| Public Service Electric and Gas Company | | Public Service Electric and Gas Company Octobe Director, Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 |
| * Octobe Director, Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555
| |
|
| |
|
| ==Dear Sir,== | | ==Dear Sir,== |
Line 33: |
Line 32: |
| APPENDIX B AVERAGE DAILY UNrf. POWER LEVEL *',, /*: ,. .. ' | | APPENDIX B AVERAGE DAILY UNrf. POWER LEVEL *',, /*: ,. .. ' |
| DOCKET NO. 50-272 . | | DOCKET NO. 50-272 . |
| .
| |
| 0 UNIT Salem No. l 7_6~ | | 0 UNIT Salem No. l 7_6~ |
| DATE _l_0....,./--5.,_/...... | | DATE _l_0....,./--5.,_/...... |
Line 98: |
Line 96: |
| B: MAlNT. OR TEST C: REFUEUNG D: REGULATORY RESTRXCTION E: OPERATOR.TRAINING AND LICENSE EXAMINATION f: AmllNiS'fRAT!VE G: OPERATIONAL ERROR (EXPLAIN) | | B: MAlNT. OR TEST C: REFUEUNG D: REGULATORY RESTRXCTION E: OPERATOR.TRAINING AND LICENSE EXAMINATION f: AmllNiS'fRAT!VE G: OPERATIONAL ERROR (EXPLAIN) |
| H: OTHER (EXPLAIN) | | H: OTHER (EXPLAIN) |
| *
| |
| ...
| |
| (2) METHOD 1: MANUAL 2: MANUAL SCRAM. | | (2) METHOD 1: MANUAL 2: MANUAL SCRAM. |
| 3: AUTOMATIC SCRAM 4: OTHER (EXPLAIN) | | 3: AUTOMATIC SCRAM 4: OTHER (EXPLAIN) |
Line 105: |
Line 101: |
|
| |
|
| ==SUMMARY== | | ==SUMMARY== |
| :
| |
| \~ __ )}} | | \~ __ )}} |
Similar Documents at Salem |
---|
Category:Letter
MONTHYEARIR 05000272/20230042024-02-0505 February 2024 Integrated Inspection Report 05000272/2023004 and 05000311/2023004 ML24009A1022024-01-26026 January 2024 Exemption from Select Requirements of 10 CF Part 73 (EPID L-2023-LLE-0045 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000272/20234012024-01-22022 January 2024 Material Control and Accounting Program Inspection Report 05000272/2023401 and 05000311/2023401 ML24004A1542024-01-0808 January 2024 Notification of Conduct of a Fire Protection Team Inspection LR-N23-0079, Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days2023-12-0707 December 2023 Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days ML23270C0072023-11-29029 November 2023 Notice of Proposed Amendment to Decommissioning Trust Agreement LR-N23-0077, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion2023-11-29029 November 2023 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion ML23324A3072023-11-17017 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000272/20230032023-11-13013 November 2023 Integrated Inspection Report 05000272/2023003 and 05000311/2023003 LR-N23-0072, Core Operating Limits Report Cycle 302023-11-0101 November 2023 Core Operating Limits Report Cycle 30 IR 05000272/20230102023-10-12012 October 2023 Biennial Problem Identification and Resolution Inspection Report O5000272/2023010 and 05000311/2023010 IR 05000272/20234022023-10-12012 October 2023 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2023402, 05000272/2023402 and 05000311/2023402 (Cover Letter Only) LR-N23-0045, and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement ML23249A2612023-09-0606 September 2023 License Amendment Request to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20230052023-08-31031 August 2023 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023005 and 05000311/2023005) ML23233A0762023-08-21021 August 2023 Requalification Program Inspection ML23192A8212023-08-14014 August 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 234, 347, and 329 Revise Technical Specifications to Delete Meteorological Tower Location IR 05000272/20230022023-08-0909 August 2023 Integrated Inspection Report 05000272/2023002 and 05000311/2023002 LR-N23-0055, Special Report 272/23-01-00, Pursuant to the Requirements of Technical Specification 3.3.3.1, Action 23, for the Vent Noble Gas Rad Monitor Inoperable for Greater than Seven Days2023-08-0303 August 2023 Special Report 272/23-01-00, Pursuant to the Requirements of Technical Specification 3.3.3.1, Action 23, for the Vent Noble Gas Rad Monitor Inoperable for