MONTHYEARML20217N1931999-10-22022 October 1999 Forwards Insp Rept 50-298/99-12 on 990927-30.No Violations Noted.Insp Exam of Activities Under License as They Relate to Emergency Preparedness & to Compliance with Commission Rules & Regulations & with Conditions of License ML20217G8771999-10-14014 October 1999 Forwards Insp Rept 50-298/99-10 on 990920-24.No Violations Noted ML20217G7401999-10-14014 October 1999 Forwards MOR for Sept 1999 for Cooper Nuclear Station. Rept Includes Documentation of Challenges to Safety/Relief Valves,Iaw TS 5.6.4 ML20217C2671999-10-0808 October 1999 Forwards Insp Rept 50-298/99-03 on 990823-27 & 0907-10.No Violations Noted.Purpose of Insp to Ensure That Licensee Had Effective Programs for Identifying,Evaluating & Correcting Problems Which Could Impact Safe Plant Operations ML20212K9661999-09-30030 September 1999 Forwards Safety Evaluation Accepting plant-specific Safety Evaluation Rept for USI A-46 Program Implementation at Cooper Nuclear Station ML20216J1081999-09-28028 September 1999 Ltr Contract:Task Order 048, Cooper Safety Sys Design & Performance Capability Insp, Under Contract NRC-03-98-021 ML20212J5061999-09-27027 September 1999 Forwards Insp Rept 50-298/99-07 on 990718-0828.No Violations Noted.Inspectors Focused on Implementation of Licensee Reactor Safety & Emergency Preparedness Programs ML20212F3641999-09-22022 September 1999 Forwards Insp Rept 50-298/99-09 on 990823-26.No Violations Noted ML20216J8061999-09-20020 September 1999 Forwards Rev 37 to Safeguards Plan,Iaw Provisions of 10CFR50.(p).Rev Withheld,Per 10CFR73.21 ML20212C4921999-09-15015 September 1999 Forwards Monthly Operating Rept for Aug 1999 for Cooper Nuclear Station.Rept Includes Operating Data Rept,Unit SD Rept & Documentation of Challenges to Safety/Relief Valves ML20212A6061999-09-14014 September 1999 Forwards Insp Rept 50-298/99-08 on 9900816-20.No Violations Noted.Insp Focused on Implementation & Effective Performance of Access Authorization/Fitness-for-Duty (Behavior Observation) Program & Access Control of Personnel ML20211N5271999-09-0202 September 1999 Responds to NRC 990823 RAI Re Y2K Readiness at Cooper Nuclear Station,Per GL 98-01,Suppl 1 05000298/LER-1999-006, Forwards LER 99-006-00 for Cns.Commitments Made by Util Encl1999-08-26026 August 1999 Forwards LER 99-006-00 for Cns.Commitments Made by Util Encl ML20211F1311999-08-24024 August 1999 Forwards Rev 1 to Calculation Nedc 97-044, NPSH Margins for RHR & CS Pumps, in Support of 990615 Proposed Amend to DPR-46 Re Containment Overpressure Contribution to ECCS Pumps NPSH Requirements 05000298/LER-1999-003, Informs That Commitment Re Insp Rept 50-298/98-15 & LER 99-003,to Bound Extent of Condition & Take Appropriate C/As Is Now Complete.Addl Time Is Required to Accommodate Training of Engineering Support Personnel1999-08-23023 August 1999 Informs That Commitment Re Insp Rept 50-298/98-15 & LER 99-003,to Bound Extent of Condition & Take Appropriate C/As Is Now Complete.Addl Time Is Required to Accommodate Training of Engineering Support Personnel ML20211F4661999-08-23023 August 1999 Discusses GL 98-01 Issued by NRC on 980511 & NPPD Responses for Cooper Nuclear Station & 990628 & Results of Visit to Plant on 990811-12.Staff Determined That Integrated Contigency Plan Incomplete & CNS Not Y2K Ready ML20210R0301999-08-12012 August 1999 Forwards Monthly Operating Rept for July 1999 for Cooper Nuclear Station,Iaw Guidance Provided by GL 97-02.Rept Also Includes Documentation of Challenges to Srvs,Per TS 5.6.4 ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210P6761999-08-10010 August 