| {{Adams|number = ML102600522}} | | {{Adams |
| | | number = ML102600522 |
| | | issue date = 09/13/2010 |
| | | title = IR 05000282-10-502 (Drs), 05000306-10-502 (Drs), on 08/23/2010 - 08/27/2010 for Prairie Island Nuclear Generating Plan, Units 1 and 2; Baseline Emergency Preparedness Biennial Exercise Inspection |
| | | author name = Peterson H |
| | | author affiliation = NRC/RGN-III/DRS/OLB |
| | | addressee name = Schimmel M |
| | | addressee affiliation = Northern States Power Co |
| | | docket = 05000282, 05000306 |
| | | license number = DPR-042, DPR-060 |
| | | contact person = |
| | | document report number = IR-10-502 |
| | | document type = Inspection Report, Letter |
| | | page count = 11 |
| | }} |
|
| |
|
| {{IR-Nav| site = 05000282 | year = 2010 | report number = 502 }} | | {{IR-Nav| site = 05000282 | year = 2010 | report number = 502 }} |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter: | | {{#Wiki_filter:ember 13, 2010 |
| [[Issue date::September 13, 2010]]
| |
|
| |
|
| Mr. MarkSite Vice President Prairie Island Nuclear Generating Plant Northern States Power Company, Minnesota 1717 Wakonade Drive East Welch, MN 55089
| | ==SUBJECT:== |
| | PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2 BASELINE EMERGENCY PREPAREDNESS BIENNIAL EXERCISE INSPECTION REPORT 05000282/2010502(DRS); 05000306/2010502(DRS) |
|
| |
|
| SUBJECT: PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2 BASELINE EMERGENCY PREPAREDNESS BIENNIAL EXERCISE INSPECTION REPORT 05000282/2010502(DRS); 05000306/2010502(DRS)
| | ==Dear Mr. Schimmel:== |
| | On August 27, 2010, the U. S. Nuclear Regulatory Commission (NRC) completed a Baseline Emergency Preparedness Biennial Exercise inspection at your Prairie Island Nuclear Generating Plant, Units 1 and 2. The enclosed report documents the results of this inspection, which were discussed on August 27, 2010, with you, and other members of your staff. |
| | |
| | The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license. |
| | |
| | The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. |
| | |
| | Based on the results of this inspection, no NRC-identified and no self-revealed findings of very low safety significance were identified. |
|
| |
|
| ==Dear Mr. Schimmel:==
| | In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). |
| On August 27, 2010, the U. S. Nuclear Regulatory Commission (NRC) completed a Baseline Emergency Preparedness Biennial Exercise inspection at your Prairie Island Nuclear Generating Plant, Units 1 and 2. The enclosed report documents the results of this inspection, which were discussed on August 27, 2010, with you, and other members of your staff. The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. Based on the results of this inspection, no NRC-identified and no self-revealed findings of very low safety significance were identified. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
| |
|
| |
|
| Sincerely,/RA/ | | Sincerely, |
| Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-282; 50-306 License Nos. DPR-42; DPR-60 | | /RA/ |
| | Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-282; 50-306 License Nos. DPR-42; DPR-60 |
|
| |
|
| ===Enclosure:=== | | ===Enclosure:=== |
| Inspection Report 05000282/2010502(DRS); 05000306/2010502(DRS) | | Inspection Report 05000282/2010502(DRS); 05000306/2010502(DRS) |
| | w/Attachment: Supplemental Information |
|
| |
|
| ===w/Attachment:===
| | REGION III== |
| Supplemental Information cc w/encl: Distribution via ListServ U. S. NUCLEAR REGULATORY COMMISSION REGION III Docket Nos: 50-282; 50-306 License Nos: DPR-42; DPR-60 Report No: 05000282/2010502(DRS); 05000306/2010502(DRS) Licensee: Northern States Power Company, Minnesota Facility: Prairie Island Nuclear Generating Plant, Units 1 and 2 Location: Welch, Minnesota Dates: August 23 through 27, 2010 Inspectors: Robert Jickling, Sr. Emergency Preparedness Inspector Charles Zoia, Operations Engineer Paul Zurawski, Resident Inspector
| | Docket Nos: 50-282; 50-306 License Nos: DPR-42; DPR-60 Report No: 05000282/2010502(DRS); 05000306/2010502(DRS) |
| | Licensee: Northern States Power Company, Minnesota Facility: Prairie Island Nuclear Generating Plant, Units 1 and 2 Location: Welch, Minnesota Dates: August 23 through 27, 2010 Inspectors: Robert Jickling, Sr. Emergency Preparedness Inspector Charles Zoia, Operations Engineer Paul Zurawski, Resident Inspector Approved by: Hironori Peterson, Chief Operations Branch Division of Reactor Safety Enclosure |
|
| |
|
| Approved by: Hironori Peterson, Chief Operations Branch Division of Reactor Safety Enclosure
| | =SUMMARY OF FINDINGS= |
| | IR 05000282/2010502(DRS); 05000306/2010502(DRS); 08/23/2010 - 08/27/2010; |
|
| |
|
| =SUMMARY OF FINDINGS=
| | Prairie Island Nuclear Generating Plan, Units 1 and 2; Baseline Emergency Preparedness Biennial Exercise Inspection This report covers a one week period of announced baseline inspection by two regional inspectors and one resident inspector. The significance of most findings is indicated by their color (Green, White, Yellow, Red) using Inspection Manual Chapter (IMC) 0609, Significance Determination Process (SDP). Findings for which the SDP does not apply may be Green or be assigned a severity level after NRC management review. The NRCs program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, |
| IR 05000282/2010502(DRS); 05000306/2010502(DRS); 08/23/2010 - 08/27/2010; Prairie Island Nuclear Generating Plan, Units 1 and 2; Baseline Emergency Preparedness Biennial Exercise Inspection This report covers a one week period of announced baseline inspection by two regional inspectors and one resident inspector. The significance of most findings is indicated by their color (Green, White, Yellow, Red) using Inspection Manual Chapter (IMC) 0609, "Significance Determination Process" (SDP). Findings for which the SDP does not apply may be Green or be assigned a severity level after NRC management review. The NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, "Reactor Oversight Process," Revision 4, dated December 2006.
