| PUBLIC SERVICE December 12, 1979 INDIANA S. W. Shields Vice President . Electric System Mr. James G. Keppler United States Nuclear Regulatory Commission Region III 799 Roosevelt Road Docket Nos.: STN 50-546 Glen Ellyn, Illinois 60137 STN 50-547 | | PUBLIC SERVICE December 12, 1979 INDIANA S. W. Shields Vice President . Electric System Mr. James G. Keppler United States Nuclear Regulatory Commission Region III 799 Roosevelt Road Docket Nos.: STN 50-546 Glen Ellyn, Illinois 60137 STN 50-547 |
|
| |
|
Line 36: |
Line 33: |
| : h. Five occasions in which UST personnel were certified to Level I requirements prior to completion of the -interview and practical demonstration of their proficiency. This is not in accordance with UST Procedure No. UST-TQ-1, Revision 9, Section V, paragraph 4.1. | | : h. Five occasions in which UST personnel were certified to Level I requirements prior to completion of the -interview and practical demonstration of their proficiency. This is not in accordance with UST Procedure No. UST-TQ-1, Revision 9, Section V, paragraph 4.1. |
| 1785 015 1g@S g6 1000 East Main Street, Plainfield, Indiana 46168 Ikk39 1 | | 1785 015 1g@S g6 1000 East Main Street, Plainfield, Indiana 46168 Ikk39 1 |
|
| |
| .
| |
| .
| |
| .
| |
| .
| |
| : i. Two occasions in which UST personnel were certified to Level I requirements prior to receiving visual e::aminatione. This is not in accordance with UST Procedure No. UST-TQ-1, Eevision 9, Section V, paragraph 5.0. | | : i. Two occasions in which UST personnel were certified to Level I requirements prior to receiving visual e::aminatione. This is not in accordance with UST Procedure No. UST-TQ-1, Eevision 9, Section V, paragraph 5.0. |
| : j. Four occasions in which the required physical and visual re-examinations were overdue for periods up to two months. This is not in accordance with UST Procedure No. UST-TQ-1, Revision 9, Section V, paragraph 7.2. | | : j. Four occasions in which the required physical and visual re-examinations were overdue for periods up to two months. This is not in accordance with UST Procedure No. UST-TQ-1, Revision 9, Section V, paragraph 7.2. |
Line 55: |
Line 47: |
| 1785 016 | | 1785 016 |
|
| |
|
| *
| |
| .
| |
| .
| |
| e i-j. U.S. Testing reviewed all personnel qualifications to determine the number of physical or visual examinations which were missed or past due. Past Jue physical and visual examinations were performed. Results of these examinations showed that the physical and visual capabilities of technicians were satisfactory. | | e i-j. U.S. Testing reviewed all personnel qualifications to determine the number of physical or visual examinations which were missed or past due. Past Jue physical and visual examinations were performed. Results of these examinations showed that the physical and visual capabilities of technicians were satisfactory. |
| : k. U.S. Testing reviewed all personnel qualifications and found that all personnel met the requirements of UST-TQ-1 Revision 9 in that paragraph 3.2 references paragraph 3.1.2 which states experience requirements shall not be treated as absolute when other factors provide reasonable assurance that a person can competently perform a particular task. The personnel found not to be qualified as a Level I to perform General testing and inspection duties were given a proficiency evaluation to qualify them for a specific test to be performed only under the supervision of a qualified Level II. | | : k. U.S. Testing reviewed all personnel qualifications and found that all personnel met the requirements of UST-TQ-1 Revision 9 in that paragraph 3.2 references paragraph 3.1.2 which states experience requirements shall not be treated as absolute when other factors provide reasonable assurance that a person can competently perform a particular task. The personnel found not to be qualified as a Level I to perform General testing and inspection duties were given a proficiency evaluation to qualify them for a specific test to be performed only under the supervision of a qualified Level II. |
Line 71: |
Line 60: |
| Such surveillance shall be continued on a periodic basis. | | Such surveillance shall be continued on a periodic basis. |
| Dates When Full Compliance Will be Achieved | | Dates When Full Compliance Will be Achieved |
| - .
| |
| : a. Full compliance was achieved on December 3,1979. | | : a. Full compliance was achieved on December 3,1979. |
| g-k. Full compliance is expected by January 14, 1980. | | g-k. Full compliance is expected by January 14, 1980. |
| 1785 017 | | 1785 017 |
| .
| |
|
| |
|
| .
| |
| .
| |
| Item of Noncompliance (546/79-18-03; 547/79-18-03) | | Item of Noncompliance (546/79-18-03; 547/79-18-03) |
| The RIII inspector noted the fol!owing examples of nonconformance reports which had not received the proper design organization evaluation as required by ANSI N45.2-1971, Seccion 4.4. | | The RIII inspector noted the fol!owing examples of nonconformance reports which had not received the proper design organization evaluation as required by ANSI N45.2-1971, Seccion 4.4. |
Line 90: |
Line 75: |
| A total of 212 nonconformance reports out of the 2724 reviewed have been identified as requiring engineering review. | | A total of 212 nonconformance reports out of the 2724 reviewed have been identified as requiring engineering review. |
| Corrective Action To Prevent Recurrence Reported on November 1,1979 PSI is in the process of developing and implementing procedural and organizational changes to its nuclear project. These changes are not complete and additional time is requested to address action to prevent recurrence. | | Corrective Action To Prevent Recurrence Reported on November 1,1979 PSI is in the process of developing and implementing procedural and organizational changes to its nuclear project. These changes are not complete and additional time is requested to address action to prevent recurrence. |
| .
| |
| 1785 018 | | 1785 018 |
| . . . . -
| |
|
| |
|
| * .
| |
| .