Greater than Seven Days IR 05000354/20230022023-08-0303 August 2023 Integrated Inspection Report 05000354/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200048/2023001 LR-N23-0054, In-Service Inspection Activities2023-07-26026 July 2023 In-Service Inspection Activities LR-N23-0046, Emergency Plan Document Revisions Implemented June 28, 20232023-07-10010 July 2023 Emergency Plan Document Revisions Implemented June 28, 2023 LR-N23-0005, License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2023-06-23023 June 2023 License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML23139A1472023-06-0505 June 2023 Relief Request Associated with Fourth Interval In-service Inspection Limited Examinations of Weld Coverage ML23096A1842023-05-0909 May 2023 Issuance of Amendment No. 328 Revise and Relocate Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to Pressure and Temperature Limits Report IR 05000272/20230012023-05-0303 May 2023 Integrated Inspection Report 05000272/2023001 and 05000311/2023001 ML23081A4662023-05-0202 May 2023 Issuance of Amendment Nos. 346 and 327 Revise Technical Specifications to Extend Allowable Outage Time for Inoperable Emergency Diesel Generator IR 05000272/20233012023-05-0101 May 2023 Initial Operator Licensing Examination Report 05000272/2023301 and 05000311/2023301 LR-N23-0034, 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station2023-04-27027 April 2023 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station LR-N23-0035, 2022 Annual Radioactive Effluent Release Report (ARERR)2023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report (ARERR) LR-N23-0033, Core Operating Limits Report Cycle 272023-04-26026 April 2023 Core Operating Limits Report Cycle 27 LR-N23-0010, License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location2023-04-21021 April 2023 License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location ML23089A0942023-04-17017 April 2023 NRC to PSEG Hope Creek, Transmittal of the National Marine Fisheries Service'S March 24, 2023, Biological Opinion GAR-2020-02842 Concerning Salem and Hope Creek ML23087A1492023-04-17017 April 2023 NRC to PSEG Salem, Transmittal of the National Marine Fisheries Service'S March 24, 2023, Biological Opinion GAR-2020-02842 Concerning Salem and Hope Creek ML23103A3232023-04-13013 April 2023 Submittal of Updated Final Safety Analysis Report, Rev. 26, Summary of Revised Regulatory Commitments for Hope Creek, Summary of Changes to PSEG Nuclear LLC, Quality Assurance Topical Report, NO-AA-10, Rev. 89 ML23095A3682023-04-12012 April 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Threshold Determination for Proposed Transfer of Land Ownership LR-N23-0006, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-24024 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23086A0912023-03-24024 March 2023 NMFS to NRC, Transmittal of Biological Opinion for Continued Operations of Salem and Hope Creek Nuclear Generating Stations RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations LR-N23-0019, and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2023-03-21021 March 2023 and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums ML23044A1052023-03-13013 March 2023 Issuance of Amendment Nos. 345 and 326 Relocate Technical Specifications Requirements for Reactor Head Vents to Technical Requirements Manual ML23037A9712023-03-0909 March 2023 and Salem Nuclear, Unit Nos. 1 and 2 Issuance of Amendment Nos. 233, 344, and 325 Relocate Technical Specification Staff Qualification Requirements to the PSEG Quality Assurance Topical Report IR 05000272/20230112023-03-0707 March 2023 Comprehensive Engineering Team Inspection Report 05000272/2023011 and 05000311/2023011 IR 05000272/20220062023-03-0101 March 2023 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2022006 and 05000311/2022006) LR-N23-0016, and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments2023-02-28028 