| | Reactor Oversight Process, Revision 4, dated December 2006. |
|
| |
|
| ===A. NRC-Identified=== | | ===NRC-Identified=== |
| and Self-Revealed Findings | | and Self-Revealed Findings |
|
| |
|
| ===Cornerstone: Emergency Preparedness=== | | ===Cornerstone: Emergency Preparedness=== |
| | |
| No findings of significance were identified. | | No findings of significance were identified. |
|
| |
|
| ===B. Licensee-Identified Violations=== | | ===Licensee-Identified Violations=== |
| No violations of significance were identified. 1 Enclosure | | |
| | No violations of significance were identified. |
|
| |
|
| =REPORT DETAILS= | | =REPORT DETAILS= |
|
| |
|
| ==REACTOR SAFETY== | | ==REACTOR SAFETY== |
| Cornerstones: Emergency Preparedness | | Cornerstones: Emergency Preparedness {{a|1EP1}} |
| {{a|1EP1}} | |
| ==1EP1 Exercise Evaluation== | | ==1EP1 Exercise Evaluation== |
| {{IP sample|IP=IP 71114.01}} | | {{IP sample|IP=IP 71114.01}} |
| ===.1 Exercise Evaluation | | ===.1 Exercise Evaluation=== |
|
| |
|
| ====a. Inspection Scope==== | | ====a. Inspection Scope==== |
| The inspectors reviewed the August 24, 2010, biennial emergency preparedness exercise's objectives and scenario to ensure that the exercise would acceptably test major elements of the licensee's emergency plan and to verify that the exercise's=== | | The inspectors reviewed the August 24, 2010, biennial emergency preparedness exercises objectives and scenario to ensure that the exercise would acceptably test major elements of the licensees emergency plan and to verify that the exercises simulated problems provided an acceptable framework to support demonstration of the licensees capability to implement its plan. The inspectors also reviewed records of other drills and exercises conducted in 2008, 2009, and 2010, to verify that those drills scenarios were sufficiently different from the scenario used in the August 24, 2010 exercise. |
| | |
| | The inspectors evaluated the licensees exercise performance, focusing on the risk significant activities of emergency classification, notification, and protective action decision making, implementation of accident mitigation strategies, and correction of past exercise weaknesses in the following emergency response facilities: |
| | * Control Room Simulator (CRS); |
| | * Technical Support Center (TSC); and |
| | * Emergency Operations Facility (EOF) |
| | The inspectors also assessed the licensees recognition of abnormal plant conditions, transfer of responsibilities between facilities, internal communications, interfaces with offsite officials, readiness of emergency facilities and related equipment, and overall implementation of the licensees emergency plan. |
|
| |
|
| simulated problems provided an acceptable framework to support demonstration of the licensee's capability to implement its plan. The inspectors also reviewed records of other drills and exercises conducted in 2008, 2009, and 2010, to verify that those drills' scenarios were sufficiently different from the scenario used in the August 24, 2010 exercise. The inspectors evaluated the licensee's exercise performance, focusing on the risk significant activities of emergency classification, notification, and protective action decision making, implementation of accident mitigation strategies, and correction of past exercise weaknesses in the following emergency response facilities: Control Room Simulator (CRS); Technical Support Center (TSC); and Emergency Operations Facility (EOF) The inspectors also assessed the licensee's recognition of abnormal plant conditions, transfer of responsibilities between facilities, internal communications, interfaces with offsite officials, readiness of emergency facilities and related equipment, and overall implementation of the licensee's emergency plan. The inspectors attended post-exercise critiques in the CRS, TSC, and EOF to evaluate the licensee's initial self-assessment of its exercise performance. The inspectors later met with the licensee's lead exercise evaluators and managers to obtain the licensee's findings and assessments of its exercise participants' performances. These self-assessments were then compared with the inspectors' independent observations and assessments to assess the licensee's ability to adequately critique its exercise performance. Documents reviewed are listed in the Attachment to this report. This exercise evaluation inspection constituted one sample as defined in Inspection Procedure (IP) 71114.01-05.
| | The inspectors attended post-exercise critiques in the CRS, TSC, and EOF to evaluate the licensees initial self-assessment of its exercise performance. The inspectors later met with the licensees lead exercise evaluators and managers to obtain the licensees findings and assessments of its exercise participants performances. These self-assessments were then compared with the inspectors independent observations and assessments to assess the licensees ability to adequately critique its exercise performance. Documents reviewed are listed in the Attachment to this report. |
| | |
| | This exercise evaluation inspection constituted one sample as defined in Inspection Procedure (IP) 71114.01-05. |
|
| |
|
| ====b. Findings==== | | ====b. Findings==== |
| No findings of significance were identified. 2 Enclosure | | No findings of significance were identified. |
|
| |
|
| ==OTHER ACTIVITIES== | | ==OTHER ACTIVITIES== |
Line 58: |
Line 91: |
| ==4OA1 Performance Indicator (PI) Verification== | | ==4OA1 Performance Indicator (PI) Verification== |
| {{IP sample|IP=IP 71151}} | | {{IP sample|IP=IP 71151}} |
| ===.1 Drill/Exercise Performance | | ===.1 Drill/Exercise Performance=== |
|
| |
|
| ====a. Inspection Scope==== | | ====a. Inspection Scope==== |
| The inspectors sampled licensee submittals for the Drill/Exercise Performance PI for the period from the second quarter 2009 through second quarter 2010.=== | | The inspectors sampled licensee submittals for the Drill/Exercise Performance PI for the period from the second quarter 2009 through second quarter 2010. To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in the Nuclear Energy Institute (NEI) Document 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 6, were used. The inspectors reviewed the licensees records associated with the performance indicator to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI; assessments of PI opportunities during pre-designated control room simulator training sessions, and performance during other drills. Documents reviewed are listed in the to this report. |
| To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in the Nuclear Energy Institute (NEI) Document 99-02, "Regulatory Assessment Performance Indicator Guideline," Revision 6, were used. The inspectors reviewed the licensee's records associated with the performance indicator to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI; assessments of PI opportunities during pre-designated control room simulator training sessions, and performance during other drills. Documents reviewed are listed in the Attachment to this report. This inspection constituted one drill/exercise performance sample as defined in IP 71151-05. | | |
| | This inspection constituted one drill/exercise performance sample as defined in IP 71151-05. |
|
| |
|
| ====b. Findings==== | | ====b. Findings==== |
| No findings of significance were identified. | | No findings of significance were identified. |
|
| |
|
| ===.2 Emergency Response Organization Drill Participation | | ===.2 Emergency Response Organization Drill Participation=== |
|
| |
|
| ====a. Inspection Scope==== | | ====a. Inspection Scope==== |
| The inspectors sampled licensee submittals for the Emergency Response Organization (ERO) Drill Participation PI for the period from the second quarter 2009=== | | The inspectors sampled licensee submittals for the Emergency Response Organization (ERO) Drill Participation PI for the period from the second quarter 2009 through second quarter 2010. To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in the NEI Document 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 6, were used. |
|
| |
|
| through second quarter 2010. To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in the NEI Document 99-02,
| | The inspectors reviewed the licensees records associated with the PI to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI; performance during the 2009 and 2010 exercises and drills; and revisions of the roster of personnel assigned to key emergency response organization positions. Documents reviewed are listed in the Attachment to this report. |
| "Regulatory Assessment Performance Indicator Guideline," Revision 6, were used. The inspectors reviewed the licensee's records associated with the PI to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI; performance during the 2009 and 2010 exercises and drills; and revisions of the roster of personnel assigned to key emergency response organization positions. Documents reviewed are listed in the Attachment to this report. This inspection constituted one ERO drill participation sample as defined in IP 71151-05.
