ML19329E971: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
(One intermediate revision by the same user not shown) | |||
Line 20: | Line 20: | ||
~ ~ | ~ ~ | ||
l'.. | l'.. | ||
o.cg w G | o.cg w G | ||
. I C],13'ET3;"3 | . I C],13'ET3;"3 | ||
. i | . i s.:mr v,c. e...,,,,,, | ||
s.:mr | |||
v,c. e...,,,,,, | |||
w, s . . . . .m . ] | w, s . . . . .m . ] | ||
o.n.r. ome..: sis w..e wenio.n u.nw., soca.on wenio.n .omoi February 10, 1978 Hove-13-78 | o.n.r. ome..: sis w..e wenio.n u.nw., soca.on wenio.n .omoi February 10, 1978 Hove-13-78 | ||
~ | ~ | ||
Mr J. G. Keppler, Regional Director '' % | Mr J. G. Keppler, Regional Director '' % | ||
Office of Inspection and Enforcement Region III . | Office of Inspection and Enforcement Region III . | ||
US Nuclear Regulatory Commission . | US Nuclear Regulatory Commission . | ||
799 Roosevelt Road 4 ,. | 799 Roosevelt Road 4 ,. | ||
Glen Ellyn, IL 00137 | Glen Ellyn, IL 00137 s .s | ||
s .s | |||
- D7 , | - D7 , | ||
MELAND NUCLEAR PLANT - V7. | MELAND NUCLEAR PLANT - V7. | ||
Line 50: | Line 38: | ||
C .s x, - - s . | C .s x, - - s . | ||
1 | 1 | ||
==Attachment:== | ==Attachment:== | ||
Line 62: | Line 48: | ||
8006190 h y Q g l | 8006190 h y Q g l | ||
REPORT ON REACTOR COOLANT PUMP MOTORIFLANCE DEFICIENCY . | |||
This report documents the evaluation of the deficiency in the design andcobtructionofreactorcoolantpumpmotorflanges. The subject motors were designed for installation'at the Consumers Power Company Midland Units | This report documents the evaluation of the deficiency in the design andcobtructionofreactorcoolantpumpmotorflanges. The subject motors were designed for installation'at the Consumers Power Company Midland Units | ||
. 1 and 2. The purpose of this report is to determine whether the deficiency constitutes a significant deficiency as defined by 10 CFR 50.55(e). | . 1 and 2. The purpose of this report is to determine whether the deficiency constitutes a significant deficiency as defined by 10 CFR 50.55(e). | ||
Identification of Problem Dhring a routine dimensional inspection of a RC pump motor'at the vendor's (CE) shop prior to shipment in February 1977, it was determined that the as-built rabbet height dimension'on' the motor mounting flange-was less than that specified. on~the motor drawing. The rabbet is a cylindrical extension of the motor flange that fits into a eatinterbore in the motor support stand flange with a very close clearance; its purpose is to assure axial alignment of the motor with the pump and to bear the horizontal shear loads resulting from LOCA and seismic forces. Upon'further investigation, it was determined that the rabbet had also been incorrectly designed and was not adequate 'to | Identification of Problem Dhring a routine dimensional inspection of a RC pump motor'at the vendor's (CE) shop prior to shipment in February 1977, it was determined that the as-built rabbet height dimension'on' the motor mounting flange-was less than that specified. on~the motor drawing. The rabbet is a cylindrical extension of the motor flange that fits into a eatinterbore in the motor support stand flange with a very close clearance; its purpose is to assure axial alignment of the motor with the pump and to bear the horizontal shear loads resulting from LOCA and seismic forces. Upon'further investigation, it was determined that the rabbet had also been incorrectly designed and was not adequate 'to | ||
~ | ~ | ||
withstand the design loads; this, inadequate design exists in all eight of the- | withstand the design loads; this, inadequate design exists in all eight of the-RC pump motors for Midland Units 1 and 2. | ||
RC pump motors for Midland Units 1 and 2. | |||
Safety Implications - | Safety Implications - | ||
Specification 08-101600007-01, Drive Motor for Reactor Coolant Pump is the procurement specification for these motors. Section 3.1 of this specification e | |||
Specification 08-101600007-01, Drive Motor for Reactor Coolant Pump is the procurement specification for these motors. Section 3.1 of this specification | l 4m | ||
4m | |||
* m e as asup 4 * | * m e as asup 4 * | ||
* eemme -.W 4 _ -- D*" iO | * eemme -.W 4 _ -- D*" iO | ||
- ) | - ) | ||
6*be = * .x ~ | 6*be = * .x ~ | ||
l crates "The motor shall be capable of withstanding the Seismic and LOCA Loads cpecified in Appendix C insuring that the criterfa and stress limits specified | |||
l | |||
crates "The motor shall be capable of withstanding the Seismic and LOCA Loads | |||
cpecified in Appendix C insuring that the criterfa and stress limits specified | |||
] | ] | ||
