| number = ML18018B138
| number = ML18018B138
| issue date = 01/22/2018
| issue date = 01/22/2018
| title = 01/11/2018 Summary of Meeting with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit No. 1 (EPID L-2017-LRM-0066)
| title = Summary of Meeting with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit No. 1
| author name = Rankin J K
| author name = Rankin J
| author affiliation = NRC/NRR/DORL/LPLIII
| author affiliation = NRC/NRR/DORL/LPLIII
| addressee name = Gebbie J P
| addressee name = Gebbie J
| addressee affiliation = Indiana Michigan Power Co
| addressee affiliation = Indiana Michigan Power Co
| docket = 05000315
| docket = 05000315
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:LICENSEE:
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, 0.C. 20555-0001 January 22, 2018 LICENSEE:       Indiana Michigan Power Company, LLC FACILITY:       Donald C. Cook Nuclear Plant, Unit No. 1
FACILITY:  


==SUBJECT:==
==SUBJECT:==
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, 0.C. 20555-0001 January 22, 2018 Indiana Michigan Power Company, LLC Donald C. Cook Nuclear Plant, Unit No. 1


==SUMMARY==
==SUMMARY==
OF JANUARY 11, 2018, MEETING WITH INDIANA MICHIGAN POWER COMPANY REGARDING DONALD C. COOK NUCLEAR PLANT, UNIT NO. 1 (EPID L-2017-LRM-0066)
OF JANUARY 11, 2018, MEETING WITH INDIANA MICHIGAN POWER COMPANY REGARDING DONALD C. COOK NUCLEAR PLANT, UNIT NO. 1 (EPID L-2017-LRM-0066)
On January 11, 2018, a Category I public meeting was held between the U.S. Nuclear Regulatory Commission (NRG) and representatives of Indiana Michigan Power Company (the licensee) via teleconference.
On January 11, 2018, a Category I public meeting was held between the U.S. Nuclear Regulatory Commission (NRG) and representatives of Indiana Michigan Power Company (the licensee) via teleconference. This meeting was open to members of the public. No regulatory decisions were made at this meeting.
This meeting was open to members of the public. No regulatory decisions were made at this meeting. The purpose of the meeting was to discuss a planned license amendment request (LAR) for Donald C. Cook Nuclear Plant (CNP), Unit No. 1. The licensee intends to submit a request to implement the leak-before-break (LBB) methodology for the Unit No. 1 reactor coolant system (RCS) auxiliary lines. The meeting notice and agenda, dated December 19, 2017, is available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML 17353A702.
The purpose of the meeting was to discuss a planned license amendment request (LAR) for Donald C. Cook Nuclear Plant (CNP), Unit No. 1. The licensee intends to submit a request to implement the leak-before-break (LBB) methodology for the Unit No. 1 reactor coolant system (RCS) auxiliary lines. The meeting notice and agenda, dated December 19, 2017, is available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML17353A702. A list of attendees is provided as Enclosure 1. The meeting handouts can be found at ADAMS Accession No. ML18018B139.
A list of attendees is provided as Enclosure  
The licensee presented a historical overview of LBB, and the site-specific LBB methodology for RCS main loop piping for CNP, Unit No. 1. The licensee specified the RCS auxiliary lines the LAR would consider. This includes the 8" and 14" residual heat removal lines, the 1O" accumulator lines, and the 6", 8", and 1O" safety injection lines. The licensee also discussed the various reasons for submitting this proposed LAR. The NRG staff notes the following as a result of the licensee's presentation:
: 1. The meeting handouts can be found at ADAMS Accession No. ML 18018B139.
The licensee presented a historical overview of LBB, and the site-specific LBB methodology for RCS main loop piping for CNP, Unit No. 1. The licensee specified the RCS auxiliary lines the LAR would consider.
This includes the 8" and 14" residual heat removal lines, the 1 O" accumulator lines, and the 6", 8", and 1 O" safety injection lines. The licensee also discussed the various reasons for submitting this proposed LAR. The NRG staff notes the following as a result of the licensee's presentation:
* The LAR should describe how the proposed piping meets all the requirements of NUREG-0800, "Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition," Section 3.6.3, Revision 1, "Leak-Before-Break Evaluation Procedures" (ADAMS Accession No. ML063600396}.
* The LAR should describe how the proposed piping meets all the requirements of NUREG-0800, "Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition," Section 3.6.3, Revision 1, "Leak-Before-Break Evaluation Procedures" (ADAMS Accession No. ML063600396}.
* The LAR should also describe there is not an active degradation mechanism present.
* The LAR should also describe there is not an active degradation mechanism present.
* The licensee does not anticipate the proposed LAR changing any previous updated final safety analysis chapter 15 accident analysis.
* The licensee does not anticipate the proposed LAR changing any previous updated final safety analysis chapter 15 accident analysis.
* The licensee does not anticipate the proposed LAR changing any leakage detection system capabilities.
* The licensee does not anticipate the proposed LAR changing any leakage detection system capabilities.
The licensee indicated that it would submit the LAR in February 2018, and request NRG approval by December 2018. The public was invited to listen to the meeting and was given an opportunity to communicate with the NRC after the business portion, but before the meeting was adjourned.
The licensee indicated that it would submit the LAR in February 2018, and request NRG approval by December 2018.
Members of the public were present and provided comments to the NRC staff. Please direct any inquiries to me at 301-415-1530, or Jennivine.Rankin@nrc.gov.
 