1999 Requests That Following Changes Be Made to Distribution on NRC Correspondence ML20210P6861999-08-0909 August 1999 Forwards Insp Rept 50-298/99-06 on 990530-0717.No Violations Noted.During Insp,Inspectors Identified Two Issues Categorized as Being Low Risk Significance & within Licensee Response Band ML20210N1331999-08-0606 August 1999 Forwards Notice of Withdrawal of Application for Amend to FOL DPR-46.By Ltr Licensee Withdrew Amend Request Which Would Have Revised Usfar to Reflect as-built Configuration of Reactor Bldg Isolation Dampers ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210K6071999-08-0202 August 1999 Submits Withdrawal of Proposed License Amend Re Secondary Containment Isolation Description & Refueling Accident Analysis Results ML20210K3811999-08-0202 August 1999 Forwards Listed Info,Which NPPD Believes Demonstrates Ability to Obtain Funds in Amount of $10 Million for Payment of Such Premiums within Specified Three Month Period,Iaw 10CFR140.21 ML20210G5101999-07-28028 July 1999 Forwards fitness-for-duty Program semi-annual Performance Rept for Period of 990101-0630,per Provisions of 10CFR26.71(d) ML20210D2541999-07-21021 July 1999 Forwards Insp Rept 50-298/99-02 on 990628-0702.Purpose of Insp Was Primarily to Evaluate Effectiveness of Licensed Operator Requalification Program.No Violations Were Identified ML20210C2041999-07-20020 July 1999 Discusses 990715 Mgt Meeting with Midamerican Energy Co Re risk-informed Baseline Insp Program Recently Implemented at Cooper & Fort Calhoun Stations ML20209H8191999-07-15015 July 1999 Forwards Safety Evaluation on GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Cooper Nuclear Station ML20209E6951999-07-12012 July 1999 Discusses Response to RAI on GL 92-01,rev 1,suppl 1, Rv Structural Integrity. Recommends Review of New Database Diskettes on Listed Website.Comments Due by 990901 or Data Entered Into Rvid for Plant Will Be Acceptable ML20209D8731999-07-0808 July 1999 Refers to 990707 Meeting Re Licensee Recent Maintenance Program self-assessment.Also Discussed How Licensee Incorporated Assessment Findings Into Rev of Maintenance Performance Improvement Plan.List of Attendees Encl ML20209B7851999-07-0101 July 1999 Forwards Corrected Occupational Radiation Exposure Repts, for Cys 1996 & 1997.Util Stated That Repts Did Not Properly Tabulate Number of Personnel Receiving Exposures Less than 100 Mrem by Work & Job Functions in CY96 & CY97 05000298/LER-1999-005, Forwards LER 99-005-00 for Cns.Commitments Made by Util Encl1999-07-0101 July 1999 Forwards LER 99-005-00 for Cns.Commitments Made by Util Encl ML20196J2471999-06-29029 June 1999 Discusses Completion of Licensing Action for GL 97-04, Assurance of Sufficient Net Positive Suction Head for ECC & Containment Heat Removal Pumps, 05000298/LER-1999-004, Forwards LER 99-004-01.Commitments Made by Util Are Encl1999-06-28028 June 1999 Forwards LER 99-004-01.Commitments Made by Util Are Encl ML20209B5451999-06-28028 June 1999 Submits Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Disclosure Encl ML20196H0331999-06-24024 June 1999 Informs NRC of Deletion of 1991 Commitment Contained in Ltr Re Feedwater Nozzle Bypass Leakage Monitoring at Plant ML20196F7511999-06-24024 June 1999 Discusses 990622 Meeting with Public at Arbor Manor, Alburn,Ne to Provide Overview of Pilot Insp Program ML20209A7221999-06-23023 June 1999 Submits Revised Pages to Proposed Change to Plant TS Previously Submitted in ,Per 990615 Telcon with NRC ML20196F5331999-06-22022 June 1999 Forwards Examination Summary Rept for FW Nozzle Examinations Performed During 