession Number. Documents referenced in this letter are publicly available using the Accession Number in ADAMS. Please contact me at (610) 337-5200 with any questions you have regarding this letter
.
Sincerely,
/RA/ Fred L. Bower, III, Chief Project Branch 3 Division of Reactor Projects Docket No.
50-354 License No.
NPF-57 Enclosure:
Hope Creek Inspection Plan cc: Distribution via ListServ SUBJECT: UPDATED INSPECTION PLAN FOR HOPE CREEK GENERATING STATION UNIT 1 (REPORT 05000354/2017005)
DATED AUGUST 28, 2017 DISTRIBUTION w/enc l: DDorman, RA (R1ORAMail Resource)
DLew, DRA (R1ORAMail Resource)
RLorson, DRP (R1DRPMail Resource)
DPelton, DRP (R1DRPMail Resource)
JYerokun, DRS (R1DRSMail Resource)
BWelling, DRS (R1DRSMAIL Resource)
FBower, DRP RBarkley, DRP MDraxton, DRP JHawkins, DRP, SRI SHaney, DRP, RI COtt, DRP, AA JBowen, RI, OEDO RidsNrrPMHopeCreek Resource RidsNrrDorlLpl1 Resource ROPReports Resource DOCUMENT NAME:
S:\ROP Assessment Meetings
\ROP-18 Second Quarter Process
\Branch 3\ROP 18 Inspection Plan Letter HC FINAL.docx ADAMS ACCESSION NUMBER:
ML17233A013 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME JHawkins/per email MD MDraxton FBower DATE 8/17/17 8/17/17 8/21/17 OFFICIAL RECORD CO PY Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site Hope CreekInspection / Activity Plan 08/29/2017-06/30/2019 Page 1 of 2 08/29/2017 09:29:392/12EXAM-HOPE CREEK INITIAL OL EXAM 5 1 FY18 HOPE CREEK EXAM (FEBRUARY 2018)
U01958 01/08/2018 01/12/2018 1 FY18 HOPE CREEK EXAM (FEBRUARY 2018)
U01958 02/12/2018 02/23/201871124-RAD PROTECTION 1 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 09/18/2017 09/22/2017 1 IP Occupational ALARA Planning and Controls71124.02 09/18/2017 09/22/2017 1 IP Occupational Exposure Control Effectiveness71151-OR01 09/18/2017 09/22/2017 1 IP RETS/ODCM Radiological Effluent Occurrences71151-PR01 09/18/2017 09/22/2017T1-191-FUKUSHIMA LESSONS-LEARNED 4 1 IP Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 2515/191 09/18/2017 09/22/201771124.08-RADWASTE 1 1 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.08 10/16/2017 10/20/201771124-BASELINE HP 1 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 01/22/2018 01/26/2018 1 IP Occupational ALARA Planning and Controls71124.02 01/22/2018 01/26/2018 1 IP Occupational Dose Assessment71124.04 01/22/2018 01/26/2018 U1 ISI-UNIT 1 INSERVICE INSPECTION 2 1 IP Inservice Inspection Activities - BWR7111108G 04/23/2018 04/27/201871124-BASELINE HP 1 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 04/30/2018 05/04/2018 1 IP Occupational ALARA Planning and Controls71124.02 04/30/2018 05/04/2018 1 IP Occupational Dose Assessment71124.04 04/30/2018 05/04/20187111121M-DESIGN BASES ASSURANCE INSPECTION (TEAM)
6 1 IP Design Bases Assurance Inspection (Teams)7111121M 06/04/2018 06/08/2018 1 IP Design Bases Assurance Inspection (Teams)7111121M 06/18/2018 06/22/201871124.07-REMP 1 1 IP Radiological Environmental Monitoring Program71124.07 06/25/2018 06/29/2018REQUAL-HC REQUAL INSP WITH P/F RESULTS 2 1 IP Licensed Operator Requalification Program - Annual Review7111111A 10/08/2018 10/12/2018 1 IP Licensed Operator Requalification Program7111111B 10/08/2018 10/12/201871124-BASELINE HP 1 1 IP Radiological Hazard Assessment and Exposure Controls71124.0111/26/201811/30/2018 1 IP Occupational ALARA Planning and Controls71124.0211/26/201811/30/2018 1 IP In-Plant Airborne Radioactivity Control and Mitigation71124.0311/26/201811/30/2018 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site Hope CreekInspection / Activity Plan 08/29/2017-06/30/2019 Page 2 of 2 08/29/2017 09:29:3971124-BASELINE HP 1 1 IP Occupational Exposure Control Effectiveness71151-OR0111/26/201811/30/2018 1 IP RETS/ODCM Radiological Effluent Occurrences71151-PR0111/26/201811/30/201871124-HP 1 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 01/07/201901/11/2019 1 IP Occupational ALARA Planning and Controls71124.02 01/07/201901/11/2019 EP-EP PROGRAM INSPECTION 2 1 IP A lert and Notification System Testing711140202/11/2019 02/15/2019 1 IP Emergency Preparedness Organization Staffing and Augmentation System711140302/11/2019 02/15/2019 1 IP Correction of Emergency Preparedness Weaknesses and Deficiencies711140502/11/2019 02/15/2019 1 IP Performance Indicator Verification7115102/11/2019 02/15/20197111105T-TRIENNIAL FIRE PROTECTION 4 1 IP Fire Protection [Triennial]7111105T03/11/2019 03/15/2019 1 IP Fire Protection [Triennial]7111105T 03/25/2019 03/29/201971124.06-RETS 1 1 IP Radioactive Gaseous and Liquid Effluent Treatment71124.06 06/24/2019 06/28/2019 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.