February 2023 and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments LR-N23-0012, Annual Property Insurance Status Report2023-02-24024 February 2023 Annual Property Insurance Status Report LR-N23-0014, Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.7172023-02-23023 February 2023 Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.717 ML23034A1532023-02-0909 February 2023 Operator Licensing Examination Approval ML23019A3482023-02-0202 February 2023 Issuance of Relief Request No. SC-I5R-221 for the Alternative Repair for Service Water System Piping LR-N23-0003, Response to Requests for Additional Information Salem Unit 2 Relief Request S2-I4R-2112023-02-0101 February 2023 Response to Requests for Additional Information Salem Unit 2 Relief Request S2-I4R-211 2024-02-05
[Table view] Category:Operating Report
MONTHYEARLR-N23-0016, and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments2023-02-28028 February 2023 and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments LR-N21-0055, Corrected Report of Changes, Tests, and Experiments2021-07-20020 July 2021 Corrected Report of Changes, Tests, and Experiments LR-N18-0136, Report of 10 CFR 72.48 Changes, Tests, and Experiments2018-12-0505 December 2018 Report of 10 CFR 72.48 Changes, Tests, and Experiments LR-N06-0046, PSEG Metrics for Improving Work Environment, Salem and Hope Creek, Quarterly Report2006-01-31031 January 2006 PSEG Metrics for Improving Work Environment, Salem and Hope Creek, Quarterly Report LR-N05-0196, Report of Changes, Tests and Experiments2005-03-31031 March 2005 Report of Changes, Tests and Experiments ML0402908812004-01-22022 January 2004 New Jersey Pollutant Discharge Elimination System Discharge Monitoring Reports Salem Generating Station Permit No. NJ0005622 LR-N04-0013, December 2003 Monthly Operating Report Salem Generating Station Unit 22004-01-15015 January 2004 December 2003 Monthly Operating Report Salem Generating Station Unit 2 ML19031A3521978-10-10010 October 1978 Submit Operating Report for Month of September 1978 ML19030A3241978-09-12012 September 1978 Submit Monthly Operating Report for the Month of August 1978 for Salem No. 1 ML19030A3261978-08-10010 August 1978 Submit Monthly Operating Report for the Month of July 1978 for Salem No. 1 ML19030A3291978-07-12012 July 1978 Submit Monthly Operating Report for the Month of June 1978 for Salem No. 1 ML19030A3281978-07-10010 July 1978 Attached Monthly Operating Report of Industrial Waste Treatment Plant for the Month of June 1978 ML19030A3311978-06-0909 June 1978 Submit Monthly Operating Report for the Month of May 1978 for Salem No. 1 ML19030A3321978-06-0909 June 1978 Submit Monthly Operating Report for the Month of May 1978 for Salem No. 1 ML19030A3341978-05-10010 May 1978 Submit Monthly Operating Report for the Month of April 1978 for Salem No. 1 ML19030A3351978-04-10010 April 1978 Submit Monthly Operating Report for the Month of March 1978 for Salem No. 1 ML19030A3371978-04-10010 April 1978 Submit Monthly Operating Report for the Month of March 1978 for Salem No. 1 ML19030A3381978-03-0707 March 1978 Submit Monthly Operating Report for the Month of February 1978 for Salem No. 1 ML19030A3401978-02-15015 February 1978 Submit Monthly Operating Report for the Month of January 1978 for Salem No. 1 ML19030A3411978-01-0909 January 1978 Submit Monthly Operating Report for the Month of December 1977 for Salem No. 1 ML19030A3431977-12-0909 December 1977 Submit Monthly Operating Report for the Month of November 1977 for Salem No. 1 ML19030A3471977-11-0404 November 1977 Submit Monthly Operating Report for the Month of November 1977 for Salem No. 1 ML19030A3491977-10-0505 October 1977 Submit Monthly Operating Report for the Month of September 1977 for Salem No. 1 ML19030A3511977-09-0909 September 1977 Submit Monthly Operating Report for the Month of August 1977 for Salem No. 1 ML19030A3531977-08-10010 