| |
| 0 Updated Corrective Action to Prevent Recurrence The PSI Quality Assurance Progtam is being revised to reduce the number of forms used to report nonconforming conditions and eliminate confusion. The accompanying procedures for ut e of nonconformance forms have also been changed to clearly require Englaeering review and approval of: | | 0 Updated Corrective Action to Prevent Recurrence The PSI Quality Assurance Progtam is being revised to reduce the number of forms used to report nonconforming conditions and eliminate confusion. The accompanying procedures for ut e of nonconformance forms have also been changed to clearly require Englaeering review and approval of: |
| : a. All Nonconformance Reports for items in PSI custody. | | : a. All Nonconformance Reports for items in PSI custody. |
Line 102: |
Line 83: |
| Engineering re-review of nonconformance reports identified by the review team will be complete by January 2, 1980. | | Engineering re-review of nonconformance reports identified by the review team will be complete by January 2, 1980. |
| Revisions to the PSI Quality Assurance Program addressing handling of nonconformances shall be approved and issued for use by January 2,1980. | | Revisions to the PSI Quality Assurance Program addressing handling of nonconformances shall be approved and issued for use by January 2,1980. |
| Sincerely, | | Sincerely, S. W. Shields Vice President-Electric System SWS:aaa cc: J. J. Harrison E. R. Schweibinz, P. E. |
| .
| |
| S. W. Shields Vice President-Electric System SWS:aaa cc: J. J. Harrison E. R. Schweibinz, P. E. | |
| -
| |
| .
| |
| 1785 01"9 | | 1785 01"9 |
| . . .}} | | . . .}} |
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20235B4531987-09-22022 September 1987 Final Response to FOIA Request for Documents Re Specified Dockets.Documents in App a Already Available in Pdr.Forwards App B Documents.App B Documents Also Available in Pdr. Documents for Listed Dockets Could Not Be Located ML20238D0201987-09-0909 September 1987 Forwards Breakdown of Analysis of Costs for Plant OL Application Reviews for 860622-1216,per 10CFR170.12(b). Invoice Will Be Sent Shortly ML20235B3621987-08-25025 August 1987 FOIA Request for Listed Documents for Specified Dockets ML20237K9961987-08-17017 August 1987 Responds to Requesting re-review of OL Fee Charges Under 10CFR170 as Billed on Invoices F1385 & F1386, ,for Review Period 840624-860621.Charges Billed Applicable to Plant Cases.Supportive Fee Info Encl ML20237L0261987-08-0707 August 1987 Ack Receipt of Invoices Re Plant for 840624-0721.Since All Licensing Activities Suspended in Jan 1984 & CP Surrendered on 850301,review of Charges & Issue of Credit Requested ML20235Q0291987-07-15015 July 1987 Advises That Cost Analyses for OL Application Reviews for 840624-860621 Completed.Breakdown of Review Costs by Program Ofc Encl.Util Will Receive Invoices for Listed Amounts ML20211P1311986-12-16016 December 1986 Advises That Encl Order Terminating CPPR-170 & CPPR-171 for Facility & Notice of Withdrawal of Application for OLs Have Been Forwarded to Ofc of Fr for Publication,Per Return of CPs by Util on 850301 ML20214R5961986-09-23023 September 1986 Responds to 860918 Request & Forwards Printout of Recent Filings in Facility Case.No Ruling Made by ASLB Since 860618 Ruling.Served on 860924 ML20214R6331986-09-22022 September 1986 Advises That Listed Individuals Served W/Author ML20214R6061986-09-18018 September 1986 Requests Confirmation Whether or Not Author on Mailing List & Whether Any Rulings Filed Since 860814.Response Requested ML20214R6381986-09-18018 September 1986 Requests Confirmation Whether or Not Author on Mailing List & Whether Any Rulings Filed Since 860814 ML20203E8271986-07-18018 July 1986 Informs That Recently Received Encl Ltrs Procedurally Insufficient.Requests That Provisions of Sections 2.701, 2.708,2.709 & 2.712 Re Filing & Svc of Documents Be Reviewed.Served on 860722 ML20199L0381986-07-0202 July 1986 Forwards Pleading in Response to Board Memorandum & Order Directing Briefs Be Served on 860602.Response Addresses Indiana Sassafras Audubon Soc & Save the Valley, Inc 860626 Motion ML20141A2171986-04-0101 April 1986 Informs That QA Program Being Revised Due to Cancellation of Const Activities & in Keeping W/Intention of Investment Recovery to Reflect Organizational Structure of Investment Recovery Program ML20138H5461985-12-0909 December 1985 Forwards Overview of Regional Ofc & Detailed Organizational Charts for Ofc Divs Due to Recent Organizational & Staff Changes.W/O Encl ML20137Z7951985-12-0404 December 1985 Forwards Matl to Support Removal of Unqualified Instrumentation from Diesel Generator Engine & Engine Skid. Devices Added to Equipment Q-list to Ensure That Qualification Maintained ML20138Q8301985-12-0303 December 1985 Further Response to FOIA Request for Records Re Voluntary or Required Redress of Sites Where Const Was Terminated, Including Crbr & Legal Analysis.Forwards App E Documents.App D & E Documents Available in Pdr.Photographs Also Available ML20133D1471985-10-0202 October 1985 Notifies That Util Rescinding ASME QA Program.Certificate of Authorization N-2456 & Code N Symbol Stamp Returned to ASME ML20135H7471985-09-17017 September 1985 Requests That Date of 850924 Originally Set for NRC Site Stabilization Survey of Const Site Be Rescheduled to Late Oct or Early Nov 1985 Due to Scheduling Conflicts ML20127P1861985-06-26026 June 1985 Forwards Insp Repts 50-546/85-01 & 50-547/85-01 on 850122-0614.No Violation Identified ML20133C7371985-06-14014 June 1985 Further Response to FOIA Request for Documents Re Site Redress Where Plant Const Begun,Including Clinch River Facility & NRC Legal Analysis Re Redress.Forwards App B Documents.App C Document Withheld (Ref FOIA Exemption 5) ML20134A8941985-06-10010 June 1985 Further Response to