| | |
| | This inspection constituted one ERO drill participation sample as defined in IP 71151-05. |
|
| |
|
| ====b. Findings==== | | ====b. Findings==== |
| No findings of significance were identified. 3 Enclosure 4 Enclosure | | No findings of significance were identified. |
|
| |
|
| ===.3 Alert and Notification System | | ===.3 Alert and Notification System=== |
|
| |
|
| ====a. Inspection Scope==== | | ====a. Inspection Scope==== |
| The inspectors sampled licensee submittals for the Alert and Notification System (ANS) PI for the period from the second quarter 2009 through second quarter 2010.=== | | The inspectors sampled licensee submittals for the Alert and Notification System (ANS) |
| To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in the NEI Document 99-02, "Regulatory Assessment Performance Indicator Guideline," Revision 6, were used. The inspectors reviewed the licensee's records associated with the PI to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI and results of periodic scheduled ANS operability tests. Documents reviewed are listed in the Attachment to this report. This inspection constituted one alert and notification system sample as defined in IP 71151-05. | | PI for the period from the second quarter 2009 through second quarter 2010. To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in the NEI Document 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 6, were used. The inspectors reviewed the licensees records associated with the PI to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI and results of periodic scheduled ANS operability tests. Documents reviewed are listed in the Attachment to this report. |
| | |
| | This inspection constituted one alert and notification system sample as defined in IP 71151-05. |
|
| |
|
| ====b. Findings==== | | ====b. Findings==== |
| No findings of significance were identified. | | No findings of significance were identified. |
| {{a|4OA6}} | | {{a|4OA6}} |
| ==4OA6 Management Meetings== | | ==4OA6 Management Meetings== |
|
| |
|
| ===.1 Exit Meeting Summary On August 27, 2010, the inspectors presented the inspection results to you and other members of the licensee staff.=== | | ===.1 Exit Meeting Summary=== |
| The licensee acknowledged the issues presented. The inspectors confirmed that none of the potential report input discussed was considered proprietary.
| |
|
| |
|
| ===.2 Public and Media Briefing On August 27, 2010, the inspector summarized the NRC's preliminary exercise inspection conclusions at a public and media briefing hosted by Department of===
| | On August 27, 2010, the inspectors presented the inspection results to you and other members of the licensee staff. The licensee acknowledged the issues presented. The inspectors confirmed that none of the potential report input discussed was considered proprietary. |
|
| |
|
| Homeland Security/Federal Emergency Management Agency Region V Field Office staff in Red Wing, Minnesota. ATTACHMENT: | | ===.2 Public and Media Briefing=== |
| | |
| | On August 27, 2010, the inspector summarized the NRC's preliminary exercise inspection conclusions at a public and media briefing hosted by Department of Homeland Security/Federal Emergency Management Agency Region V Field Office staff in Red Wing, Minnesota. |
| | |
| | ATTACHMENT: |
|
| |
|
| =SUPPLEMENTAL INFORMATION= | | =SUPPLEMENTAL INFORMATION= |
|
| |
|
| ==KEY POINTS OF CONTACT== | | ==KEY POINTS OF CONTACT== |
| Licensee | | |
| : [[contact::M. Schimmel]], Site Vice President | | Licensee |
| : [[contact::K. Ryan]], Plant Manager | | : [[contact::M. Schimmel]], Site Vice President |
| : [[contact::C. Bough]], Environmental Manager | | : [[contact::K. Ryan]], Plant Manager |
| : [[contact::J. Callahan]], Corporate Emergency Preparedness Manager | | : [[contact::C. Bough]], Environmental Manager |
| : [[contact::R. Ciamarra]], Systems Engineering Manager | | : [[contact::J. Callahan]], Corporate Emergency Preparedness Manager |
| : [[contact::M. Davis]], Regulatory Affairs Analyst | | : [[contact::R. Ciamarra]], Systems Engineering Manager |
| : [[contact::K. DeFusco]], Emergency Preparedness Manager | | : [[contact::M. Davis]], Regulatory Affairs Analyst |
| : [[contact::D. Hartinger]], Nuclear Oversight | | : [[contact::K. DeFusco]], Emergency Preparedness Manager |
| : [[contact::J. Kivi]], Employee Concerns Program Manager | | : [[contact::D. Hartinger]], Nuclear Oversight |
| : [[contact::S. Lappegaard]], On-line Manager | | : [[contact::J. Kivi]], Employee Concerns Program Manager |
| : [[contact::J. Lash]], Operations Manager | | : [[contact::S. Lappegaard]], On-line Manager |
| : [[contact::R. Madjerich]], Production Planning Manager | | : [[contact::J. Lash]], Operations Manager |
| : [[contact::S. Martin]], Nuclear Oversight | | : [[contact::R. Madjerich]], Production Planning Manager |
| : [[contact::M. Milly]], Maintenance Manager | | : [[contact::S. Martin]], Nuclear Oversight |
| : [[contact::J. Nemcek]], Emergency Preparedness Coordinator | | : [[contact::M. Milly]], Maintenance Manager |
| : [[contact::M. Moseman]], Radiation Protection Supervisor | | : [[contact::J. Nemcek]], Emergency Preparedness Coordinator |
| : [[contact::S. Northard]], Performance Improvement Manager | | : [[contact::M. Moseman]], Radiation Protection Supervisor |
| : [[contact::A. Notbohm]], Performance Assessment Supervisor | | : [[contact::S. Northard]], Performance Improvement Manager |
| : [[contact::K. Peterson]], Business Support Manager | | : [[contact::A. Notbohm]], Performance Assessment Supervisor |
| : [[contact::A. Pullam]], Training Manager | | : [[contact::K. Peterson]], Business Support Manager |
| : [[contact::T. Roddey]], Engineering Design Manager | | : [[contact::A. Pullam]], Training Manager |
| : [[contact::K. Thomas]], Emergency Preparedness Trainer | | : [[contact::T. Roddey]], Engineering Design Manager |
| : [[contact::R. Womack]], Outage Manager Nuclear Regulatory Commission | | : [[contact::K. Thomas]], Emergency Preparedness Trainer |
| : [[contact::P. Zurawski]], Resident Inspector | | : [[contact::R. Womack]], Outage Manager |
| | Nuclear Regulatory Commission |
| | : [[contact::P. Zurawski]], Resident Inspector |
| | |
| ==LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED== | | ==LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED== |
| Opened, Closed, and Discussed None Attachment 1 | | |
| | ===Opened, Closed, and Discussed=== |
| | |
| | None Attachment |
|
| |
|
| ==LIST OF DOCUMENTS REVIEWED== | | ==LIST OF DOCUMENTS REVIEWED== |
| The following is a list of documents reviewed during the inspection.
