ML19321B049: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 19: Line 19:
{{#Wiki_filter:_                                                                      -_ . _ _ - _ - _ _ _ - _ - _ _ _ _
{{#Wiki_filter:_                                                                      -_ . _ _ - _ - _ _ _ - _ - _ _ _ _
s
s
  "
                                 ~1>.%zz555 . - a rt          _~-C=:~'
                                 ~1>.%zz555 . - a rt          _~-C=:~'
:,. .;;;        r . : ,31: , .                                                        <
:,. .;;;        r . : ,31: , .                                                        <
Line 30: Line 29:


TOUNESSEE VALLEY AUniORITY - SEQUOYMI I;UCLEAR PLA;iT U:iIT 1 - DOC:tET NO. 50-327 - FACILITY OPERAiT"G LICENSE DPR REPORTABLE OCCURRENCE REPORI SQRO-50-327/3091 The caciosed report provides details concerning the inoperability of containment sump level loop 1-LI-63-179 whien resulted in a tripped condition. This report is subsitted in accordance with Sequoyah unit 1 Te.~.nical Specification 6.9.1.13.
TOUNESSEE VALLEY AUniORITY - SEQUOYMI I;UCLEAR PLA;iT U:iIT 1 - DOC:tET NO. 50-327 - FACILITY OPERAiT"G LICENSE DPR REPORTABLE OCCURRENCE REPORI SQRO-50-327/3091 The caciosed report provides details concerning the inoperability of containment sump level loop 1-LI-63-179 whien resulted in a tripped condition. This report is subsitted in accordance with Sequoyah unit 1 Te.~.nical Specification 6.9.1.13.
Very truly yours, TElaiESSZZ VALLEY AUDIORITY J. R. Calhoun Director of Muclear Power
Very truly yours, TElaiESSZZ VALLEY AUDIORITY J. R. Calhoun Director of Muclear Power 2nclosure (3) cc (Enclosure):
.
2nclosure (3) cc (Enclosure):
Director (3)
Director (3)
Office of ;fanagement Information and Program Control U.S. Nuclear Regulatory Co:::siscion                  x                                                '
Office of ;fanagement Information and Program Control U.S. Nuclear Regulatory Co:::siscion                  x                                                '

Latest revision as of 04:29, 1 February 2020

Forwards LER 80-091/03L-0
ML19321B049
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 07/22/1980
From: Calhoun J
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19321B050 List:
References
NUDOCS 8007250414
Download: ML19321B049 (1)


Text

_ -_ . _ _ - _ - _ _ _ - _ - _ _ _ _

s

~1>.%zz555 . - a rt _~-C=:~'

,. .;;; r . : ,31: , . <

1730 Chestnut Street Tever II .

July 22, 1980

}

4 lir. James P. O'Reilly, Director e U.S.1Tuclear Regulatory Co:: mission Office of Inspection and Enforcement Region II 101 lbriatta Street, Suite 3100 Atlanta, Georgil 30303

Dear dr. O'2ailly:

TOUNESSEE VALLEY AUniORITY - SEQUOYMI I;UCLEAR PLA;iT U:iIT 1 - DOC:tET NO. 50-327 - FACILITY OPERAiT"G LICENSE DPR REPORTABLE OCCURRENCE REPORI SQRO-50-327/3091 The caciosed report provides details concerning the inoperability of containment sump level loop 1-LI-63-179 whien resulted in a tripped condition. This report is subsitted in accordance with Sequoyah unit 1 Te.~.nical Specification 6.9.1.13.

Very truly yours, TElaiESSZZ VALLEY AUDIORITY J. R. Calhoun Director of Muclear Power 2nclosure (3) cc (Enclosure):

Director (3)

Office of ;fanagement Information and Program Control U.S. Nuclear Regulatory Co:::siscion x '

s Usshington. DC 20535 \

Director (40)

Office of Inspection and Enforcenent U.S. Nuclear Regulator / Co:nission Jashington, DC 20555 kir. Eill Lavallae Nuclear Safety Analysis Center Palo Alto, California 94303 0 5

3r. U. T. Cottle, URC-Inspector, Sequoyah

//

8 007250 y/[