August 1977 Submit Monthly Operating Report for the Month of July 1977 for Salem No. 1 ML19030A3561977-07-0808 July 1977 Submit Monthly Operating Report for the Month of June 1977 for Salem No. 1 ML19030A3591977-06-0606 June 1977 Submit Monthly Operating Report for the Month of May 1977 for Salem No. 1 ML19030A3601977-05-0909 May 1977 Submit Monthly Operating Report for the Month of April 1977 for Salem No. 1 ML19030A3611977-05-0909 May 1977 Submit Monthly Operating Report for the Month of April 1977 for Salem No. 1 ML19030A3621977-04-0606 April 1977 Submit Monthly Operating Report for the Month of March 1977 for Salem No. 1 ML19030A3641977-03-0303 March 1977 Submit Monthly Operating Report for the Month of February 1977 for Salem No. 1 ML19030A3661977-02-0707 February 1977 Submit Monthly Operating Report for the Month of January 1977 for Salem No. 1 ML19030A3681977-01-28028 January 1977 Submit Monthly Operating Report for the Month of December 1976 for Salem No. 1 ML19030A3691977-01-12012 January 1977 Submit Monthly Operating Report for the Month of December 1976 for Salem No. 1 ML19030A3711976-12-0101 December 1976 Submit Monthly Operating Report for the Month of November 1976 for Salem No. 1 ML19030A3721976-12-0101 December 1976 Submit Monthly Operating Report for the Month of November 1976 for Salem No. 1 ML19030A3741976-11-0101 November 1976 Submit Monthly Operating Report for the Month of October 1976 for Salem No. 1 ML19030A3761976-10-18018 October 1976 Submit Monthly Operating Report for the Month of September 1976 for Salem No. 1 ML19030A3771976-09-14014 September 1976 Submit Monthly Operating Report for the Month of August 1976 for Salem No. 1 2023-02-28
[Table view] Category:Monthly
MONTHYEARLR-N04-0013, December 2003 Monthly Operating Report Salem Generating Station Unit 22004-01-15015 January 2004 December 2003 Monthly Operating Report Salem Generating Station Unit 2 ML19031A3521978-10-10010 October 1978 Submit Operating Report for Month of September 1978 ML19030A3241978-09-12012 September 1978 Submit Monthly Operating Report for the Month of August 1978 for Salem No. 1 ML19030A3261978-08-10010 August 1978 Submit Monthly Operating Report for the Month of July 1978 for Salem No. 1 ML19030A3291978-07-12012 July 1978 Submit Monthly Operating Report for the Month of June 1978 for Salem No. 1 ML19030A3281978-07-10010 July 1978 Attached Monthly Operating Report of Industrial Waste Treatment Plant for the Month of June 1978 ML19030A3311978-06-0909 June 1978 Submit Monthly Operating Report for the Month of May 1978 for Salem No. 1 ML19030A3321978-06-0909 June 1978 Submit Monthly Operating Report for the Month of May 1978 for Salem No. 1 ML19030A3341978-05-10010 May 1978 Submit Monthly Operating Report for the Month of April 1978 for Salem No. 1 ML19030A3351978-04-10010 April 1978 Submit Monthly Operating Report for the Month of March 1978 for Salem No. 1 ML19030A3371978-04-10010 April 1978 Submit Monthly Operating Report for the Month of March 1978 for Salem No. 1 ML19030A3381978-03-0707 March 1978 Submit Monthly Operating Report for the Month of February 1978 for Salem No. 1 ML19030A3401978-02-15015 February 1978 Submit Monthly Operating Report for the Month of January 1978 for Salem No. 1 ML19030A3411978-01-0909 January 1978 Submit Monthly Operating Report for the Month of December 1977 for Salem No. 1 ML19030A3431977-12-0909 December 1977 Submit Monthly Operating Report for the Month of November 1977 for Salem No. 1 ML19030A3471977-11-0404 November 1977 Submit Monthly Operating Report for the Month of November 1977 for Salem No. 1 ML19030A3491977-10-0505 October 1977 Submit Monthly Operating Report for the Month of September 1977 for Salem No. 1 ML19030A3511977-09-0909 September 1977 Submit Monthly Operating Report for the Month of August 1977 for Salem No. 1 ML19030A3531977-08-10010 August 1977 Submit Monthly Operating Report for the