crehet. The criteria for upset, emergency and faulted conditions is that no damage is caused to other plant components. This shall be satisfied by chowins that the major motor structures do not become missiles." Appendix C cf that specification lists the design loads and defines the major motor ctructures as the flywheel and the motor frame. The incorrect design of the rabbet violated the design requirenents as 'specified in Section 3.1 and Appendix C of this specification. | crehet. The criteria for upset, emergency and faulted conditions is that no damage is caused to other plant components. This shall be satisfied by chowins that the major motor structures do not become missiles." Appendix C cf that specification lists the design loads and defines the major motor ctructures as the flywheel and the motor frame. The incorrect design of the rabbet violated the design requirenents as 'specified in Section 3.1 and Appendix C of this specification. | ||
The deficiency in the design of the motor flange rabbet, were, it. to have remained uncorrected, could have permitted the motor structure to become detached from its mounting as a result of'LOCA or' seismic forces, thus creating the potential for damaging other systems and components in the vicinity of the motors that are vital to plant safety. An analysis of (1) the extent to which the motors would have been hurled, would have fallen, or would have otherwise been displaced as the result of e LOCA or a seismic event, (2) the extent of damage | The deficiency in the design of the motor flange rabbet, were, it. to have remained uncorrected, could have permitted the motor structure to become detached from its mounting as a result of'LOCA or' seismic forces, thus creating the potential for damaging other systems and components in the vicinity of the motors that are vital to plant safety. An analysis of (1) the extent to which the motors would have been hurled, would have fallen, or would have otherwise been displaced as the result of e LOCA or a seismic event, (2) the extent of damage to other components, and (3) the effect on plant safety resulting from such damage, has not been made, however. While the motor procurement specifica-tion characterizes the motor frame as having the potential for becoming c " missile", the Midland Units 1 and 2 FSAR, Section 3.5.1 does not include the motor frame as a component that has been analyzed or has been examined with respect to its potential for becoming a missile. The motor, nevertheless, could have been displaced from its mountings under LOCA or seismic forces, cad has the potential for acting in a manner analogous to a " missile" in that it could damage other components vital to safety. The design deficiency in '- | ||
to other components, and (3) the effect on plant safety resulting from such damage, has not been made, however. While the motor procurement specifica-tion characterizes the motor frame as having the potential for becoming c " missile", the Midland Units 1 and 2 FSAR, Section 3.5.1 does not include the motor frame as a component that has been analyzed or has been examined with respect to its potential for becoming a missile. The motor, nevertheless, could have been displaced from its mountings under LOCA or seismic forces, cad has the potential for acting in a manner analogous to a " missile" in that it could damage other components vital to safety. The design deficiency in '- | |||
the motor flange rabbet is therefore concluded to represent a possible significant de-ficiency within the meaning of 10CFR 50.55(e) in that, "were it to have remained uncorrected, it could have affected adversely the safety of operations of the , | the motor flange rabbet is therefore concluded to represent a possible significant de-ficiency within the meaning of 10CFR 50.55(e) in that, "were it to have remained uncorrected, it could have affected adversely the safety of operations of the , | ||
nuclear power plant at any time throughout the expected lifetime of the plant." | nuclear power plant at any time throughout the expected lifetime of the plant." | ||
'~ | '~ | ||
i | i | ||
. '32 , | . '32 , | ||
The deficiency also satisfies the definition of 10 C2K 50.55(e) in I | The deficiency also satisfies the definition of 10 C2K 50.55(e) in I | ||
that it is a" deficiency in final design as approved and released for ' | that it is a" deficiency in final design as approved and released for ' | ||
construction such that the design does not conform to the criteria and bases i | construction such that the design does not conform to the criteria and bases i | ||
stated in the safety analysis report or construction permit." The specific | stated in the safety analysis report or construction permit." The specific | ||
. criteria in the Midland FSAR that would be violated is General Design Criterion | . criteria in the Midland FSAR that would be violated is General Design Criterion | ||