Docket No. 50-315  
The public was invited to listen to the meeting and was given an opportunity to communicate with the NRC after the business portion, but before the meeting was adjourned. Members of the public were present and provided comments to the NRC staff.
Please direct any inquiries to me at 301-415-1530, or Jennivine.Rankin@nrc.gov.
Sincerely,
                                              .          ~
                                            ~ a n k i n , Project Manager Plant Licensing Branch Ill Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-315


==Enclosure:==
==Enclosure:==


List of Attendees cc: Listserv Sincerely, . ~ankin, Project Manager Plant Licensing Branch Ill Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation LIST OF ATTENDEES JANUARY 11, 2018, PUBLIC MEETING WITH l&M DONALD C. COOK NUCLEAR PLANT, UNIT NO. 1 PLANNED LICENSE AMENDMENT REQUEST REGARDING INCORPORATION OF LEAK-BEFORE-BREAK METHODOLOGY Name Organization Jennivine Rankin NRC -CNP Project Manaqer John Tsao NRC -Senior Materials Engineer, Division of Materials and License Renewal, Piping and Head Penetrations Branch Gerard Purciarello NRC -Senior Reactor Systems Engineer, Division of Safety Systems, Balance-of-Plant Branch Robert Beaton NRC -Reactor Systems Engineer, Division of Safety Systems, Reactor Systems Branch David Alley NRC -Branch Chief, Division of Materials and License Renewal, Piping and Head Penetrations Branch Jeffrey Poehler NRC -Senior Materials Engineer, Division of Materials and License Renewal, Vessels and Internals Branch Mel Holmberq NRC -Senior Reactor Inspector, Region Ill Helen Levendosky CNP Req. Affairs Supervisor Joe Tanko CNP ReQ. Affairs -LicensinQ Coordinator Amanda Britton CNP Design Engineering
List of Attendees cc: Listserv
-Structural Supervisor David Dolby CNP -Project Manager Pete Brusamonti Westinqhouse Project ManaQer Eric Johnson Westinghouse Engineer -Structural Design and Analysis Marv Lewis Public John Barkhamer PSEG Enclosure 


==SUBJECT:==
LIST OF ATTENDEES JANUARY 11, 2018, PUBLIC MEETING WITH l&M DONALD C. COOK NUCLEAR PLANT, UNIT NO. 1 PLANNED LICENSE AMENDMENT REQUEST REGARDING INCORPORATION OF LEAK-BEFORE-BREAK METHODOLOGY Name                                    Organization Jennivine Rankin                        NRC - CNP Project Manaqer John Tsao                                NRC - Senior Materials Engineer, Division of Materials and License Renewal, Piping and Head Penetrations Branch Gerard Purciarello                      NRC - Senior Reactor Systems Engineer, Division of Safety Systems, Balance-of-Plant Branch Robert Beaton                            NRC - Reactor Systems Engineer, Division of Safety Systems, Reactor Systems Branch David Alley                              NRC - Branch Chief, Division of Materials and License Renewal, Piping and Head Penetrations Branch Jeffrey Poehler                          NRC - Senior Materials Engineer, Division of Materials and License Renewal, Vessels and Internals Branch Mel Holmberq                            NRC - Senior Reactor Inspector, Region Ill Helen Levendosky                        CNP Req. Affairs Supervisor Joe Tanko                                CNP ReQ. Affairs - LicensinQ Coordinator Amanda Britton                          CNP Design Engineering - Structural Supervisor David Dolby                              CNP - Project Manager Pete Brusamonti                          Westinqhouse Project ManaQer Eric Johnson                            Westinghouse Engineer - Structural Design and Analysis Marv Lewis                              Public John Barkhamer                          PSEG Enclosure


==SUMMARY==
ML180186138 OFFICE     D0RL/LPL3/PM     D0RL/LPL3/LA   D0RL/LPL3/BC   D0RL/LPL3/PM NAME       JRankin         SRohrer         DWrona         JRankin DATE       01/22/2018       01/22/2018     01/22/2018     01/22/2018}}
OF JANUARY 11, 2018, MEETING WITH INDIANA MICHIGAN POWER COMPANY REGARDING DONALD C. COOK NUCLEAR PLANT, UNIT NO. 1 (EPID L-2017-LRM-0066)
DATED JANUARY 22, 2018 DISTRIBUTION:
PUBLIC RidsNrrLASRohrer Resource RidsRgn3mailCenter Resource RidsAcrs_MailCTR Resource RidsNrrPmDCCook Resource RidsNrrDorlLpl3 Resource RidsNrrDorl Resource RidsOpaMail Resource RidsNrrDlmrMphb Resource PMNS Resource ADAMS Accession No. ML 180186138 OFFICE D0RL/LPL3/PM D0RL/LPL3/LA D0RL/LPL3/BC NAME JRankin SRohrer DWrona DATE 01/22/2018 01/22/2018 01/22/2018 OFFICIAL RECORD COPY D0RL/LPL3/PM JRankin 01/22/2018}}