| | |
| : Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort.
| |
| : Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report. 1EP1 Exercise Evaluation Prairie Island Nuclear Generating Plant Emergency Plan; Revision 41 Prairie Island Nuclear Generating Plant August 24, 2010 Exercise Manual; August 3, 2010 Drill and Exercise Scenario Timelines; July 2008 - August 2010
| |
| : Drill and Exercise Corrective Action Program Items; July 2008 - August 2010
| |
| : AR 01247070; Exercise-Communications Deficiencies; August 25, 2010
| |
| : AR 01247026; Exercise-Offsite Interface Issues; August 25, 2010
| |
| : AR 01247020; Exercise-Drill Management Issues; August 25, 2010
| |
| : AR 01247016; Exercise-EOF ENS Communications; August 25, 2010
| |
| : AR 01247012; Exercise-Second PAR Development Problems; August 25, 2010
| |
| : AR 01246997; Exercise-Exercise Timeline Variations; August 25, 2010
| |
| : AR 01246939; Exercise-TSC Released Non-Essential Personnel without Directions to Avoid Release Path; August 25, 2010
| |
| : AR 01246925; Exercise-TSC Failed to Implement KI to ERO; August 25, 2010
| |
| : AR 01246779; Exercise-TSC Inject Prevented Accountability Demonstration; August 24, 2010
| |
| : AR 01246778; Exercise-ERFs Activated without Evaluating Turbine Building Evacuation; August 24, 2010 4OA1 Performance Indicator Verification PINGP 1120; ANS Monthly Trend Reports; April 2009 - June 2010 PINGP 1325; DEP Performance Simulator Records; April 2009 - June 2010
| |
| : SP 1397; Emergency Plan Fixed Siren Tests; April 2009 - June 2010
| |
| : ERO Participation Performance Indicator Records; June 2009 - June 2010 Attachment 2
| |
| ==LIST OF ACRONYMS==
| |
| : [[USED]] [[]]
| |
| : [[ADAMS]] [[Agency-wide Documents Access and Management System]]
| |
| : [[ANS]] [[Alert and Notification System]]
| |
| AR Action Request
| |
| CFR Code of Federal Regulations
| |
| CRS Control Room Simulator
| |
| : [[DRS]] [[Division of Reactor Safety]]
| |
| : [[ENS]] [[Emergency Notification System]]
| |
| : [[EOF]] [[Emergency Operations Facility EP Emergency Preparedness]]
| |
| : [[ERF]] [[Emergency Response Facility]]
| |
| : [[ERO]] [[Emergency Response Organization]]
| |
| : [[IMC]] [[Inspection Manual Chapter]]
| |
| : [[IP]] [[Inspection Procedure]]
| |
| : [[IR]] [[Issue Report]]
| |
| : [[NEI]] [[Nuclear Energy Institute NOS Nuclear Oversight]]
| |
| : [[NRC]] [[U. S. Nuclear Regulatory Commission]]
| |
| : [[OSC]] [[Operations Support Center PAR Protective Action Recommendation]]
| |
| : [[PA]] [[]]
| |
| : [[RS]] [[Publicly Available Records]]
| |
| : [[PI]] [[Performance Indicator]]
| |
| SDP Significance Determination Process
| |
| TSC Technical Support Center Attachment 3
| |
| Mr. Mark A. Schimmel Site Vice President Prairie Island Nuclear Generating Plant Northern States Power Company, Minnesota
| |
| 1717 Wakonade Drive East
| |
| Welch,
| |
| : [[MN]] [[55089]]
| |
| : [[SUBJEC]] [[T:]]
| |
| : [[PRAIRI]] [[E]]
| |
| : [[ISLAND]] [[]]
| |
| : [[NUCLEA]] [[R]]
| |
| : [[GENERA]] [[]]
| |
| : [[TING]] [[]]
| |
| : [[PLANT]] [[,]]
| |
| : [[UNITS]] [[]]
| |
| : [[1 AND]] [[2]]
| |
| : [[BASELI]] [[NE]]
| |
| : [[EMERGE]] [[]]
| |
| : [[NCY]] [[]]
| |
| : [[PREPAR]] [[]]
| |
| : [[EDNESS]] [[]]
| |
| : [[BIENNI]] [[]]
| |
| : [[AL]] [[]]
| |
| : [[EXERCI]] [[]]
| |
| : [[SE]] [[]]
| |
| : [[INSPEC]] [[]]
| |
| : [[TION]] [[]]
| |
| : [[REPORT]] [[05000282/2010502(]]
| |
| : [[DRS]] [[); 05000306/2010502(DRS) Dear Mr. Schimmel: On August 27, 2010, the]]
| |
| : [[U.]] [[S. Nuclear Regulatory Commission (]]
| |
| NRC) completed a Baseline Emergency Preparedness Biennial Exercise inspection at your Prairie Island Nuclear Generating Plant, Units 1 and 2. The enclosed report documents the results of this inspection, which were discussed on August 27, 2010, with you, and other members of your staff. The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed
| |
| personnel. Based on the results of this inspection, no
| |
| : [[NRC]] [[-identified and no self-revealed findings of very low safety significance were identified. In accordance with 10]]
| |
| : [[CFR]] [[2.390 of the]]
| |
| : [[NRC]] [['s "Rules of Practice," a copy of this letter will be available electronically for public inspection in the]]
| |
| : [[NRC]] [[Public Document Room or from the Publicly Available Records System (PARS) component of]]
| |
| : [[NRC]] [['s Agencywide Documents Access and Management System (]]
| |
| : [[ADAMS]] [[), accessible from the]]
| |
| : [[NRC]] [[Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Sincerely, /]]
| |
| : [[RA]] [[/ Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-282; 50-306 License Nos.]]