FOIA Request for Records Re Ford Amend Study.Records in App K Available in Pdr.Review for Addl Records Continuing ML20117P5131985-05-31031 May 1985 Ack Receipt of 850412 Response to Ltr Disputing Billed Amounts by NRC for OL Reviews.Requests That Due Date for Any Final Payment Be Extended for Reasonable Period of Time to Allow Issues to Be Resolved.Fee Paid ML20116N3691985-05-0101 May 1985 Forwards Response to 850402 Request for Addl Info Re Acreage Disturbed by Project & Emergency Offsite Facility Site Layup Actions.No Addl Permits or Approvals from Other Federal, State & Local Agencies Anticipated ML20100G3251985-04-0404 April 1985 Forwards SW Shields to HR Denton Re Surrendering CPPR-170 & CPPR-171 & Summarizing Util Plan to Stabilize Site & Motion to Terminate Proceeding ML20126J9081985-03-0606 March 1985 Further Response to FOIA Request That All Internal Memos to Div of Licensing from May-Nov 1984 Which Provided Draft SER, SER Sections & Questions or Requests for Addl Info Be Placed in Pdr.App C Documents Placed in PDR ML20102C2331985-03-0101 March 1985 Surrenders CPs CPPR-170 & CPPR-171.All const-related Activities on Site Halted.Site Activities Conducted Per Author .Commitments Contained in Encl Site Stabilization Plan Will Govern Future Activities ML20102B7551985-02-25025 February 1985 Disputes Billing Amounts in NRC 850122 Summary Statement of Costs.Errors & Lack of Documentation Do Not Allow Acceptance of Billing Solely on Basis of NRC Internal Controls.Meeting Re Questioned Items & Extension of Due Date Requested ML20091S4501984-06-0101 June 1984 Responds to NRC Ltr Re Allegations Noted in IE Insp Repts 50-546/84-01 & 50-547/84-01.Corrective Actions:Independent Engineering Consultants Evaluation of Concrete Const Showed Concrete Good to Excellent Quality ML20084P3501984-03-14014 March 1984 Requests Response to Encl W & V Smelser 840210 Inquiry Into NRC Attitude Toward Utils.Concerns Include Marble Hill & Bailly Cancellation,Withdrawal of Util Application for Zimmer & Denial of License for Byron Facility ML20086K1021984-01-20020 January 1984 Forwards Util 840116 Press Release Explaining Financial Reasons for Halting Facility Const.Certificate of Svc Encl ML20080Q9121984-01-18018 January 1984 Notifies of Suspension of Const.Site Work Force Reduced to Less than 1,000.Action Taken Due to Inability to Finance Project.Nrc Should Issue Draft SER as Is,So Benchmark Exists for Licensing Review Process ML20079N4611984-01-11011 January 1984 Responds to NRC Re IE Insp Repts 50-546/83-20 & 50-547/83-21.Const Suspended.Insp Repts & Notice of Violation Will Be Placed W/Util Records of Nonconforming Conditions to Be Addressed When Const Resumed ML20083E2891983-12-22022 December 1983 Informs That Applicant Will Require Time to Consider & Determine Response to Special Task Force of Governor of in Recommendation That Const of Facilities Be Canceled.Aslb Should Defer Further Action.Certificate of Svc Encl ML20083E0501983-12-21021 December 1983 Forwards Revised Affidavit Requesting That Matl Transmitted to NRC in Response to Question 470.7 of NRC Environ Rept - OL Stage Be Withheld Per 10CFR2.790.Revised Affidavit Submitted in Response to NRC 831125 Request ML20083H6691983-12-14014 December 1983 Responds to NRC Re Violations Noted in IE Insp Repts 50-546/83-19 & 50-547/83-20.Corrective Actions:Sys Developed to Identify Matls Requiring Periodic Maint & Storage Procedures Revised to Identify Sys ML20082R6411983-12-0808 December 1983 Forwards Pp 11 Omitted from 831130 Response to Sassafras Audubon Soc & Valley Watch,Inc Contentions ML20082M9481983-12-0202 December 1983 Forwards Amend 30 to FSAR & Suppl 4 to Environ Rept - OL Stage (Filed in PDR Category C).Affidavit of Distribution Encl ML20082M8251983-11-30030 November 1983 Requests Extension Until 840301 for Response to Byron Integrated Design Insp Rept ML20082D2131983-11-14014 November 1983 Responds to IE Bulletin 83-06,Nonconforming Matls Supplied by Tube-Line Corp.... Requests Submittal Extension Until 840331 to Respond to Permit Adequate Review & Evaluation of Vendor Info ML20081K6081983-11-0707 November 1983 Forwards,For Review,Util Response to Generic Ltr 82-33 Re Reg Guide 1.97 Planned Improvement Rept on Instrumentation for light-water-cooled Power Plants to Assess Plant Environs Following Accident ML20086A8591983-11-0101 November 1983 Forwards Addl Copies of Sassafras Audubon/Valley Watch 831022 Joint Suppl.Svc List Requested.W/O Encl ML20078P1541983-10-28028 October 1983 Corrects Ref on Page 10,Line 2,of 831021 Joint Suppl to Sassafras Audubon Soc & Valley Watch Petitions for Intervention in OL Hearing.Certificate of Svc Encl ML20085L3131983-10-11011 October 1983 Responds to NRC Re Violations Noted in IE Insp Repts 50-546/83-15 & 50-547/83-15.Corrective Actions: Directive Will Be Issued to Pullman Const Industries Emphasizing Resposibility for Reporting Nonconformances ML20080N2841983-09-30030 September 1983 Forwards Status of Outstanding Third Quarter 1983 Commitments in Amends to Fsar.Description of Containment Hydrogen Monitoriing Sys Will Be Submitted During First Quarter 1984 ML20080J0201983-09-23023 September 1983 Forwards Changes to Safeguards Vol & Responses to NRC Requests for Addl Info,Included in Amend 28 to OL Application.Changes Withheld (Ref 10CFR73.21) ML20080J0531983-09-21021 September 1983 Forwards Responses to 830824 Requests for Addl Info Re Fsar. Requests Which Pertain to Byron FSAR Not Addressed.Responses Will Be Included in Dec Amend ML20080G2731983-09-16016 September 1983 Discusses Feasibility & Benefits to Util of Eliminating Postulated Pipe Breaks in RCS Primary Loop from Structural Design Basis,Per NRC .Approx 200,000 Manhours of Installation Time Per Unit Will Be Saved ML20024F1781983-09-0202 September 1983 Requests Extension Until 840401 for Submittal of Responses