1998 Fall Refueling Outage at Cooper Nuclear Station.Rept Covers Past Examinations Up to & Including 1998 Fall Refueling Outage ML20196B4681999-06-17017 June 1999 Forwards TS Bases Changes Made at Plant Subsequent to Receipt of License Amend 178,dtd 980731,for Conversion to Its,Through 990610.List of Effective Pages for TS Bases, Encl ML20196E1411999-06-16016 June 1999 Forwards Insp Rept 50-298/99-05 on 990502-29.Noncited Violations Identified ML20195H8891999-06-14014 June 1999 Forwards Response to NRC 990315 RAI Re GL 95-07, Pressure Locking & Thermal-Binding of SR Power-Operated Gate Valves, 180-day Response Submitted by District on 960213 ML20195F6171999-06-0909 June 1999 Informs That GE Rept, Matl Presented by GE 970709 Meeting at Cooper Nuclear Power Station Re Replacement of ECCS Pump Suction Strainers Between Nppd,Ge & NRC Staff, Will Be Withheld from Public Disclosure as Requested ML20207G3031999-06-0808 June 1999 Ack Receipt of Which Transmitted Changes to Cooper Nuclear Station EP Implementing Procedure EPIP 5.7.1, Emergency Classification,Rev 24,under 10CFR50,App E,Section V Provisions.No Violations Identified ML20195E2351999-06-0808 June 1999 Forwards Response to NRC 990517 RAI Re Util Proposed Change to TS Re Calibr Frequency of Reactor Recirculation Flow Transmitters Associated with APRM ML20207G4481999-06-0808 June 1999 Ack Receipt of Which Transmitted Changes to Cooper Nuclear Station EP Implementing Procedure,Epip 5.7.1, Emergency Classification,Rev 23 C2,under Provisions of 10CFR50,App E,Section V ML20207G3001999-06-0707 June 1999 Ack Receipt of Which Transmitted Changes to Cooper Nuclear Station Ep,Rev 33,under Provisions of 10CFR50,App E,Section V.No NRC Approval Required Based on Determination That EP Effectiveness Not Affected by Changes ML20207G4531999-06-0707 June 1999 Ack Receipt of Which Transmitted Changes to Cooper Nuclear Station EP Implementing Procedure EPIP 5.7.1, Emergency Classification,Revision 25,under Provisions of 10CFR50,App E,Section V ML20207D3811999-05-27027 May 1999 Informs That During Next 6 to 12 Months,Starting 990530,NRC Plans to Conduct Insps Shown in Attached Insp Plan.Insps Include Both Planned Baseline & Supplemental Insps (Formerly Core & Regional Initiative Insps) ML20207A5191999-05-19019 May 1999 Forwards Insp Rept 50-298/99-04 on 990321-0501.Four Violations Identified & Being Treated as non-cited Violations 1999-09-30
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217N1931999-10-22022 October 1999 Forwards Insp Rept 50-298/99-12 on 990927-30.No Violations Noted.Insp Exam of Activities Under License as They Relate to Emergency Preparedness & to Compliance with Commission Rules & Regulations & with Conditions of License ML20217G8771999-10-14014 October 1999 Forwards Insp Rept 50-298/99-10 on 990920-24.No Violations Noted ML20217C2671999-10-0808 October 1999 Forwards Insp Rept 50-298/99-03 on 990823-27 & 0907-10.No Violations Noted.Purpose of Insp to Ensure That Licensee Had Effective Programs for Identifying,Evaluating & Correcting Problems Which Could Impact Safe Plant Operations ML20212K9661999-09-30030 September 1999 Forwards Safety Evaluation Accepting plant-specific Safety Evaluation Rept for USI A-46 Program Implementation at Cooper Nuclear Station ML20216J1081999-09-28028 September 1999 Ltr Contract:Task Order 048, Cooper Safety Sys Design & Performance Capability Insp, Under Contract NRC-03-98-021 ML20212J5061999-09-27027 September 1999 Forwards Insp Rept 50-298/99-07 on 990718-0828.No Violations Noted.Inspectors Focused on Implementation of Licensee Reactor Safety & Emergency