ML19323A081: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 20: Line 20:
QU .,                                                  LICENSEE EVENT REPORT
QU .,                                                  LICENSEE EVENT REPORT
* cONTROt 8tOCx: '                l l    l    l  1
* cONTROt 8tOCx: '                l l    l    l  1
                                                                   %                  (PLEASE PRINT CR TYPE ALL REQUIRED INFORMATION)
                                                                   %                  (PLEASE PRINT CR TYPE ALL REQUIRED INFORMATION) l0 ltl8l 9Ml AlLICENSEE 7
                                                                                                                                                                      -
l0 ltl8l 9Ml AlLICENSEE 7
P l PCODE    l S l 114l@l15 0 l 0 l - l 0 lLICENSE 0 l 0NUMBER l 0 l 0 l- l0 l 0 l@l 25    4 l 1LICENSE 26 l 1 l 1TYPE  l 1Jol@l57 CAT l 58 l@
P l PCODE    l S l 114l@l15 0 l 0 l - l 0 lLICENSE 0 l 0NUMBER l 0 l 0 l- l0 l 0 l@l 25    4 l 1LICENSE 26 l 1 l 1TYPE  l 1Jol@l57 CAT l 58 l@
CON'T
CON'T lOlIl I        8 SObRC      60 l L l@l 61 0 l DOCKET 5 l 0 NUMBER l - 10 l 2 ] 9    68 l 369 @l 0  l 3 l 216 l 874 l 075l@l REPORT EVENT DATE 0 l 4DATEl 0 l 9 l808 l 0 l@
                                                                                                                                                                      .
lOlIl I        8 SObRC      60 l L l@l 61 0 l DOCKET 5 l 0 NUMBER l - 10 l 2 ] 9    68 l 369 @l 0  l 3 l 216 l 874 l 075l@l REPORT EVENT DATE 0 l 4DATEl 0 l 9 l808 l 0 l@
EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h 10121 l on March 26. 1980. utilizing approved station procedure number TP80-37 entitled                                                                        l
EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h 10121 l on March 26. 1980. utilizing approved station procedure number TP80-37 entitled                                                                        l
,g      ,,
,g      ,,
Line 33: Line 29:
flawed beams have been replaced.                                                                                                              ;
flawed beams have been replaced.                                                                                                              ;
9 ,
9 ,
101s 1 l                                                                                                                                                      l 10171 l                                                                                                                                                      l
101s 1 l                                                                                                                                                      l 10171 l                                                                                                                                                      l 10181I                                                                                                                                                        I 80 7      8 9 E        CODE      S SC E                COMPONENT CODE                SU8 CODE          SU    E lO191                        'l Cl B l@ W@ l D l@ lP l Ul Ml Pl Xl Xl@ W@ l Zl@
* 10181I                                                                                                                                                        I 80 7      8 9 E        CODE      S SC E                COMPONENT CODE                SU8 CODE          SU    E lO191                        'l Cl B l@ W@ l D l@ lP l Ul Ml Pl Xl Xl@ W@ l Zl@
                               ,_                                SEQUENTIAL                      OCCURRENCE          REPORT                    REVISION LER/RO        EVENT YEAR                      REPORT NO.                          CODE              TYPE                          NO.
                               ,_                                SEQUENTIAL                      OCCURRENCE          REPORT                    REVISION LER/RO        EVENT YEAR                      REPORT NO.                          CODE              TYPE                          NO.
b RE yu g                            l-l          l0 l1 'li l            l/l        l0 l 1l            lTl            l_l        l 0l
b RE yu g                            l-l          l0 l1 'li l            l/l        l0 l 1l            lTl            l_l        l 0l
Line 44: Line 39:
41 lN lg lN l@ lGl0(8l0l@
41 lN lg lN l@ lGl0(8l0l@
42                43            44            47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS                                                                                                  ,
42                43            44            47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS                                                                                                  ,
l i l o l l Replacement, in kind, of the beam bolt assemblies on Jet Pumps 1, 3 and 15 has been                                                                l
l i l o l l Replacement, in kind, of the beam bolt assemblies on Jet Pumps 1, 3 and 15 has been                                                                l Ii t i l l completed. Approved Station Procedure number 80-42 entitled Replacing Beams on
                                                                                                                                                                        ;
Ii t i l l completed. Approved Station Procedure number 80-42 entitled Replacing Beams on
                                                                                                                                                                        '
                                                                                                                                                                 ]
                                                                                                                                                                 ]
I i 12 I I Reactor Vessel Jet Pumps was utilized for this maintenance. The procedure requires                                                                  I g l detensioning the jet pumps, replacing the beams, and tack welding the lock nuts.                                                                          l li l41 I                                                                                                                                                      i 7      8 9                                                                                                                                                  80 ST                % POWER                OTHER STATUS            On O RY                          DISCOVERY DESCRIPTION y l H l@ l0 l 0 l0 l@l                                    N.A.              l    l Cl@l          Special Inspection                                          l ACTIVITY CO TENT RELEASE                              AMOUNT OF ACTIVITY                                              LOCATION OF RELEASE N.A.
I i 12 I I Reactor Vessel Jet Pumps was utilized for this maintenance. The procedure requires                                                                  I g l detensioning the jet pumps, replacing the beams, and tack welding the lock nuts.                                                                          l li l41 I                                                                                                                                                      i 7      8 9                                                                                                                                                  80 ST                % POWER                OTHER STATUS            On O RY                          DISCOVERY DESCRIPTION y l H l@ l0 l 0 l0 l@l                                    N.A.              l    l Cl@l          Special Inspection                                          l ACTIVITY CO TENT RELEASE                              AMOUNT OF ACTIVITY                                              LOCATION OF RELEASE N.A.