to Generic Ltr 83-28,to Incorporate Efforts Underway on Generic Requirements by Westinghouse Owners Group,Nuclear Util Task Action Committee (Nutac) ML20076D3371983-08-16016 August 1983 Forwards Response to IE Bulletin 83-05 Re Hayward Tyler Pump Co Failure to Effectively Implement QA Program.Pumps Not Commercially Accepted for Installation at Plant Site 1987-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20235B3621987-08-25025 August 1987 FOIA Request for Listed Documents for Specified Dockets ML20237L0261987-08-0707 August 1987 Ack Receipt of Invoices Re Plant for 840624-0721.Since All Licensing Activities Suspended in Jan 1984 & CP Surrendered on 850301,review of Charges & Issue of Credit Requested ML20214R6331986-09-22022 September 1986 Advises That Listed Individuals Served W/Author ML20214R6061986-09-18018 September 1986 Requests Confirmation Whether or Not Author on Mailing List & Whether Any Rulings Filed Since 860814.Response Requested ML20214R6381986-09-18018 September 1986 Requests Confirmation Whether or Not Author on Mailing List & Whether Any Rulings Filed Since 860814 ML20199L0381986-07-0202 July 1986 Forwards Pleading in Response to Board Memorandum & Order Directing Briefs Be Served on 860602.Response Addresses Indiana Sassafras Audubon Soc & Save the Valley, Inc 860626 Motion ML20141A2171986-04-0101 April 1986 Informs That QA Program Being Revised Due to Cancellation of Const Activities & in Keeping W/Intention of Investment Recovery to Reflect Organizational Structure of Investment Recovery Program ML20137Z7951985-12-0404 December 1985 Forwards Matl to Support Removal of Unqualified Instrumentation from Diesel Generator Engine & Engine Skid. Devices Added to Equipment Q-list to Ensure That Qualification Maintained ML20133D1471985-10-0202 October 1985 Notifies That Util Rescinding ASME QA Program.Certificate of Authorization N-2456 & Code N Symbol Stamp Returned to ASME ML20135H7471985-09-17017 September 1985 Requests That Date of 850924 Originally Set for NRC Site Stabilization Survey of Const Site Be Rescheduled to Late Oct or Early Nov 1985 Due to Scheduling Conflicts ML20117P5131985-05-31031 May 1985 Ack Receipt of 850412 Response to Ltr Disputing Billed Amounts by NRC for OL Reviews.Requests That Due Date for Any Final Payment Be Extended for Reasonable Period of Time to Allow Issues to Be Resolved.Fee Paid ML20116N3691985-05-0101 May 1985 Forwards Response to 850402 Request for Addl Info Re Acreage Disturbed by Project & Emergency Offsite Facility Site Layup Actions.No Addl Permits or Approvals from Other Federal, State & Local Agencies Anticipated ML20100G3251985-04-0404 April 1985 Forwards SW Shields to HR Denton Re Surrendering CPPR-170 & CPPR-171 & Summarizing Util Plan to Stabilize Site & Motion to Terminate Proceeding ML20102C2331985-03-0101 March 1985 Surrenders CPs CPPR-170 & CPPR-171.All const-related Activities on Site Halted.Site Activities Conducted Per Author .Commitments Contained in Encl Site Stabilization Plan Will Govern Future Activities ML20102B7551985-02-25025 February 1985 Disputes Billing Amounts in NRC 850122 Summary Statement of Costs.Errors & Lack of Documentation Do Not Allow Acceptance of Billing Solely on Basis of NRC Internal Controls.Meeting Re Questioned Items & Extension of Due Date Requested ML20091S4501984-06-0101 June 1984 Responds to NRC Ltr Re Allegations Noted in IE Insp Repts 50-546/84-01 & 50-547/84-01.Corrective Actions:Independent Engineering Consultants Evaluation of Concrete Const Showed Concrete Good to Excellent Quality ML20084P3501984-03-14014 March 1984 Requests Response to Encl W & V Smelser 840210 Inquiry Into NRC Attitude Toward Utils.Concerns Include Marble Hill & Bailly Cancellation,Withdrawal of Util Application for Zimmer & Denial of License for Byron Facility ML20086K1021984-01-20020 January 1984 Forwards Util 840116 Press Release Explaining Financial Reasons for Halting Facility Const.Certificate of Svc Encl ML20080Q9121984-01-18018 January 1984 Notifies of Suspension of Const.Site Work Force Reduced to Less than 1,000.Action Taken Due to Inability to Finance Project.Nrc Should Issue Draft SER as Is,So Benchmark Exists for Licensing Review Process ML20079N4611984-01-11011 January 1984 Responds to NRC Re IE Insp Repts 50-546/83-20 & 50-547/83-21.Const Suspended.Insp Repts & Notice of Violation Will Be Placed W/Util Records of Nonconforming Conditions to Be Addressed When Const Resumed ML20083E2891983-12-22022 December 1983 Informs That Applicant Will Require Time to Consider & Determine Response to Special Task Force of Governor of in Recommendation That Const of Facilities Be Canceled.Aslb Should Defer Further Action.Certificate of Svc Encl ML20083E0501983-12-21021 December 1983 Forwards Revised Affidavit Requesting That Matl Transmitted to NRC in Response to Question 470.7 of NRC Environ Rept - OL Stage Be Withheld Per 10CFR2.790.Revised Affidavit Submitted in Response to NRC 831125 Request ML20083H6691983-12-14014 December 1983 Responds to NRC Re Violations Noted in IE Insp Repts 50-546/83-19 & 50-547/83-20.Corrective Actions:Sys Developed to Identify Matls Requiring Periodic Maint & Storage Procedures Revised to Identify Sys ML20082R6411983-12-0808 December 1983 Forwards Pp 11 Omitted from 831130 Response to Sassafras Audubon Soc & Valley Watch,Inc Contentions ML20082M9481983-12-0202 December 1983 Forwards Amend 30 to FSAR & Suppl 4 to Environ Rept - OL Stage (Filed in PDR Category C).Affidavit of Distribution Encl ML20082M8251983-11-30030 November 1983 Requests Extension Until 840301 for Response to Byron Integrated Design Insp Rept ML20082D2131983-11-14014 November 1983 Responds to IE Bulletin 83-06,Nonconforming Matls Supplied by Tube-Line Corp.... Requests Submittal Extension Until 840331 to Respond to Permit Adequate Review & Evaluation of Vendor