Preparedness Programs ML20212F3641999-09-22022 September 1999 Forwards Insp Rept 50-298/99-09 on 990823-26.No Violations Noted ML20212A6061999-09-14014 September 1999 Forwards Insp Rept 50-298/99-08 on 9900816-20.No Violations Noted.Insp Focused on Implementation & Effective Performance of Access Authorization/Fitness-for-Duty (Behavior Observation) Program & Access Control of Personnel ML20211F4661999-08-23023 August 1999 Discusses GL 98-01 Issued by NRC on 980511 & NPPD Responses for Cooper Nuclear Station & 990628 & Results of Visit to Plant on 990811-12.Staff Determined That Integrated Contigency Plan Incomplete & CNS Not Y2K Ready ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210P6861999-08-0909 August 1999 Forwards Insp Rept 50-298/99-06 on 990530-0717.No Violations Noted.During Insp,Inspectors Identified Two Issues Categorized as Being Low Risk Significance & within Licensee Response Band ML20210N1331999-08-0606 August 1999 Forwards Notice of Withdrawal of Application for Amend to FOL DPR-46.By Ltr Licensee Withdrew Amend Request Which Would Have Revised Usfar to Reflect as-built Configuration of Reactor Bldg Isolation Dampers ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210D2541999-07-21021 July 1999 Forwards Insp Rept 50-298/99-02 on 990628-0702.Purpose of Insp Was Primarily to Evaluate Effectiveness of Licensed Operator Requalification Program.No Violations Were Identified ML20210C2041999-07-20020 July 1999 Discusses 990715 Mgt Meeting with Midamerican Energy Co Re risk-informed Baseline Insp Program Recently Implemented at Cooper & Fort Calhoun Stations ML20209H8191999-07-15015 July 1999 Forwards Safety Evaluation on GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Cooper Nuclear Station ML20209E6951999-07-12012 July 1999 Discusses Response to RAI on GL 92-01,rev 1,suppl 1, Rv Structural Integrity. Recommends Review of New Database Diskettes on Listed Website.Comments Due by 990901 or Data Entered Into Rvid for Plant Will Be Acceptable ML20209D8731999-07-0808 July 1999 Refers to 990707 Meeting Re Licensee Recent Maintenance Program self-assessment.Also Discussed How Licensee Incorporated Assessment Findings Into Rev of Maintenance Performance Improvement Plan.List of Attendees Encl ML20196J2471999-06-29029 June 1999 Discusses Completion of Licensing Action for GL 97-04, Assurance of Sufficient Net Positive Suction Head for ECC & Containment Heat Removal Pumps, ML20196F7511999-06-24024 June 1999 Discusses 990622 Meeting with Public at Arbor Manor, Alburn,Ne to Provide Overview of Pilot Insp Program ML20196E1411999-06-16016 June 1999 Forwards Insp Rept 50-298/99-05 on 990502-29.Noncited Violations Identified ML20195F6171999-06-0909 June 1999 Informs That GE Rept, Matl Presented by GE 970709 Meeting at Cooper Nuclear Power Station Re Replacement of ECCS Pump Suction Strainers Between Nppd,Ge & NRC Staff, Will Be Withheld from Public Disclosure as Requested ML20207G3031999-06-0808 June 1999 Ack Receipt of Which Transmitted Changes to Cooper Nuclear Station EP Implementing Procedure EPIP 5.7.1, Emergency Classification,Rev 24,under 10CFR50,App E,Section V Provisions.No Violations Identified ML20207G4481999-06-0808 June 1999 Ack Receipt of Which Transmitted Changes to Cooper Nuclear Station EP Implementing Procedure,Epip 5.7.1, Emergency Classification,Rev 23 C2,under Provisions of 10CFR50,App E,Section V ML20207G4531999-06-0707 June 1999 Ack Receipt of Which Transmitted Changes to Cooper Nuclear Station EP Implementing Procedure EPIP 5.7.1, Emergency Classification,Revision 25,under Provisions of 10CFR50,App E,Section