Latest revision as of 15:51, 2 December 2019

Summary of Meeting with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit No. 1
ML18018B138
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 01/22/2018
From: Jennivine Rankin
Plant Licensing Branch III
To: Gebbie J
Indiana Michigan Power Co
Rankin J K/NRR/DORL/LPLIII
References
EPID L-2017-LRM-0066
Download: ML18018B138 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, 0.C. 20555-0001 January 22, 2018 LICENSEE: Indiana Michigan Power Company, LLC FACILITY: Donald C. Cook Nuclear Plant, Unit No. 1

SUBJECT:

SUMMARY

OF JANUARY 11, 2018, MEETING WITH INDIANA MICHIGAN POWER COMPANY REGARDING DONALD C. COOK NUCLEAR PLANT, UNIT NO. 1 (EPID L-2017-LRM-0066)

On January 11, 2018, a Category I public meeting was held between the U.S. Nuclear Regulatory Commission (NRG) and representatives of Indiana Michigan Power Company (the licensee) via teleconference. This meeting was open to members of the public. No regulatory decisions were made at this meeting.

The purpose of the meeting was to discuss a planned license amendment request (LAR) for Donald C. Cook Nuclear Plant (CNP), Unit No. 1. The licensee intends to submit a request to implement the leak-before-break (LBB) methodology for the Unit No. 1 reactor coolant system (RCS) auxiliary lines. The meeting notice and agenda, dated December 19, 2017, is available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML17353A702. A list of attendees is provided as Enclosure 1. The meeting handouts can be found at ADAMS Accession No. ML18018B139.

The licensee presented a historical overview of LBB, and the site-specific LBB methodology for RCS main loop piping for CNP, Unit No. 1. The licensee specified the RCS auxiliary lines the LAR would consider. This includes the 8" and 14" residual heat removal lines, the 1O" accumulator lines, and the 6", 8", and 1O" safety injection lines. The licensee also discussed the various reasons for submitting this proposed LAR. The NRG staff notes the following as a result of the licensee's presentation:

  • The LAR should describe how the proposed piping meets all the requirements of NUREG-0800, "Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition," Section 3.6.3, Revision 1, "Leak-Before-Break Evaluation Procedures" (ADAMS Accession No. ML063600396}.
  • The LAR should also describe there is not an active degradation mechanism present.
  • The licensee does not anticipate the proposed LAR changing any previous updated final safety analysis chapter 15 accident analysis.
  • The licensee does not anticipate the proposed LAR changing any leakage detection system capabilities.

The licensee indicated that it would submit the LAR in February 2018, and request NRG approval by December 2018.

The public was invited to listen to the meeting and was given an opportunity to communicate with the NRC after the business portion, but before the meeting was adjourned. Members of the public were present and provided comments to the NRC staff.

Please direct any inquiries to me at 301-415-1530, or Jennivine.Rankin@nrc.gov.

Sincerely,

. ~

~ a n k i n , Project Manager Plant Licensing Branch Ill Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-315

Enclosure:

List of Attendees cc: Listserv

LIST OF ATTENDEES JANUARY 11, 2018, PUBLIC MEETING WITH l&M DONALD C. COOK NUCLEAR PLANT, UNIT NO. 1 PLANNED LICENSE AMENDMENT REQUEST REGARDING INCORPORATION OF LEAK-BEFORE-BREAK METHODOLOGY Name Organization Jennivine Rankin NRC - CNP Project Manaqer John Tsao NRC - Senior Materials Engineer, Division of Materials and License Renewal, Piping and Head Penetrations Branch Gerard Purciarello NRC - Senior Reactor Systems Engineer, Division of Safety Systems, Balance-of-Plant Branch Robert Beaton NRC - Reactor Systems Engineer, Division of Safety Systems, Reactor Systems Branch David Alley NRC - Branch Chief, Division of Materials and License Renewal, Piping and Head Penetrations Branch Jeffrey Poehler NRC - Senior Materials Engineer, Division of Materials and License Renewal, Vessels and Internals Branch Mel Holmberq NRC - Senior Reactor Inspector, Region Ill Helen Levendosky CNP Req. Affairs Supervisor Joe Tanko CNP ReQ. Affairs - LicensinQ Coordinator Amanda Britton CNP Design Engineering - Structural Supervisor David Dolby CNP - Project Manager Pete Brusamonti Westinqhouse Project ManaQer Eric Johnson Westinghouse Engineer - Structural Design and Analysis Marv Lewis Public John Barkhamer PSEG Enclosure

ML180186138 OFFICE D0RL/LPL3/PM D0RL/LPL3/LA D0RL/LPL3/BC D0RL/LPL3/PM NAME JRankin SRohrer DWrona JRankin DATE 01/22/2018 01/22/2018 01/22/2018 01/22/2018