, No. 4, Environmental and missile design bases Appendix A to 10 CFR 50. This criterion states that " structures, systems and components important to safety shall be appropriately protected against dynamic effects, including the affects of missiles, pipe whipping and discharging fluids, that may result from equipment failures." The potential loosening 'and falling of the motor during a LOCA or seismic event and the potential for damaging surrounding components that a'r,e vital to safety would be a violation of GDC No. 4 The reported deficiency therefore satisfies the necessary requirements for reportability as a significant deficiency under 10 CFR 50.55(e). | |||
, No. 4, Environmental and missile design bases Appendix A to 10 CFR 50. This criterion states that " structures, systems and components important to safety shall be appropriately protected against dynamic effects, including the affects of missiles, pipe whipping and discharging fluids, that may result from equipment failures." The potential loosening 'and falling of the motor during a LOCA or | Corrective Action - | ||
The load carrying capability of the motor flange rabbet will be augmented by increasing the friction load between the surfaces of the mo~ tor flange and the motor ' support flange of the reactor coolant pump. This will be accomplished by replacing the 16 cap screws with studs and nuts and by specifying the required atud I | |||
seismic event and the potential for damaging surrounding components that a'r,e vital to safety would be a violation of GDC No. 4 The reported deficiency therefore satisfies the necessary requirements for reportability as a significant deficiency under 10 CFR 50.55(e). | preloading. The replacement of the sc.rews with studs was necessary since the cap screws could not be tightened to the preload required to achieve the flange friction force due to the fact that the limited available access to the screws precluded the use of the necessary torque tools. The available access, however, was adequate to permit the use of stud tensioners and hence the use of studs, which can be tightened with tensioners, was adopted. The instruction manuals l | ||
preloading. The replacement of the sc.rews with studs was necessary since the cap screws could not be tightened to the preload required to achieve the flange friction force due to the fact that the limited available access to the screws precluded the use of the necessary torque tools. The available access, however, was adequate to permit the use of stud tensioners and hence the use of studs, | |||
which can be tightened with tensioners, was adopted. The instruction manuals l | |||
L . .: m -- A . .:.w a.s w~. um h-i- r e - - - -#,:.#. .#.. y ,, ,,, m,_ , | L . .: m -- A . .:.w a.s w~. um h-i- r e - - - -#,:.#. .#.. y ,, ,,, m,_ , | ||
i 4 | |||
9 . | |||
i | |||
describing the method of attaching the motor to the motor support stand will be | describing the method of attaching the motor to the motor support stand will be | ||
's | 's revised to provide for the um of studs and stud tensioners and to speciy the reguired preloading of the studs. | ||
revised to provide for the um of studs and stud tensioners and to speciy the reguired preloading of the studs. | |||
This corrective action has been approved and is being implemented for all 8 pump and motor units for Hidland 1 and 2. The motor vendor stress report has been revised accordingly and the repori; has been approved. | This corrective action has been approved and is being implemented for all 8 pump and motor units for Hidland 1 and 2. The motor vendor stress report has been revised accordingly and the repori; has been approved. | ||
e | e | ||
/ | / | ||
M 9 | |||
M | e 4 | ||
I e | |||
a | |||
'e I | |||
'e | |||
I | |||
i i | i i | ||
i e | i e | ||
- __ + | - __ + | ||
o * , | o * , | ||
a . | a . | ||
REGULATORY INFORMATION DISTRIBUTION SYSTEM DISTRIBUTION FOR INCOMING MATERIAL (RIDS)hll$h)3SO S | REGULATORY INFORMATION DISTRIBUTION SYSTEM DISTRIBUTION FOR INCOMING MATERIAL (RIDS)hll$h)3SO S | ||
REC- KEPPLER J G ORG: HOWELL S H DOCDATE: 02/10/78 | REC- KEPPLER J G ORG: HOWELL S H DOCDATE: 02/10/78 |
Latest revision as of 14:14, 18 February 2020
ML19329E971 | |
Person / Time | |
---|---|
Site: | Midland |
Issue date: | 02/10/1978 |
From: | Howell S CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
To: | James Keppler |
References | |
HOWE-13-78, NUDOCS 8006190742 | |
Download: ML19329E971 (5) | |
Text
_ - _ _ - _ _ _ _ _ _ _ _ - - __
~
~ ~
l'..
o.cg w G
. I C],13'ET3;"3
. i s.:mr v,c. e...,,,,,,
w, s . . . . .m . ]
o.n.r. ome..: sis w..e wenio.n u.nw., soca.on wenio.n .omoi February 10, 1978 Hove-13-78
~
Mr J. G. Keppler, Regional Director %
Office of Inspection and Enforcement Region III .