| |
| : [[DPR]] [[-42;]]
| |
| : [[DPR]] [[-60 Enclosure: Inspection Report 05000282/2010502(DRS); 05000306/2010502(DRS) w/Attachment: Supplemental Information cc w/encl: Distribution via ListServ]]
| |
| : [[DOCUME]] [[]]
| |
| : [[NT]] [[]]
| |
| : [[NAME]] [[: G:\]]
| |
| : [[DRS]] [[\Work in Progress\PRA 2010]]
| |
| : [[502 DRS]] [[]]
| |
| : [[OL.]] [[docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy]]
| |
| : [[OFFI]] [[]]
| |
| : [[CE]] [[]]
| |
| : [[RI]] [[]]
| |
| : [[II]] [[E]]
| |
| : [[NA]] [[]]
| |
| ME
| |
| RJickling:co
| |
| : [[HP]] [[eterson]]
| |
| : [[DA]] [[]]
| |
| TE
| |
| 09/07/2010
| |
| 09/13/2010
| |
| : [[OFFICI]] [[]]
| |
| : [[AL]] [[]]
| |
| : [[RECORD]] [[]]
| |
| : [[COPY]] [[Letter to Mark]]
| |
| : [[A.]] [[Schimmel from Hironori Peterson, dated September 13, 2010.]]
| |
| : [[SUBJEC]] [[T:]]
| |
| : [[PRAIRI]] [[E]]
| |
| : [[ISLAND]] [[]]
| |
| : [[NUCLEA]] [[R]]
| |
| : [[GENERA]] [[TING]]
| |
| : [[PLANT]] [[,]]
| |
| : [[UNITS]] [[]]
| |
| : [[1 AND]] [[2]]
| |
| : [[BASELI]] [[NE]]
| |
| : [[EMERGE]] [[]]
| |
| : [[NCY]] [[]]
| |
| : [[PREPAR]] [[]]
| |
| : [[EDNESS]] [[]]
| |
| : [[BIENNI]] [[]]
| |
| : [[AL]] [[]]
| |
| : [[EXERCI]] [[]]
| |
| : [[SE]] [[]]
| |
| : [[INSPEC]] [[]]
| |
| : [[TION]] [[]]
| |
| : [[REPORT]] [[05000282/2010502(]]
| |
| : [[DRS]] [[); 05000306/2010502(DRS)]]
| |
| }} | | }} |
|
---|
Category:Inspection Report
MONTHYEARIR 05000282/20244032024-10-25025 October 2024 – Security Baseline Inspection Report 05000282/2024403 and 05000306/2024403 IR 05000282/20243012024-09-13013 September 2024 NRC Initial License Examination Report 05000282/2024301 and 05000306/2024301 IR 05000282/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Prairie Island Nuclear Generating Plant, Units 1 and 2 (Report 05000282/2024005 and 05000306/2024005) IR 05000282/20245012024-08-0505 August 2024 Emergency Preparedness Inspection Report 05000282/2024501 and 05000306/2024501 IR 05000282/20240022024-07-30030 July 2024 Integrated Inspection Report 05000282/2024002 and 05000306/2024002 IR 05000282/20240102024-06-28028 June 2024 Comprehensive Engineering Team Inspection Report 05000282/2024010 and 05000306/2024010 IR 05000282/20240012024-05-15015 May 2024 Integrated Inspection Report 05000282/2024001 and 05000306/2024001 IR 05000282/20244012024-04-25025 April 2024 – Security Baseline Inspection Report 05000282/2024401 and 05000306/2024401 IR 05000282/20230062024-02-28028 February 2024 Annual Assessment Letter for Prairie Island Nuclear Generating Plant, Units 1 and 2 (Report 05000282/2023006 and 05000306/2023006) IR 05000282/20230042024-02-0101 February 2024 Integrated Inspection Report 05000282/2023004 and 05000306/2023004 IR 07200010/20234012023-12-20020 December 2023 Independent Spent Fuel Storage Installation Security Inspection Report 07200010/2023401 IR 05000282/20234012023-12-13013 December 2023 Security Baseline Inspection Report 05000282/2023401 and 05000306/2023401 IR 05000282/20230032023-11-0808 November 2023 Integrated Inspection Report 05000282/2023003 and 05000306/2023003 IR 05000282/20230052023-08-30030 August 2023 Updated Inspected Plan for Prairie Island Nuclear Generating Plant Report 05000282/2023005 and 05000306/2023005 IR 05000282/20230102023-08-17017 August 2023 NRC Inspection Report 05000282/2023010 and 05000306/2023010 IR 05000282/20230022023-08-0303 August 2023 Integrated Inspection Report 05000282/2023002 and 05000306/2023002 IR 05000282/20234202023-06-0101 June 2023 Security Baseline Inspection Report 05000282/2023420 and 05000306/2023420 IR 05000282/20230112023-05-16016 May 2023 Biennial Problem Identification and Resolution Inspection Report 05000282/2023011 and 05000306/2023011 IR 05000282/20230012023-05-10010 May 2023 Integrated Inspection Report 05000282/2023001 and 05000306/2023001 IR 05000282/20220062023-03-0101 March 2023 Annual Assessment Letter for Prairie Island Nuclear Generating Plant, Units 1 and 2 (Report, Units 1 and 2 (Report 05000282/2022006 and 05000306/2022006) IR 05000282/20224042023-01-30030 January 2023 Material Control and Accounting Program Inspection Report 05000282/2022404 and 05000306/2022404 (Public) IR 05000282/20220042023-01-26026 January 2023 Integrated Inspection Report 05000282/2022004 and 05000306/2022004 IR 05000282/20224032023-01-24024 January 2023 Security Baseline Inspection Report 05000282/2022403 and 05000306/2022403 IR 05000282/20220022022-12-0808 December 2022 RE-Issue Prairie Island Nuclear Generating Plant Integrated Inspection Report 05000282/2022002 and 05000306/2022002 IR 05000282/20224022022-11-30030 November 2022 Cyber Security Inspection Report 05000282/2022402 and 05000306/2022402 IR 07200010/20222012022-11-0909 November 2022 TN-40HT, Dry Storage Cask, Inspection Report No. 07200010/2022201 IR 05000282/20220032022-11-0101 November 2022 Integrated Inspection Report 05000282/2022003 and 05000306/2022003 IR 05000282/20220112022-09-26026 September 2022 Phase 4 Post-Approval Site Inspection for License Renewal Report 05000282/2022011 and 05000306/2022011 IR 05000282/20223012022-08-31031 August 2022 NRC Initial License Examination Report 05000282/2022301; 05000306/2022301 IR 05000282/20220052022-08-29029 August 