Info ML20081K6081983-11-0707 November 1983 Forwards,For Review,Util Response to Generic Ltr 82-33 Re Reg Guide 1.97 Planned Improvement Rept on Instrumentation for light-water-cooled Power Plants to Assess Plant Environs Following Accident ML20086A8591983-11-0101 November 1983 Forwards Addl Copies of Sassafras Audubon/Valley Watch 831022 Joint Suppl.Svc List Requested.W/O Encl ML20078P1541983-10-28028 October 1983 Corrects Ref on Page 10,Line 2,of 831021 Joint Suppl to Sassafras Audubon Soc & Valley Watch Petitions for Intervention in OL Hearing.Certificate of Svc Encl ML20085L3131983-10-11011 October 1983 Responds to NRC Re Violations Noted in IE Insp Repts 50-546/83-15 & 50-547/83-15.Corrective Actions: Directive Will Be Issued to Pullman Const Industries Emphasizing Resposibility for Reporting Nonconformances ML20080N2841983-09-30030 September 1983 Forwards Status of Outstanding Third Quarter 1983 Commitments in Amends to Fsar.Description of Containment Hydrogen Monitoriing Sys Will Be Submitted During First Quarter 1984 ML20080J0201983-09-23023 September 1983 Forwards Changes to Safeguards Vol & Responses to NRC Requests for Addl Info,Included in Amend 28 to OL Application.Changes Withheld (Ref 10CFR73.21) ML20080J0531983-09-21021 September 1983 Forwards Responses to 830824 Requests for Addl Info Re Fsar. Requests Which Pertain to Byron FSAR Not Addressed.Responses Will Be Included in Dec Amend ML20080G2731983-09-16016 September 1983 Discusses Feasibility & Benefits to Util of Eliminating Postulated Pipe Breaks in RCS Primary Loop from Structural Design Basis,Per NRC .Approx 200,000 Manhours of Installation Time Per Unit Will Be Saved ML20024F1781983-09-0202 September 1983 Requests Extension Until 840401 for Submittal of Responses to Generic Ltr 83-28,to Incorporate Efforts Underway on Generic Requirements by Westinghouse Owners Group,Nuclear Util Task Action Committee (Nutac) ML20076D3371983-08-16016 August 1983 Forwards Response to IE Bulletin 83-05 Re Hayward Tyler Pump Co Failure to Effectively Implement QA Program.Pumps Not Commercially Accepted for Installation at Plant Site ML20077J4941983-08-15015 August 1983 Informs of Change of Address.Related Correspondence ML20080B4641983-08-0101 August 1983 Forwards Nonproprietary Version of Independent Evaluation of Proposed Mods to Westinghouse D4,D5 & E Steam Generators. Mods Will Reduce Tube Vibration in Preheater Section & Do Not Result in Unreviewed Safety Question ML20024D0881983-07-29029 July 1983 Comments on Potential Impact of Plant on Aquatic Biota of Ohio River.Full Implementation of NRC Findings in Both Draft & Final EIS W/Complete Monitoring Program Recommended ML20077G7761983-07-27027 July 1983 Discusses Status of 830415 Commitments Re Suspension of Electrical Work Outlined in 830203 Confirmatory Action Ltr. Item I,Ii,Iii,Vi & VII Commitments Met.Surveillance Program for Backlog & Hanger Insp in Progress ML20077D1301983-07-25025 July 1983 Requests Correspondence Re Util Be Sent to Author Address ML20024D0221983-07-18018 July 1983 Forwards Proprietary Independent Evaluation of Proposed Mods to Westinghouse D4,D5 & DE Steam Generators. Rept Withheld (Ref 10CFR2.790) ML20076L4911983-07-15015 July 1983 Forwards Detailed Control Room Design Review Per Requirements of Generic Ltr 82-33, Suppl 1 to NUREG-0737 Requirements for Emergency Response Capability. Reg Guide 1.97 Implementation Rept Will Be Submitted by 831101 ML20076L3451983-07-14014 July 1983 Forwards Annual Financial Repts 1982 for Public Svc Co of Indiana,Inc & Wabash Valley Power Assoc,Inc ML20076M6691983-07-12012 July 1983 Comments on 830712 Public Meeting Re Environ Concerns for Application for Ols.Util Should Present Analyses of Environ Risks Associated W/More Severe Types of Very Low Probability Accidents in Environ Rept ML20077H4231983-07-0707 July 1983 Requests Withholding Proprietary Info in, Independent Evaluation of Proposed Mods to Westinghouse Model D4,D5 & E Steam Generators, Final Draft (Ref 10CFR2.790) ML20076L4181983-07-0606 July 1983 Informs That Completion Date for Item II of Re Cable Tray Hanger Insp Extended to 830805.Corrective Actions for Procedures & Nonconformances Created Delay ML20080J8841983-07-0505 July 1983 Requests Response to Concerns of Indiana Sassafras Audubon Soc Re safety-related Electrical Work at Site.Public Hearing Before ASLB Prior to Resumption of safety-related Electrical Const Requested ML20076L4951983-07-0101 July 1983 Requests Assignment of Inspector,Beginning 830707,to Verify Adequacy of Program for Improved Control Over Electrical Cable Tray Installation 1987-08-07
[Table view] Category:UTILITY TO NRC
MONTHYEARML20235B3621987-08-25025 August 1987 FOIA Request for Listed Documents for Specified Dockets ML20237L0261987-08-0707 August 1987 Ack Receipt of Invoices Re Plant for 840624-0721.Since All Licensing Activities Suspended in Jan 1984 & CP Surrendered on 850301,review of Charges & Issue of Credit Requested ML20141A2171986-04-0101 April 1986 Informs That QA Program Being Revised Due to Cancellation of Const Activities & in Keeping W/Intention of Investment Recovery to Reflect Organizational Structure of Investment Recovery Program ML20137Z7951985-12-0404 December 1985 Forwards Matl to Support Removal of Unqualified Instrumentation from Diesel Generator Engine & Engine Skid. Devices Added to Equipment Q-list to Ensure That Qualification Maintained ML20133D1471985-10-0202 October 1985 Notifies That Util Rescinding ASME QA Program.Certificate of Authorization N-2456 & Code N Symbol Stamp Returned to ASME ML20135H7471985-09-17017 September 1985 Requests That Date of 850924 Originally Set for NRC Site Stabilization Survey of Const Site Be Rescheduled to Late Oct or Early Nov 1985 Due to Scheduling Conflicts ML20117P5131985-05-31031 May 1985 Ack Receipt of 850412 Response to Ltr