Latest revision as of 20:54, 18 February 2020

LER 80-011/01T-0:on 800326,utilizing Approved Station Procedure TP80-37,PNPS Jet Pumps Examined & Jet Pump Beams 1,3 & 15 Found to Have Discontinuities.Caused Not Stated. Flawed Beams & Beam Bolt Assemblies Replaced
ML19323A081
Person / Time
Site: Pilgrim
Issue date: 04/09/1980
From: Mcloughlin M
BOSTON EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19323A080 List:
References
LER-80-011-01T, LER-80-11-1T, NUDOCS 8004170191
Download: ML19323A081 (1)


Text

NRC FtRM 366 U.S. NUCLEAR REGULATORY COMMISSION (7-77) .

QU ., LICENSEE EVENT REPORT

  • cONTROt 8tOCx: ' l l l l 1

% (PLEASE PRINT CR TYPE ALL REQUIRED INFORMATION) l0 ltl8l 9Ml AlLICENSEE 7

P l PCODE l S l 114l@l15 0 l 0 l - l 0 lLICENSE 0 l 0NUMBER l 0 l 0 l- l0 l 0 l@l 25 4 l 1LICENSE 26 l 1 l 1TYPE l 1Jol@l57 CAT l 58 l@

CON'T lOlIl I 8 SObRC 60 l L l@l 61 0 l DOCKET 5 l 0 NUMBER l - 10 l 2 ] 9 68 l 369 @l 0 l 3 l 216 l 874 l 075l@l REPORT EVENT DATE 0 l 4DATEl 0 l 9 l808 l 0 l@

EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h 10121 l on March 26. 1980. utilizing approved station procedure number TP80-37 entitled l

,g ,,

"U.T. Examination of Jet Pump Beams",PNPS jet pumps were examined. As a result of

,g y this testing, Jet Pump Beams 1, 3 & 15 were found to have discontinuities. The  ;

flawed beams have been replaced.  ;

9 ,

101s 1 l l 10171 l l 10181I I 80 7 8 9 E CODE S SC E COMPONENT CODE SU8 CODE SU E lO191 'l Cl B l@ W@ l D l@ lP l Ul Ml Pl Xl Xl@ W@ l Zl@

,_ SEQUENTIAL OCCURRENCE REPORT REVISION LER/RO EVENT YEAR REPORT NO. CODE TYPE NO.

b RE yu g l-l l0 l1 'li l l/l l0 l 1l lTl l_l l 0l

_ l218 22l0 l 23 24 26 27 28 29 30 31 32 TK N AC ON ONP NT ME HOURS 22 SB I FOR 8. SUPPL 1 MANUFACTURER

[A_j@lZl@

33 34 lZl@

35 l36Z l@ l0 l0 l0 l0 l 31 40

]@

41 lN lg lN l@ lGl0(8l0l@

42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS ,

l i l o l l Replacement, in kind, of the beam bolt assemblies on Jet Pumps 1, 3 and 15 has been l Ii t i l l completed. Approved Station Procedure number 80-42 entitled Replacing Beams on

]

I i 12 I I Reactor Vessel Jet Pumps was utilized for this maintenance. The procedure requires I g l detensioning the jet pumps, replacing the beams, and tack welding the lock nuts. l li l41 I i 7 8 9 80 ST  % POWER OTHER STATUS On O RY DISCOVERY DESCRIPTION y l H l@ l0 l 0 l0 l@l N.A. l l Cl@l Special Inspection l ACTIVITY CO TENT RELEASE AMOUNT OF ACTIVITY LOCATION OF RELEASE N.A.

l 1 l8 69 l W @D OF RELEASEW@l 7 10 11 N.A.

44 l l 45 l

80 PERSONNEL EXPOSURES NUM8ER l i 171 ] 0 l 0 l 0 l@lTYPE l @l DESCRIPTION N.A. l l PERSONNE L INJURIES NUMBER DESCRIPTION N.A.

ITTa1 7 8 9 10 l 010 l@l1211 l

80 LOSS OF OR DAMAGE TO FACILITY 4 )

TYPE DESCRIPTION I i I 9 I LZ_J@l N.A. l 7 8 9 10 80 PUBLICITY NRC USE ONLY

  • 2 O ISSUED l_N_j l @ DESCRIPTION N.A. l lllllllllllll}

8 * ' ** ** '

8004170lif-7 617-746-7900 o

- -gm M. Thomas McLoushlin s