US Nuclear Regulatory Commission .
799 Roosevelt Road 4 ,.
Glen Ellyn, IL 00137 s .s
- D7 ,
MELAND NUCLEAR PLANT - V7.
'O 3 h
-- - u-r.\ '
UNIT NO. 1, DOCKET NO. 50-329 UNIT NO. 2, DOCKET NO. 50-330 REACTOR COOLANT PLNP M0'IOR FLANGES In accordance with the requirements of 10 CFR 50 55(e), this letter constitutes an interim report on the eight reactor coolant pump motors which have a desi En deficiency in their motor mounting flanges. Attached is a report prepared by the Babcock and Wilcox Company (B&W) which provides a description of the deficiency and the proposed corrective action. Additional information has been requested from B&W to better enable Consumers Power to review the adequacy of their proposed repair. Either a final or another interim report will be sent on or before March 31, 1978.
C .s x, - - s .
1
Attachment:
Report on Reactor Coolant Pump Motor Flange Deficiency CC: Dr Ernst Volgenau, USNRC (15)
Director, Office of Mana6e=ent Information and Pro 6 ram Control, USHRC (1) ,
}
illW Memmet FE8131978 r
A P h5 1
(
8006190 h y Q g l
REPORT ON REACTOR COOLANT PUMP MOTORIFLANCE DEFICIENCY .
This report documents the evaluation of the deficiency in the design andcobtructionofreactorcoolantpumpmotorflanges. The subject motors were designed for installation'at the Consumers Power Company Midland Units
. 1 and 2. The purpose of this report is to determine whether the deficiency constitutes a significant deficiency as defined by 10 CFR 50.55(e).
Identification of Problem Dhring a routine dimensional inspection of a RC pump motor'at the vendor's (CE) shop prior to shipment in February 1977, it was determined that the as-built rabbet height dimension'on' the motor mounting flange-was less than that specified. on~the motor drawing. The rabbet is a cylindrical extension of the motor flange that fits into a eatinterbore in the motor support stand flange with a very close clearance; its purpose is to assure axial alignment of the motor with the pump and to bear the horizontal shear loads resulting from LOCA and seismic forces. Upon'further investigation, it was determined that the rabbet had also been incorrectly designed and was not adequate 'to
~
withstand the design loads; this, inadequate design exists in all eight of the-RC pump motors for Midland Units 1 and 2.
Safety Implications -
Specification 08-101600007-01, Drive Motor for Reactor Coolant Pump is the procurement specification for these motors. Section 3.1 of this specification e
l 4m
- m e as asup 4 *
- eemme -.W 4 _ -- D*" iO
- )
6*be = * .x ~
l crates "The motor shall be capable of withstanding the Seismic and LOCA Loads cpecified in Appendix C insuring that the criterfa and stress limits specified
]
crehet. The criteria for upset, emergency and faulted conditions is that no damage is caused to other plant components. This shall be satisfied by chowins that the major motor structures do not become missiles." Appendix C cf that specification lists the design loads and defines the major motor ctructures as the flywheel and the motor frame. The incorrect design of the rabbet violated the design requirenents as 'specified in Section 3.1 and Appendix C of this specification.
The deficiency in the design of the motor flange rabbet, were, it. to have remained uncorrected, could have permitted the motor structure to become detached from its mounting as a result of'LOCA or' seismic forces, thus creating the potential for damaging other systems and components in the vicinity of the motors that are vital to plant safety. An analysis of (1) the extent to which the motors would have been hurled, would have fallen, or would have otherwise been displaced as the result of e LOCA or a seismic event, (2) the extent of damage to other components, and (3) the effect on plant safety resulting from such damage, has not been made, however. While the motor procurement specifica-tion characterizes the motor frame as having the potential for becoming c " missile", the Midland Units 1 and 2 FSAR, Section 3.5.1 does not include the motor frame as a component that has been analyzed or has been examined with respect to its potential for becoming a missile. The motor, nevertheless, could have been displaced from its mountings under LOCA or seismic forces, cad has the potential for acting in a manner analogous to a " missile" in that it could damage other components vital to safety. The design deficiency in '-
the motor flange rabbet is therefore concluded to represent a possible significant de-ficiency within the meaning of 10CFR 50.55(e) in that, "were it to have remained uncorrected, it could have affected adversely the safety of operations of the ,
nuclear power plant at any time throughout the expected lifetime of the plant."
