IR 05000528/1990025: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 35: Line 35:


==Dear Mr.Martin:==
==Dear Mr.Martin:==
Subj ect;Palo Verde Nuclear Generating Station (PVNGS).Units 1, 2 and 3 Submittal of Emergency Lighting Independent Review-Impell Study File: 90-019-026; 90-056-026 As requested, APS is submitting the ABB Impell Corporation (Impell)Study.This study, contracted by APS, is an independent review of the PVNGS Emergency Lighting System.The study was conducted to: (a)determine which NRC requirements are applicable to the PVNGS emergency lighting system.(b)sample work done on, the emergency lighting system to determine whether work done by APS meets these requirements.(c)survey other nuclear plants to determine what actions they are taking or have taken to meet requirements applicable to their emergency lighting systems.(d)evaluate the concerns raised by the NRC in Inspection Report 90-02 and other concerns raised by the NRC and others subsequent to January 1, 1990.(e)judge whether APS has been responsive to these concerns.900Sl00292 9LI0803 PDR ADOCK 05000528 Q PBC 4
Subj ect;Palo Verde Nuclear Generating Station (PVNGS).Units 1, 2 and 3 Submittal of Emergency Lighting Independent Review-Impell Study File: 90-019-026; 90-056-026 As requested, APS is submitting the ABB Impell Corporation (Impell)Study.This study, contracted by APS, is an independent review of the PVNGS Emergency Lighting System.The study was conducted to: (a)determine which NRC requirements are applicable to the PVNGS emergency lighting system.(b)sample work done on, the emergency lighting system to determine whether work done by APS meets these requirements.(c)survey other nuclear plants to determine what actions they are taking or have taken to meet requirements applicable to their emergency lighting systems.(d)evaluate the concerns raised by the NRC in Inspection Report 90-02 and other concerns raised by the NRC and others subsequent to January 1, 1990.(e)judge whether APS has been responsive to these concerns.900Sl00292 9LI0803 PDR ADOCK 05000528 Q PBC  
 
Mr.John B.Martin U.S.Nuclear Regulatory Commission Page 2 161'-03382-WFC/KLMC August 3, 1990 As discussed in the referenced letter, APS is currently completing its review of the Impell Study.During this review, APS will evaluate and disposition each recommendation to ensure that appropriate actions are taken.
Mr.John B.Martin U.S.Nuclear Regulatory Commission Page 2 161'-03382-WFC/KLMC August 3, 1990 As discussed in the referenced letter, APS is currently completing its review of the Impell Study.During this review, APS will evaluate and disposition each recommendation to ensure that appropriate actions are taken.


Sincerely,WFC/WFQ Enclosure CC'ocument Control Desk S.R.Peterson C.M.Trammell D..H.Coe A..H.Gutterman A.C.Gehr 4~'%a,
Sincerely, WFC/WFQ Enclosure CC'ocument Control Desk S.R.Peterson C.M.Trammell D..H.Coe A..H.Gutterman A.C.Gehr 4~'%a,
}}
}}

Revision as of 23:24, 9 May 2019

Forwards Rev 1 to Abb Impell Rept 01-1658-1815, Emergency Lighting Independent Review, Per Insp Repts 50-528/90-25, 50-529/90-25 & 50-530/90-25
ML17305A987
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 08/03/1990
From: CONWAY W F
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: MARTIN J B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML17305A988 List:
References
161-03382-WFC-K, 161-3382-WFC-K, NUDOCS 9008100292
Download: ML17305A987 (6)


Text

ACCELERATED DISTRIBUTION DEMOiM+RATION SYSTEIVI REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)DOCKET 05000528 05000529 05000530 I D

SUBJECT: Forwards Rev 1 to ABB Impell Rept 01-1658-1815," mergency Lighting Independent Revs.ew," per request.DISTRIBUTION CODE: IEOID COPIES RECEIVED: LTR ENCL SIZE: 3.7 TITLE: General (50 Dkt)-Insp Rept/Notice of Vio ation esponse/05000528 05000529 05000530 D NOTES:STANDARDIZED PLANT Standardized, plant.Standardized plant.ACCESSION NBR:9008100292 DOC.DATE: 90/08/03 NOTARIZED:

NO FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Pu li AUTH.NAME AUTHOR AFFILIATION CONWAY,W.F.

Arizona Public Service Co.(formerly Arizona uclear Pow r RECIP.NAME RECIPIENT AFFILIATION MARTIN,J.B.

Region 5, Ofc of the Director RECIPIENT ID CODE/NAME PD5 PD TRAMMELL, C.INTERNAL: ACRS AEOD/DEIIB DEDRO NRR SHANKMAN,S NRR/DOEA DIR 11 NRR/DRIS/DIR NRR/PMAS/ILRB12 OE DIR RE-LE 02 EXTERNAL: LPDR NSIC NOTES COPIES LTTR ENCL 1 1 1 1 , 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PETERSON', S'.AEOD AEOD/TPAD NRR MORISSEAU'gD NRR/DLPQ/LPEB10 NRR/DREP/PEPB9D NRR/DST/DIR

'8E2 NUDOCS-ABSTRACT OGC/HDS 1 RGN5 FILE 01 NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 'U1 1 1 1 1 1 D S R NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED: LTTR 26 ENCL 26 D D S',

i~, v III

~~I;g aIy Arizona Public Service Company...

PO.BOX 53999~PHOENIX, ARIZONA 850723999 i~I~" Oi P., j;I;II'.Q WILLIAM F.CONWAY EXECUTIVEVICEPRESIDENT NUCI.EAR 161-03382-WFC/KLMC August 3, 1990 Docket Nos.STN 50-528/529/530 Mr.John B.Martin Regional Administrator, Region V U.S.Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596-5368 Reference:

Letter to J.B.Martin, NRC, from W.F.Conway, APS, ,dated August 1, 1990;Subject: Response to NRC Inspection Report Nos.50-528/90-25, 50-529/90-25 and 50-530/90-25 Safe Shutdown Emergency Lighting (161-03373).

Dear Mr.Martin:

Subj ect;Palo Verde Nuclear Generating Station (PVNGS).Units 1, 2 and 3 Submittal of Emergency Lighting Independent Review-Impell Study File: 90-019-026; 90-056-026 As requested, APS is submitting the ABB Impell Corporation (Impell)Study.This study, contracted by APS, is an independent review of the PVNGS Emergency Lighting System.The study was conducted to: (a)determine which NRC requirements are applicable to the PVNGS emergency lighting system.(b)sample work done on, the emergency lighting system to determine whether work done by APS meets these requirements.(c)survey other nuclear plants to determine what actions they are taking or have taken to meet requirements applicable to their emergency lighting systems.(d)evaluate the concerns raised by the NRC in Inspection Report 90-02 and other concerns raised by the NRC and others subsequent to January 1, 1990.(e)judge whether APS has been responsive to these concerns.900Sl00292 9LI0803 PDR ADOCK 05000528 Q PBC

Mr.John B.Martin U.S.Nuclear Regulatory Commission Page 2 161'-03382-WFC/KLMC August 3, 1990 As discussed in the referenced letter, APS is currently completing its review of the Impell Study.During this review, APS will evaluate and disposition each recommendation to ensure that appropriate actions are taken.

Sincerely, WFC/WFQ Enclosure CC'ocument Control Desk S.R.Peterson C.M.Trammell D..H.Coe A..H.Gutterman A.C.Gehr 4~'%a,