Disputing Billed Amounts by NRC for OL Reviews.Requests That Due Date for Any Final Payment Be Extended for Reasonable Period of Time to Allow Issues to Be Resolved.Fee Paid ML20116N3691985-05-0101 May 1985 Forwards Response to 850402 Request for Addl Info Re Acreage Disturbed by Project & Emergency Offsite Facility Site Layup Actions.No Addl Permits or Approvals from Other Federal, State & Local Agencies Anticipated ML20102C2331985-03-0101 March 1985 Surrenders CPs CPPR-170 & CPPR-171.All const-related Activities on Site Halted.Site Activities Conducted Per Author .Commitments Contained in Encl Site Stabilization Plan Will Govern Future Activities ML20102B7551985-02-25025 February 1985 Disputes Billing Amounts in NRC 850122 Summary Statement of Costs.Errors & Lack of Documentation Do Not Allow Acceptance of Billing Solely on Basis of NRC Internal Controls.Meeting Re Questioned Items & Extension of Due Date Requested ML20091S4501984-06-0101 June 1984 Responds to NRC Ltr Re Allegations Noted in IE Insp Repts 50-546/84-01 & 50-547/84-01.Corrective Actions:Independent Engineering Consultants Evaluation of Concrete Const Showed Concrete Good to Excellent Quality ML20080Q9121984-01-18018 January 1984 Notifies of Suspension of Const.Site Work Force Reduced to Less than 1,000.Action Taken Due to Inability to Finance Project.Nrc Should Issue Draft SER as Is,So Benchmark Exists for Licensing Review Process ML20079N4611984-01-11011 January 1984 Responds to NRC Re IE Insp Repts 50-546/83-20 & 50-547/83-21.Const Suspended.Insp Repts & Notice of Violation Will Be Placed W/Util Records of Nonconforming Conditions to Be Addressed When Const Resumed ML20083E0501983-12-21021 December 1983 Forwards Revised Affidavit Requesting That Matl Transmitted to NRC in Response to Question 470.7 of NRC Environ Rept - OL Stage Be Withheld Per 10CFR2.790.Revised Affidavit Submitted in Response to NRC 831125 Request ML20083H6691983-12-14014 December 1983 Responds to NRC Re Violations Noted in IE Insp Repts 50-546/83-19 & 50-547/83-20.Corrective Actions:Sys Developed to Identify Matls Requiring Periodic Maint & Storage Procedures Revised to Identify Sys ML20082M9481983-12-0202 December 1983 Forwards Amend 30 to FSAR & Suppl 4 to Environ Rept - OL Stage (Filed in PDR Category C).Affidavit of Distribution Encl ML20082M8251983-11-30030 November 1983 Requests Extension Until 840301 for Response to Byron Integrated Design Insp Rept ML20082D2131983-11-14014 November 1983 Responds to IE Bulletin 83-06,Nonconforming Matls Supplied by Tube-Line Corp.... Requests Submittal Extension Until 840331 to Respond to Permit Adequate Review & Evaluation of Vendor Info ML20081K6081983-11-0707 November 1983 Forwards,For Review,Util Response to Generic Ltr 82-33 Re Reg Guide 1.97 Planned Improvement Rept on Instrumentation for light-water-cooled Power Plants to Assess Plant Environs Following Accident ML20085L3131983-10-11011 October 1983 Responds to NRC Re Violations Noted in IE Insp Repts 50-546/83-15 & 50-547/83-15.Corrective Actions: Directive Will Be Issued to Pullman Const Industries Emphasizing Resposibility for Reporting Nonconformances ML20080N2841983-09-30030 September 1983 Forwards Status of Outstanding Third Quarter 1983 Commitments in Amends to Fsar.Description of Containment Hydrogen Monitoriing Sys Will Be Submitted During First Quarter 1984 ML20080J0201983-09-23023 September 1983 Forwards Changes to Safeguards Vol & Responses to NRC Requests for Addl Info,Included in Amend 28 to OL Application.Changes Withheld (Ref 10CFR73.21) ML20080J0531983-09-21021 September 1983 Forwards Responses to 830824 Requests for Addl Info Re Fsar. Requests Which Pertain to Byron FSAR Not Addressed.Responses Will Be Included in Dec Amend ML20080G2731983-09-16016 September 1983 Discusses Feasibility & Benefits to Util of Eliminating Postulated Pipe Breaks in RCS Primary Loop from Structural Design Basis,Per NRC .Approx 200,000 Manhours of Installation Time Per Unit Will Be Saved ML20024F1781983-09-0202 September 1983 Requests Extension Until 840401 for Submittal of Responses to Generic Ltr 83-28,to Incorporate Efforts Underway on Generic Requirements by Westinghouse Owners Group,Nuclear Util Task Action Committee (Nutac) ML20076D3371983-08-16016 August 1983 Forwards Response to IE Bulletin 83-05 Re Hayward Tyler Pump Co Failure to Effectively Implement QA Program.Pumps Not Commercially Accepted for Installation at Plant Site ML20080B4641983-08-0101 August 1983 Forwards Nonproprietary Version of Independent Evaluation of Proposed Mods to Westinghouse D4,D5 & E Steam Generators. Mods Will Reduce Tube Vibration in Preheater Section & Do Not Result in Unreviewed Safety Question ML20077G7761983-07-27027 July 1983 Discusses Status of 830415 Commitments Re Suspension of Electrical Work Outlined in 830203 Confirmatory Action Ltr. Item I,Ii,Iii,Vi & VII Commitments Met.Surveillance Program for Backlog & Hanger Insp in Progress ML20024D0221983-07-18018 July 1983 Forwards Proprietary Independent Evaluation of Proposed Mods to Westinghouse D4,D5 & DE Steam Generators. Rept Withheld (Ref 10CFR2.790) ML20076L4911983-07-15015 July 1983 Forwards Detailed Control Room Design Review Per Requirements of Generic Ltr 82-33, Suppl 1 to NUREG-0737 Requirements for Emergency Response Capability. Reg Guide 1.97 Implementation Rept Will Be Submitted by 831101 ML20076L3451983-07-14014 July 1983 Forwards Annual Financial Repts 1982 for Public Svc Co of Indiana,Inc & Wabash Valley Power Assoc,Inc ML20076L4181983-07-0606 July 1983 Informs That Completion Date for Item II of Re Cable Tray Hanger Insp Extended to 830805.Corrective Actions for Procedures & Nonconformances Created Delay ML20076L4951983-07-0101 July 1983 Requests Assignment of Inspector,Beginning 830707,to Verify Adequacy of Program for Improved Control Over Electrical