Month of July 1977 for Salem No. 1 ML19030A3561977-07-0808 July 1977 Submit Monthly Operating Report for the Month of June 1977 for Salem No. 1 ML19030A3591977-06-0606 June 1977 Submit Monthly Operating Report for the Month of May 1977 for Salem No. 1 ML19030A3601977-05-0909 May 1977 Submit Monthly Operating Report for the Month of April 1977 for Salem No. 1 ML19030A3611977-05-0909 May 1977 Submit Monthly Operating Report for the Month of April 1977 for Salem No. 1 ML19030A3621977-04-0606 April 1977 Submit Monthly Operating Report for the Month of March 1977 for Salem No. 1 ML19030A3641977-03-0303 March 1977 Submit Monthly Operating Report for the Month of February 1977 for Salem No. 1 ML19030A3661977-02-0707 February 1977 Submit Monthly Operating Report for the Month of January 1977 for Salem No. 1 ML19030A3681977-01-28028 January 1977 Submit Monthly Operating Report for the Month of December 1976 for Salem No. 1 ML19030A3691977-01-12012 January 1977 Submit Monthly Operating Report for the Month of December 1976 for Salem No. 1 ML19030A3711976-12-0101 December 1976 Submit Monthly Operating Report for the Month of November 1976 for Salem No. 1 ML19030A3721976-12-0101 December 1976 Submit Monthly Operating Report for the Month of November 1976 for Salem No. 1 ML19030A3741976-11-0101 November 1976 Submit Monthly Operating Report for the Month of October 1976 for Salem No. 1 ML19030A3761976-10-18018 October 1976 Submit Monthly Operating Report for the Month of September 1976 for Salem No. 1 ML19030A3771976-09-14014 September 1976 Submit Monthly Operating Report for the Month of August 1976 for Salem No. 1 2004-01-15
[Table view] |
Text
,... ...-.*
Public Service Electric and Gas Company Octobe Director, Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555
Dear Sir,
MONTHLY OPERATING REPORT SALEM NO. 1 DOCKET NO. 50-272 In compliance with Section 6.9, Reporting Requirements for the Salem Technical Specifications, and USNRC Regulatory Guide 1.16, 10 copies of the following monthly operating reports for the month of September 1976 are hereby submitted:
Appendix B - Average Daily Unit Power Level Appendix C - Operating Data Report Appendix D - Unit Shutdowns and Power Reductions Sincerely yours,
~-
Frank P. Li br~
General Manager -
Electric Production CC Mr. James P. O'Reilly (1 Copy )
Director of US NRC Office of Inspection and Enforcement Region I 631 Park Avenue King of Prussia, Pa. 19406 Director, Office of Management (2 Copies)
Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C. 20555 The Energy People 95-2001 300M 8-75
,**. *.-: __:_ .. -**-::---**-- -* --* **----**- ..* _........:.__ ____________ ~-- --- . *---***-.--- ..
APPENDIX B AVERAGE DAILY UNrf. POWER LEVEL *',, /*: ,. .. '
DOCKET NO. 50-272 .
0 UNIT Salem No. l 7_6~
DATE _l_0....,./--5.,_/......
COJvf PLETED BY ;:i-. M. ~u:E.,ko ,1~'2.F L 60 TELEPHONE i~f~ 5 ;b~o~
MONTI.I SEPTEMBER 1976 .
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Nct) (MWe-Nct) 1 NiA - See Below* 17 N/A 2 N/A 18 N,{A 3 N/A 19 N/A 4 N/A 20 N/A i
/
5 21 N/A 6 N/A 22 N/A 7 23 N/A 8 N/A 24 N/A 9 NLA 25 N/A 10 N/A 26 N/A 11 NLA 27 NLA 12 NLA 28 . N/A 13 NLA 29 N/A 14 NLA 30 N/A' 15 N/A 31 N/A
. 16 N/A
- Salem No. 1 Unit limited to 1% of core thermal power by operating license No. DPR-70.
INSTRUCTIONS .
On !his form, !isl lhc average daily unit power Jew! in MWc-Ncl for each da)' in lhc rt'plirling month. Compute to the ne:irest whole nwgawa t t.
These nl~llrCS will be used lo plot ;1 ~raph ror rach repo1 li11g lllllllth. Nllle tlt:1t \\'hl'll 111:1ximlllll dq1l'lld:1hk eap:il"ily is Used for the Ill'( clcctrk:tl r;ttill~ or the llllil, there lll:l)' !Je llL'L':lSillllS when the liaily :1\'Cr:tgC !lll\\'l'f fl'WI L'XL'l'\.'t!S the I 00'};, line (or thL~ restridetl. plnwr kl'el linl!). 111 s11L"11 L:;1ses. the an:r;tgL' d:1ily 1111it power oulpul ~hL'L'l slwuld bL' foulnotcd to explain the app:.trl'lll anomaly.