2022 Updated Inspection Plan for Prairie Island Nuclear Generating Plant (Report 05000282/2022005; 05000306/2022005) IR 05000282/20225012022-08-22022 August 2022 Emergency Preparedness Biennial Exercise Inspection Report 05000282/2022501 and 05000306/2022501 ML22227A1902022-08-16016 August 2022 Island Nuclear Generating Plant, Unit 1 - Notification of NRC Baseline Inspection and Request for Information: Inspection Report 05000282/2022004 ML22222A1732022-08-11011 August 2022 Integrated Inspection Report 05000282/2022002 and 05000306/2022002 IR 05000282/20220102022-06-24024 June 2022 Triennial Fire Protection Inspection Report 05000282/2022010 and 05000306/2022010 IR 05000282/20224012022-05-23023 May 2022 Security Baseline Inspection Report 05000282/2022401 and 05000306/2022401 ML22103A2522022-05-0404 May 2022 Review of the 2021 Steam Generator Tube Inspection Report IR 05000282/20220012022-05-0303 May 2022 Integrated Inspection Report 05000282/2022001, 05000306/2022001, and 07200010/2020001 IR 05000282/20210062022-03-0202 March 2022 Annual Assessment Letter (Report 05000282/2021006 and 05000306/2021006) IR 05000282/20210042022-02-11011 February 2022 Integrated Inspection Report 05000282/2021004 and 05000306/2021004 ML22017A0052022-01-17017 January 2022 (PINGP) 2021 Unit 2 180-Day Steam Generator Tube Inspection Report IR 05000282/20214032021-12-0202 December 2021 Security Baseline Inspection Report 05000282/2021403 and 05000306/2021403 IR 05000282/20210032021-11-12012 November 2021 Integrated Inspection Report 05000282/2021003 and 05000306/2021003 IR 05000282/20210122021-10-27027 October 2021 NRC Inspection Report 05000282/2021012 and 05000306/2021012 IR 05000282/20210052021-09-0101 September 2021 Updated Inspection Plan for Prairie Island Nuclear Generating Plant Units 1 and 2 (Report 05000282/2021005 and 05000306/2021005) IR 05000282/20215012021-08-25025 August 2021 Emergency Preparedness Biennial Exercise Inspection Report 05000282/2021501 and 05000306/2021501 IR 05000282/20210022021-08-0606 August 2021 Integrated Inspection Report 05000282/2021002 and 05000306/2021002 IR 05000282/20214022021-07-28028 July 2021 Security Baseline Inspection Report 05000282/2021402 and 05000306/2021402 IR 05000282/20210102021-06-22022 June 2021 Design Basis Assurance Inspection (Teams) Inspection Report 05000282/2021010 and 05000306/2021010 IR 05000282/20210112021-06-0303 June 2021 Biennial Problem Identification and Resolution Inspection Report 05000282/2021011 and 05000306/2021011 IR 05000282/20210012021-05-0606 May 2021 Integrated Inspection Report 05000282/2021001 and 05000306/2021001 2024-09-13
[Table view] Category:Letter
MONTHYEARML24298A0552024-10-30030 October 2024 Response to Alternative RR-10, Auxiliary Feedwater Valve Testing IR 05000282/20244032024-10-25025 October 2024 – Security Baseline Inspection Report 05000282/2024403 and 05000306/2024403 05000282/LER-2024-001-01, Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies2024-10-22022 October 2024 Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies L-PI-24-044, Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program2024-10-21021 October 2024 Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program ML24277A1012024-10-0303 October 2024 Closure of Interim Report of a Potential Deviation or Failure to Comply Associated with Bentley Systems Incorporated Autopipe Software ML24221A3622024-09-27027 September 2024 Issuance of Amendment Nos. 245 and 233 Revise Technical Specification 3.8.1, AC Sources-Operating, Surveillance Requirement 3.8.1.2, Note 3 ML24241A1682024-09-23023 September 2024 Transmittal Letter Amendment No. 13 to Materials License No. Special Nuclear Material-2506 for the Prairie Island Independent Spent Fuel Storage Installation 05000282/LER-2024-001, Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies2024-09-16016 September 2024 Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies IR 05000282/20243012024-09-13013 September 2024 NRC Initial License Examination Report 05000282/2024301 and 05000306/2024301 IR 05000282/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Prairie Island Nuclear Generating Plant, Units 1 and 2 (Report 05000282/2024005 and 05000306/2024005) L-PI-24-040, Post-Submittal Package Letter2024-08-23023 August 2024 Post-Submittal Package Letter IR 05000282/20245012024-08-0505 August 2024 Emergency Preparedness Inspection Report 05000282/2024501 and 05000306/2024501 ML24213A1592024-07-31031 July 2024 Operator Licensing Examination Approval - Prairie Island Nuclear Generating Plant IR 05000282/20240022024-07-30030 July 2024 Integrated Inspection Report 05000282/2024002 and 05000306/2024002 ML24208A1502024-07-26026 July 2024 Independent Spent Fuel Storage Installation - Submittal of Quality Assurance Topical Report (NSPM-1) ML24197A2012024-07-15015 July 2024 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000282/2024004 IR 05000282/20240102024-06-28028 June 2024 Comprehensive Engineering Team Inspection Report 05000282/2024010 and 05000306/2024010 L-PI-24-036, – Preparation and Scheduling of Operator Licensing Examinations2024-06-28028 June 2024 – Preparation and Scheduling of Operator Licensing Examinations ML24158A5912024-06-0606 