Cable Tray Installation ML20076J5501983-06-10010 June 1983 Requests Assignment of Inspector to Verify Program for Improved Control Over Electrical Const Program Beginning 830613,per Meeting Prerequisites Outlined in 830202 Confirmatory Action Ltr ML20024E6281983-06-0909 June 1983 Forwards Revised QA Program Reflecting Organizational Changes & Clarifications Since 800428 Version ML20072B8681983-06-0909 June 1983 Forwards Schedular Commitments for Submittal of Environ Qualification Program,In Response to Questions M270.2 & M270.3,per 830510 Request for Addl Info Re Environ Qualification of Electrical & Mechanical Equipment ML20023D8371983-05-31031 May 1983 Forwards Audit of Jul 1982 Cost Estimate for Marble Hill Nuclear Project, in Support of Util Petition to Increase Existing Rates & Changes for Retail Electric Svc & for Approval of New Rate Schedules,Rules & Regulations ML20071N6461983-05-24024 May 1983 Responds to NRC Re Violations Noted in IE Insp Repts 50-546/83-01 & 50-547/83-01.Corrective Actions:Cable Tray to Hanger Attachments & Cable Tray Splice Plate Bolting Identified as safety-related on Design Drawings ML20071J3131983-05-18018 May 1983 Advises of 830527 Prompt Notification Sys Development Meeting in Clarksville,In to Discuss Objectives & Design of Emergency Planning Zone ML20023D2541983-05-16016 May 1983 Forwards Amend 25 to CP & OL Applications,Including Revs to Security Plan.Amend Withheld (Ref 10CFR2.790) ML20074A5021983-05-0909 May 1983 Forwards Response to Generic Ltr 83-10C Re Resolution of TMI Action Item II.K.3.5, Automatic Trip of Reactor Coolant Pumps. Response to Items I.1e,I.3a & I.3c Will Be Addressed in Fsar,App E,Scheduled for Submittal by 840331 ML20074A2911983-04-15015 April 1983 Confirms 830414 Commitment Re Electrical Cable Tray Hanger Installation Under Conditions Outlined in 830203 Confirmatory Action Ltr.Request to Restart Installation of Hangers Renewed ML20073K1521983-04-15015 April 1983 Forwards Response to Generic Ltr 82-33, Suppl 1 to NUREG-0737 - Requirements for Emergency Response Capability ML20071N6601983-04-0808 April 1983 Requests Inspector Verification That Program for Improved Control Over Electrical Const Adequate Per 830202 Confirmatory Action Ltr,Items 2-6 Re Electrical Cable Tray Hanger Installation ML20069G6081983-03-23023 March 1983 Advises That Response to Generic Ltr 83-10c Re Resolution of TMI Action Item II.K.3.5 Will Be Provided within Specified 60-day Timeframe.Responses to Items I.1e,I.3a & I.3c Will Be Submitted in Amend to App E,Section E.52 of FSAR by 840331 ML20069F0191983-03-15015 March 1983 Forwards Summary of Feb 1983 Organizational Changes,Per Commitment to Notify of Changes Altering Organizations Described in Consolidated Description of QA Program ML20071G1131983-03-10010 March 1983 Ack Receipt of Ltr Requesting Cost Analysis of Backfitting Requirements Imposed by Nrc.Facilities Will Require Some Backfit Mods.Costs Will Be Almost Identical to Byron Increases ML20069C0601983-02-28028 February 1983 Forwards Schedule for Site Visits to Conduct Operator Licensing Exams,In Response to Generic Ltr 83-01.Exams Tentatively Scheduled for Mar-May 1986 for Unit 1.Exams for Unit 2 Will Be Requested in Early 1987 ML20071B3401983-02-24024 February 1983 Forwards Info for Antitrust Review of OL Application,Marble Hill Nuclear Generating Station Units 1 & 2. Amend 22 to OL Application Submitted Under Separate Cover ML20028E8951983-01-20020 January 1983 Advises That Shop Fabricated ASME Code Class 1 & 2 Piping Subassemblies W/Pipe Wall Thicknesses Less than 1/2 Inch Included in Onsite Radiograph Review,Supplementing Util 821216 Response to IE Bulletin 82-01,Rev 1,Suppl 1 1987-08-07
[Table view] |
Text
.
m-121 7 7 -0<-e.!nv9v 1,,
.- p L
PUBLIC SERVICE December 12, 1979 INDIANA S. W. Shields Vice President . Electric System Mr. James G. Keppler United States Nuclear Regulatory Commission Region III 799 Roosevelt Road Docket Nos.: STN 50-546 Glen Ellyn, Illinois 60137 STN 50-547
Dear Sir:
In accordance with the provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, Public Service Indiana offe.rs the following additional information in response to items of noncompliance contained in inspection report 50-546/79-18, 50-547/79-18 as previously addressed in Public Service Indiana letter number 1102795065 of November 1, 1979.
Item of Noncompliance (546/79-18-01; 547/79-18-01)
Marble Hill PSAR, Chapter 1, Section 1.7, commits to Regulatory Guide 1.28 (June 7, 1972) and therefore to ANSI N45.2-71. ANSI N45.2-?l, Section 6, states that " Activities affecting quality shall be prescribed by documented instructions, procedures, or drawings of the type appropriate to the circumstances and shall be accomplished in accordance with these instructions, procedures, or drawings."
Contrary to the above, the RIII inspector observed the following:
- a. The loading rate applied to two compressive strength concrete cylinders were observed to exceed the 20-50 psi loading rate specified in ASTM C39.
b-f. (Previously addressed on November 1,1979).
- g. Four occasions in which UST Level II personnel were evaluated for certification, other UST Level II personnel. This is not in accordance with UST Frocedure No. UST-TQ-1, Revision 9,Section IV, paragraphs 1.5 and 1.6.
- h. Five occasions in which UST personnel were certified to Level I requirements prior to completion of the -interview and practical demonstration of their proficiency. This is not in accordance with UST Procedure No. UST-TQ-1, Revision 9,Section V, paragraph 4.1.
1785 015 1g@S g6 1000 East Main Street, Plainfield, Indiana 46168 Ikk39 1
- i. Two occasions in which UST personnel were certified to Level I requirements prior to receiving visual e::aminatione. This is not in accordance with UST Procedure No. UST-TQ-1, Eevision 9,Section V, paragraph 5.0.