V ML20207G3001999-06-0707 June 1999 Ack Receipt of Which Transmitted Changes to Cooper Nuclear Station Ep,Rev 33,under Provisions of 10CFR50,App E,Section V.No NRC Approval Required Based on Determination That EP Effectiveness Not Affected by Changes ML20207D3811999-05-27027 May 1999 Informs That During Next 6 to 12 Months,Starting 990530,NRC Plans to Conduct Insps Shown in Attached Insp Plan.Insps Include Both Planned Baseline & Supplemental Insps (Formerly Core & Regional Initiative Insps) ML20207A5191999-05-19019 May 1999 Forwards Insp Rept 50-298/99-04 on 990321-0501.Four Violations Identified & Being Treated as non-cited Violations ML20206Q6171999-05-17017 May 1999 Forwards RAI Re 990301 & 10 Ltrs Re Proposed TS Changes to Calibr Frequency of Recirculation Flow Transmitters from Once Every 184 Days to Once Every 18 Months.Util Responses Should Be Provided within 30 Days of Ltr Date ML20206P0171999-05-12012 May 1999 Discusses GL 96-05 Issued on 960918 & NPPD Responses Submitted on 961118,970317,980504 & 990222 for Cooper Nuclear Station.Forwards Safety Evaluation Concluding That NPPD Adequately Addressed Actions Requested in GL 96-05 IR 05000298/19980091999-05-12012 May 1999 Refers to Insp Rept 50-298/98-09 Conducted Between 981227-990130.During Insp,Apparent Violation of 10CFR50.50 Identified & Being Treated as non-cited ML20206M1791999-05-11011 May 1999 Informs That NRC Ofc of NRR Reorganized Effective 990328. Reorganization Chart Encl ML20206H4191999-05-0707 May 1999 Informs That on 990407,NRC Administered Gfes of Written Operator Licensing Exam.Licensee Facility Did Not Participate in Exam,However,Copy of Master Exam with Answer Key,Encl for Info.Without Encl ML20206P8961999-05-0707 May 1999 Refers to Meeting Conducted at Region IV Office on 990506 Re Licensee Upcoming Rev to Strategy for Achieving Engineering Excellence & Plans to Achieve Performance Improvements.List of Attendees & Util Presentation,Encl ML20206H7541999-05-0505 May 1999 Forwards Insp Rept 50-298/99-01 on 990207-0320.Violations Being Treated as non-cited Violations ML20205R5541999-04-16016 April 1999 Submits Summary of 990330 Public Meeting in Brownville,Ne to Discuss Results of PPR Completed on 990211,which Allowed for Exchange on New Assessment Process,Current Performance Review & Upcoming Actions Taken in Response to Y2K Concerns IR 05000298/19980221999-03-19019 March 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-298/98-22 on 990107.Finds Reply Responsive to Concerns Raised in NOV ML20205E8991999-03-19019 March 1999 Advises of Completion of Plant Performance Review on 990209 to Develop Integrated Understanding of Safety Performance. Overall Performance Was Acceptable.Problems with Communication in CR Resulted in Several Minor Events ML20204D9451999-03-18018 March 1999 Forwards Insp Rept 50-298/98-09 on 981227-990206.Three Violations Identified & Being Treated as Noncited Violations,Consistent with App C of Enforcement Policy ML20207M9591999-03-15015 March 1999 Forwards Request for Addl Info Re Licensee Response to GL 95-07, Pressure-Locking & Thermal-Binding of Safety-Related Power-Operated Gate Valves, for Cooper Nuclear Station ML20204B6771999-03-15015 March 1999 Submits Withdrawal of Amend Request for Operating License DPR-46.Proposed Change Would Have Modified Facility TSs Pertaining to Neutron Monitoring Neutron Detectors ML20207M9811999-03-15015 March 1999 Advises That Which Withdrew 980415 Amend Request, Being Treated as Withdrawal.Proposed Change Would Have Modified Facility TSs Pertaining to Neutron Monitoring,Flow Biased Rod Block Monitor