June 2024 CFR 50.46 LOCA Annual Report L-PI-24-031, Independent Spent Fuel Storage Installation, Supplement to License Amendment Request to Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2)2024-06-0505 June 2024 Independent Spent Fuel Storage Installation, Supplement to License Amendment Request to Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2) L-PI-24-014, License Amendment Request to Revise the Technical Specification Definition of Reactor Trip System (RTS) Response Time and Apply Response Time Testing to RTS Trip Functions with Time Delay Assumption2024-06-0303 June 2024 License Amendment Request to Revise the Technical Specification Definition of Reactor Trip System (RTS) Response Time and Apply Response Time Testing to RTS Trip Functions with Time Delay Assumption 05000306/LER-2024-001-01, Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump2024-05-31031 May 2024 Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump ML24155A1922024-05-31031 May 2024 Refueling Outage Unit 2 R33 Owners Activity Report for Class 1, 2, 3 and Mc Inservice Inspections ML24149A3712024-05-29029 May 2024 (Ping) - Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection ML24262A1992024-05-29029 May 2024 L-PI-24-018 PINGP 75 Day Letter L-PI-24-030, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.8.12024-05-22022 May 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.8.1 ML24141A1292024-05-22022 May 2024 Northern States Power Company - Use of Encryption Software for Electronic Transmission of Safeguards Information ML24141A0452024-05-20020 May 2024 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML24128A2572024-05-16016 May 2024 ISFSI A13 Acceptance Letter IR 05000282/20240012024-05-15015 May 2024 Integrated Inspection Report 05000282/2024001 and 05000306/2024001 ML24130A2362024-05-0909 May 2024 Independent Spent Fuel Storage Installation - 2023 Annual Radiological Environmental Monitoring Program Report ML24130A2392024-05-0909 May 2024 2023 Annual Radioactive Effluent Report ML24071A1162024-05-0101 May 2024 Issuance of Amendment Nos. 244 and 232 Revise TS 3.7.8, Cooling Water (Cl) System ML24128A0882024-04-30030 April 2024 Submittal of Updated Safety Analysis Report (Usar), Revision 38 05000306/LER-2024-001, Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump2024-04-29029 April 2024 Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump ML24089A2382024-04-29029 April 2024 Summary of Nuclear Property Insurance IR 05000282/20244012024-04-25025 April 2024 – Security Baseline Inspection Report 05000282/2024401 and 05000306/2024401 ML24100A8042024-04-24024 April 2024 – Alternative Request RR-09 for Safety Injection and Volume Control System Category C Check Valve Inservice Testing ML24114A0882024-04-23023 April 2024 Annual Report of Individual Monitoring for the Prairie Island Nuclear Generating Plant (PINGP) ML24113A1182024-04-12012 April 2024 NRC Letter Re NRC Office of Investigations Report No. 3-2023-004 ML24100A1212024-04-0909 April 2024 Submittal of Revised Pressure and Temperature Limits Report ML24093A2832024-04-0202 April 2024 Nuclear Material Transaction Report L-PI-24-012, Independent Spent Fuel Storage Installation - License Amendment Request: Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2)2024-04-0202 April 2024 Independent Spent Fuel Storage Installation - License Amendment Request: Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2) ML24089A2402024-03-29029 March 2024 Guarantee of Payment of Deferred Premiums ML24060A1232024-03-27027 March 2024 To Request 1-RR-5-10 and 2-RR-5-10 Regarding Reactor Pressure Vessel Welds and Nozzle Welds 05000282/LER-2023-001-01, Reactor Trip, Auxiliary Feedwater and Emergency Service Water System Actuation Due to Electrical Transient in DC Control Power Cables2024-03-21021 March 2024 Reactor Trip, Auxiliary Feedwater and Emergency Service Water System Actuation Due to Electrical Transient in DC Control Power Cables ML24262A1512024-03-15015 March 2024 L-PI-24-011 150 Day Letter 2024 PINGP ILT NRC Exam ML24010A0582024-03-0505 March 2024 Amendment No. 12 to Materials License No. Special Nuclear Material-2506 for the Prairie Island Independent Spent Fuel Storage Installation L-PI-24-004, Independent Spent Fuel Storage Installation - Annual Effluent Report, January Through December 20232024-02-29029 February 2024 Independent Spent Fuel Storage Installation - Annual Effluent Report, January Through December 2023 IR 05000282/20230062024-02-28028 February 2024 Annual Assessment Letter for Prairie Island Nuclear Generating Plant, Units 1 and 2 (Report 05000282/2023006 and 05000306/2023006) 2024-09-27
[Table view] |
Text
ember 13, 2010
SUBJECT:
PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2 BASELINE EMERGENCY PREPAREDNESS BIENNIAL EXERCISE INSPECTION REPORT 05000282/2010502(DRS); 05000306/2010502(DRS)
Dear Mr. Schimmel:
On August 27, 2010, the U. S. Nuclear Regulatory Commission (NRC) completed a Baseline Emergency Preparedness Biennial Exercise inspection at your Prairie Island Nuclear Generating Plant, Units 1 and 2. The enclosed report documents the results of this inspection, which were discussed on August 27, 2010, with you, and other members of your staff.