- j. Four occasions in which the required physical and visual re-examinations were overdue for periods up to two months. This is not in accordance with UST Procedure No. UST-TQ-1, Revision 9,Section V, paragraph 7.2.
- k. At least seven UST personnel were certified to Level I that did not meet experience requirements. This is not in accordance with UST Procedure No. UST-TQ-1, Revision,Section V, paragraph 3.2.
Corrective Action Taken And Result? Achieved Reported by PSI on November 1, 1979
- a. The cylinders in question were for non safety related concrete po urs . To assure this condition does not occur when testing safety related concrete, U.S. Testing has instructed technicians breaking cylinders to verify the rate of load a minimum of twice a day, for a minimum of ten second intervals. This verification will be recorded in the remarks section of the break sheet for the cylinder tested.
g-k. U.S. Testing documented these discrepancies on ICAR #1036-67.
U.S. Testing is presently in the process of evaluating these problems to determine the corrective actions necessary. This evaluation will be completed by December 15, 1979 at which time corrective actions and corrective actions to prevent recurrences will be described.
Updated Corrective Action Taken and Results Achieved
- a. No change.
- g. U.S. Testing Level III personnel performed a review of their Level II personnel evaluated by other Level II personnel. The Level III personnel found that the Level II personnel were adequately qualified. This review and the acceptability of the qualifications of the Level II personnel were documented or.
appropriate qualification records by the U.S. Testing Level III personnel.
- h. U.S. Testing performed a review of all Level I qualifications and found that even though there were a few people that were certified prior to completion of their proficiency evaluation, no technicians in the past or present performed any " record" tests until the proficiency eva'luation form had been completed.
1785 016
e i-j. U.S. Testing reviewed all personnel qualifications to determine the number of physical or visual examinations which were missed or past due. Past Jue physical and visual examinations were performed. Results of these examinations showed that the physical and visual capabilities of technicians were satisfactory.
- k. U.S. Testing reviewed all personnel qualifications and found that all personnel met the requirements of UST-TQ-1 Revision 9 in that paragraph 3.2 references paragraph 3.1.2 which states experience requirements shall not be treated as absolute when other factors provide reasonable assurance that a person can competently perform a particular task. The personnel found not to be qualified as a Level I to perform General testing and inspection duties were given a proficiency evaluation to qualify them for a specific test to be performed only under the supervision of a qualified Level II.
Corrective Actions to Prevent Recurrence Reports on November 1, 1979
- a. U.S. Testing Co. has written a letter dated 10-29-79 requesting the purchase of a loading pacer for the DRQC 200 comparison machine.
The above mentioned pacer is in process of being procured by P3I.
g-k. Corrective action to prevent recurrence has not been finalized because U.S. Testing Co. is in the process of evaluating its overall inspector qualification program. Additional time is requested to complete this action.
Updated Corrective Actions to Prevent Recurrence
- a. U.S. Testing Co. has purchased a loading pacer for the DRQC 200 compression machine. The pacer was installed and put into operation the week of 11-26-79.
g-k. U.S. Testing has implemented a tickler file which will be checked on a monthly basis to pre.clude the recurrence of missed re-e xamina t ions .
The U.S. Testing site supervisor has indicated that personnel errars in meeting UST-TQ-1, Revision 9 shall be monitored by him to assure they do not recur and that the practice of certifying personnel prior to completion of their proficiency evaluation will not be used and has not been used since May 1979.
Additionally, PSI shall perform surveillance of U.S. Testing qualifications and require correction of any deficiencies fouad.
Such surveillance shall be continued on a periodic basis.
Dates When Full Compliance Will be Achieved
- a. Full compliance was achieved on December 3,1979.
g-k. Full compliance is expected by January 14, 1980.
1785 017
Item of Noncompliance (546/79-18-03; 547/79-18-03)
The RIII inspector noted the fol!owing examples of nonconformance reports which had not received the proper design organization evaluation as required by ANSI N45.2-1971, Seccion 4.4.
- a. PSI FCAR No. 69, dated December 22, 1977
- b. PSI FNR No. 018, dated February 21, 1978
- c. N-MH FCR No. 314, dated January 8, 1979
- d. N-MH No. 316, dated January 16, 1979
- e. N-MH NCR No. 183, dated June 8, 1978 Corrective Action Taken And Results Achieved Reported an November 1, 1979 Engineering evaluation of these nonconformance reports has been include (
within the scope of an overall evaluation of nonconformance reports to assure completed work is adequate. This overall evaluation is not completed yet and additional time is requested to complete this action.
Updated Corrective Action Taken And Results Achieved A three man review team made up of representatives from Engineering, Quality Assurance, and Construction disciplines was formed to review all Field Corrective Action Requests (FCAR), Field Nonconformance Reports (FNR), Deviation Control Records (DCR) and Contractor Nonconformance Reports (NCR) . The review team x iewed 2724 reports, identified each report reviewed, and maintained records of each report requiring engineering review or disposition. Each report requiring such engineering review or disp)sition has been considered as remaining open pending engineering review and is subject to Site Design Control Group review in the same manner as newly initiated nonconformances.
A total of 212 nonconformance reports out of the 2724 reviewed have been identified as requiring engineering review.
Corrective Action To Prevent Recurrence Reported on November 1,1979 PSI is in the process of developing and implementing procedural and organizational changes to its nuclear project. These changes are not complete and additional time is requested to address action to prevent recurrence.
1785 018
0 Updated Corrective Action to Prevent Recurrence The PSI Quality Assurance Progtam is being revised to reduce the number of forms used to report nonconforming conditions and eliminate confusion. The accompanying procedures for ut e of nonconformance forms have also been changed to clearly require Englaeering review and approval of:
- a. All Nonconformance Reports for items in PSI custody.
- b. Contractor Nonconformance Reports dispositioned use-as-is or repair.
Dates When Full Compliance Will be Achieved Review of nonconformance reports by the three man team is complete.
Engineering re-review of nonconformance reports identified by the review team will be complete by January 2, 1980.
Revisions to the PSI Quality Assurance Program addressing handling of nonconformances shall be approved and issued for use by January 2,1980.
Sincerely, S. W. Shields Vice President-Electric System SWS:aaa cc: J. J. Harrison E. R. Schweibinz, P. E.