'~
i
. '32 ,
The deficiency also satisfies the definition of 10 C2K 50.55(e) in I
that it is a" deficiency in final design as approved and released for '
construction such that the design does not conform to the criteria and bases i
stated in the safety analysis report or construction permit." The specific
. criteria in the Midland FSAR that would be violated is General Design Criterion
, No. 4, Environmental and missile design bases Appendix A to 10 CFR 50. This criterion states that " structures, systems and components important to safety shall be appropriately protected against dynamic effects, including the affects of missiles, pipe whipping and discharging fluids, that may result from equipment failures." The potential loosening 'and falling of the motor during a LOCA or seismic event and the potential for damaging surrounding components that a'r,e vital to safety would be a violation of GDC No. 4 The reported deficiency therefore satisfies the necessary requirements for reportability as a significant deficiency under 10 CFR 50.55(e).
Corrective Action -
The load carrying capability of the motor flange rabbet will be augmented by increasing the friction load between the surfaces of the mo~ tor flange and the motor ' support flange of the reactor coolant pump. This will be accomplished by replacing the 16 cap screws with studs and nuts and by specifying the required atud I
preloading. The replacement of the sc.rews with studs was necessary since the cap screws could not be tightened to the preload required to achieve the flange friction force due to the fact that the limited available access to the screws precluded the use of the necessary torque tools. The available access, however, was adequate to permit the use of stud tensioners and hence the use of studs, which can be tightened with tensioners, was adopted. The instruction manuals l
L . .: m -- A . .:.w a.s w~. um h-i- r e - - - -#,:.#. .#.. y ,, ,,, m,_ ,
i 4
9 .
describing the method of attaching the motor to the motor support stand will be
's revised to provide for the um of studs and stud tensioners and to speciy the reguired preloading of the studs.
This corrective action has been approved and is being implemented for all 8 pump and motor units for Hidland 1 and 2. The motor vendor stress report has been revised accordingly and the repori; has been approved.
e
/
M 9
e 4
I e
a
'e I
i i
i e
- __ +
o * ,
a .
REGULATORY INFORMATION DISTRIBUTION SYSTEM DISTRIBUTION FOR INCOMING MATERIAL (RIDS)hll$h)3SO S
REC- KEPPLER J G ORG: HOWELL S H DOCDATE: 02/10/78
' 4RC CONSUMERS PWR DATE RCVD: 02/2S/78 DOCTYPE: LETTER NOTARI ZED: NO COPIES RECEIVED SUDJECT: LTR 1 ENCL 1 INTERIM REPT. ON REACTOR COOLANT PUMP MOTOR FLANGE DEFICIENCY.
PLANT NAME: MIDLAND - UNIT 1 REV7 EWER INITI AL: XRL MIDLAND - UNIT 2 DISlRIBUTER INITIAL:
occoo************ DISTRIBUTION OF THIS MATERIAL IS AS FC_ LOWS ******************
CONSTRUCTION DEFICIENCY REPORT (10CFR50.55(E).
(DISTRIBUTION CODE BOO 4)
FOR ACTION: ASST DIR VASSALLO**LTR ONLv BR CHIEF VARGA**LTR ONLY PROJ MGR HOOD **LTR ONLY LIC ASST SERVICE **LTR ONLY INTERNAL: tiG FILyW/ ENCL NRC PDR**W/ ENCL
- -W/2 ENCL OELD**LTR ONLY GOSSICK & STAFF **LTR ONLY MIPC**W/ ENCL BOYD**LTR ONLY DEYOUNG**W/ ENCL HELTEMES**W/ ENCL R. MATTSON**LTR ONLY KNIGHT **LTR ONLY ROSS**LTR ONLY TEDESCO**LTR ONLY EISENHUT**LTR ONLY STANDARDS DEV.**W/ ENCL K SEYFRIT/IE**W/ ENCL EXTERNAL: LPDR'S MIDLAND, M'**W/ ENCL TIC **W/ ENCL NSIC**W/ ENCL ACRS CAT A**W/16 LTRS UlslN16UIIUN: LTR 40 ENCL 28 SIZE: IP+4P CONTROL NBR:
l '[
o**o******************************* THE END ******************************* ***