The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
Based on the results of this inspection, no NRC-identified and no self-revealed findings of very low safety significance were identified.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-282; 50-306 License Nos. DPR-42; DPR-60
Enclosure:
Inspection Report 05000282/2010502(DRS); 05000306/2010502(DRS)
w/Attachment: Supplemental Information
REGION III==
Docket Nos: 50-282; 50-306 License Nos: DPR-42; DPR-60 Report No: 05000282/2010502(DRS); 05000306/2010502(DRS)
Licensee: Northern States Power Company, Minnesota Facility: Prairie Island Nuclear Generating Plant, Units 1 and 2 Location: Welch, Minnesota Dates: August 23 through 27, 2010 Inspectors: Robert Jickling, Sr. Emergency Preparedness Inspector Charles Zoia, Operations Engineer Paul Zurawski, Resident Inspector Approved by: Hironori Peterson, Chief Operations Branch Division of Reactor Safety Enclosure
SUMMARY OF FINDINGS
IR 05000282/2010502(DRS); 05000306/2010502(DRS); 08/23/2010 - 08/27/2010;
Prairie Island Nuclear Generating Plan, Units 1 and 2; Baseline Emergency Preparedness Biennial Exercise Inspection This report covers a one week period of announced baseline inspection by two regional inspectors and one resident inspector. The significance of most findings is indicated by their color (Green, White, Yellow, Red) using Inspection Manual Chapter (IMC) 0609, Significance Determination Process (SDP). Findings for which the SDP does not apply may be Green or be assigned a severity level after NRC management review. The NRCs program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649,
Reactor Oversight Process, Revision 4, dated December 2006.
NRC-Identified
and Self-Revealed Findings
Cornerstone: Emergency Preparedness
No findings of significance were identified.
Licensee-Identified Violations
No violations of significance were identified.
REPORT DETAILS
REACTOR SAFETY
Cornerstones: Emergency Preparedness
1EP1 Exercise Evaluation
Main article: IP 71114.01
.1 Exercise Evaluation
a. Inspection Scope
The inspectors reviewed the August 24, 2010, biennial emergency preparedness exercises objectives and scenario to ensure that the exercise would acceptably test major elements of the licensees emergency plan and to verify that the exercises simulated problems provided an acceptable framework to support demonstration of the licensees capability to implement its plan. The inspectors also reviewed records of other drills and exercises conducted in 2008, 2009, and 2010, to verify that those drills scenarios were sufficiently different from the scenario used in the August 24, 2010 exercise.
The inspectors evaluated the licensees exercise performance, focusing on the risk significant activities of emergency classification, notification, and protective action decision making, implementation of accident mitigation strategies, and correction of past exercise weaknesses in the following emergency response facilities:
- Control Room Simulator (CRS);
- Emergency Operations Facility (EOF)
The inspectors also assessed the licensees recognition of abnormal plant conditions, transfer of responsibilities between facilities, internal communications, interfaces with offsite officials, readiness of emergency facilities and related equipment, and overall implementation of the licensees emergency plan.
The inspectors attended post-exercise critiques in the CRS, TSC, and EOF to evaluate the licensees initial self-assessment of its exercise performance. The inspectors later met with the licensees lead exercise evaluators and managers to obtain the licensees findings and assessments of its exercise participants performances. These self-assessments were then compared with the inspectors independent observations and assessments to assess the licensees ability to adequately critique its exercise performance. Documents reviewed are listed in the Attachment to this report.
This exercise evaluation inspection constituted one sample as defined in Inspection Procedure (IP) 71114.01-05.
b. Findings
No findings of significance were identified.
OTHER ACTIVITIES
4OA1 Performance Indicator (PI) Verification
.1 Drill/Exercise Performance
a. Inspection Scope
The inspectors sampled licensee submittals for the Drill/Exercise Performance PI for the period from the second quarter 2009 through second quarter 2010. To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in the Nuclear Energy Institute (NEI) Document 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 6, were used. The inspectors reviewed the licensees records associated with the performance indicator to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI; assessments of PI opportunities during pre-designated control room simulator training sessions, and performance during other drills. Documents reviewed are listed in the to this report.
This inspection constituted one drill/exercise performance sample as defined in IP 71151-05.
b. Findings
No findings of significance were identified.
.2 Emergency Response Organization Drill Participation
a. Inspection Scope
The inspectors sampled licensee submittals for the Emergency Response Organization (ERO) Drill Participation PI for the period from the second quarter 2009 through second quarter 2010. To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in the NEI Document 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 6, were used.
The inspectors reviewed the licensees records associated with the PI to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI; performance during the 2009 and 2010 exercises and drills; and revisions of the roster of personnel assigned to key emergency response organization positions. Documents reviewed are listed in the Attachment to this report.
This inspection constituted one ERO drill participation sample as defined in IP 71151-05.
b. Findings
No findings of significance were identified.
.3 Alert and Notification System
a. Inspection Scope
The inspectors sampled licensee submittals for the Alert and Notification System (ANS)
PI for the period from the second quarter 2009 through second quarter 2010. To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in the NEI Document 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 6, were used. The inspectors reviewed the licensees records associated with the PI to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI and results of periodic scheduled ANS operability tests. Documents reviewed are listed in the Attachment to this report.
This inspection constituted one alert and notification system sample as defined in IP 71151-05.
b. Findings
No findings of significance were identified.
4OA6 Management Meetings
.1 Exit Meeting Summary
On August 27, 2010, the inspectors presented the inspection results to you and other members of the licensee staff. The licensee acknowledged the issues presented. The inspectors confirmed that none of the potential report input discussed was considered proprietary.
.2 Public and Media Briefing
On August 27, 2010, the inspector summarized the NRC's preliminary exercise inspection conclusions at a public and media briefing hosted by Department of Homeland Security/Federal Emergency Management Agency Region V Field Office staff in Red Wing, Minnesota.
ATTACHMENT:
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee
- M. Schimmel, Site Vice President
- K. Ryan, Plant Manager
- C. Bough, Environmental Manager
- J. Callahan, Corporate Emergency Preparedness Manager
- R. Ciamarra, Systems Engineering Manager
- M. Davis, Regulatory Affairs Analyst
- K. DeFusco, Emergency Preparedness Manager
- D. Hartinger, Nuclear Oversight
- J. Kivi, Employee Concerns Program Manager
- S. Lappegaard, On-line Manager
- J. Lash, Operations Manager
- R. Madjerich, Production Planning Manager
- S. Martin, Nuclear Oversight
- M. Milly, Maintenance Manager
- J. Nemcek, Emergency Preparedness Coordinator
- M. Moseman, Radiation Protection Supervisor
- S. Northard, Performance Improvement Manager
- A. Notbohm, Performance Assessment Supervisor
- K. Peterson, Business Support Manager
- A. Pullam, Training Manager
- T. Roddey, Engineering Design Manager
- K. Thomas, Emergency Preparedness Trainer
- R. Womack, Outage Manager
Nuclear Regulatory Commission
- P. Zurawski, Resident Inspector
LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED
Opened, Closed, and Discussed
None Attachment
LIST OF DOCUMENTS REVIEWED