ML20204B3301999-03-11011 March 1999 Forwards SE Accepting Third 10-year Interval Inservice Insp Program Plan Requests for Relief Numbers RI-13,RI-17 & RI-25 for Plant ML20204B7061999-03-11011 March 1999 Requests Approval of Proposed Operability Criteria for Use in Evaluation & Interim Resolution of Degraded & Nonconforming Conditions with Piping & Pipe Supports at Facility ML20205A5811999-03-0909 March 1999 Forwards Exam Rept 50-298/99-301 for Exam Administered on 990212.Exam Included Evaluation of Four Applicants for Reactor Operator License ML20207K3231999-03-0808 March 1999 Discusses 990224 Meeting Re Staff Critique of Refueling & Equipment Outage RE-18 & Implementation Status of Improvement Strategy for Engineering.List of Attendees & Matl Used in Presentation Encl ML20202G1701999-02-0202 February 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam at Util Facility on 990407.Authorized Representative from Facility Must Submit Ltr Listing Names of Candidates ML20202E3121999-01-22022 January 1999 Forwards Insp Rept 50-298/98-08 on 981115-1226 & Notice of Violation.First Violation Re Staff Failure to Follow Procedures (Two in Operations,One in Maint & One in Plant Support) ML20199G6041999-01-19019 January 1999 Informs That Effective 990118,JN Donohew Has Assumed NRC Project Mgt Responsibility for Cooper Nuclear Station ML20199E1521999-01-0707 January 1999 Forwards Insp Rept 50-298/98-22 on 981116-1208 & Notice of Violation Re Lack of Effective Oversight by Plant Mgt 1999-09-30
[Table view] |
Inspection Report - Cooper - 1996026 |
---|
|
|
Text
_ . . . . . _ . . . . .-_-_ . ._. __m._._m_._ _..___._ _ . _ __
.
___.-_.m.~._m_.-- m. _ . - .. ..
?
, t ** " 4r UNITE D STATES
' [p .?t NUCLE AR REGULATORY COMMISSION ;
l [ ,k [ 5 REGtON IV l
'
0, 611 RY AN PLAZA oRIVE, Sulf E 400 4 $ ' **
ARLINGTON, TE XAS 76011 8064
<
9...8 .
! FEB - T 1997 i
G. R. Horn, Senior Vice President !
of Energy Supply Nebraska Public Power District '
141415th Street :
Columbus, Nebraska 68601 r
SUBJECT: NRC INSPECTION REPORT 50-298/96-26
Dear Mr. Horn:
Thank you for your letter of January 27,1997,in response to our letter and Notice of I Violation dated December 26,1996. We have reviewed your reply and find it responsive to the concerns raised in our Notice of Violation. We will review the i culementation of your corrective actions during a future inspection to determine that full compliance has been achieved and will be maintained.
Sinc .ely, /
/
M rthur T. Howell 111, Acting Director Division o Reactor Projects Docket No.: 50-298 License No.: DPR-46 cc:
John R. McPhail, General Counsel Nebraska Public Power District P.O. Box 499 Columbus, Nebraska 68602-0499 P. D. Graham, Vice President of Nuclear Energy j Nebraska Public Power District !
P.O. Box 98 l Brownville, Nebraska 68321 l
9702120284 970207 PDR ADOCK 05000298 G PDR
)
.
Nebraska Public Power District -2-B. L. Houston, Nuclear Licensing and Safety Manager Nebraska Public Power District P.O. Box 98 Brownville, Nebraska 68321 R. J. Singer, Manager-Nuclear Midwest Power 907 Walnut Street P.O. Box 657 Des Moines, Iowa 50303 Mr. Ron Stoddard
_ Lincoln Electric System
'11th and O Streets Lincoln, Nebraska 68508 Randolph Wood, Director Nebraska Department of Environmental Quality P.O. Box 98922 Lincoln, Nebraska 68509-8922 Chairman Nemaha County Board of Commissioners Nemaha County Courthouse 1824 N Street Auburn, Nebraska 68305 Cheryl Rogers, LLRW Program Manager Environmental Protection Section Nebraska Department of Health 301 Centennial Mall, South P.O. Box 95007 Lincoln, Nebraska 68509-5007 Dr. Mark B. Horton, M.S.P.H.
