| issue date = 01/09/2009
| issue date = 01/09/2009
| title = IR 05000282-09-402, & IR 05000306-09-402, on 10/31/2008 - 12/30/2008, for Prairie Island, Units 1 & 2
| title = IR 05000282-09-402, & IR 05000306-09-402, on 10/31/2008 - 12/30/2008, for Prairie Island, Units 1 & 2
| author name = Duncan E R
| author name = Duncan E
| author affiliation = NRC/RGN-III/DRS/PSB
| author affiliation = NRC/RGN-III/DRS/PSB
| addressee name = Wadley M D
| addressee name = Wadley M
| addressee affiliation = Northern States Power Co
| addressee affiliation = Northern States Power Co
| docket = 05000282, 05000306
| docket = 05000282, 05000306
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:ary 9, 2009
[[Issue date::January 9, 2009]]


Mr. Michael Site Vice President Prairie Island Nuclear Generating Plant Northern States Power Company-Minnesota 1717 Wakonade Drive East Welch, MN 55089
==SUBJECT:==
PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 and 2 NRC SECURITY TEMPORARY INSTRUCTION 2201/002 INSPECTION REPORT 05000282/2009402; 05000306/2009402(DRS)


SUBJECT: PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 and 2 NRC SECURITY TEMPORARY INSTRUCTION 2201/002 INSPECTION REPORT 05000282/2009402; 05000306/2009402(DRS)
==Dear Mr. Wadley:==
On December 30, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed a temporary instruction inspection at your Prairie Island Nuclear Generating Plant, Units 1 and 2.


==Dear Mr. Wadley:==
The inspection covered activities associated with the licensees proposed intention to transition from a contract to a proprietary security force. On December 19, 2008, the NRC was notified that the licensee had discontinued their plans to transition to a proprietary security force. The enclosed inspection report documents the inspection results that had been accomplished as of the date of this notification, and which were discussed on December 30, 2008, with Mr. D. Axt and other members of your staff.
On December 30, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed a temporary instruction inspection at your Prairie Island Nuclear Generating Plant, Units 1 and 2. The inspection covered activities associated with the licensee's proposed intention to transition from a contract to a proprietary security force. On December 19, 2008, the NRC was notified that the licensee had discontinued their plans to transition to a proprietary security force. The enclosed inspection report documents the inspection results that had been accomplished as of the date of this notification, and which were discussed on December 30, 2008, with Mr. D. Axt and other members of your staff.


The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license.
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.


The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.
The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.
Line 34: Line 34:
No findings of significance were identified.
No findings of significance were identified.


In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.


Enclosure Contains Sensitive Unclassified Non-Safeguards Information. Upon separation, this page is decontrolled. Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Enclosure Contains Sensitive Unclassified Non-Safeguards Information. Upon separation, this page is decontrolled. Should you have any questions concerning this inspection, we will be pleased to discuss them with you.


Sincerely,/RA/ Eric Duncan, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 50-282; 50-306 License Nos. DPR-42; DPR-60 Nonpublic  
Sincerely,
 
/RA/
===Enclosure:===
Eric Duncan, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 50-282; 50-306 License Nos. DPR-42; DPR-60 Nonpublic Enclosure: Inspection Report 05000282/2009402; 05000306/2009402(DRS)
Inspection Report 05000282/2009402; 05000306/2009402(DRS)  
w/Attachment: Supplemental Information cc w/encl: D. Riffle, NSIR/DSO/DDSO cc w/o encl: D. Koehl, Chief Nuclear Officer Regulatory Affairs Manager P. Glass, Assistant General Counsel Nuclear Asset Manager J. Stine, State Liaison Officer, Minnesota Department of Health Tribal Council, Prairie Island Indian Community Administrator, Goodhue County Courthouse Commissioner, Minnesota Department of Commerce Manager, Environmental Protection Division Office of the Attorney General of Minnesota Emergency Preparedness Coordinator, Dakota County Law Enforcement Center
 
===w/Attachment:===
Supplemental Information cc w/encl: D. Riffle, NSIR/DSO/DDSO cc w/o encl: D. Koehl, Chief Nuclear Officer Regulatory Affairs Manager P. Glass, Assistant General Counsel Nuclear Asset Manager J. Stine, State Liaison Officer, Minnesota Department of Health Tribal Council, Prairie Island Indian Community Administrator, Goodhue County Courthouse Commissioner, Minnesota Department of Commerce Manager, Environmental Protection Division Office of the Attorney General of Minnesota Emergency Preparedness Coordinator, Dakota County Law Enforcement Center
}}
}}

Latest revision as of 09:54, 14 November 2019

IR 05000282-09-402, & IR 05000306-09-402, on 10/31/2008 - 12/30/2008, for Prairie Island, Units 1 & 2
ML090140369
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 01/09/2009
From: Eric Duncan
Plant Support Branch II
To: Wadley M
Northern States Power Co
References
IR-09-402
Download: ML090140369 (4)


Text

ary 9, 2009

SUBJECT:

PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 and 2 NRC SECURITY TEMPORARY INSTRUCTION 2201/002 INSPECTION REPORT 05000282/2009402; 05000306/2009402(DRS)

Dear Mr. Wadley:

On December 30, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed a temporary instruction inspection at your Prairie Island Nuclear Generating Plant, Units 1 and 2.

The inspection covered activities associated with the licensees proposed intention to transition from a contract to a proprietary security force. On December 19, 2008, the NRC was notified that the licensee had discontinued their plans to transition to a proprietary security force. The enclosed inspection report documents the inspection results that had been accomplished as of the date of this notification, and which were discussed on December 30, 2008, with Mr. D. Axt and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.

No findings of significance were identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.

Enclosure Contains Sensitive Unclassified Non-Safeguards Information. Upon separation, this page is decontrolled. Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/RA/

Eric Duncan, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 50-282; 50-306 License Nos. DPR-42; DPR-60 Nonpublic Enclosure: Inspection Report 05000282/2009402; 05000306/2009402(DRS)

w/Attachment: Supplemental Information cc w/encl: D. Riffle, NSIR/DSO/DDSO cc w/o encl: D. Koehl, Chief Nuclear Officer Regulatory Affairs Manager P. Glass, Assistant General Counsel Nuclear Asset Manager J. Stine, State Liaison Officer, Minnesota Department of Health Tribal Council, Prairie Island Indian Community Administrator, Goodhue County Courthouse Commissioner, Minnesota Department of Commerce Manager, Environmental Protection Division Office of the Attorney General of Minnesota Emergency Preparedness Coordinator, Dakota County Law Enforcement Center