ML20203D300: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:. - _ _ _ _ _ _ _ _ _ - - - _ _ - _ _ _ _ _ _ _ - _ _
  / o. **
Duxe Powen GoxPm P.O. HOX 33180 CHA14LOTTE. N.C. 28242 HAL B. TI'CKER                                                                                                        TetrPuonn vum Passinant stELEAa PauDETT50R (704) 373~Wll April 16, 1986 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Connaission Washington, D. C. 20555 Attention:      Mr. B. J. Youngblood, Project Director PWR Project Directorate No. 4 Re: Catawba Nuclear Station Docket Nos. 50-413 and 50-414
 
==Dear Sir:==
 
By {{letter dated|date=November 5, 1986|text=letter dated November 5, 1986}}, Duke Power Company transmitted NUREG-0588 EQ sunsaary sheets for specific Unit 2 equipment different from Unit 1.
During the Staff review of the qualification summaries it was noted that page 18e of Attachment 1 (Valve Solenoid Operators - Pressurizer PORV's -
Unit 2) contained a typographical egror. The radiation qualificgtion should have been listed as 2.0 X 10 R but was given as 0.2 X 10 R.                                          The corrected page is attached.
Very truly yours, Af Hal B.~ Tucker l
ROS: sib f
Attachment ze:      Dr. J. Nelson Grace, Regional Administration U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 NRC Resident Inspector                                                                                    g)
Catawba Nuclear Station                                                                              gV 8604220079 860416                                                                      '  t PDR  ADOCK 05000413 P                  PDR                                                                              l
 
r-            -
I                                                                                                                                                      s CATAWBA NUCLEAR STATION - UNITS 1 AND 2                                                                        Page 18c SU MARY OF ENVIRONMENTAL QUALIFICATION OF CLASS 1E EQUIPMENT                                                        Rev. 1 LOCATED INSIDE CONTAINMENT EQUIPMENT ID:        Valve Solenoid Operators -              MANUFACTURER: ASCO                                                                MODEL #: NP3316E35E/E34E (1)          Pressurizer PORVs - Unit 2 (LowerContainment)
ACCIDENT                  ENVIRONMENT          OPERABILITY          OPERABILITY                                                ACCURACY            ACCURACY ENVIRONMENT                  TO WHICH            REQUIRED IN          DEMONSTRATED                                                REQUIRED        DEMONSTRATED (2)                    QUALIFIED            ACCIDENT                                                                      (% OF SPAN)          (% OF SPAN)
ENVIRONMENT Temp:      327 F        Temp:      346 F            <30 days            30 days                                                      N/A                  N/A Press:      14.4 psig    Press:      110              post DBE            post DBE RH:        100%          RH:        100%psig 8                    2.0X10sg Rad:        1X10 R        Rad:
Chem Spray: Boric        Chem Spray: Boric acid and sodium          acid, and sodium tetraborate soln.        thio-sulfate and sodium hydroxide soln.
3000 ppa 10 pH
                                                ~'
SUBMERGENCE: No QUALIFICATION REPORT: ASCO Report AQS21678/TR Rev. A (CNM-1205.02-0499)
METHOD: Test REPLACEMENT INTERVAL: 4 yrs. for coils & elasi.omeric materials.                                                                                                MDIC i                                                                                              _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _                .
                                                                                                                                                                              .. .  -}}

Latest revision as of 14:23, 7 December 2021

Forwards Revised Page 18c Re Environ Qualification of Class 1E Equipment Located Inside Containment,Correcting Radiation Qualification.Page Submitted on 851105 in Attachment 1 to Environ Qualification Summary Sheets
ML20203D300
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 04/16/1986
From: Tucker H
DUKE POWER CO.
To: Harold Denton, Youngblood B
Office of Nuclear Reactor Regulation
References
NUDOCS 8604220079
Download: ML20203D300 (2)


Text

. - _ _ _ _ _ _ _ _ _ - - - _ _ - _ _ _ _ _ _ _ - _ _

/ o. **

Duxe Powen GoxPm P.O. HOX 33180 CHA14LOTTE. N.C. 28242 HAL B. TI'CKER TetrPuonn vum Passinant stELEAa PauDETT50R (704) 373~Wll April 16, 1986 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Connaission Washington, D. C. 20555 Attention: Mr. B. J. Youngblood, Project Director PWR Project Directorate No. 4 Re: Catawba Nuclear Station Docket Nos. 50-413 and 50-414

Dear Sir:

By letter dated November 5, 1986, Duke Power Company transmitted NUREG-0588 EQ sunsaary sheets for specific Unit 2 equipment different from Unit 1.

During the Staff review of the qualification summaries it was noted that page 18e of Attachment 1 (Valve Solenoid Operators - Pressurizer PORV's -

Unit 2) contained a typographical egror. The radiation qualificgtion should have been listed as 2.0 X 10 R but was given as 0.2 X 10 R. The corrected page is attached.

Very truly yours, Af Hal B.~ Tucker l

ROS: sib f

Attachment ze: Dr. J. Nelson Grace, Regional Administration U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 NRC Resident Inspector g)

Catawba Nuclear Station gV 8604220079 860416 ' t PDR ADOCK 05000413 P PDR l

r- -

I s CATAWBA NUCLEAR STATION - UNITS 1 AND 2 Page 18c SU MARY OF ENVIRONMENTAL QUALIFICATION OF CLASS 1E EQUIPMENT Rev. 1 LOCATED INSIDE CONTAINMENT EQUIPMENT ID: Valve Solenoid Operators - MANUFACTURER: ASCO MODEL #: NP3316E35E/E34E (1) Pressurizer PORVs - Unit 2 (LowerContainment)

ACCIDENT ENVIRONMENT OPERABILITY OPERABILITY ACCURACY ACCURACY ENVIRONMENT TO WHICH REQUIRED IN DEMONSTRATED REQUIRED DEMONSTRATED (2) QUALIFIED ACCIDENT (% OF SPAN) (% OF SPAN)

ENVIRONMENT Temp: 327 F Temp: 346 F <30 days 30 days N/A N/A Press: 14.4 psig Press: 110 post DBE post DBE RH: 100% RH: 100%psig 8 2.0X10sg Rad: 1X10 R Rad:

Chem Spray: Boric Chem Spray: Boric acid and sodium acid, and sodium tetraborate soln. thio-sulfate and sodium hydroxide soln.

3000 ppa 10 pH

~'

SUBMERGENCE: No QUALIFICATION REPORT: ASCO Report AQS21678/TR Rev. A (CNM-1205.02-0499)

METHOD: Test REPLACEMENT INTERVAL: 4 yrs. for coils & elasi.omeric materials. MDIC i _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .

.. . -