Director Nebraska Department of Health P.O. Box 950070 Lincoln, Nebraska 68509-5007
-
.
.
Nebraska Public Power District -3-R. A. Kucera, Department Director of Intergovernmental Cooperation Department of Natural Resources P.O. Box 176 Jefferson City, Missouri 65102 Kansas Radiation Control Program Director
,
l I
l l
,
_ _ . . _ _ _ . _ . . _ . . _ . . _ . . . . . . _ . . . _ . - . . _ . - _ . _ _ _-..=._m._~ . _ . , __ _ . . - . _ - . . _ -
6-
!
i
Nebraska Public Power District -4- l FEB - 71997 i
!
bec to DMB (IE01) .,
bec distrib. by RIV:
L. J. Callan Resident inspector DRP Director DRS-PSB Branch Chief (DRP/C) MIS System Branch Chief (DRP/TSS) RIV File Project Engineer (DRP/C) Leah Tremper (OC/LFDCB, MS: TWFN 9E10)
,
,
!
!
,
!
!
\
DOCUMENT NAME: R:\_CNS\CN626AK.MHM To receive copy of document, indicate in box: "C" = Copy withput enclosures "E" = Copy with enclosures "N" = No copy RIV:DRPA. AC:DRF/C D:DRg i TReis;dNr 4- LAYandellW JEDfd/w 2/4 /97 2/q /97 2/1/Gg7 OFFICIAL RECORD COPY 4 I
120009
l N .-
-)
.
.
Nebraska Public Power District -4-FEB - 7 WI
!
l bec to DMB (IE01) ]
bec distrib. by RIV:
L. J. Callan Resident inspector DRP Director DRS-PSB Branch Chief (DRP/C) MIS System Branch Chief (DRP/TSS) RIV File Project Engineer (DRP/C) Leah Tremper (OC/LFDCB, MS: TWFN 9E10)
. l I
I i
DOCUMENT NAME: R:\_CNS\CN626AK.MHM To receive copy of document, indicate in box: "C" = Copy withput enclosures "E" = Copy with enclosures "N" = No copy RIV:DRW l AC:DRP/C D:DR$ l TReis;dtP4 LAYandelliav JEDfd h 2/4 /97 2/9 /97 2/T/Q7 OFFICIAL RECORD COPY
-- . . - . - -. .__ _ - _ . - -
, ,
t- P.O. BOX ROWNVE.LE, NE ASKA 68m h
.
'
Nebraska Public Power District SEN""
.
a
'
i NLS970003 m.
January 27,1997 M d ,
s i
U.S. Nuclear Regulatory Commission >
Attention: Document Control Desk Washington, D.C. 20555-0001 Gentlemen:
Subject: Reply to a Notice of Violation NRC Inspection Report No. 50-298/96-26 ;
Cooper Nuclear Station, NRC Docket 50-298, DPR-46 Reference: 1. Ietter to Hom (NPPD) from Dyer (USNRC) dated December 26,1996,"NRC Inspection Report 50-298/96-26 and Notice of Violation" By letter dated December 26,1996, (Reference 1), the NRC cited Nebraska Public Power District (District) as being in violation of NRC requirements. This letter, including Attachment 1, constitutes the District's reply to the referenced Notice of Violation in accordance j with 10 CFR 2.201. The District admits to the violation and has completed all corrective actions !
necessary to retum CNS to full compliance.
Should you have any questions concerning this matter, please contact me.
Si cere y, A
P. D. Graham Vice President - Nuclear
/cct Attachment
~
Qgt j (1DM N'
Wmmmmmmmmmmmmmmmmmmur:Immnms:rmtwnym TammuummumusuuhudE
--- - . . . .. . . ._ . . - . .
~. 1
- ,
i
-
i l
l*
l !
NLS970003 January 24,1997 Page 2 of 2 cc: Regional Administrator )
l USNRC-Region IV Senior Project Manager l
'
l USNRC -NRR Project DirectorateIV-1 Senior Resident Inspector t USNRC i i
!