.. ~.
APPENDIX C
- OPERATING DATA REPORT DOCK ET NO. -""'5'""0._-_,.2......7......2..___ _ __
UNIT Salem No. 1
-; DATE 10/5/76 .
COMPLETED BY J
TELEPHONE 609-365-7000 [
Ext~ 507 OPERATING STATUS
- 1. REPORTING PERIOD: SEPTEMBER 19 7 6, GROSS . 7 20 ~~~~~.
HOURS IN REPORT.ING PERIOD: ......,..t_o___,.b~.e=* I
- 2. CURRENTL y AUTHORIZED POWER LEVEL (MWtl: ...lhJJL MAX. DEPEND. CAPACITY (MWe-Nctl: determin'ed DESIGN ELECTRICAL RA!ING (MWe-Net): 1090 *1
- 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY} IMWe-Nct}: See i tern 4 below
- 4. REASONS FOR RESTRICTION (IF ANY}:
Operating license restriction to l~
THIS MONTH YR TO DATE CUMULATIVE of core thermal power.
N/A .N/A N/A
- 5. NUMBER OF HOURS REACTOR WAS CRITICAL ************* ,
- G. REACTOR RESERVE SHUTDOWN HOURS *******************
N/A N/A N/A 7~ HOURS GENERATOR ON UNE ************************** Ni A NLA NLA Ni A Ni A NLA --.,
- 8. UNIT RESERVE SHUTDOWN HOURS **********************
/
- 9. GROSS THERMAL ENERGY GENERATED (MWH) .**.....*.*.** N/A N/A N/A
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWH) *************
N/A N/A N/A
- 11. NET ELECTRICAL ENERGY GENERATED (MWH) **********.*** Nl:A N/A NLA
- 12. RE~CTOR SERVICE FACTOR ************** .,*************
- 13. REACTOR AVAILABILITY FACTOR ********************** _. NLA Ni A NL:A
- 14. UNIT SERVICE FACTOR ****** , * ~ ..................... .
- 15. UNIT AVAILABILITY FACTOR **************************
N/~
N/A N/A N/A Nl:A NLA I
- 16. 'UNIT CA~ACITY FACTOR (Using MDC) ***.******************
N/A N/A Nf.A
- 17. UNIT CAPACITY FACTOR (Using Design MWcl **************** ',
N/A N/A N/A
- 18. UNIT FORCED OUTAGE HATE **************************
N/A N/A Nf.A
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND PU RATION OF EACH):
- 20. IF SHUT DOWN AT'END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: _ _ _ _ _ __
- 21. UNITS IN TEST STATUS (PRIOR TO COMMrnCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY 9L30L76 INITIAL ELECTRICITY 11/01/76 COMMERCIAL OPERATION 12/20/76 l .16-9 r;,-: --- -- *---**-. -
APPENDIX D .. DOCKET NO. 5*0-2 72 .' .,_
(
i UNIT SHUTDOWNS AND POWER .REDUCTIONS UNIT NAME Sal_em No. 1\ l
. !)ATE 10/5/76
~OMPLETED BY J.M. Zupko, Jr.
REPORT MONTH SEPTEMBER 19.76 TELEPHONE 609-:-365-7000 Ext. 507 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REAC!OR OR NO. DATE S: SCHEDULED (HOURS) REASON (1) REDUCING POWER (2) CORRECTIVE ACTIONS/COMMENTS (1) REASON A: EQUIPMENT FAILURE (EXPLAIN)
B: MAlNT. OR TEST C: REFUEUNG D: REGULATORY RESTRXCTION E: OPERATOR.TRAINING AND LICENSE EXAMINATION f: AmllNiS'fRAT!VE G: OPERATIONAL ERROR (EXPLAIN)
H: OTHER (EXPLAIN)
(2) METHOD 1: MANUAL 2: MANUAL SCRAM.
3: AUTOMATIC SCRAM 4: OTHER (EXPLAIN)
Information for this report not applicable -.Salem No. 1 initial startup testing.
SUMMARY
\~ __ )