NPG Distribution -
!
f
i l
,
!
,
I
.,
i h
. , _ _ . _ . , . . . - - _ , . . . _ . _
. ._ _ . _ _ - . . _ . _ _ _ _ . _ ._ _ _ _. _
..
,
.
.
.
i Page 1 of 2 REPLY TO DECEMBER 26,1996, NOTICE OF VIOLATION i COOPER NUCLEAR STATION NRC DOCKET NO. 50-298, LICENSE DPR-46 During NRC inspection activities conducted on October 20 through November 30,1996, one l violation ofNRC requirements was identified. The particular violation and the District's reply
- are set forth below
l Violation
" Technical Specification 4.5.F.1.c states, in part, when it is determined that one diesel .-
generator is inoperable, to determine within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> that the operable diesel generator is not inopercble due to common causefailure orperform Technical Specification Surveillance Requirement 4.9.A.2.a.1.
i
On October 21,1996. Diesel Generator 2 was declared inoperable due to afuel oilleak on the supplyline to injector 7L.
On October 23,1996, during thepostmaintenance test on Diesel Generator 2, the motor-operatedpotentiometerfailed, causing the diesel to drop load.
Contrary to the above,for the two abovefailures, the licensee did not determine within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> that the operable diesel generator was not inoperable due to common causefailure :
and did notperform Technical Specification Surveillance Requirement 4.9.A.2.a.1 (to run the I operable diesel generator) within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. " l l
Admission or Denial to Violation l
The District admits the violation.
Reason for Violation l
The surveillance requirement of Technical Specification 4.5.F.1.c was implemented in Amendment 175 to the CNS operating license on April 29,1996. Administrative controls for i documenting the required common cause failure analysis were not developed. This violation resulted from the failure of management to adequately communicate expectations through the development or initiation of administrative controls for the staff to implement the Technical Specification 4.5.F.1.c surveillance requirement regarding documentation of a common mode failure analysis.
,
i
__ ___ _ __ _ ____.._._ _ _ _ _ . _ . . _ _ _ . _ _ _ . _ .
, <
i j .
i
!
i j Page 2 of 2 i
i Corrective Steos Taken and the Results Achieved
.
l In both examples, Operations personnel were aware of the Technical Specification surveillance
- requirement. Common mode failure analyses that determined Diesel Generator 1 was operable
! were performed but not documented. Common mode failure evaluations were subsequently j documented for both occurrences of Diesel Generator 2 inoperability. Both evaluations
indicated Diesel Generator 1 was not inoperable due to a common cause.
!.
l Other occurrences of diesel generator inoperability since the Technical Specification
'
surveillance requirement was implemented were reviewed for other examp?es of undocumented j common cause failure analyses. No other examples were found.
i
- Operations Management discussed this violation with all Shift Supervisors sad Shift Technical Engineers to communicate expectations regarding review and documentation of Technical j Specification requirements.
Additionally, the Tech Spec Tracker program has been revised to prompt personnel to perform and document the common cause failure analysis required when a Diesel Generator becomes inoperable, i
forrective Steos That Will Be Taken to Avoid Further Violations i Administrative controls are being evaluated to provide a consistent mechanism to document
! common mode failure analyses.
l Date When Fuil Comoliance Will Be Achieved
!
l The District is in full compliance with respect to the identified violation.
!
l
!
!
i i
k
!
i
i
i
!
.
e L
-_. _. .. . . -
- --
)
_ _
.-
,
0 f ATTACHMENT 3 LIST OF NRC COMMITMENTS Cormspondence No: NLS97003 The following table identifies those actions committed to by the District in this document. Any I
'
other actions discussed in the submittal represent intended orplanned actions by the District.
They are described to the NRC for the NRC's infonnation and are not regulatory commitments.
Please notify the Licensing Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.
COMMfITED DATE COMMITMENT OR OUTAGE Administrative controls are being evaluated to provide a consistent I mechanism to document common mode failure analyses.
l i
l l
l l PROCEDURE NUMBER 0.42 l REVISION NUMBER 1.2 l PAGE 8 OF 10 l
\ >